RECOMMENDATION:
The City Council is requested to provide direction on the following options:
1.Appropriate $34,000 from the City Public Art Fund for the Library Art Project;
2.Authorize that any additional donations or payments from the County of Los Angeles
or other entities for this Library Art Project be reimbursed to the City Public Art Fund;
and
3. Authorize the City Manager to execute agreements with subcontractors for
fabrication work, printing, lighting, and installation with the following vendors;
Graphic Spider, Klus Lighting, Grahic Two, R and R Electric, Gander and White, and
Louise Griffin to fabricate artwork, lighting, and installation with a total project cost
not to exceed $132,000.
BACKGROUND:
1.In September 2017, the City Council authorized fundraising efforts to develop a
unique art element for the Temple City library's renovation.
2.From October 2017 to May 2019, the City received $118,025 for the Library Art
Project.
3.On July 2, 2018, City contracted with Louise Griffin, an artist and art consultant, to
perform tasks related to the artistic interior enhancement of the Temple City Library
renovation and expansion project.
AGENDA
ITEM 9.A.
City Council
April 20, 2021
Page 2 of 2
ANALYSIS :
The City and County Public Library worked together to find an artist that worked on
previous County projects and Louise Griffin was selected and mutually agreed upon to
develop the Library Art Project. Mrs. Griffin created a storybook colleague of color and
translucent acrylic panels with original artwork and illustrations created by acclaimed
author Sharee Miller. The art presentation spans over almost the entire library's length
and has key identifiable points and illustrations with different sections of the library.
The costs for original illustrations, payments for concept development, structural and
electrical engineering plans was $20,850. The fabrication of 170 acrylic pieces, the
entryway threshold piece, screen printing, installation, project management, and an 8%
contingency is $131,100. The total cost of the art enhancement is $151,950, of which
fundraising is covering $118,025 leaving a balance of $33,925. The City has been in
conversation with the County of Los Angeles (County) to see if the funding for the
library renovation project could cover some of the cost for the art enhancement. At this
time, as the project is nearing completion, the fabrication and installation of the acrylic
pieces, electrical, and structural work needs to be initiated soon. While the City wait to
hear back from the County, the project could move ahead with the City covering the
remaining balance using the Public Art Fund, allowing the City Manager to make
deposits for the fabrication of the pieces and secure the technical assistance of art
installers.
CITY STRATEGIC GOALS:
City Council’s approval of staff’s recommendation would further promote the City
Strategic Goals of Quality of Life.
FISCAL IMPACT :
This item does not have an impact on the Fiscal Year (FY) 2020-2021 City General
Fund Budget. The Public Art Fund (Fund 51) is a dedicated source of funding that can
be used exclusively for public art projects and currently has an unallocated fund
balance of $119,420. There is sufficient fund balance to provide the library art project's
financing and Primrose Park's art component, which has not yet been identified.
ATTACHMENTS:
A. Systemic of project
B. Remaining Project Budget
TEMPLE CITY LIBRARY ARTWORK
FINAL DESIGN PHASE
“LET THE ADVENTURE UNFOLD”
LOUISE GRIFFIN
02.10.20
ATTACHMENT A
FINAL DESIGN OVERVIEW
- FULL DEVELOPMENT OF ARTWORK CONCEPT INCLUDING ILLUSTRATIONS, CONSTRUCTION DOCUMENTS, ENGINEERING, BUDGET AND SCHEDULE
PACKAGE INCLUDES:
1. REFLECTED CEILING PLAN IDENTIFYING ARTWORK LOCATIONS
2. EACH ILLUSTRATION
3. EACH ILLUSTRATION SHOWN WITHIN THE PAGES OF A BOOK
4. ENTRY PIECE INTO CHILDREN’S & FAMILY AREA
5. DONOR BRICKS
6. REFLECTED CEILING PLAN WITH ALL ILLUSTRATIONS
7. APPENDIX
A. TECHNICAL DRAWINGS
B. BUDGET INCLUDING FABRICATOR & VENDOR PROPOSALS
C. TENTATIVE FABRICATION & INSTALLATION SCHEDULE
D. CONSERVATION REPORT(COMING AFTER DONOR BRICK DESIGN APPROVAL)
E. STRUCTURAL CALCULATIONS (COMING AFTER DONOR BRICK DESIGN APPROVAL)
LET THE ADVENTURE UNFOLD
LOUISE GRIFFIN
02.10.20
LET THE ADVENTURE UNFOLD
FAMILY PLACE SEATING
AND SHELVES AREA
CHILD SEATING AND
HOMEWORK AREA
CHILDREN’S
ENTRY PIECE
TEEN AND
ADULT AREA
ARTWORK OVERVIEW AND LOCATION
DONOR WALL
LOUISE GRIFFIN
02.10.20
DASHED BLUE LINES INDICATE
LOCATION OF ILLUSTRATION
TYPICAL BOOK CLUSTER
22 BOOKS
12 ILLUSTRATIONS BROKEN INTO THE FOLLOWING AREAS:
5 IN THE FAMILY AREA
2 IN THE CHILDREN’S AREA
3 IN THE TEEN AREA
2 IN THE ADULT AREA
BOOK & ILLUSTRATION OVERVIEW
LET THE ADVENTURE UNFOLD
CHILDREN’S
ENTRY PIECE
LOUISE GRIFFIN
02.10.20
LET THE ADVENTURE UNFOLD
ILLUSTRATIONS
CHILDREN +
FAMILY PLACE
LOUISE GRIFFIN
02.10.20
ILLUSTRATION #1-
CHILDREN GATHERING FOR STORYTIME
LET THE ADVENTURE UNFOLD
LOUISE GRIFFIN
02.10.20
ILLUSTRATION #1 SHOWN ON A BOOK-
CHILDREN GATHERING FOR STORYTIME
LET THE ADVENTURE UNFOLD
LOUISE GRIFFIN
02.10.20
ILLUSTRATION #2-
CHILDREN FINDING BOOKS IN THEIR LIBRARY
LET THE ADVENTURE UNFOLD
LOUISE GRIFFIN
02.10.20
ILLUSTRATION #3 SHOWN ON A BOOK-
CHILDREN FINDING BOOKS IN THEIR LIBRARY
LET THE ADVENTURE UNFOLD
LOUISE GRIFFIN
02.10.20
ILLUSTRATION #3-
FAMILY ENJOYING BOOKS TOGETHER
LOUISE GRIFFIN
02.10.20LET THE ADVENTURE UNFOLD
ILLUSTRATION #4-
CONCERTS IN THE PARK
LOUISE GRIFFIN
02.10.20LET THE ADVENTURE UNFOLD
LET THE ADVENTURE UNFOLD
ILLUSTRATION #3 #4 SHOWN ON BOOKS-
FAMILY ENJOYING BOOKS TOGETHER & CONCERTS IN THE PARK
LOUISE GRIFFIN
02.10.20
LET THE ADVENTURE UNFOLD
ILLUSTRATION #5-
CAMELLIA FESTIVAL
LOUISE GRIFFIN
02.10.20
LET THE ADVENTURE UNFOLD
ILLUSTRATION #5 SHOWN ON A BOOK-
CAMELLIA FESTIVAL
LOUISE GRIFFIN
02.10.20
LET THE ADVENTURE UNFOLD
ILLUSTRATION #6-
FAMILIES IN THE COMMUNITY GARDEN
LOUISE GRIFFIN
02.10.20
ILLUSTRATION SHOWN ON A BOOK-
FAMILIES IN THE COMMUNITY GARDEN
LOUISE GRIFFIN
02.10.20LET THE ADVENTURE UNFOLD
ILLUSTRATION #7-
CRAFTS IN THE LIBRARY
LOUISE GRIFFIN
02.10.20LET THE ADVENTURE UNFOLD
ILLUSTRATION #7 SHOWN ON A BOOK-
CRAFTS IN THE LIBRARY
LOUISE GRIFFIN
02.10.20LET THE ADVENTURE UNFOLD
LOUISE GRIFFIN
10.07.19
ILLUSTRATIONS
TEEN+
ADULT
LOUISE GRIFFIN
02.10.20
ILLUSTRATION #8-
GROUP STUDY
LOUISE GRIFFIN
02.10.20LET THE ADVENTURE UNFOLD
ILLUSTRATION #8 SHOWN ON A BOOK-
GROUP STUDY
LOUISE GRIFFIN
02.10.20LET THE ADVENTURE UNFOLD
ILLUSTRATION #9-
TEENS IN THEIR VR LAB
LOUISE GRIFFIN
02.10.20LET THE ADVENTURE UNFOLD
LET THE ADVENTURE UNFOLD
ILLUSTRATION #9 SHOWN ON A BOOK-
TEENS IN THEIR VR LAB
LOUISE GRIFFIN
02.10.20
LET THE ADVENTURE UNFOLD
ILLUSTRATION #10-
TEENS IN A MAKERSPACE/STEM LAB
LOUISE GRIFFIN
02.10.20
ILLUSTRATION #10 SHOWN ON A BOOK-
TEENS IN A MAKERSPACE/STEM LAB
LOUISE GRIFFIN
02.10.20LET THE ADVENTURE UNFOLD
ILLUSTRATION #11-
YOGA IN THE PARK WITH THE PARROTS
LOUISE GRIFFIN
02.10.20LET THE ADVENTURE UNFOLD
LET THE ADVENTURE UNFOLD
ILLUSTRATION #11 SHOWN ON A BOOK-
YOGA IN THE PARK WITH THE PARROTS
LOUISE GRIFFIN
02.10.20
LET THE ADVENTURE UNFOLD
ILLUSTRATION #12-
MAHJONG IN THE PARK
LOUISE GRIFFIN
02.10.20
ILLUSTRATION #12 SHOWN ON A BOOK-
MAHJONG IN THE PARK
LOUISE GRIFFIN
02.10.20LET THE ADVENTURE UNFOLD
ENTRY PIECE
INTO THE CHILDREN’S
+FAMILY AREA
LOUISE GRIFFIN
02.10.20
LET THE ADVENTURE UNFOLD
OPEN BOOKS &
CONCEPT AT ENTRY
CHARACTERS FROM
ILLUSTRATIONS
COMBINING THE
BOOKS & THE
CHARACTERS
FROM THE
ILLUSTRATIONS
LOUISE GRIFFIN
02.10.20
LET THE ADVENTURE UNFOLD
THE ENTRY PIECE WITH FOUR CHARACTERS
FROM THE ILLUSTRATIONS TO GREET THE
LIBRARY PATRONS
LOUISE GRIFFIN
02.10.20
FAMILY CHILDREN TEEN ADULT
ILLUSTRATION LOCATION
LET THE ADVENTURE UNFOLD
LOUISE GRIFFIN
02.10.20
LET THE ADVENTURE UNFOLD LOUISE GRIFFIN
10.07.19
DONOR WALL
LOUISE GRIFFIN
02.10.20
LET THE ADVENTURE UNFOLD
LOUISE GRIFFIN
02.10.20
ONE BRICK PER DONOR.
THE DONOR’S NAME AND MESSAGE ARE ETCHED
INTO ACRYLIC PIECES. THE COLORS OF THE BRICK
MATCH THE 3D BOOKS AND ENTRY PIECE.
DONOR WALL IS MADE UP OF 1/2” MDF AND ALUMINUM TRACKS. BOTH
ARE PAINTED TO MATCH THE WALL COLOR. INDIVIDUAL BRICKS REST
BEHIND THE METAL TRACKS, ALLOWING FOR NEW BRICKS TO BE ADDED
AT A LATER DATE.
60” WIDE
30”
HIGH
LET THE ADVENTURE UNFOLD
LOUISE GRIFFIN
02.10.20
8” WIDE
2 1/2”
LONG
ONE BRICK PER DONOR.
THE DONOR’S NAME AND MESSAGE ARE
ETCHED INTO ACRYLIC PIECES. THE BRICK
COLORS MATCH THE 3D BOOKS AND
ENTRY PIECE.
PAINTED TRACKS HOLD BRICKS AND
ALLOW FOR FUTURE BRICKS TO BE ADDED
LOUISE GRIFFIN
02.10.20
TWO TEENS ARE READING BELOW THE
DONOR WALL.
LOUISE GRIFFIN
02.10.20
THE DONOR WALL AND THE TWO TEENS
READING BELOW IT ARE MOUNTED BEHIND
THE CUSTOMER SERVICE DESK IN THE
TEEN AREA.
BOTH DONOR WALL AND ILLUSTRATIONS
ARE MADE OF THE SAME MATERIAL AND
COLORS AS THE REST OF THE ARTWORK.
LET THE ADVENTURE UNFOLD
THE LIBRARY ARTWORK IS AN ADVENTURE
UNFOLDING FOR BOTH ITS VISITORS AND
THE CHARACTERS FOUND WITHIN THE
PAGES OF THESE 3-DIMENSIONAL BOOKS.
IT’S TIME TO EXPLORE YOUR NEW LIBRARY!
LOUISE GRIFFIN
02.10.20
Temple City Library Artwork Budget
QTY TOTAL
Acrylic Books - 22 Total
170 24" x 36" x .25" Acrylic Pieces (145 Color & 25 Clear)$121.90 $20,723.00
10 Metal Support Material - 3/16" 6065 Aluminum
(Books nested to reduce material cost)$632.50 $6,325.00
10 Metal Support Laser or Waterjet Cutting - 3/16" 6065 Aluminum
(Books nested to reduce cutting time)$632.50 $6,325.00
10 Metal Support Fabrication - Powder Coated Cut Pieces $517.50 $5,175.00
Entry Threshold Piece - 3D Books, Letters & Characters
3 5 Page Books, pages mounted to one another $1,092.50 $3,277.50
22 8" x 1" Laminated Letter in 10 different colors $138.00 $3,036.00
3 Two rounds of cutting of characters and mounting to page books.$230.00 $690.00
4 Template Cutout for Each Characters $150.00 $600.00
Donor Wall & 2 Characters
1 90 Bricks with unique Etched Name & Phrase & Back Plate $5,000.00 $5,000.00
2 Character Milling $250.00 $500.00
2 Template Cutout for Each Characters $250.00 $500.00
2 Artwork Packaging/Pallets for Transport $450.00 $900.00
1 Delivery of artwork packages and pallets to site - multiple trips $900.00 $900.00
1 Monthly Storage - If Needed (Not Included in Base Quote)$1,437.50 $0.00
Material and Fabrication Sub-Total $53,951.50
1 Sales Tax 9.50%$5,125.39
Material and Fabrication Sub-Total with Tax $59,076.89
54 KLUS EX-ALU Aluminum Extrusion - 78.75"W
324 KLUS EX-ALU End Cap (2 per 1 Extrusion)
162 Cutting Extrusion Down to 24"W Part. 3 Parts Per 78.75" Length $5,975.64
Shipping - Estimate Only/Added To Final Invoice 10.00%$597.56
Sales Tax 9.50%$567.69
Material and Fabrication Sub-Total with Tax $7,140.89
Screen printing 27 unique illustrations onto 24" x 36" acrylic.
3 colors total per each print
1 Artwork preparation and film positives $2,646.00 $2,646.00
1 Screen ocating, exposure and screen reclaiming $3,330.00 $3,330.00
1 Press setup, inkk and print $2,700.00 $2,700.00
1 3 Months Panel Storage Prior to installation (Not Included In Base
Quote)$150.00 $0.00
Material and Fabrication Sub-Total $8,676.00
Sales Tax 9.50%$824.22
Material and Fabrication Sub-Total with Tax $9,500.22
ACRYLIC FABRICATION - 3D BOOKS, ENTRY PIECE & DONOR WALL BY GRAPHIC SPIDER
ALUMINUM EXTRUSIONS (TO HOLD BOOK PAGES) BY KLUS LIGHTING
SCREEN PRINTING OF ILLUSTRATIONS BY GRAHIC TWO
ATTACHMENT B
Supply material and labor to install electrical wiring for new fixtures being
installed
1 Time clock control
4 Dimmer Switch
8 Light Box Outlet
8 Licenses and Inspections & Equipment Rental
8 Lightfixture per schedule to include Sistemalux Stem Mounted
Monopoint Light Fixtures
Electrical Sub-Contractor and Light Fixtures $17,459.00
1 Installation Labor - 4 Technicians 5 Install Days $26,650.00
1 Scissor Lift Rental $670.00
Installation Total $27,320.00
Coordinate 90 Donor Names and Text with City
Prepare each brick's artwork for fabrication
Coordinate with fabricator/export 90 files for etching
1 32hrs @ $50/hour $2,000.00 $1,600.00
2 Font for Bricks - Knockout by Hoefler & Co - 2 font styles $169.00 $338.00
Prepartion of Donor Brick Artwork Total $1,938.00
Coordinate and project manage all fabricators, electricans, vendors and
installers.
Prepare fabrication documents and arwtork files for all vendors
Prepare installation documents for installer
Oversee installation
5% Of Artwork Fabrication Cost $5,300.00
Unforeseen Costs & Conditions
8% Of Artwork Fabrication Cost $8,480.00
All Artwork Fabrication and Installation $131,089.61
PROJECT CONTINUGENCY
PENDANT LIGHTING & ELECTRICAN BY R & R ELECTRIC
ARTWORK INSTALLATION BY GANDER & WHITE
PROJECT MANAGEMENT OF FABRICATION & INSTALLATION BY LOUISE GRIFFIN