SECTION 3, The City Clerk if hereby instructed to pro-
coed at once to make out s ?ocial tax bills under the seal of the
City of Jefferson. Missouri, of the aforesaid amounts against
said lots or pieces of land in the aforesaid Sewer District No.
73 situated, mentioned and described in the heretofore
mentioned sections of this Ordinance in the name of the owners
thereof, which said special and certified tax bills shall be
signed by the May it and..a ttested aiidrCcorded by the City clerk
andx delivered to loin Brunner onstruction Company ,
the contracter of the work of construct on of he aforesaid
sewers as proAided by the "barter of the City of Jefferson and
the Ordinances authorizing m d ordering the construction of
sewers in said Sewer District No. 73 , heretofore passed and
approved by the council.
SECTION 4. `his Ordinance shall take effect and be in force
from and a fter its j assage and approval.
Appr,o#ed Oct 13, 1950 Passed Oct 2, 1950
Lawrence Lutkewitte Lawrence Lutkewitte
Mayor President of the Uouncil
, 5347
AN ORDINANCE LEVYING AND ASSESSING A SP'CIAL TAX BILL AGAINST THE
LOTS OF TRACTS OF LA- D FRONTING OR ABUTTING ON THE ROADWAY OF
BOLTON DRIVE, FROM THE INTERSECTION OF BOLTONd DRIVE AND DAVIS
'717"REET TO THE INTERSEC`T'ION OF BOLTON DRIVE AND THE EADT LINE OF LOT
10 BLOCK 2 BRUNS ' SECOND ADDITION IN THE CITY OF JEFFERSON,
MISSOURI, FOR THE IMPROVEMENT OF THE SAID R OADWAY BY GRADING,
CURBING ARID '=UTTERIVG AND PAVING WITH ASPHALT MACADAM.
BE IT ORDAINED BY THIS COUNCIL OF THE CITY OF JEFFERSON:, AS FOLLOWS:
Section 1. There is hereby levied and assessed at the rate ar.-d
and cost piece per front foot as specified in Section 2 of this
ordinm ce, against the aggregate lots or tracts of "land fronting
or abutting on the roadway of Bolton Drive, from the intersection
of Bolton Drive and Davis Street -to the intersection of Bolton Drive
and the east line of lot 10 Block 2 of Brurss' Second Addition in
the City of Jefferson, M-ssouri , for the improvement of the road-
way Bolton Drive aforesaid, including such grading as may be
necessary for the reception of a cement sidewalk, the sum of
$11,663.53 as the total costs of theimprovement of said street
and the number of front feet fronting or abuttinf said roadway of
said Bolton Drive aforesaid, between the aforesaid streets
amounts o_. 1617.20 , running feet; the cost price per running
foot is;=
458-
WADE H. & ED11-1A FORD owners of the south of the east j of Lot
63 of West Dcaglas lace
Assessment 28.1 figet at 5.203 Cost $ 146.20
28.1 ft of curb & gutter at 1,95 Cost
BEN J.. & BERNADINE FECHTEL, owners of the north j of the east 2
of lot 63 of West Douglas Place
Assessment 28.1 feet at$ 5. 203 Cost 146.20
28.1 ft of curb & gutter at 1. 95 'lost 54.79
BEN J. &. BERNADINE FECTTTELP owners of lot 62 of West Douglas Place
Assessment 95.0 feet at 5.203 Cost IS 494.29
95.0 ft of curb & gutter at 1.95 Cost 111 185.25-
BEN J. & BER14ADINE FECHTEL, owners of a part of lot 61 of West
Douglas Place and described as: Beginning at the southwest corner
of said lot; thence northerly along the westerly line thereof;
thence easterly to a point on the east line of said lot, 17.8 feet
northerly of the southeasterly corner thereof; thende south 17.13
feet; thence west 75 feet to the point og beginning.
Assessment 17.8 feet at 1' 5.203 Cost 0 92.61
17.8 ft of curb & gutter at x.95 Cost $14.71
ELMER BUD & MARTHA D.HEMMEL.9 owners of the northerly part of lot
61 of West Douglas Place, and described as: beginning at a point
of the west line of said lot 9.2 feet north of the southwest
corner thereof; thence north 85 feet to the northwest corner of
said lot; thence east 75 feet to the northeast corner of said
lot; thence south 77.2 feet along the easterly line of said lot;
thence westerly to the point of beginning.
Assessment 77.2 feet at 5. 203 Cost $401. 67
77.2 feet of curb & gutter at 1. 95 Cost $ 150. 54
ELTAER BUD 8: MARTHA D. HEM-EL' owners of lot 16 Block 9ABruns '
Second Addition
Assessment 60.0 feet at 5.203 Cost 312-. 18
60.0 fib-11-1-ofurb & gutter Oost 117. 00
FLORENCE E. BALES, owner of lot 15 Block 2 of Brun's Second
Addition
fVz
Assessemnt 60.0 feet at 5.203 Cost 312. 18
60.0 feet of curb & gutter at MI 95 Cost 117.
FLORENCE E. BALES, ower of lot 14 Block 2 of Bruns 's Second
Addition
Assessment 60.0 feet at 5.203 Cost 312.18
60.0 ft of curb & gutter at 1. 95 Cost
DAVID & FLORENCE BALES ownurs of lot 13 Block 2 of Bruns ' Second
Addition ip .
Assessment 60.0 feet at 5.203 Cost S 312.18
57.0 feet of curb & gutter at -1. 95 Cost 111.15
EDWIV B. & MILDRED J. STEWART., owners of the east 114.2 feet of
lot 12 of Bruns ' Second Addition
Assessment 114.2 feet at 6 5.203 Cost $ 594.18
138. 5 feet of curb 8- gutter at N- 95 Cost $ 70.08
LEO F. & NANCY 3ECKETT, owners of lot 11 Brock 2 of Brunst
Second Addition
Assess4ent 60.0 feet at 5.203 Cost $ 312.18
58.5 feet of curb & gutter at 9� 1. 95 Cost $7E4
qP _7,�08
FLOYD C. & KATHERINE LARSENs owners of lot 10 Block 2 Bruns'
Second Addition
Assessment 60.0 feet at $ 5.203 Cost 317.13
60.0 feet of curb & gutter Cost 117.05 __
DICK D. STOUT, MARY STOUT, NE-1-1111Z 2C VEIEHARDT, !1ELLIE MAE MEII-iliARDT.,
owners of lot 55 of West Douglas Fla ce.
Assessment 61.55 feet at 5.203 Cost 320,24
85.55 feet of curb & gutter at $ 1. 95 Cost 166.82
45!)
7:
WY, W ec RUTH SMITH, owners of lot 56 of West 1--ou g I as Place
Assessment 61.55 feet at 8 5.203 (lost $320.24
X 1
61.55 feet of curb & gutter at $777. Cost 1; 120.02
WY. W. & RU�111 SMITH owners of lot 57 of West Douglas Place
Assessment 61.7 feet at I' 5. 203 Cost $ 321. 02
61.7 feet of curb & gutter at FP 1. 95 Cost N5 120.3�
WMI. W. & RUGH SMITH., owners of lot 58 of West Douglas Place
Assessment 61.5 feet at 5. 203 Cost 319. 98
8
61. 5 feet of curb & gutter at L- 95 Cost 119.
ROBERT J. & KEITH W. MAJOR, owners of lot 59 of West Douglas Place
Assessment 61.5 feet at 5.203 Cost 319.98
61.5 feet of curb & gutter at 1. C,)5 Cost 91119. 93
ROBERT J & KEITH W. MAJOR, owners of lot 60 of West Douglas Place
Assessment 61 .5 feet at 5.203 Cost 319. 98
r gutter at 8 - 9-'=
61. 5 feet of curb e T. 95 Cost 9. 93
J. H. BRUNS 0111hER OF LOT 7 31ock 3 of Bruns ' Second Addition
Assessment 60.0 feet at $ 5.203 Cost 312.18
60. 0 feet of curb & gutter at $ 1. 95 Cost $�i7.(.'O
J. H. BRU• SI owner of lot 6 Block 3 of Bruns ' Second Addition
.9
Assessment 60.0 feet at $ 5.203 Cost $ 312.18
60.0 feet of curb & gutter at $ 1. 95 Cost
J. BRUNS,, owner- of lot 5 Block 3 of 3runs ' Second Addition
Assessment 97.7 feet at '4. 5.203 Cost $ 508.33
99. 9 feet of curb er gutter at 1. 95 Qost $�94.80
J. H. BRUI."S, owner of lot 4 Block 3 of Bruns ' Second Addition
Assessment 90.2 feet at 5.203 Cost $ 469.31
99.0 feet of curb & gutter at 1. 55 Cost ti 193.05
J. H. 3RU17S., owner of lot 3 Block 3 of Bruns ' Second L)ubdivision
Assessment 66.5 feet at 5.203 Cost x'346.00
60.8 feet of curb & gutter at 1.95 cost
Section 3. The name of each property owner or owners and
the description bf each lot or piece of ground fronting or abutting
on each side of Bolton Drive from the intersection of Bolton
Drive to the intersection of Bolton Drive and the ,east line of
lot 6f lot 10 Block 2 Bruns ' Second Addition and the number of
front feet a,.vned by each owner or owners and contained in the lots
or tracts of land so owned and abuttinf said block or street be-
tween the aforesaid streets and the cost price per front foot for
said improvement and the amount hereby levied and assessed as a
special tax for said improvement against each lot or piece of ground
fronting or abutting said Bolton Drive or the roadway from the
center of the intersection of 6olton Drive and Davis Street to the
intersection of 'jolton Drive acid he east line of lot 10 Block 2
Bruns ► Second Addition
Section 4. That the City Clerk is hereby instructed to make
out special tax bills in favor of the contraxtor Pope onstruction
out
for the within mentioned work in ccordance with the
ordinances of the Uity o!' Jefferson, Missouri , relative to said
kind of work and in accordance with the Charter of said City in regard
to said work.
Section 5. This ordinance shall tkke effect and be in force
from and after its passage and approval.
Pass6d',-.. 2, 1950
Approved Oct. 12, 1950
Lawrence Lutkewitte Lawrence L'tkewitte
PreTi7f,6'di-i,�vf the 'ouncil Ylayor