Loading...
HomeMy Public PortalAbout4808 BALDWIN AVE_Building_4/20/2022_B22-42203_add roomTEMPLE CITY PERMIT NO. B22-42203 City of Temple City 119701 Las Tunas Drive I Temple City, California 91780 1 (626)285-2171 1 www.templecity.us Address: 4808 Baldwin Avenue Unit 103, Temple City, California 91780 Parcel: 8585-009-052 Permit No: B22-42203 Type: Building Subtype: Tl Tenant Improvement Description: TENANTIMPROVEMENT-ADD ONE ROOM WITH 2X4AND Special DRYWALL, ADD A PARTITION WITH I/2 CLEAR TEMPER Conditions: GLASS Issue Date: 03-09-2022 Expire 03-09-2023 Extension: Extension: Date: Permit expires on date shown if: l) work does not commence, or 2) work is suspended or abandoned, or 3) applicant fails to obtain code required inspection. Contacts Owner Sure Charm Investment, LLC. 4808 Baldwin Ave #103, Temple City, California 91780 ( Applicant YI Liang 10825 Fawcett Avenue, South EI Monte, California 91733 (626) 688-2168 Contractor A -Z Glazing Corporation 18305 Valley Boulevard Unit 7 , La Puente, California 91744 (626) 248-0662 1044810 Building Details Building Inspections Approval Date Inspector Location/Setbacks Soils Engineer Foundation Forms Slab/Under Floor Raised Floor Framing Underfloor Insulation 1 st Floor Sheathing 2nd Floor Sheathing Approval .. Date Inspector Approval Date Inspector Roof Sheathing Rated Fire Dept Framing ,„Floor/Ceiling Bldg Dept Framing Rated Walls Shear Panels Rated Shafts Sprinkler Hangars T -Bar Ceilings Insulation/Weather StripLot Drainage Interior aR R Smoke Lath/Drywall Detectors Exterior Lath Fire Dept Approval FINAL 1 Structure l: Commercial 2: 3: 4: Construction Type: V-8 Occupancy Group: Tenant improvement New/Added Area: 0 0 0 0 Remodel/TI Area: 170 0 0 0 New Dwelling Units: 0 0 0 0 Stories: 0 0 0 0 Fees Total_ �IPermlt Valuation $13,000.00 Plan Check Fees $361.62 Fees $425,44�� Strong Motion Fee $3.64 SB 1473 Fee $1.00 Parks Dev Fee $0,00 Sewer Const Fee $0.00 Building Inspections Approval Date Inspector Location/Setbacks Soils Engineer Foundation Forms Slab/Under Floor Raised Floor Framing Underfloor Insulation 1 st Floor Sheathing 2nd Floor Sheathing Approval .. Date Inspector Approval Date Inspector Roof Sheathing Rated Fire Dept Framing ,„Floor/Ceiling Bldg Dept Framing Rated Walls Shear Panels Rated Shafts Sprinkler Hangars T -Bar Ceilings Insulation/Weather StripLot Drainage Interior aR R Smoke Lath/Drywall Detectors Exterior Lath Fire Dept Approval FINAL 1