HomeMy Public PortalAbout4808 BALDWIN AVE_Building_4/20/2022_B22-42203_add roomTEMPLE CITY PERMIT NO. B22-42203
City of Temple City 119701 Las Tunas Drive I Temple City, California 91780 1 (626)285-2171 1 www.templecity.us
Address: 4808 Baldwin Avenue Unit 103, Temple City, California 91780 Parcel: 8585-009-052
Permit No: B22-42203 Type: Building Subtype: Tl Tenant
Improvement
Description: TENANTIMPROVEMENT-ADD ONE ROOM WITH 2X4AND Special
DRYWALL, ADD A PARTITION WITH I/2 CLEAR TEMPER Conditions:
GLASS
Issue Date: 03-09-2022 Expire 03-09-2023 Extension: Extension:
Date:
Permit expires on date shown if: l) work does not commence, or 2) work is suspended or abandoned, or 3) applicant fails to obtain code
required inspection.
Contacts
Owner Sure Charm Investment, LLC. 4808 Baldwin Ave #103, Temple City, California 91780 (
Applicant YI Liang 10825 Fawcett Avenue, South EI Monte, California 91733 (626) 688-2168
Contractor A -Z Glazing Corporation 18305 Valley Boulevard Unit 7 , La Puente, California 91744 (626) 248-0662 1044810
Building Details
Building Inspections
Approval Date Inspector
Location/Setbacks
Soils Engineer
Foundation Forms
Slab/Under Floor
Raised Floor
Framing
Underfloor
Insulation
1 st Floor
Sheathing
2nd Floor
Sheathing
Approval .. Date Inspector Approval Date Inspector
Roof Sheathing Rated
Fire Dept Framing ,„Floor/Ceiling
Bldg Dept Framing Rated Walls
Shear Panels Rated Shafts
Sprinkler Hangars T -Bar
Ceilings
Insulation/Weather
StripLot Drainage
Interior aR R Smoke
Lath/Drywall Detectors
Exterior Lath Fire Dept
Approval
FINAL
1
Structure l: Commercial
2:
3:
4:
Construction Type: V-8
Occupancy Group: Tenant improvement
New/Added Area: 0
0
0
0
Remodel/TI Area: 170
0
0
0
New Dwelling Units: 0
0
0
0
Stories: 0
0
0
0
Fees Total_
�IPermlt
Valuation $13,000.00
Plan Check Fees $361.62
Fees
$425,44��
Strong Motion Fee $3.64
SB 1473 Fee $1.00
Parks Dev Fee
$0,00 Sewer Const Fee $0.00
Building Inspections
Approval Date Inspector
Location/Setbacks
Soils Engineer
Foundation Forms
Slab/Under Floor
Raised Floor
Framing
Underfloor
Insulation
1 st Floor
Sheathing
2nd Floor
Sheathing
Approval .. Date Inspector Approval Date Inspector
Roof Sheathing Rated
Fire Dept Framing ,„Floor/Ceiling
Bldg Dept Framing Rated Walls
Shear Panels Rated Shafts
Sprinkler Hangars T -Bar
Ceilings
Insulation/Weather
StripLot Drainage
Interior aR R Smoke
Lath/Drywall Detectors
Exterior Lath Fire Dept
Approval
FINAL
1