HomeMy Public PortalAbout2002-02 Approving the Guaranteed Maximum Price and Authorizing the Construction of Phase 1 Site for the Civic CenterRESOLUTION NO. 2002-2
A RESOLUTION OF THE VILLAGE COUNCIL OF THE
VILLAGE OF KEY BISCAYNE, FLORIDA; APPROVING
THE GUARANTEED MAXIMUM PRICE (GMP) AND
AUTHORIZING THE CONSTRUCTION OF PHASE 1 SITE
AND SITE INFRASTRUCTURE WORK FOR THE CIVIC
CENTER; PROVIDING THAT THE SPENDING AUTHORITY
AS SET FORTH IN THE VILLAGE'S AGREEMENT WITH
THE STATE OF FLORIDA DEPARTMENT OF
MANAGEMENT SERVICES IS AMENDED TO
CORRESPOND WITH THE GUARANTEED MAXIMUM
PRICE OF THE SITE AND SITE INFRASTRUCTURE WORK;
PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the Agreement between the Village and James A. Cummings Inc. provides for
the establishment of a Guaranteed Maximum Price (GMP) for the Civic Center buildings and related
infrastructure; and
WHEREAS, James A. Cummings Inc. has submitted the GMP for Phase 1 of the Site and
Site Infrastructure Work for the Civic Center.
NOW, THEREFORE BE IT RESOLVED BY THE VILLAGE COUNCIL OF THE
VILLAGE OF KEY BISCAYNE, FLORIDA AS FOLLOWS:
Section 1. Recitals. Each of the above recitals is adopted and confirmed
Section 2. GMP. That the Guaranteed Maximum Price (GMP), as set forth in the attached
January 24, 2002 report from James A. Cummings, Inc. of $801,660 for the Phase 1 Site and Site
Infrastructure Work (the "Work") and $400,000 for Work that will be performed by the Village
through Florida Power and Light is hereby approved.
Section 3. GMP Plans. That the Guaranteed Maximum Price (GMP) for the Work
referenced in Section 2 above is based on the attached plans (the "Plans") prepared by Spillis
Candela DMJM for the Phase 1 Site and Site Infrastructure Work, which is hereby approved.
Section 4. Construction Authorized. That the Village Manager is hereby directed to
proceed with the Work as described in Section 2 and 3 above.
Section S. DMS Authority; Agreement Amended. That the spending authority as set forth
in the Village's Agreement with the State of Florida Department of Management Services is hereby
amended to correspond with the Guaranteed Maximum Price (GMP) for the above described Work
in accordance with the contract amendments attached thereto.
Section 6. Authority. That the Village Manager and the Village Attorney are authorized
to take any and all action necessary to implement this Resolution.
Section 7. That this resolution shall take effect immediately upon adoption.
PASSED AND ADOPTED this 29th day of January , 2002.
HITA H. ALVAREZ, CMC, VILLAGE CLER
APPROVED AS TO FORM AND LEGAL SUFFICIE
RICHARD JAY WEISS, VILLAGE ATTORNEY
MAYOR JOE I. RASCO
Amendment No.: 2
AMENDMENT TO
AGREEMENT BETWEEN CLIENT AND AGENT
State Project No.: VKB-98069000
State Project Name and Location:
Proposed Village Community Center, Village
Fire Station, Police Station, and Administrative
Office of the Village
Village of Key Biscayne, Florida
THIS AMENDMENT
made this 29th day of January in the year Two Thousand And Two
By and Between Building Construction (BC), Department of Management Services, State of
Florida, hereinafter called the Agent or BC, and
Village of Key Biscayne
85 West McIntyre Street
Key Biscayne, Florida 33149
Phone: (305) 365-5500
Fax (305) 365-8936
hereinafter called the Client or Owner.
WITNESSETH, that whereas the Agent and Client entered into Agreement on August 10, 1999 for
implementing the above described project; that whereas on May 7th 2001, Amendment Number 1
was created to accept the Guaranteed Maximum Price for the Fire and Police Station, and the Agent
and Client amended this Agreement to establish that Project Budget; that whereas the Agent and
Client now wish to further amend this Agreement to include funding in the amount of eight hundred
one thousand and six hundred and sixty dollars ($801,660) for Phase 1 Site and Site Infrastructure
Work and that whereas this is the purpose of this Amendment and the work as approved by the
Village Council and as set forth in Article 2 below.
NOW THEREFORE, the Agent and Client, for the considerations hereinafter set forth, agree to
amend the following Articles and Exhibits of the Agreement to read as follows:
Article 2. The Project Budget is amended to include Phase 1 Site and Site Infrastructure Work in
the amount of $801,660.
1
The above work is further described and priced as set forth in the Guaranteed Maximum Price
prepared by James A. Cummings and dated January 24, 2002 for the Phase 1 Site and Site
Infrastructure Work.
CLIENT
VILLAGE OF KEY BISCAYNE, FLORIDA
Village Clerk
By
Village Manager
Reviewed and Approved for Legal Form and
Sufficiency:
By
Village Attorney
AGENT
DEPARTMENT OF MANAGEMENT SERVICES
As Witnessed: APPROVED:
By By
Garrett Blanton, Chief of Staff
Approved As To Form And Legality:
By
Office of General Counsel
Department of Management Services
2
I
umrnincjs
General Contractors
January 24, 2002
Village of Key Biscayne
85 West McIntyre Street
Key Biscayne, Florida 33149
Attn: Mr. Sam Kissinger, Village Manager
James A. Cummings
3575 Northwest 53rd Si
Fort Lauderdale, FL 33", -
Phone: 954-733-421
Fax: 954-485-968E
Website:
www.Jamesacummings
Re: Village Civic Center, Phase I Site & Site Infrastructure Work (Without FP&L Costs)
Guaranteed Maximum Price Proposal - 100% Construction Documents
Dear Mr. Kissinger,
Our Guaranteed Maximum Price Proposal based on the 100% Construction Documents for the
Village Civic Center, Phase I Site & Site Infrastructure Work is $1,743,479.00. Enclosed
herewith please find the GMP Cost Summary, the List of Documents upon which this Estimate is
based; the proposed Schedule and the Description of Work including the Qualifications and
Clarifications.
Very truly yours,
JAMES A. CUMM GyS'INC.
f
Alan lum
Chief Estimator
CC: Jud Kurlancheek
Ralph Martinez
James A. Cummings
William R. Derrer
Michael F. Lanciault
Rob Maphis
Scott Pate
Raul Lastra
Nina Gladstone
Roberto Lage
Robert Currie
1
VILLAGE OF KEY BISCAYNE
SITE & SITE INFRASTRUCTURE PHASE 1
ARCHITECT: SPILLIS CANDELA DMJM
OMP PROPOSAL DATE: JANUARY 24, 2002
ADDED SITE & SITE INFRASTRUCTURE WORK IN JANUARY REQUIRES A TIME EXTENSION TO THE PROJECT OF TWO AND A HALF MONTHS
PHASE 1 WITHOUT FP&L AND SOUTHERN BELL
ITEM i SECTION
1
DESCRIPTION MATERIAL LABOR Z_ SUB 1- TOTAL
GENERAL CONDITIONS 0 0 0 0
SEE WINDOW 0 0 64,629 64,629
EXTEND PROJECT TWO AND A HALF MONTHS FOR INFRASTRUCTURE WOR 0 0 32,936 32,936
0 0 0 0
TOTAL AREA
102,000 SF
SUBCONTRACTORS NAME GRAND TOTAL
S/SF
JAC
JAC
0
64,629
32,936
0
0.00
0.63
0.32
0.00
NOTE: WORK FROM CRANDON BLVD 195' WEST ALONG NORTH VILLAGE
GREEN WAY IS NOT INCLUDED AND SHALL BE PROVIDED BY OTHERS 0 0 0 0 0 0.00
0 0 0 0 0 0.00
00320 (SPIL) SOIL INVESTIGATION DATA REPORT BY K&B 0 0 0 0 0 0.00
0 0 0 0 0 0.00
NO SPEC COORDINATION DRAWINGS 0 0 0 0 0 0.00
NO SPEC FIELD ENGINEERING 0 0 6,720 6,720 JAC/BALANCE IN SITEWORK' 6,720 0.07
FINAL SURVEY 0 0 21,000 21,000 JAC/WAG 21,000 0.21
0 0 0 0 0 0.00
NO SPEC OWNER ALLOWANCES - FURNISH/INSTALL COMPLETE 0 0 0 0 0 0.00
1. ON -SITE LANDSCAPING/SOD/IRRIGATION 0 0 162,500 162,500 OWNERS ALLOWANCE 162,500 1.59
2. FOUNTAIN AT WEST MCINTYRE STREET NIC NIC NIC NIC NOT INCL./SEE BELOW 0 0.00
3. FEATURE COLUMNS - 8 EACH NIC NIC NIC NIC NOT INCL./SEE BELOW 0 0.00
4. TRAFFIC CIRCLE ARCHITECTURAL ELEMENT NIC NIC NIC NIC NOT INCL./SEE BELOW 0 0.00
5. PARK GAZEBO NIC NIC NIC NIC NOT INCLJSEE BELOW 0 0.00
6. TRELLIS NIC NIC NIC NIC NOT INCLJSEE BELOW 0 0.00
7. ARCHITECTURAL PRECAST NIC NIC NIC NIC NOT INCL./SEE BELOW 0 0.00
8. MISC. SPECIALTIES NIC NIC NIC NIC NOT INCL./SEE BELOW 0 0.00
9. COMMUNICATION DUCT BANKS BETWEEN BLDGS 0 0 34,611 34,611 OWNERS ALLOWANCE 34,611 0.34
10. POLICE SECURITY CONDUIT 0 0 19,461 19,461 OWNERS ALLOWANCE 19,461 0.19
11. FIRE SECURITY CONDUIT 0 0 67,202 67,202 OWNERS ALLOWANCE 67,202 0.66
12. FLORIDA POWER & LIGHT AND SOUTHERN BELL - NIC NIC NIC NIC NIC NOT INCL./SEE BELOW 0 0.00
0 0 0 0 0 0.00
NO SPEC CONSTRUCTION PHOTOGRAPHS 0 0 IN GC'S 0 INCLUDED IN GENERAL CONDITIONS 0 0.00
0 0 0 0 0 0.00
NO SPEC QUALITY CONTROL BY OWNER 0 0 0 0 NIC- BY OWNER 0 0.00
0 0 0 0 0 0.00
2 NO SPEC MAINTENANCE OF TRAFFIC 0 0 0 0 INCLUDED IN EARTHWORK 0 0.00
DRWGS. TEMPORARY FENCE 0 0 0 0 INCLUDED IN EARTHWORK 0 0.00
DRWGS. BARRICADES 0 0 0 0 INCLUDED IN EARTHWORK 0 0.00
DRWGS. PLASTIC DRUMS 0 0 0 0 INCLUDED IN EARTHWORK 0 0.00
DRWGS. SIGNAGE 0 0 0 0 INCLUDED IN EARTHWORK 0 0.00
DRWGS. WARNING LIGHTS & FLASHERS 0 0 0 0 INCLUDED IN EARTHWORK 0 0.00
DRWGS. ALL SIGNAGE & BARRICADES PER FDOT SPEC 0 0 0 0 INCLUDED IN EARTHWORK 0 0.00
MAINTENANCE OF SIGNAGE & BARRICADES 0 0 0 0 INCLUDED IN EARTHWORK 0 0.00
0 0 0 0 0 0.00
3 02050 (SPIL) DEMOLITION, REMOVALS AND RELOCATION 0 0 0 0 INCLUDED IN PHASE 2 & 3 0 0.00
1.3 COORDINATION 0 0 0 0 INCLUDED IN PHASE 2& 3 0 0.00
1.4.A PROTECT EXISTING TO REMAIN 0 0 0 0 INCLUDED IN PHASE 2 & 3 0 0.00
.8 ENVIORNMENTAL PROTECTION 0 0 0 0 INCLUDED IN PHASE 2& 3 0 0.00
1 TRAFFIC MAINTENANCE 0 0 0 0 INCLUDED IN PHASE 2& 3 0 0.00
3 f FILL HOLES AND HAZARDOUS OPENINGS 0 ) 0 0 0 INCLUDED IN PHASE 2 3 3 0 0.00
VILLAGE OF KEY BISCAYNE
SITE & SITE INFRASTRUCTURE PHASE 1
ARCHITECT: SPILLIS CANDELA DMJM
OMP PROPOSAL DATE: JANUARY 24, 2002
ADDED SITE & SITE INFRASTRUCTURE WORK IN JANUARY REQUIRES A TIME EXTENSION TO THE PROJECT OF TWO AND A HALF MONTHS
PHASE 1 WITHOUT FP&L AND SOUTHERN BELL
ITEM SECTION DESCRIPTION
MATERIAL
3.5 REMOVE MATERIALS AND DEBRIS FROM SITE 0
3.6 SALVABLE MATERIALS 0
DRWGS. REMOVE EXISTING BANK/BUILDING DEPARTMENT BUILDING 0
DRWGS. REMOVE EXISTING BLDG. @ SOUTH SIDE OF SITE 0
DRWGS. REMOVE SITE WALLS & FOOTINGS 0
DRWGS. REMOVE SIDEWALKS 0
DRWGS. REMOVE FP&L LIGHT POLES - NIC 0
DRWGS. REMOVE FP&L POWER POLES & PULL BOXES - NIC 0
DRWGS. RELOCATE FP&L POWER POLES & PULL BOXES - NIC 0
DRWGS. SURFACE DEMOLITION 0
DRWGS. SAWCUTTING EXISTING ASPHALT 0
DRWGS. REMOVE ASPHALT SURFACE & BASE 0
0
4 02220 (SPIL) EARTHWORK 0
1.8.B.1 PROTECT EXISTING STRUCTURES & PROPERTY 0
.2 PROTECT EXISTING STREETS & SIDEWALKS 0
3.2 LAYOUT & AS-BUILTS 0
3.3 CLEARING & GRUBBING 0
DRWGS. REMOVE EXISTING TREES 0
DRWGS. RELOCATE EXISTING TREES 0
3.4.A REMOVE & DISPOSE OF SURFACE LITTER & DEBRIS 0
.B STRIP & STOCKPILE TOPSOIL 0
.0 REMOVE TOP 2' OF SOIL WITHIN CONSTRUCTION AREA 0
DISPOSAL OF UNSUITABLE MATERIAL 0
3.5 SITE FILLING & COMPACTION 0
.A PROOF ROLL CUT SURFACE 0
3.6 EXCAVATION FOR STRUCTURES 0
3.7 BACKFILL AND COMPACTING 0
3.8 DISPOSE OF EXCESS MATERIALS 0
3.9 DEWATERING(NO CONC. PLACED IN WATER) 0
3.10 TESTING BY OWNER 0
3.11 PREPARATION FOR TOPSOIL 0
0
5 02511 (SPIL) ASPHALTIC CONCRETE PAVING 0
2.1 SUBGRADE STABILIZATION 12" 0
2.2 BASE COURSE LIMEROCK 8" 0
2.3 PRIME & TACK COATS 0
2.4 ASPHALTIC CONCRETE 1 1/2" TYPE 5 0
3.2 TESTING BY OWNER 0
PAVEMENT RESTORATION 0
DRWGS. NEW MEDIAN CUT AT CRANDON BLVD. 0
DRWGS. MODIFY EXISTING MEDIAN CUT AT CRANDON BLVD. 0
NO SPEC PORTLAND CEMENT CONCRETE PAVING 0
02514 (SPIL) CONC. SIDEWALKS, CURBS, CURBS & GUTTERS & WHEEL STOPS 0
3.1 CONCRETE SIDEWALKS 0
3.2 CURBS 0
LABOR SUB
0 0
0 0
0 0
0 0
0 0
0 0
O 0
0 0
0 0
0 0
0 0
0 0
0 0
0 340,961
0 0
0 0
0 0
0 0
0 0
O 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
O 0
0 0
0 0
0 0
O 0
0 0
O 0
0 0
TOTAL
0
0
0
0
0
0
0
0
0
0
0
0
0
340,961
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
SUBCONTRACTORS NAME
INCLUDED IN PHASE 2 & 3
NONE SHOWN/ NONE INCLUDED
INCLUDED IN PHASE 2
INCLUDED IN PHASE 3
INCLUDED IN PHASE 2
INCLUDED IN PHASE 2
NIC- BY OWNER
NIC- BY OWNER
NIC- BY OWNER
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
TOTAL AREA
102,000 SF
GRAND TOTAL
0
0
0
0
0
0
0
0
0
0
0
0
0
MEGATRAN OR METRO/STONECIRCLE/ BONDED 340,961
INCL 0
INCL 0
INCL 0
INCL 0
INCL 0
NIC- BY OWNER 0
INCL 0
INCL 0
INCL 0
NOT INCLUDED 0
INCL 0
INCL 0
INCLUDED IN OWNERS ALLOWANCE 0
INCL 0
INCL 0
INCL 0
NIC- BY OWNER 0
INCL 0
0
INCLUDED IN EARTHWORK 0
INCLUDED IN EARTHWORK 0
INCLUDED IN EARTHWORK 0
INCLUDED IN EARTHWORK 0
INCLUDED IN EARTHWORK 0
NIC- BY OWNER 0
INCLUDED IN ELECTRICAL 0
INCLUDED IN EARTHWORK 0
INCLUDED IN EARTHWORK 0
NONE SHOWN/ NONE INCLUDED 0
INCLUDED IN EARTHWORK 0
INCLUDED IN EARTHWORK 0
INCLUDED IN EARTHWORK 0
$/SF
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
01/24/2002 0
PM
JAMES t 1MINGS, INC. 2
11111 in -111 III IMI MIL 1111 Am Ili Nib -Mb 11111 lows Ides mu
VILLAGE OF KL:Y BISCAYNE
SITE & SITE INFRASTRUCTURE PHASE 1
ARCHITECT: SPILLIS CANDELA DMJM
GMP PROPOSAL DATE: JANUARY 24, 2002
ADDED SITE & SITE INFRASTRUCTURE WORK IN JANUARY REQUIRES A TIME EXTENSION TO THE PROJECT OF TWO AND A HALF MONTHS
PHASE 1 WITHOUT FP&L AND SOUTHERN BELL
ITEM
SECTION F DESCRIPTION 1 MATERIAL LABOR SUB F TOTAL L
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
16,945 16,418 5,339 38,702
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
NO BID NO BID NO BID 0
0 0 0 0
6 02222 (SPIL) EXCAVATION, BACKFILLING AND COMPACTING FOR UTILITES 0 0 0 0
1.5.B+C PROTECT EXISTING UTILITIES, SIDEWALKS & STREETS 0 0 0 0
HAND EXCAVATION 0 0 0 0
3.1.A DEWATERING 0 0 0 0
.0 REMOVE UNSATISFACTORY SOIL 0 0 0 0
3.5 TESTING BY OWNER 0 0 0 0
02660 WATER DISTRIBUTION 0 0 0 0
1.6.A.1 WATER METERS 0 0 0 0
.2 TAP TO THE EXISTING LINES 0 0 0 0
.0 METER DEPOSITS & SERVICE CONNECTION CHARGES BY OWNER 0 0 0 0
2.1.A DUCTILE IRON W/ CEMENT MORTAR LINING 0 0 0 0
2.2 JOINTS 0 0 0 0
2.3 FITTINGS & SPECIAL ITEMS 0 0 0 0
2.4 VALVES 0 0 0 0
2.5 CAST IRON VALVE BOXES 0 0 0 0
2.6 FIRE HYDRANTS 0 0 0 0
2.7.A DISINFECTION 0 0 0 0
3.2 COPPER PIPING FOR WATER SERVICE LINES 3" OR LESS 0 0 0 0
3.3 DUCTILE IRON PIPING FOR WATER SERVICE LINES 4" OR LARGER 0 0 0 0
3.10 THRUST BLOCKS 0 0 0 0
3.11+15 TESTING BY CONTRACTOR 0 0 0 0
3.12+16 DISINFECTION & CONNECTION TO EXIST. WATER MAINS 0 0 0 0
BACKFLOW PREVENTORS & DDCV'S 0 0 0 0
DRWGS ADJUST EXISTING WATER METER VAULT 0 0 0 0
DRWGS REMOVE EXISTING WATER METER VAULTS 0 0 0 0
DRWGS CAP EXISTING WATER LINES 0 0 0 0
PROVIDE WATER SERVICE TO FOUNTAIN 0 0 0 0
PROVIDE WATER SERVICE TO IRRIGATION 0 0 0 0
02720 STORM DRAINAGE SYSTEM 0 0 0 0
2.1.A CORRUGATED ALUMINUM PIPE 0 0 0 0
.B CORRUGATED STEEL PIPE W/ BITUMINOUS COATING 0 0 0 0
2.2 DRAINAGE STRUCTURES 0 0 0 0
3.3 CURBS 8. GUTTERS
3.4 TESTING BY OWNER
DRWGS 6" CONCRETE BASE FOR PAVERS AT FIRESTATION CURB CUT
DRWGS 4" CONCRETE SIDEWALKS
DRWGS 12" & 24" WIDE CONCRETE BANDS
DRWGS COLORED CONC. AT CURBS, GUTTERS, SIDEWALKS & BANDS
CURBS AT TREE GRATES
SEE SITE CONCRETE WINDOW
02580 (SPIL) PAVEMENT MARKING
1.3 PER FOOT SPECIFICATIONS
3.5 SPARE PAINT
NO SPEC. SITE SIGNAGE
NO SPEC. TRAFFIC SIGNALIZATION
SUBCONTRACTORS NAME ---1
INCLUDED IN EARTHWORK
NIC- BY OWNER
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
JAC
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
NOT INCLUDED BY OWNER
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
NOT INCLUDED
NIC- BY OWNER
INCLUDED IN EARTHWORK
NIC- BY OWNER
INCLUDED IN EARTHWORK
NIC- BY OWNER
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
NONE SHOWN/ NONE INCLUDED
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
INCLUDED IN OWNERS ALLOWANCE
INCLUDED IN OWNERS ALLOWANCE
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
TOTAL AREA
102,000 SF
GRAND TOTAL $/SF
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
51,048 0.50
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
01/24/2002 01:03 PM
JAMES A. CUMMINGS, INC. 3
1111111 __ Irk Mae MIN wi
NOM maid
1111111111111111
1111110111,
w.r
111111111110.0
VILLAGE OF KEY BISCAYNE
SITE & SITE INFRASTRUCTURE PHASE 1
ARCHITECT: SPILLIS CANDELA DMJM
GMP PROPOSAL DATE: JANUARY 24, 2002
ADDED SITE & SITE INFRASTRUCTURE WORK IN JANUARY REQUIRES A TIME EXTENSION TO THE PROJECT OF TWO AND A HALF MONTHS
PHASE 1 WITHOUT FP&L AND SOUTHERN BELL
ITEM 1 SECTIO DESCRIPTION
2.3+4 BALLAST ROCK & PLASTIC FILTER FABRIC
3.3 EXFILTRATION TRENCH
3.5 TESTING BY CONTRACTOR
DRWGS. ADJUST EXISTING CATCH BASINS TO REMAIN
DRWGS. CAP EXISTING STORM SEWER
DRWGS. REMOVE EXISTING CATCH BASINS AND ASSOCIATED PIPING
DRWGS. REMOVE EXISTING TRENCH DRAIN
DRWGS. REMOVE EXISTING FRAME & GRATE AND PROVIDE NEW
DRWGS. EXFILTRATION TRENCH TO 15' BELOW EXIST'G GROUND ELEV.
NO SPEC SANITARY SEWER SYSTEM
PIPE, FITTINGS & MANHOLES
TESTING & INSPECTION BY CONTRACTOR
SANITARY SEWER FOR FOUNTAIN
7 02517
2.2
2.3
2.4
.A
3.3.A
.D
.E
3.4.8
.D
.E -G
3.5
DRWGS.
DRWGS.
DRWGS.
DRWGS.
DRWGS.
DRWGS.
8 NO SPEC
DRWGS.
DRWGS.
DRWGS.
DRWGS.
DRWGS.
DRWGS.
NO SPEC
DRWGS.
DRWGS.
SOLID INTERLOCKING CONC. PAVERS - 76,000 SF
3 1/8" THICK KEY SHAPE & RECTANG. AT EDGES
EDGE RESTRAINTS
SAND LAYING COURSE 1"
SAND FOR JOINTS
CUT PAVERS WITH MASONRY SAW
TOLERANCE= 1/32" OFFSET & 1/8" IN 10' FROM LEVEL
EXPANSION & CONTROL JOINTS - SEALANT FILLED
SOIL STERILIZER
VIBRATE CONC. PAVERS INTO LEVELING COURSE
SAND FILL AT JOINTS
REPAIR, CLEANING & PROTECTION
CONCRETE PAVER ROADWAYS
CONCRETE PAVER PARKING AREAS
CONCRETE PAVER SIDEWALKS
COLORED PAVERS FOR TRAFFIC MARKINGS
12" STABILIZED SUB -GRADE
6" OR 8" LIMEROCK BASE
ON SITE CONCRETE PAVERS AT FIRE AND POLICE
LANDSCAPING
PLANT MATERIAL FLA NO.1 OR BETTER
MULCH
WEED CONTROL FABRIC
TREE RELOCATION
MAINTENANCE UNTIL FINAL ACCEPTANCE
GUARANTEE = 1 YEAR FROM ACCEPTANCE
SODDING
CERTIFIED TURFGRASS-ST. AUGUSTINE OR KENTUCKY BLUE
PLASTIC EDGING
1" PLANTING SOIL UNDER ALL SOD
GUARANTEE = 6 MONTHS FROM COMPLETION
MATERIAL I -LABOR I_ SUB ] TOTAL 1 SUBCONTRACTORS NAME
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
121,788 121,788
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
TOTAL AREA
102,000 SF
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
NOT INCLUDED
NOT INCLUDED
NOT INCLUDED
INCLUDED IN OWNERS ALLOWANCE
HOLLYWOOD STONE/ BONDED
INCLUDED AS 2-3/8" RECTANGULAR
INCL
INCL
INCL
INCL
INCL
NOT REQUIRED/ NOT INCLUDED
INCL
INCL
INCL
INCL
INCL
INCL
INCL
INCL
INCLUDED IN EARTHWORK
INCLUDED IN EARTHWORK
INCLUDED IN PHASE 1
INCLUDED IN OWNERS ALLOWANCE
INCLUDED IN OWNERS ALLOWANCE
INCLUDED IN OWNERS ALLOWANCE
INCLUDED IN OWNERS ALLOWANCE
NIC• BY OWNER
INCLUDED IN OWNERS ALLOWANCE
INCLUDED IN OWNERS ALLOWANCE
INCLUDED IN OWNERS ALLOWANCE
INCLUDED IN OWNERS ALLOWANCE
INCLUDED IN OWNERS ALLOWANCE
INCLUDED IN OWNERS ALLOWANCE
INCLUDED IN OWNERS ALLOWANCE
GRAND TOTAL
0
0
0
0
0
0
0
0
0
0
0
0
0
0
121,788
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$/SF
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.19
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
01/24/2002
3M
JAMES AMINGS, INC. 4
iiii in ME in in in CM is mi as a ma as • ma ta ma ;a a
VILLAGE OF KEY BISCAYNE
SITE & SITE INFRASTRUCTURE PHASE 1
ARCHITECT: SPILLIS CANDELA DMJM
GMP PROPOSAL DATE: JANUARY 24, 2002
ADDED SITE & SITE INFRASTRUCTURE WORK IN JANUARY REQUIRES A TIME EXTENSION TO THE PROJECT OF TWO AND A HALF MONTHS
PHASE 1 WITHOUT FP&L AND SOUTHERN BELL
l
ITEM i SECTION 1 DESCRIPTION
NO SPEC IRRIGATION
DRWGS. BACKFLOW PREVENTER
DRWGS. WATER METER
DRWGS. HOSE BIBS FOR MANUAL WATERING
CONTROL WIRING
9 NO SPEC CONCRETE REINFORCEMENT, NON-STRUCTURAL
WELDED WIRE MESH MATERIAL
WELDED WIRE MESH LABOR
NO SPEC ARCHITECTURAL PRECAST CONCRETE
DRWGS. CONCRETE BOLLARDS
10 NO SPEC METAL FABRICATIONS
DRWGS. TREE GRATES
DRWGS. PIPE BOLLARDS
11 DIV. 10 MISC. SPECIALTIES
DRWGS . FLAGPOLES
12 DIV 15 MECHANICAL
DISCONNECT PLUMBING & MAKE SAFE FOR DEMOLITION
REMOVE FREON & MAKE SAFE FOR DEMOLITION
13 DIV. 18
DRWGS.
DRWGS.
DRWGS.
DRWGS.
DRWGS.
DRWGS.
DRWGS.
DRWGS.
DRWGS.
DRWGS.
DRWGS.
DRWGS.
DRWGS.
DRWGS.
DRWGS.
DRWGS.
DRWGS.
DRWGS.
DRWGS.
DRWGS.
DRWr4S.
ELECTRICAL
ELECTRICAL DUCT BANK
COMMUNICATION DUCT BANK
TELEPHONE & CABLE TV DUCT BANK
FP&L MANHOLES • FURNISHED BY FP&L INSTALLED BY CONTRACTOR
FP&L CONDUIT - FURNISHED BY FP&L INSTALLED BY CONTRACTOR
BELLSOUTH MANHOLES- FURN. & INSTALL BY CONTRACTOR
COMMUNICATION MANHOLES- FURN. & INSTALL BY CONTRACTOR
WATERPROOFING OF MANHOLES
FP&L POWER POLES • NIC
TEMPORARY FP&L POWER POLES - NIC
FP&L CONDUCTORS & CABLES - NIC
PAD MOUNTED TRANSFORMERS - NIC
STREET LIGHTING
PLANTER LIGHTING
PRECAST LIGHTPOLE BASES TO MEET WIND LOADING REQ.
CONCRETE EQUIPMENT PADS
FIBER REINFORCED PLASTIC ENCLOSURES
RELOCATE EXISTG LIGHT POLES & LIGHT POLE PULL BOXES - NIC
REMOVE EXISTING FP&L LIGHT POLES & PULL BOXES - NIC
REMOVE EXISTING FP&L OVERHEAD POLE & POWER LINES • NIC
CONNECTION TO FOUNTAIN PUMP & CONTROLLER
TOTAL AREA
102,000 SF
I MATERIAL LABOR I SUB 1 _TOTAL [ SUBCONTRACTORS NAME
0 0 0
0 0 0
0
0
0
o 0 0
O 0 0
0 0 0
O 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
27,622 2,200 0
1,200 1,800 1,077
O 0 0
0 0 0
O 0 0
O 0 0
O 0 0
0 0 0
0 0 0
0 0 0
0 0 409,470
0 0 0
O 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 2,000
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
O 0 0
0 0 0
O 0 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
29,822
4,077
0
0
0
0
0
0
0
0
409,470
0
0
0
0
0
0
0
2,000
0
0
0
0
0
0
0
0
0
0
0
0
0
INCLUDED IN OWNERS ALLOWANCE
INCLUDED IN OWNERS ALLOWANCE
NIC- BY OWNER
INCLUDED IN OWNERS ALLOWANCE
INCLUDED IN OWNERS ALLOWANCE
INCLUDED IN SITE CONCRETE
INCLUDED IN SITE CONCRETE
INCLUDED IN SITE CONCRETE
INCLUDED IN OWNERS ALLOWANCE
INCLUDED IN OWNERS ALLOWANCE
IRONSMITHIJAC
DIXIE METALS/JAC
INCLUDED IN OWNERS ALLOWANCE
INCLUDED IN OWNERS ALLOWANCE
INCLUDED IN PHASE 2
INCLUDED IN PHASE 2
FISK/ BONDED
INCL
INCL
INCL
INCL
INCL
INCL
INCL
JAC
NIC - BY OWNER
NIC - BY OWNER
NIC - BY OWNER
NIC - BY OWNER
INCL
INCL
INCL
INCLUDED IN EARTHWORK
INCL
NIC - BY OWNER
NIC - BY OWNER
NIC - BY OWNER
INCL
GRAND TOTAL $/SF j
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
33,124 0.32
5,388 0.05
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
409,470 4.01
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
2,000 0.02
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
01/24/2002 01:03 PM
JAMES A. CUMMINGS, INC. 5
a rr wwa UM III Ei 11111a -wart
VILLAGE OF KEY BISCAYNE
SITE & SITE INFRASTRUCTURE PHASE 1
ARCHITECT: SPILL'S CANDELA DMJM
OMP PROPOSAL DATE: JANUARY 24, 2002
ADDED SITE & SITE INFRASTRUCTURE WORK IN JANUARY REQUIRES A TIME EXTENSION TO THE PROJECT OF TWO AND A HALF MONTHS
PHASE 1 WITHOUT FP&L AND SOUTHERN BELL
C _ITEM_ I SECTION_ I
DESCRIPTION_ __ I MATERIAL LABOR SUB I TOTAL �� SUBCONTRACTORS NAME
THE FOLLOWING ITEMS OF WORK ARE SEPARATE OWNER ALLOWANCES
WHICH ARE NOT INCLUDED IN THIS PROPOSAL AND WHICH DO NOT INCLUDE
ANY CONSTRUCTION MANAGER'S MARK-UPS FOR PERMITS, TAXES,
INSURANCE, BONDS, CONTINGENCIES AND OVERHEAD AND PROFIT.
FOUNTAIN AT WEST MCINTYRE STREET
FEATURE COLUMNS - 8 EACH
TRAFFIC CIRCLE ARCHITECTURAL ELEMENT
PARK GAZEBO
TRELLIS
ARCHITECTURAL PRECAST
MISC. SPECIALTIES
FLORIDA POWER & LIGHT AND SOUTHERN BELL WORK PROVIDED BY
OWNER
TOTAL
60,000 OWNER ALLOWANCE NIC - WORK BY OWNER
40,000 OWNER ALLOWANCE NIC - WORK BY OWNER
125,000 OWNER ALLOWANCE NIC • WORK BY OWNER
25,000 OWNER ALLOWANCE NIC - WORK BY OWNER
15,000 OWNER ALLOWANCE NIC - WORK BY OWNER
4,000 OWNER ALLOWANCE NIC - WORK BY OWNER
6,000 OWNER ALLOWANCE NIC - WORK BY OWNER
400,000 OWNER ALLOWANCE NIC • WORK BY OWNER
675,000
TOTAL AREA
102,000 SF
GRAND TOTAL I SISF
i
01/24/2002 01:03 PM JAMES A CUMMINGS, INC.
7
Department of Management Services
Village of Key Biscayne Recreation Center
Site & Infrastructure List of Drawings
January 24, 2002
M
1�
CIVIL DRAWINGS
C1.1.00
C1.1.01
C1.1.02
C1.1.03
C1.1.04
C1.1.05
C1.1.06
C2.1.00
C2.1.01
C2.1.02
C2.1.03
C2.1.04
C2.1.05
C2.1.06
C3.1.00
C3.1.01
C3.1.02
C3.1.03
C3.1.04
C3.1.05
C3.1.06
C3.1.07
C4.1.00
C4.1.01
C4.1.02
C4.1.03
C4.1.04
C4.1.05
C4.1.06
C5.1.00
C5.1.01
C5.1.02
C5.1.03
Location Plan
Demolition Plan - Village Green Way
Demolition Plan - Village Green Way
Demolition Plan - Village Green Way
Demolition Plan - Fernwood Road
Demolition Plan - Fernwood Road
Demolition Plan - West McIntyre Street
Location Plan
Geometry Plan - Village Green Way
Geometry Plan - Village Green Way
Geometry Plan - Village Green Way
Geometry Plan - Fernwood Road
Geometry Plan - Fernwood Road
Geometry Plan - West McIntyre Street
Location Plan
Grading & Drainage Plan - Village Green
Way
Grading & Drainage Plan -
Way
Grading & Drainage Plan -
Way
Grading & Drainage Plan -
Grading & Drainage Plan -
Grading & Drainage Plan -
Street
Grading & Drainage Plan -
Street
Location Plan
Underground Utilities Plan
Way
Underground Utilities Plan - Village Green
Way
Underground Utilities Plan - Village Green
Way
Underground Utilities Plan - Femwood
Road
Underground Utilities Plan - Fernwood
Road
Underground Utilities Plan - West McIntryre
Street
Location Plan
Electrical, Telephone & Communications
Plan - Village Green Way
Electrical, Telephone & Communications
Plan - Village Green Way
Electrical, Telephone & Communications
Plan - Fernwood Road
Village Green
Village Green
Fernwood Road
Fernwood Road
West McIntyre
West McIntyre
- Village Green
08/03/01
08/03/01
08/03/01
06/29/01
06/29/01
06/29/01
09/25/01
08/03/01
08/21/01
08/21/01
08/21/01
09/25/01
08/21/01
09/25/01
08/03/01
09/25/01
08/21/01
08/21/01
09/25/01
08/21/01
09/25/01
06/29/01
08/03/01
09/25/01
09/25/01
08/21/01
09/25/01
09/25/01
09/25/01
08/03/01
09/25/01
09/25/01
09/25/01
CIVIL DRAWINGS (coned)
C5.1.04 Electrical, Telephone & Communications
Plan - Fernwood Road
C5.1.05 Electrical, Telephone & Communications
Plan - West McIntyre Street
C6.1.01 Details
C6.1.02 Details
C6.1.03 Watermain Profile
C6.1.04 Notes
C7.1.00 Location Plan
C7.1.01 Traffic Marking Plan - Village Green Way
C7.1.02 Traffic Marking Plan - Village Green Way
C7.1.03 Traffic Marking Plan - Village Green Way
C7.1.04 Traffic Marking Plan - Femwood Road
C7.1.05 Traffic Marking Plan - West McIntyre Street
C8.1.01 Traffic Maintenance Plan
C8.1.02 Traffic Maintenance Plan
C8.1.03 "Phase 1" Plan
C8.1.04 "Phase 2" Plan
C8.1.05 "Phase 3" Plan
ELECTRICAL DRAWINGS
EE0.1.01 Fixture Schedule, Calculation Schedule &
Details
EE0.1.02 Electrical Site Utilities - Details &
Specifications
EE1.1.01 Demolition Electrical Site Plan
EE1.1.02 Site Lighting Plan 'Area A'
EE1.1.03 Site Lighting Plan 'Area B'
EE1.1.04 Site Lighting Plan 'Area C'
EE 1.1.05 Photometric Plan 'Area A'
EE 1.1.06 Photometric Plan 'Area B'
EE1.1.07 Photometric Plan 'Area C'
EE 1.1.08 Electrical Site Utility Plan
IRRIGATION DRAWINGS
11 R.O.W. Irrigation Plan - Zone 1
I2 Irrigation Plan - Zone 2, 3, & 4
I3 Irrigation Notes and Details
LANDSCAPING DRAWINGS
LI R.O.W. Planting Plan - Zone 1
L2 R.O.W. Planting Plan - Zone 2, 3, & 4
PROJECT SPECIFICATIONS
DIVISION 2 - SITEWORK
02050 Demolition, Removals and
Relocation
02220 Earthwork
09/25
09/25
06/29
08/03
09/25
08/21
08/03
08/21
08/21
08/21
09/25
09/25
11/0:
11/0:
11/0:
11/02
11/0:
08/2:
08/2=
08/1(
08/1(
08/1(
08/2:
08/1(
08/1(
08/1(
09/25
09/1C
09/1C
09/1C
06/0`
06/05
JAC I' 8/17,
JAC 1 '8/17,
DIVISION
02222
02511
02514
02517
02580
02660
02720
2 - SITEWORK (cont'dl
Excavating, Backfilling and
Compacting for Utilities
Asphaltic Concrete Paving
Concrete Sidewalks, Curbs,
Curbs and Gutters, and Wheel
Stops
Solid Interlocking Concrete
Pavers
Pavement Marking
Water Distribution
Storm Drainage System
OTHER DOCUMENTS
Response to Request for Information #PC002
JAC Date 08/17/01
JAC Date 08/17/01
JAC Date 08/17/01
JAC Date 08/17/01
JAC Date 08/17/01
JAC Date 08/17/01
JAC Date 08/17/01
10/31/01
Act
ID
FIRE STATION
Activity
Description
1100 CONSTRUCTION OF NEW FIRE
STATION
1110 SUBSTANTIAL COMPLETION
1120 PUNCH LIST
Org Early Early
Dur Start Finish
103 25JAN02 18JUNO2
1 19JUNO2 19JUNO2
22 19JUNO2 18JUL02
ADMINISTRATION & POLICE
2100 CONSTRUCTION OF NEW ADMIN. 103 25JAN02 18JUNO2
& POLICE STATION
2900 RELOCATE&DEMO.EXIST.POLICE/ 40 19JUNO2 13AUGO2
FIRE&INSTALL S.PARK.
2110 SUBSTANTIAL COMPLETION
2120 PUNCHLIST
1 19JUNO2 19JUNO2
22 19JUNO2 18JUL02
SITE,UTILITIES &STREETS -PHASE I (FIRE/ADMIN/POL)
2106 PERMITTING
2107 OWNER APPROVAL OF GMP &
AMENDMENT TO CONTRACT
2108 SITE, UTILITIES & STREETS
WORK @ FIRE & ADMIN.
32 28JAN02* 12MAR02
15 20FEB02 12MAR02
70 13MAR02 18JUNO2
FINAL COMPLETION FIRE & POLICE/ADMIN.
9999 FINAL COMPLETION
14AUGO2 14AUGO2
SITE, UTILITIES & STREETS - PHASE II (FERNWOOD)
3106 PERMITTING
3108 SITE, UTILITIES & STREETS
WORK @ FERNWOOD
66 28JAN02* 29APR02
105 28MAR03 21AUGO3
2002 2(
J FMAMJ JASONDJ FMAMJ J.A.S
CONSTRUCTION OF NEW FIRE STATION
*SUBSTANTIAL COMPLETION
PUNCH LIST
SOMAIWAWMCONSTRUCTION OF NEW ADMIN. & POLICE ij/NRELOCATE&DEMO.EXIST.POLICE/ FIRE&INST/
TSUBSTANTIAL COMPLETION
PUNCHLIST
PERMITTING
OWNER APPROVAL OF GMP & AMENDMENT TO CONTRACT
SITE, UTILITIES & STREETS WORK @ FIRE & ADMIN.
FINAL COMPLETION
ARIWPERMITTING
SI`E, UTILITIES & STREETS WORK @ FERNWOODOEIWAIWar
1 T
Project Start
Project Finish
Data Date
Run Date
21JANO2
25SEP03
25JAN02
25JAN02
iiptimomigimWEady Bar
Progress Bar
Critical Activity
KST3
JAMES A. CUMMINGS, INC.
VILLAGE OF KEY BISCAYNE CIVIC CENTER
CIVIC CENTER COMPLETION SCHEDULE
Sheet 1 of 2
ummings
® Primavera Systems. Inc
aranNLIIILFILANL'ILIKIILIILIOLILIN. I ELK
Act
ID
Activity
Description
RECREATION CENTER
5076 VILLAGE PERMITTING
5075 WASA & COUNTY PERMITTING
5065 RELOCATE OFFICES &DEMO.
EXIST. VILLAGE HALL&BANK
5100 CONSTRUCTION OF REC.
CENTER
5110 SUBSTANTIAL COMPLETION
5120 PUNCH LIST
Org Early Early
Dur Start Finish
20 14SEP01A 27MAR02
60 19NOV01 18APRO2
22 19JUNO2 18JUL02
289 19JUL02 27AUG03
1 28AUG03 28AUG03
20 28AUG03 24SEP03
SITE, UTILITIES & STREETS -PHASE III (REC.CENTER)
4106 PERMITTING
4108 SITE, UTILITIES & STREETS
WORK @ REC. CENTER
66 28JAN02* 29APR02
109 28MAR03 27AUG03
FINAL COMPLETION RECREATION CENTER
11999 FINAL COMPLETION
1 25SEP03 25SEP03
2002 2003
J FMAMJ J ASONDJ FMAMJ J AS
SITE
A
VILLAGE PERMITTING
�WASA & COUNTY PERMITTING
RELOCATE OFFICES &DEMO. EXIST. VILLAGE HAL
CON
SUBSTANTIAL COMPLETION
PUNCH LIST
1
PERMITTING
UTILITIES & STREETS WORK @ REC. CENTERinlinffarair
FINAL COMPLETION
Project Start
Project Finish
Data Date
Run Date
21JANO2
25SEP03
25JANO2
25JANO2
Early Bar
AMMIMIIIIIIIMIldr Progress Bar
Critical Activity
KST3
JAMES A. CUMMINGS, INC.
VILLAGE OF KEY BISCAYNE CIVIC CENTER
r•niir rFMTpP ('C MPl FTION SC.HFIII II F
Sheet 2 of 2
ummincts
Qualifications and Clarifications
Where conflicts may exist between these Qualifications and Clarifications and the listed
Contract Drawings, Specifications and Architect's letters of direction, these Qualifications and
Clarifications shall govern.
1. The Owner Allowances are sums of money established for a particular item of work
which scope and description are not sufficiently defined to allow for pricing by
Cummings. These Allowances are inclusive of all labor (unless otherwise indicated),
payroll taxes and insurance, material, sales and use tax, equipment, services, general
requirements, insurance, bond and fee. The following items of work are included as
Owner Allowances:
Owner Allowances
A. Permits
B. Builders Risk Insurance
C. Landscaping, Irrigation & Sod
D. Communication Duct Banks Between Buildings
E. Police Security Conduit
F. Fire Security Conduit
G. Restoration
S 20,000.00
S 9,800.00
S 162,500.00
S 34,611.00
S 19,461.00
S 67,202.00
$ 25,000.00
2. The costs included in this proposal are as specifically identified in this proposal and are
as specifically shown in the enumerated contract documents and do not include any
unknowns, incomplete design and/or conflicts which may result from the completion of
the contract design documents.
3 This proposal is based upon the assumption that FP&L work will be complete no later
then March 1, 2002. If the FP&L work is not completed by this date through no fault of
Cummings, Cummings shall look to the Owner for all additional time extensions and
costs resulting from this delay.
4. Permit fees are included as an Owner Allowance of $20,000.00.
5. Builder's Risk Insurance is included as an Owner Allowance of S9,800.00.
6. All work required for Phases 2 and 3 is not included.
7 Construction of the traffic circle and North Village Green Way to within 195 feet west of
Crandon Blvd is not included.
8. All work from Crandon Boulevard 195 feet west along North Village Green Way shall be
provided by others.
2
9. Art In Public Places including all required infrastructure shall be provided by others.
10. Restoration of areas disturbed as a result of the Work is included as an Owner Allowance
in the amount of $25,000.00.
DIVISION 2 - SITEWORK
11. In that a geotechnical report was not prepared specifically for the Civil & Site Infrastructure,
this estimate is based strictly on the Subsurface Soil Exploration as prepared by K&B
Consultants Inc. for the Administration and Police Building. Site preparation does include
the removal of the existing top two feet (2') of existing soil within the area of construction.
All costs required to remedy and modify existing unknown subsurface conditions, including
unsuitable and/or contaminated soils are not included.
12. All existing trees which are in conflict with new construction shall be demolished and
removed from the site by Cummings.
13. Demolition of the existing Village Hall and bank and the building adjacent to the existing
fire and police facility is not included.
14. All FP&L and Southern Bell costs including but not limited to the removal and/or relocation
of FP&L light poles, power poles and pull boxes are not included.
15. The sanitary sewer servicing the Administration and Police Building as shown on sheets
C4.1.01 and C4.1.06 was previously included in the GMP proposal for the Administration
and Police Building and is therefore not included in this proposal.
16. Solid interlocking concrete pavers similar or equal to those manufactured by either Paver
Module or Tremron are included.
17. All pavers for the sidewalks are included as 4" x 8" concrete pavers. All pavers for the
roadways are included as both 4" x 4" and 4" x 8" concrete pavers. All concrete pavers for
the sidewalks and the roadways are included as 2-3/8" thick.
18. With the exception of the handicapped parking spaces, all pavement markings in areas to
receive concrete pavers are included as colored concrete pavers. All pavement markings for
handicapped parking spaces located in areas to receive concrete pavers are included as
painted.
19. All pavement markings on asphalt paving are included as painted.
20. Landscaping, Irrigation and Sod are included as an Owner Allowance in the amount of
$162,500.00.
3
21. Topsoil is included under the sod as two inches (2") thick.
22. All required reinforcing steel and welded wire mesh are included as regular plain steel and
bright welded wire mesh.
23. All sidewalks are included as key coral colored concrete with a medium broom finish.
DIVISION 5 - METALS
24. Tree grates are included as cast iron with a black enamel finish similar or equal to those
manufactured by Ironsmith Architectural Products Model M4836 and M6058.
DIVISION 16 - ELECTRICAL
25. The furnishing of manholes and conduit for FP&L duct banks is not included.
WORK PROVIDED BY OWNER
25. Threshold inspector and special inspector services.
26. County, city and other governing municipalities and agencies fees and charges and all impact
fees, utility connection and usage fees. (Permit fees are included in the GMP as an
allowance.)
27. Quality control testing.
28. Tree relocation.
29. Work from Crandon Boulevard 195 feet west along North Village Green Way.
30. Removal and/or relocation of existing trailers and other portable type facilities. (Demolition
of the existing facilities is included.)
31. Asbestos abatement and removal of other hazardous materials in existing facilities.
32. Furniture, Fixtures and Equipment (FF&E).
33. Removal, replacement and/or restoration of existing unknown utilities.
34. Detention tanks and disposal wells.
35. The cost of the water meters.
36. Traffic and/or pedestrian signalization.
4
37. All required Florida Power & Light and Southern Bell work including but not limited to
connection fees.
38. Art In Public Places including all required infrastructure
WORK NOT INCLUDED
39. The following items of work are separate Owner Allowances which are not included in this
proposal and which do not included any construction manager's mark-up for permits, taxes,
insurance, bonds, contingencies, overhead and profit.
A. Fountain at West McIntyre Street $ 60,000.00
B. Feature Columns S 40,000.00
C. Traffic Circle Architectural Element $ 125,000.00
D. Park Gazebo $ 25,000.00
E. Trellis 5 15,000.00
F. Architectural Precast Concrete 5 4,000.00
G. Miscellaneous Specialties 5 6,000.00
H. Florida Power & Light and Southern Bell 5 400,000.00
TIME EXTENSION
40. In that the permitting process has not yet started and allowing for six (6) weeks permitting
time commencing on Monday, January 28, 2002, we will require a time extension of two
and a half (2-1/2) months to the overall project duration (for the Fire Station, the
Administration and Police Building and Phase I of the Civil and Site Infrastructure work)
in accordance with the attached schedule.
5