HomeMy Public PortalAbout2021.08.26 A133 Exhibit A-D 2019 - City of McCall Parks RelocationAIA® Document A133™ – 2019 Exhibit A Guaranteed Maximum Price Amendment AIA Document A133™ – 2019 Exhibit A. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 14:28:23 MT on 06/11/2021 under Order No.2155097283 which expires on 05/14/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (1299084634) 1 ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. AIA Document A201™–2017, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified. This Amendment dated the nineteenth day of August in the year two thousand twenty-one, is incorporated into the accompanying AIA Document A133™–2019, Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price dated the twenty-eighth day of July in the year two thousand twenty-one (the “Agreement”). for the following PROJECT: City of McCall Parks Relocation 101 West Forest Street McCall, ID 83638 THE OWNER: City of McCall Parks & Recreation Department 214 E. Park Street McCall, Idaho 83638 THE CONSTRUCTION MANAGER: CM Company, Inc. 431 W. McGregor Drive Boise, Idaho 83705 TABLE OF ARTICLES A.1 GUARANTEED MAXIMUM PRICE A.2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION A.3 INFORMATION UPON WHICH AMENDMENT IS BASED A.4 CONSTRUCTION MANAGER’S CONSULTANTS, CONTRACTORS, DESIGN PROFESSIONALS, AND SUPPLIERS ARTICLE A.1 GUARANTEED MAXIMUM PRICE § A.1.1 Guaranteed Maximum Price Pursuant to Section 5.2.1 of the Agreement, the Owner and Construction Manager hereby amend the Agreement to establish a Guaranteed Maximum Price. As agreed by the Owner and Construction Manager, the Guaranteed Maximum Price is an amount that the Contract Sum shall not exceed. The Contract Sum consists of the Construction Manager’s Fee plus the Cost of the Work, as that term is defined in Article 6 of the Agreement. § A.1.1.1 The Contract Sum is guaranteed by the Construction Manager not to exceed One Million Sixty-Two Thousand Four Hundred Forty and No/100 Dollars ($1,062,440), subject to additions and deductions by Change Order as provided in the Contract Documents. § A.1.1.2 Itemized Statement of the Guaranteed Maximum Price. Provided below is an itemized statement of the Guaranteed Maximum Price organized by trade categories, including allowances; the Construction Manager’s contingency; alternates; the Construction Manager’s Fee; and other items that comprise the Guaranteed Maximum Price as defined in Section 5.2.1 of the Agreement. See Exhibit B – Schedule of Values, attached hereto and made a part thereof.        AIA Document A133™ – 2019 Exhibit A. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 14:28:23 MT on 06/11/2021 under Order No.2155097283 which expires on 05/14/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (1299084634) 2 § A.1.1.3 The Construction Manager’s Fee is set forth in Section 5.1.1 of the Agreement. § A.1.1.4 The method of adjustment of the Construction Manager’s Fee for changes in the Work is set forth in Section 5.3 of the Agreement. § A.1.1.5 Alternates § A.1.1.5.1 Alternates, if any, included in the Guaranteed Maximum Price: None. If any Alternates are selected by the Owner, they will be added via Change Order. § A.1.1.5.2 Subject to the conditions noted below, the following alternates may be accepted by the Owner following execution of this Exhibit A. Upon acceptance, the Owner shall issue a Modification to the Agreement. N/A § A.1.1.6 Unit prices, if any: N/A ARTICLE A.2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § A.2.1 The date of commencement of the Work shall be: [ ] The date of execution of this Amendment. [X] Established as follows: To be determined upon receipt of pre-engineered metal building Shop Drawings, completion of foundation design, and issuance of building permit. If a date of commencement of the Work is not selected, then the date of commencement shall be the date of execution of this Amendment. § A.2.2 Unless otherwise provided, the Contract Time is the period of time, including authorized adjustments, allotted in the Contract Documents for Substantial Completion of the Work. The Contract Time shall be measured from the date of commencement of the Work. § A.2.3 Substantial Completion § A.2.3.1 Subject to adjustments of the Contract Time as provided in the Contract Documents, the Construction Manager shall achieve Substantial Completion of the entire Work: [ ] Not later than ( ) calendar days from the date of commencement of the Work. [X] By the following date: To be determined upon receipt of pre-engineered metal building Shop Drawings, completion of foundation design, and issuance of building permit. § A.2.3.2 Subject to adjustments of the Contract Time as provided in the Contract Documents, if portions of the Work are to be completed prior to Substantial Completion of the entire Work, the Construction Manager shall achieve Substantial Completion of such portions by the following dates: To be determined upon receipt of pre-engineered metal building Shop Drawings, completion of foundation design, and issuance of building permit. § A.2.3.3 If the Construction Manager fails to achieve Substantial Completion as provided in this Section A.2.3, liquidated damages, if any, shall be assessed as set forth in of the Agreement. N/A        AIA Document A133™ – 2019 Exhibit A. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 14:28:23 MT on 06/11/2021 under Order No.2155097283 which expires on 05/14/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (1299084634) 3 ARTICLE A.3 INFORMATION UPON WHICH AMENDMENT IS BASED § A.3.1 The Guaranteed Maximum Price and Contract Time set forth in this Amendment are based on the Contract Documents and the following: § A.3.1.1 The following Supplementary and other Conditions of the Contract: N/A § A.3.1.2 The following Specifications: See Exhibit C attached hereto and made a part thereof. § A.3.1.3 The following Drawings: See Exhibit C attached hereto and made a part thereof. § A.3.1.4 The Sustainability Plan, if any: N/A Other identifying information: § A.3.1.5 Allowances, if any, included in the Guaranteed Maximum Price: See Exhibit B, attached hereto and made a part thereof. § A.3.1.6 Assumptions and clarifications, if any, upon which the Guaranteed Maximum Price is based: See Exhibit D, attached hereto and made a part thereof. § A.3.1.7 The Guaranteed Maximum Price is based upon the following other documents and information: ARTICLE A.4 CONSTRUCTION MANAGER’S CONSULTANTS, CONTRACTORS, DESIGN PROFESSIONALS, AND SUPPLIERS § A.4.1 The Construction Manager shall retain the consultants, contractors, design professionals, and suppliers, identified below: N/A This Amendment to the Agreement entered into as of the day and year first written above. OWNER (Signature) CONSTRUCTION MANAGER (Signature) Trey Crookston, President (Printed name and title) (Printed name and title)           ,Mayor ATTEST: ________________________________ BessieJo Wagner, City Clerk McCall Parks and Recreation Building Relocation Exhibit B Page 1 of 3 EXHIBIT B SCHEDULE OF VALUES Attached hereto and made a part thereof 1. Dated 8/19/21, 3 pages.        McCall Parks and Recreation Building Relocation Exhibit B Page 1 of 3        McCall Parks and Recreation Building Relocation Exhibit B Page 1 of 3        McCall Parks and Recreation Building Relocation Exhibit C Page 1 of 3 EXHIBIT C PLANS AND SPECIFICATIONS Dated June 11, 2021 DRAWINGS GENERAL G-001 COVER SHEET G-002 SHEET INDEX, PROJ LOCATION, CODE SUMMARY AND LIFE SAFETY PLAN CIVIL C-001 GENERAL NOTES, LEGEND AND SYMBOLS C-100 CIVIL SITE PLAN C-101 DEMOLITION PLAN C-102 GRADING, DRAINAGE AND STORMWATER MANAGEMENT PLAN C-103 SIGNAGE, STRIPING AND HORIZONTAL CONTROL PLAN C-200 CIVIL TYPICAL DETAILS - 1 C-201 CIVIL TYPICAL DETAILS – 2 ARCHITECTURAL A-001 GENERAL NOTES, SYMBOLS AND LEGENDS A-002 INTERIOR PARTITION TYPES A-101 LEVEL 1 FLOOR PLAN AND CEILING PLAN A-201 BUILDING EXTERIOR ELEVATIONS A-301 BUILDING SECTIONS A-321 WALL SECTIONS A-421 STAIR DETAILS A-501 INTERIOR ELEVATIONS AND DETAILS A-601 WINDOW AND DOOR FRAME TYPES, SCHEDULES, AND DETAILS STRUCTURAL S0.1 STRUCTURAL NOTES S0.2 STRUCTURAL NOTES S0.3 STRUCTURAL NOTES S1.1 FOUNDATION PLAN S2.1 MEZZANINE FRAMING PLAN S8.1 FOUNDATION DETAILS S9.1 MEZZ FRAMING DETAILS PLUMBING P-002 PLUMBING SCHEDULES P-110 DOMESTIC WATER PLANS P-120 WASTE & VENT PLANS P-201 PLUMBING DETAILS        McCall Parks and Recreation Building Relocation Exhibit C Page 2 of 3 MECHANICAL M-001 MECHANICAL LEGENDS & NOTES M-002 MECHANICAL SCHEDULES M-003 COM-CHECK M-110 HVAC PLANS M-201 MECHANICAL DETAILS ELECTRICAL E-001 ELECTRICAL LEGENDS, NOTES, & ONE-LINE DIAGRAM E-002 ELECTRICAL SCHEDULES E-003 ELECTRICAL DETAILS E-004 ELECTRICAL COMCHECK E-101 ELECTRICAL SITE PLAN E-110 LIGHTING PLANS E-120 POWER PLANS SPECIFICATIONS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS SECTION 00 31 32 GEOTECHNICAL REPORT SECTION 00 60 00 PROJECT FORMS DIVISION 01 - GENERAL REQUIREMENTS SECTION 01 10 00 SUMMARY SECTION 01 22 00 UNIT PRICES SECTION 01 25 00 SUBSTITUTION PROCEDURES SECTION 01 32 33 PHOTOGRAPHIC DOCUMENTATION SECTION 01 33 00 SUBMITTAL PROCEDURES SECTION 01 40 00 QUALITY REQUIREMENTS SECTION 01 42 00 REFERENCES SECTION 01 60 00 PRODUCT REQUIREMENTS SECTION 01 73 00 EXECUTION SECTION 01 77 00 CLOSEOUT PROCEDURES SECTION 01 78 23 OPERATION & MAINTENANCE DATA SECTION 01 78 39 PROJECT RECORD DOCUMENTS SECTION 01 79 00 DEMONSTRATION AND TRAINING DIVISION 02 - EXISTING CONDITIONS NOT APPLICABLE DIVISION 03 - CONCRETE SECTION 033500 CONCRETE SURFACE TREATMENT DIVISION 04 - MASONRY NOT APPLICABLE DIVISION 5 - METALS SECTION 055000 METAL FABRICATIONS        McCall Parks and Recreation Building Relocation Exhibit C Page 3 of 3 DIVISION 6 - WOOD AND PLASTICS SECTION 061053 MISCELLANEOUS ROUGH CARPENTRY SECTION 064116 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS SECTION 066116 SOLID SURFACING FABRICATIONS DIVISION 7 - THERMAL AND MOISTURE PROTECTION SECTION 071113 BITUMINOUS DAMPPROOFING SECTION 077253 SNOW GUARDS SECTION 079200 JOINT SEALANTS DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING SECTION 230500 COMMON WORK RESULTS FOR MECHANICAL SECTION 230507 MOTORS, DRIVES, MOTOR CONTROLLERS AND ELECTRICAL REQUIREMENTS FOR MECHANICAL EQUIPMENT SECTION 230509 MECHANICAL FIRE STOPPING SECTION 230529 HANGERS AND SUPPORTS FOR MECHANICAL PIPING & EQUIPMENT SECTION 230533 HEAT TRACING FOR MECHANICAL PIPING SECTION 230593 TESTING, ADJUSTING AND BALANCING FOR MECHANICAL SYSTEMS SECTION 230700 INSULATION FOR MECHANICAL SYSTEMS SECTION 233113 METAL DUCTS SECTION 233300 AIR DUCT ACCESSORIES SECTION 233319 DUCT SILENCERS SECTION 233400 HVAC FANS SECTION 233713 DIFFUSERS, REGISTERS & GRILLES SECTION 235400 FURNACES DIVISION 26 – ELECTRICAL SECTION 260500 COMMON WORK RESULTS FOR ELECTRICAL SECTION 260519 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES SECTION 260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS SECTION 260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 260533 RACEWAY AND WIREWAY FOR ELECTRICAL SYSTEMS SECTION 260534 CABINETS, BOXES AND FITTINGS SECTION 260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS SECTION 260583 WIRING CONNECTIONS SECTION 260923 LIGHTING CONTROL DEVICES SECTION 262416 PANELBOARDS SECTION 262726 WIRING DEVICES SECTION 262800 LOW VOLTAGE CIRCUIT PROTECTIVE DEVICES SECTION 265000 LIGHTING DIVISIONS 28 – 33 NOT APPLICABLE ADDENDA ADDENDUM #1 DATED JUNE 23, 2021 2 PAGES ADDENDUM #2 DATED JULY 8, 2021 18 PAGES        McCall Parks and Recreation Building Relocation Exhibit D Page 1 of 1 EXHIBIT D ASSUMPTIONS AND CLARIFICATIONS Attached hereto and made a part thereof 1. Due to the volatility of the steel market, the Pre-Engineered Metal Building supplier will not hold or guarantee their price until the building Shop Drawings have been reviewed by the Design Team and Building Department and approved for fabrication. A small allowance of $20,000 has been included for steel price increases but any increase beyond that, will need to be accounted for in a future Change Order. 2. Bid Package # 1 – Earthwork: The low bid is incomplete. CM Company recommends awarding to the second bidder, Granite Excavation. 3. Only specific Bid Packages are being awarded and therefore included in this GMP at this time. Remaining Bid Packages will either be awarded at a later date or –rebid in accordance with public bid laws. See Exhibit B - Schedule of Values for list of included subcontracts. 4. Temporary fencing of the site is not included at this time. 5. An allowance is being carried for Temporary Heat if required by weather at the time of installation in the amount of $3,500 6. An allowance is being carried for Weather Protection to cover and protect the area of work from inclement weather conditions if required in the amount of $6,000