Loading...
HomeMy Public PortalAboutResolution No. 081-97 09-23-1997 RESOLUTION NO. 81-97 • STATEMENT EXPRESSING OFFICIAL INTENT TO REIMBURSE COSTS OF THE SEWER SYSTEM PROJECT WHEREAS, the City of Richland Hills, Texas (the "Issuer") is a municipal corporation organized and existing under the laws of the State of Texas; WHEREAS, the Issuer expects to pay expenditures in connection with the design, planning, acquisition and construction of the project described on Exhibit "A" hereto (the "Project") prior to the issuance of obligations to finance the Project; WHEREAS, the Issuer finds, considers, and declares that the reimbursement of the Issuer for the payment of such expenditures will be appropriate and consistent with the lawful objectives of the Issuer and, as such, chooses to declare its intention, in accordance with the provisions of Section 1.150-2 of the Treasury Regulations, to reimburse itself for such payments at such time as it issues obligations to finance the Project; THEREFORE, BE IT RESOLVED BY THEY CITY COUNCIL OF THE CITY OF RICHLAND HILLS, TEXAS, THAT: Section 1. The Issuer reasonably expects to incur debt, as one or more series of obligations, with an aggregate maximum principal amount not to exceed, $4,000,000 for the purpose of paying • the costs of the Project. Section 2. All costs to be reimbursed pursuant hereto will be capital expenditures. No tax- exempt obligations will be issued by the Issuer in furtherance of this Statement after a date which is later than 18 months after the later of (1) the date the expenditures are paid or (2) the date on which the property, with respect to which such expenditures were made, is placed in service. Section 3. The foregoing notwithstanding, no tax-exempt obligation will be issued pursuant to this Statement more than three years after the date any expenditure which is to be reimbursed is paid. Date: September 23, 1997 c~'' y. ~ rr+ . Authorized Representative : ~ ~ C. F. Kelley, Mayor ~ a~ ~ e ~ • . Exhibit "A" In February, 1996, the City of Richland Hills was placed under an administrative order from the Environmental Protection Agency. The City's wastewater system does not meet EPA requirements. Defects in the systems were identified in a report from a consulting engineer study. This report was submitted to EPA. The scope of work to be accomplished under this administrative order includes the following: 1. New manholes must be added where the distance is too far between existing manholes. 2. Existing manholes must be rehabilitated where storm water and ground water infiltrates into the system. 3. Private service lines must be repaired to prevent infiltration. 4. Existing wastewater mains must be repaired where infiltration occurs. • 5. Additional sewer maintenance equipment and confined space entry equipment must be purchased in order to comply with EPA standards. 6. The City must purchase and monitor flow meters within the system in order to detect infiltration. 7. Existing wastewater mains that are too small must be replaced with larger lines. • Table 20. Total S stem Rehabilitation Method Cost Summar Rehabilitation Cost Summary Rehab No. Rehabilitation Method No. of Units Unit Cost Total Cost 1000 Locate and Expose MH 60 EA $100 $6,000 1001 Locate MH and Raise Casting to Grade 5 EA $400 $2,000 1002 Clean MH -Could Not Inspect 3 EA $100 $300 1010 Install MH Insert 5 EA $100 $500 1020 Realign and Grout Casting 25 EA $350 $8,750 1022 Replace Casting (Frame and Lid) 2 EA $450 $900 1024 Replace Casting (Lid Only) 1 EA $150 $150 1040 Clean MH, Repair as Needed & Coat 153 VF $70 $10,728 1042 Clean MH Bottom, Stop I/I, Repair as Needed & Coat to 1' 13 EA $200 $2,600 Above Pipe Crown 1050 Stop I/I, Clean, Repair as Needed & Coat Entire MH 542 VF $75 $40,635 1052 Clean MH Bottom, Stop I/I, Repair as Needed & Coat to 1' S8 EA $250 $14,500 Above Pipe Crown 1060 Remove roots, Clean MH, Repair as Needed & Coat Entire 101 VF $80 $8,069 MH 1062 Clean MH Bottom, Remove Roots, Repair as Needed & 5 EA $300 $1,500 Coat to 1' Above Pipe Crown 1110 Construct /Reconstruct MH Invert 8 EA $350 $2,800 1210 Structurally Repair and Coat Entire MH 55 EA $150 $8,250 1998 Install Manhole 33 EA $2,000 $66,000 1999 Install Clean Out 39 EA $300 $11,700 3330 Replace Missing Cleanout Cap on Private Service Line 66 EA $50 $3,300 3340 Repair Broken Cleanout on Service Line 18 EA $250 $4,500 3360 Point Repair on Service Line 26 EA $450 $11,700 3400 Replace Section of Service Line 6 EA $600 53,600 4330 Replace Missing Cleanout Cap on Main Line 2 EA $50 $100 4350 Disconnect Abandoned Service Line 1 EA $450 S450 4360 Point Repair on Mainline or Municipal Service Line 193 EA Varies 5202,500 4370 Point Repair under Pvmt. on Mainline or Municipal Service 133 EA Varies $165,900 Line 4392 TV Line, Dye Test and Disconnect Storm Line on Mainline 3 EA Varies $4,400 Under Pvmt. 4510 Clean Line & Install Cured-In-Place Liner 2,209 EA Varies $115,379 4515 Open Service Connections to CIP Liner 13 EA $250 $3,250 4530 Clean Line & Install Liner By Pipe Bursting 4,677 EA Varies $282,540 4535 Open Service Connections to PB Liner 41 EA Varies $33,850 4999 Recommended Capacity Increases 1 LS $1,856,416 $1,856,415 5000 Clean Line Segment 13,159 LF $1 $16,449 5001 Sewer Maintenance Equipment 1 EA $170,000 $170,000 5002 Confined Space Entry Equipment 1 LS $4,955 $4,955 5003 Flow Monitoring Meters 1 LS $211,993 $211,993 TOTAL COST $3,276,661 CONTINGENCY $327,666 ENGINEERING AND INSPECTION $540,649 TOTAL ESTIMATED RECOMMENDED REPAIR COST $4,144,977 i 50