Loading...
HomeMy Public PortalAbout2002-09 Approving and Authorizing the Construction of Phase 2 Site for the Civic CenterRESOLUTION NO. 2002-9 A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF KEY BISCAYNE, FLORIDA; APPROVING THE GUARANTEED MAXIMUM PRICE (GMP) AND AUTHORIZING THE CONSTRUCTION OF PHASE 2 SITE AND SITE INFRASTRUCTURE WORK FOR THE CIVIC CENTER; PROVIDING THAT THE SPENDING AUTHORITY AS SET FORTH IN THE VILLAGE'S AGREEMENT WITH THE STATE OF FLORIDA DEPARTMENT OF MANAGEMENT SERVICES IS AMENDED TO CORRESPOND WITH THE GUARANTEED MAXIMUM PRICE OF THE SITE AND SITE AND SITE INFRASTRUCTURE WORK; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the Agreement between the Village and James A. Cummings Inc. provides for the establishment of a Guaranteed Maximum Price (GMP) for the Civic Center buildings and related infrastructure; and WHEREAS, on January 29, 2002 the Village Council approved Resolution No. 2002-2 which authorized the expenditure of funds and commencement of construction for work that is below grade; and WHEREAS, it now necessary to complete work that is above grade and approve the attached Guaranteed Maximum Price (GMP) for Phase 2 of the Site and Site Infrastructure work in order to provide for pedestrian and vehicular access to the Administration/Police Building and Fire Station that is required for the CF < <ificate of Occupancy; and WHEREAS it is now necessary to approve Phase 2 of the Site and Site Infrastructure work that is associated for the lighting, irrigation, streets, and related work as set forth in the attached Guaranteed Maximum Price (GMP), which it is necessary to provide ; and WHEREAS, it is the opinion of the Village Attorney that, Village Green Way from McIntyre Street north to the traffic circle and Village Green Way from the traffic circle must be connected to that portion of Village Green Way which was built by SunTrust Bank and is required to be constructed pursuant to the terms and conditions that were set forth in the Declaration of Easements, Covenants, and Restrictions that are part of the purchase and sale agreement between the Village and SunTrust Bank; and WHEREAS, James A. Cummings Inc. has submitted the attached Guaranteed Maximum Price (GMP) which completes the infrastructure for Phase 2 of the Site and Site Infrastructure Work for the Civic Center. 1 NOW, THEREFORE BE IT RESOLVED BY THE VILLAGE COUNCIL OF THE VILLAGE OF KEY BISCAYNE, FLORIDA AS FOLLOWS: Section 1. Recitals. Each of the above recitals is adopted and confirmed Section 2. GMP. That Guaranteed Maximum Price (GMP), as set forth in the attached February 8, 2002 report from James A. Cummings, Inc. for the Phase 2 Site and Site Infrastructure Work (the "Work) is hereby approved for locations shown in the attached illustration and at prices indicated below: 1. Areas 1, 2, 3, and 5 at a price of $1,433,035: Construction shall not begin on that portion of Area 1 on McIntyre Street from Fernwood Road to Crandon Boulevard and along the Crandon Boulevard right of way until the Village obtains permits for the work in the Miami -Dade County right of way along Crandon Boulevard. 2. Areas 4 and 6 at a price of $365,138. This work will commence at the time the Village Council authorizes the construction of the Recreation Center. 3. The 32 parking spaces along Fernwood Road (15 spaces) and McIntyre Street (17 spaces, including 3 handicap) will be removed from the plans and replaced with landscaping. However, the design of this landscaped area shall accommodate the construction of parking spaces parking spaces should the Council wish to proceed in this manner. It is acknowledged that the removal of 32 parking spaces will have a negative impact on traffic, circulation and be an inconvenience to citizens. Further, that there will be insufficient parking spaces to meet the Civic Center parking requirements if they are not replaced in or within close proximity of the Civic Center. Prior to the demolition of present Village Hall and the parking spaces on that site, the Village Council shall develop a plan that will address the 32 parking space deficit. Section 3. GMP Plans. That the Guaranteed Maximum Price (GMP) for the work referenced in Section 2 above is based on the attached plans (the "Plans) prepared by Spillis Candela DMJM for the Phase 2 Site and Site Infrastructure Work, which is hereby approved. Section 4. Construction Authorized. That the Village Manager is hereby directed to proceed with the construction work as described in Section 2 and 3 above; however, the construction of work that is above grade in the McIntyre Street and Crandon Boulevard right of way shall not commence until such time as Miami -Dade County has approved the permits for such work. Section 5. DMS Authority; Agreement Amended. That the spending authority as set forth in the Village's Agreement with the State of Florida Department of Management Services is hereby amended to correspond with the Guaranteed Maximum Price (GMP) for the above described Work in accordance with the contract amendments attached thereto. 2 Section 6. Authority. That the Village Manager and the Village Attorney are authorized to take any and all action necessary to implement this Resolution. Section 7. That this resolution shall take effect immediately upon adoption. PASSED AND ADOPTED this 12th day of February , 2002. MAYOR JOE I. RASCO ITA H. ALVAREZ, CMC, VILLAGE CLE APPROVED AS TO FORM AND LEGAL SUFFICIEN fl RIC ARD JAY WEISS, VILLAGE ATTORNEY 3 VILLAGE OF KEY BISCAYNE VILLAGE CIVIC CENTER SITE & SITE INFRASTRUCTURE WORK GUARANTEED MAXIMUM PRICE FEBRUARY 8, 2002 C * ummmgs U° 1 James A. Cummings, Inc. 3575 Northwest 53rd Street Fort Lauderdale, FL 33309 fill: lmmincis Gel ,vial Contractors February 8, 2002 Village of Key Biscayne 85 West McIntyre Street Key Biscayne, Florida 33149 Attn: Mr. Sam Kissinger, Village Manager Re: Village Civic Center, Site & Site Infrastructure Work (Without FP&L Costs) Guaranteed Maximum Price Proposal - 100% Construction Documents Dear Mr. Kissinger, Phone: 954-733-4211 Fax: 954-485-9688 Website: www.jamesacummings.com Our Guaranteed Maximum Price Proposal based on the 100% Construction Documents for the Village Civic Center, Phases 1,2,3 and 5 Site & Site Infrastructure Work is $1,433,035.00 and our Guaranteed Maximum Price Proposal for Phases 4 and 6 is $365,138.00. Enclosed herewith please find the GMP Cost Summary, the List of Documents upon which this Estimate is based; the proposed Schedule and the Description of Work including the Qualifications and Clarifications which apply to the combined phases GMP as well as the separate phase estimates. Very truly yours, JAMES A CUMMINGS, IN Alan J. Rosenblum Chief Estimator cc: Jud Kurlancheek Ralph Martinez James A. Cummings William R Derrer Michael F. Lanciault Rob Maphis Scott Pate Raul Lastra Nina Gladstone Roberto Lage Robert Currie VILLAGE OF , SCAYNE VILLAGE OF KEY BISCAYNE SITE & SITE INFRASTRUCTURE ARCHITECT: BPILLIS CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY 8, 2002 PHASES 1,2,3 & 8 WITHOUT PP&L AND SOUTHERN BELL TOTAL AREA 102,000 8F ITEM -- 1 SECTION DESCRIPTION MATERIAL LABOR SUB TOTAL SUBCONTRACTORS NAME GRAND TOTAL *18F GENERAL CONDITIONS SEE WINDOW EXTEND PROJECT TWO AND A HALF MONTHS FOR INFRASTRUCTURE WOI NOTE: WORK FROM ORANDON BLVD 198' WEST ALONG NORTH VILLAGE GREEN WAY IS NOT INCLUDED AND SHALL BE PROVIDED BY OTHERS 00320 (SPIL) SOIL INVESTIGATION DATA REPORT BY K&B N0 SPEC COORDINATION DRAWINOS NO SPEC PIELD ENGINEERING FINAL SURVEY NO SPEC OWNER ALLOWANCES • PURNISHIINSTALL COMPLETE 1.ON•SITE LANDBOAPINO/SODIIRRIOATION 2. FOUNTAIN AT WEST MCINTYRE STREET 8. FEATURE COLUMNS • 8 EACH 4. TRAFFIC CIRCLE AROHITEOTURAL ELEMENT 8. PARK GAZEBO 1. TRELLIS 7. ARCHITECTURAL PRECAST 8. MISO. SPECIALTIES II. COMMUNICATION DUCT BANKS BETWEEN SLOGS 10. POLICE SECURITY CONDUIT 11. FIRE SECURITY CONDUIT 12. PLORIDA POWER & LIOHT AND SOUTHERN BELL N0 RIO CONSTRUCTION PHOTOGRAPHS N0 SPEC QUALITY CONTROL SY OWNER 2 NO SPEC MAINTENANCE OP TRAFFIC ORWOS. TEMPORARY 1,1110111 DRWGS. BARRICADES DRWOS. PLASTIC DRUMS ORWOS. SI0NA0E DRWOS. WARNING LIGHTS A PLASHERS DRWOS. ALL SIONAOE 1 BARRICADES PER FOOT SPEC MAINTENANCE OF NONAGE A BARRICADES $ 02000 (SPIL) DEMOLITION, REMOVALS AND RELOCATION 1.3 COORDINATION 1.4A PROTECT EXISTING TO REMAIN .B ENVIORNMENTAL PROTECTION 1.8 TRAFFIC MAINTENANCE 3r4 PILL HOLES AND HAZARDOUS OPENINGS 3.8 REMOVE MATERIALS AND DEBRIS PROM SITE 02/0812002 03:29 PM o 0 0 0 0 40,980 0 0 0 0 0 0 0 48,880 JAC 0 31 IN BEPERATE OMP FOR DUCT BANK & WATER MAIN 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7,400 7,400 0 0 8,140 8,140 0 0 0 0 0 0 0 0 0 0 196,000 196,000 NIC NIC NIC NIO NIO NIC NIO NIC NIC NIO NIC MO NIC NIC NIC N10 NIO NIC NIC NIC N10 NIC NIC NIC NIO NIC NIC NIO 0 0 0 0 0 0 0 0 0 NIO NIC NIC N10 0 0 0 0 0 0 IN GC'8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 72,300 72,300 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3L IN 8EPERATE 0 ?L IN BEPERATE 0 3L IN BEPERATE JAC JAC/BALANCE IN SITEWORK JAO/WAG NOT INCLJSEE BELOW NOT INCL./SEE BELOW NOT INCL./SEE BELOW NOT INCL./SEE BELOW NOT INCL./SEE BELOW NOT INCLJ88E BELOW NOT INCLJSEE BELOW OMP FOR DUCT BANK & WATER MAIN OMP FOR DUCT BANK & WATER MAIN OMP FOR DUCT BANK & WATER MAIN NOT INCL./SEE BELOW INCLUDED IN GENERAL CONDITIONS NIC- BY OWNER INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK WILDCAT BONDED INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED 0 0.00 49,580 0.49 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 7,400 0.07 8,140 0.00 0 0.00 0 0.00 196,000 1.91 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 72,300 0.71 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 JAMES A. CUMMINGS, INC. 1 VILLAGE OF KEY BISCAYNE VILLAGE OF KEY BISCAYNE SITE & SITE INFRASTRUCTURE ARCHITECT: SPILL'S CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY 1, 2002 PHASES 1,2,3 & 3 WITHOUT PP&L AND SOUTHERN BELL TOTAL AREA 102,000 SF ITEM SECTION 3.0 DRWGS. DRWO$. DRIVE'S. DRWOS. DIMS. DIMS. DRWOS. ORWOS. DRWOS. DRWOS. DESCRIPTION SALVABLE MATERIALS REMOVE EXISTING BANK/BUILDING DEPARTMENT BUILDING REMOVE EXISTING ELM. oft SOUTH 310E OP SITE REMOVE SITE WALLS & FOOTINGS REMOVE SIDEWALKS REMOVE PP&L LIGHT POLES REMOVE PP&L POWER POLES & PULL BOXES RELOCATE PP&L POWER POLES & PULL BOXES SURFACE DEMOLITION $AWOUTTINO EXISTING ASPHALT REMOVE ASPHALT SURFACE & BASE 4 02220 (SPIL) EARTHWORK 1.1.0.1 PROTECT EXISTING STRUCTURES & PROPERTY .2 3.2 3.3 DRWOE. DRWOS. 3.4.A .0 .0 3.1 A 3.5 3.7 3.5 2.5 1.10 3.11 PROTECT EXISTING STREETS & SIDEWALKS LAYOUT A AS-BUILTS CLEARING & GRUBBING REMOVE EXISTING TRIES RELOCATE EXISTING TRIES REMOVE & DISPOSE OP SURFACE LITTER & DEBRIS STRIP & STOCKPILE TOPSOIL REMOVE TOP 2' OF SOIL WITHIN CONSTRUCTION AREA DISPOSAL OF UNSUITABLE MATERIAL SRI PILLING 1 OOMPACTION PROOF ROLL OUT SURFACE EXCAVATION FOR STRUCTURIS BAOKPILL AND COMPACTING DISPOSE OF EXCESS MATERIALS DEWATIRINO(NO CONC. PLACID IN WATER) TESTING IY OWNER PREPARATION FOR TOPSOIL I 02011 (SPIL) ASPHALTIC CONCRETE PAVING 2.1 SUBORADE STAIILIZATION 12" 2.2 BASE COURSE UMIROCK 1r 2.3 PRIME & TACK COATS 2.4 ASPHALTIC CONCRETE 1 1I2" TYPE S 3.2 TESTING BY OWNER PAVEMENT RESTORATION DRWOS, NEW MEDIAN OUT AT CRANDON BLVD. DRW08. MODIFY EXISTING MEDIAN CUT AT CRANDON BLVD. NO SPEC PORTLAND CEMENT CONCRETE PAVING 02114 (SPML) COMO. SIDEWALKS, CURBS, CURBS & GUTTERS & WHEEL STOPS 3.1 CONCRETE SIDEWALKS 3.2 CURBS 3.3 CURBS & GUTTERS MATERIAL NIC NIC NIC NIC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 LABOR 1410 NIC NIC NI0 SUB 0 0 0 0 0 0 0 0 0 0 NIC NIC NIC 0 0 0 0 0 0 0 0 0 384,480 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL 0 0 0 0 0 NIC NIC NIC 0 0 0 0 384,480 0 0 0 0 0 0 0 0 0 0 0 0 1410 0 0 0 0 0 0 0 0 0 0 0 0 SUBCONTRACTORS NAME NONE SHOWN' NONE INCLUDED NOT INCLUDED INCLUDED INCLUDED INCLUDED NOT INCL./SEE BELOW NOT INCLJSEE BELOW NOT INCLJSEE BELOW INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK METRO ENOINIIRINO INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED NIC - BY OWNER INCLUDED INCLUDED INCLUDED NOT INCLUDED INCLUDED INCLUDED NOT INCL./SIN BELOW INCLUDED INCLUDED INCLUDED NIC - BY OWNER INCLUDED INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK NIC • BY OWNER 0 31. IN SEPERATE GMP FOR DUCT BANK & WATER MAIN 0 INCLUDED IN EARTHWORK 0 INCLUDED IN EARTHWORK 0 NONE SHOWN/ 140N! INCLUDED 0 INCLUDED IN EARTHWORK & BITE CONCRETE 0 INCLUDED IN SITE CONCRETE 0 INCLUDED IN EARTHWORK 0 INCLUDED IN EARTHWORK QRAND TOTAL sg3F 0 0.00 0 0.00 0 0.00 o o.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 384,400 3.77 0 0.00 0 0.00 0 0,00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0,00 0 0.00 0 0.00 02/08/2002 PM JAMES P MINGS, INC. 2 VILLAGE OF t .ISCAYNE VILLAGE OF KEY BISCAYNE SITE & SITE INFRASTRUCTURE ARCHITECT: !WILLIS CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY 8, 2002 PHASES 1,2,3 & 1 WITHOUT PP&L AND SOUTHERN BELL TOTAL AREA 102,000 SF ITEM _ SECTION DESCRIPTION MATERIAL LABOR SUB TOTAL SUBCONTRACTORS NAME GRAND TOTAL 8181' 3A DRWOS DRWOS DM* DAMPS ORME TESTING SY OWNER 8' CONCRETE BASE FOR PAVERS AT PIRESTATION CURB CUT 4° CONCRETE SIDEWALKS ir & 24' WIDE CONORITI SANDS COLORED CONC. AT OURS*, GUTTERS, SIDEWALKS & BANDS CURBS AT TRIM GRATIS SEE SITE CONCRETE WINDOW 02880 (SPIL) PAVEMENT MARKING 1.3 PER FD01' SPECIFICATIONS 3,S SPARE PAINT NO SPEC. SITE SIONAOE NO SPEC. TRAFFIC $IONALIZATION 0 02222 (SPIL) EXCAVATION, BAOKPN.LING AND COMPACTING FOR UTILITES 1.8.1140 PROTECT EXISTING UTILITIES, SIDEWALKS & STREETS HAND EXCAVATION 3.1.A DEWATERING .0 REMOVE UNSATISFACTORY SOIL 3.0 TESTING BY OWNER 0200 WATER DISTRIBUTION 1.S.A.1 WATER METERS .2 TAP TO THE EXISTING LINES .0 METER DEPOSITS & SERVICE CONNECTION CHARGES BY OWNER 2.1.A DUOTILI IRON WI CEMENT MORTAR LINING 2.2 JOINTS 2.3 FITTINGS & SPECIAL ITEMS 2.4 VALVES 2.8 OAST IRON VALVE BOXES 2.8 FIRE HYDRANTS 2.7A DISINFECTION 3.2 COPPER PIPING FOR WATER SERVICE LINES 3' OR LISS 3.3 DUCTILE MON PIPING FOR WATER SERVICE LINES 4` OR LARGER 8.10 THRUST BLOCKS 8,11+10 TESTING BY CONTRACTOR 8.12+10 DISINFECTION & OONNEOTWN TO EXIST. WATER MAINS BAOKFLOW PRIVENTORS & DDOV'S DRWG$ ADJUST EXISTING WATER METER VAULT DRW08 REMOVE EXISTING WATER MITER VAULTS DRWGS OAP EXISTING WATER LINES PROVIDE WATER SERVICE TO FOUNTAIN PROVIDE WATER SERVICE TO IRRIGATION 02720 STORM DRAINAGE SYSTEM 2.1.A CORRUGATED ALUMINUM PIPE .B CORRUGATED STEEL PIPE WI BITUMINOUS COATING 2.2 DRAINAGE STRUCTURES 2.344 BALLAST ROCK & PLASTIC FILTER FABRIC 0 0 0 0 0 0 28,903 0 0 0 0 0 0 0 0 0 0 27,020 0 0 0 0 NO BID NO BID 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC 0 0 0 0 0 NIC 0 0 0 0 0 0 0 0 0 0 0 8,886 0 0 0 0 NO BID 0 128,088 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC 0 0 0 0 0 0 NIC - BY OWNER 0 INCLUDED IN SITE CONCRETE 0 INCLUDED 114 SITE CONCRETE 0 INCLUDED IN SITE CONCRETE 0 INCLUDED IN EARTHWORK & SITE CONCRETE 0 INCLUDED IN SITE CONCRETE 68,818 0 0 0 0 0 0 JAC INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK NOT INCLUDED BY OWNER 128,008 MEOATRAN/ BONDED 0 INCLUDED 0 INCLUDED 0 INCLUDED 0 NOTINOLUDED 0 NIC - BY OWNER 0 31 IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 NIC - BY OWNER 0 3L IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 NIC - BY OWNER 0 3L IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 31 IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 3L IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 3L IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 31. IN SEPERATE GMP FOR DUCT BANK & WATER MAIN 0 31.114 SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 3L IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 31. IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 31.114 SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 3L IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 3L IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 31. IN SEPERATE OMP FOR DUCT BANK & WATER MAIN O NONE SHOWN/NONE INCLUDED 0 3L IN BEPERATI OMP FOR DUCT BANK & WATER MAIN 0 3L IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 3L IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 NOT REQUIRED/ NOT INCLUDED NIC NOT INCLJSEI BELOW 0 INCLUDED O INCLUDED 0 INCLUDED O INCLUDED 0 INCLUDED O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 36,304 0.80 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 128,083 1.28 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0,00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 02/08/2002 03:29 PM JAMES A. CUMMINGS, INC. 3 VILLAGE OF KEY BISCAYNE VILLAGE OF KEY BISCAYNI BITE a SITE INFRASTRUCTURE ARCHITECT: BPILLIS CANDELA DMJM OMP PROPOSAL DATE: FEBRUARYS, 2002 PHASES 1,2,3 & 8 WITHOUT PP&L AND SOUTHERN BELL TOTAL AREA 102,000 SF ITEM SECTION DESCRIPTION MATERIAL LABOR SUB TOTAL SUBCONTRACTORS NAME RAND TOTAU 3181' 3.1 3.3 DRWGS. DRWGS. DRWGS. DRWOS. DRWGS. DRWGS. NO SPEC 7 02317 2.1 2A 2A JA 3.3.A .D .1 3.4.E .D .EEO 3.3 DRW0$. DRWGS. DRWGS. DRWGS. DRWGS. DRWGS. S NO SPED DRWOS. DRWOS. DRWOS. DRWGS. DRWOS. DRWOS. NO SPEC DRWOS. DRWGS. NO RIO 02/08/2001 J PM EXFILTRATION TRENCH TESTING BY CONTRACTOR ADJUST EXISTING CATCH BASINS TO REMAIN OAP EXISTING STORM SEWER REMOVE EXISTING CATCH BASINS AND ASSOCIATED PIPING REMOVE EXISTING TRENCH DRAIN REMOVE EXISTING FRAME a GRATE AND PROVIDE NEW EXPILTRATION TRENCH TO 13' BELOW SXISro GROUND ELEV. SANITARY SEWER SYSTEM PIPE, FITTINGS a MANHOLES TESTING a INSPECTION SY CONTRACTOR SANITARY SEWER FOR FOUNTAIN SOLID INTERLOCKING OONO. PAVERS S 1111" THICK KEY SHAPE & REOTANG. AT EDGES EDGE RESTRAINTS SAND LAYING COURSE 1" SAND FOR JOINTS OUT PAVERS WITH MASONRY SAW TOLERANOIr 1132" OFFSET a 1/3" IN 10' FROM LEVEL EXPANSION a CONTROL JOINTS . SEALANT FILLED SOIL STERILIZER VIBRATE CONC. PAVERS INTO LEVELING COURSE SAND FILL AT JOINTS REPAIR, CLEANING a PROTECTION CONCRETE PAVER ROADWAYS CONCRETE PAVER PARKING AREAS OONORIICTE PAVER SIDEWALKS COLORED PAVERS FOR TRAFFIC MARKINGS 12" STABLIZED SUE -GRADE r OR r LIMEROOK BASE ON SITE CONCRETE PAVERS AT FIRE AND POLICE LANDSCAPING PLANT MATERIAL FLA NO.1 OR BETTER MULCH WEED CONTROL PASRIO TREE RELOOATION MAINTENANCE UNTIL FINAL ACCEPTANCE GUARANTEE • 1 YEAR FROM ACCEPTANCE SODDING CERTIFIED TURPGRABS-BT. AUGUSTINE OR KENTUCKY BLUE PLASTIC EDGING 1" PLANTING SOIL UNDER ALL SOD GUARANTEE ■ 8 MONTHS FROM COMPLETION IRRIGATION 0 0 0 0 INCLUDED 0 0 0 0 INCLUDED 0 0 0 0 INCLUDED 0 0 0 0 INCLUDED 0 0 0 0 INCLUDED 0 0 0 0 INCLUDED 0 0 0 0 INCLUDED 0 0 0 0 INCLUDED 0 0 0 0 ICLUDED IN 8EPERATE OMP FOR ADMIN/POLICE BLDG 0 0 0 0 10LUDED IN 8EPERATE OMP FOR ADMIN/POLICE BLDG 0 0 0 0 ICLUDED IN SEPERATI OMP FOR ADMINIPOLICE BLDG NIC NIC NIC NIC NOT INCLJBEE BELOW 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 183,808 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 183,808 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 HOLLYWOOD STONE/ BONDED INCLUDED AS 2-3/3" RECTANGULAR INCL INCL INCL INCL INOL NOT REQUIRED/ NOT INCLUDED INCL INCL INCL INCL INCL INCL INCL INCL INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE NIC - BY OWNER INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED 1/4 OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 o o.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 183,808 1.61 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 JAMES A MINGS, INC. 4 VILLAGE OF ISCAYNE VILLAGE OP KEY BISCAYN■ SITE 0 ORE INFRASTRUCTURE ARCHITECT: SPILL'S CANDELA DMJM GMP PROPOSAL DATE: FEBRUARY 8, 2002 PHASES 1,2,3 6: 8 WITHOUT PP&L AND SOUTHERN BELL TOTAL AREA 102,000 SF ITEM SECTION DRWO&. DRWOS. DRWOS. DESCRIPTION MATERIAL LABOR SUB TOTAL SUBCONTRACTORS NAME ()RAND TOTAL $18P BAOKPLOW PREVENTER WATER METER HOSE B1BS FOR MANUAL WATERING CONTROL WIRING S NO SPEC CONCRETE REINFORCEMENT, NON-STRUOTURAL WELDED WIRE MESH MATERIAL WELDED WIRE MESH LABOR NO RIO AROHITEOTURAL PRECAST CONCRETE DRWGS. CONCRETE BOLLARDS 10 NO SPEC DRWOS. DRWGS. METAL FABRICATIONS TREE GRATES PIPE BOLLARDS 11 DN.10 MISC. SPECIALTIES DRWOS. FLAGPOLES 12 DN 11 MECHANICAL DISCONNECT PLUMBING & MAKI SAFE FOR DEMOLITION REMOVE FREON & MAKI SAFE FOR DEMOLITION 16 DN.18 DRWOS. DRWOS. DRWOS. DRWOS. DRWOS. DRWOS. DRWGS. DRW011. DRWOS. DRWGS. DRWOS. DRWOS. DRWOS. DRWOS. DRWOS. DRWOS. DRWOS. DRWOS. DRWOS. DRWOS. DRWOS. DRWOS. ELECTRICAL ELECTRICAL DUCT BANK COMMUNICATION DUCT BANK TELEPHONE 0 GABLE TV DUCT BANK PP&L MANHOLES • FURNISHED SY FP&L INSTALLED BY CONTRACTOR PP&L CONDUIT • FURNISHED BY PP&L INSTALLED BY CONTRACTOR BELLSOUTH MANHOLES. PURN. 0 INSTALL BY CONTRACTOR COMMUNICATION MANHOLES- PURN. & INSTALL BY CONTRACTOR WATERPROOFING OP MANHOLES PP&L POWER POLES • 1110 TEMPORARY PP&L POWER POLES • NIC PP&L CONDUCTORS & CABLES • NIC PAD MOUNTED TRANSFORMERS • NI0 STREET LIGHTING PLANTER LIOHTINO PRECAST LIOHTPOLE BASES TO MEET WIND LOADING REQ. CONCRETE EQUIPMENT PADS PEER REINFORCED PLASTIC ENCLOSURES RELOCATE EXIST'S LIGHT POLES 6; LIGHT POLE PULL BOXES • NIC REMOVE EXISTING PPAL LIGHT POLES a PULL BOXES - NIO REMOVE EXISTING PP&L OVERHEAD POLE & POWER LINES • NIC CONNECTION TO FOUNTAIN PUMP & CONTROLLER ILLUMINATION TESTING SIGNED & SEALED BY PE 0 0 0 0 0 0 0 0 0 NIC NIC 0 0 36,448 1,200 0 NIC NIC NIC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC NIC 0 0 3,000 1,800 0 0 0 0 0 0 0 0 0 0 NIC NIC 0 0 0 1,076 0 0 0 0 0 0 0 0 0 0 NI0 NIC 0 0 38,448 4,070 0 NIC NIC NIC NIC NIC NI0 0 0 0 0 0 210 0 600 0 0 0 184,260 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC 0 NIC 0 INCLUDED IN OWNERS ALLOWANCE NIC - BY OWNER INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN SITE CONCRETE INCLUDED IN SITE CONCRETE INCLUDED IN SITE CONCRETE NOT INCLJSEE BELOW NOT INCLJ811 BELOW IRONSMITH/JAC DIXIE METALS/JAC NOT INCLJSEE BELOW NOT INCL./81E BELOW 0 0 260 JAC/ WAO 600 JAC/ WAG 0 164,260 PISK/ BONDED 0 3L IN SEPERATE OMP FOR DUCT BANK A WATER MAIN 0 :L IN SEPERATE OMP FOR DUCT BANK 0 WATER MAIN 0 3L IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 3L IN SEPERATE OMP FOR DUCT BANK 0 WATER MAIN 0 3L IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 31. IN SEPERATE OMP FOR DUCT BANK 0 WATER MAIN 0 3L IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 31. IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 NIC - BY OWNER 0 NIC BY OWNER O NIC BY OWNER 0 NIC • BY OWNER 0 INCLUDED O INCLUDED 0 INCLUDED 0 INCLUDED IN SITE CONCRETE 0 INCLUDED O NIC • SY OWNER 0 NIC - BY OWNER 0 NIC • BY OWNER NIC NOT INCLJSEE BELOW 0 INCLUDED 0 0.00 0 0.00 0 0.00 o o.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 43,872 0.43 6,387 0.06 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 260 0.00 600 0.00 0 0.00 164,260 1.81 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0,00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0,00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 02/08/2002 03:29 PM JAMES A. CUMMINGS, INC. 5 VILLAGE OF KEY BISCAYNE VILLAGE OF KEY BISCAYNE BITE & SITE INFRASTRUCTURE ARCHITECT: OPIUM CANDELA DMJM OMP PROPOSAL DATI: FEBRUARY 8, 2002 PHASES 1,2,3 & 6 WITHOUT PP&L AND SOUTHERN BELL TOTAL AREA 102,000 BF ITEM SECTION DESCRIPTION MATERIAL , LABOR Sus TOTAL SUBCONTRACTORS NAME GRAND TOTAL *18F CONNECTION TO IRRISATION CONTROLLER TEMPORARY ELECTRIC DISOONNICT EXISTING t MAKE SAFE FOR DEMOLITION MODIFY EXTENT OP RESTORATION BY ADDING SURFACE WORK TO UNDERO 0 0 0 0 0 0 0 0 0 0 0 0 0 (30,000) 0 0 o o 0 INCLUDED 0 INCLUDED 0 INCLUDED (30,000),EDIT TO OWNER ALLOWANCE IN UNDERGROUND OMP 0 0 0 0 0 (i0,000) 0 0 02/08/2002 PM OWNER ALLOWANCE 3,400 0.08 OWNER ALLOWANCE 7,400 0.07 14,710 0.14 0.00 1,300,248 1,300,248 12.78 0.00 DESIGN PHASE FEE NOT INCL. NOT INCL. 0.00 CONSTRUCTION PHASE FEE 82,330 82,330 0.81 EXTEND PROJECT TWO AND A HALF MONTHS FOR INPRASTRUOTURIE WORK 0 :L IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 0.00 0.00 1,382,878 1,382,878 13.36 0.00 CONSTRUCTION CONTINGENCY 16,000 16,000 0.16 0.00 1,377,878 1,377,878 13.61 0.00 OWNER CONTINGENCY 16,000 16,000 0.16 0.00 1,382,878 1,332,873 18.811 0.00 OVERHEAD & PROFIT 82,880 82,880 0.01 0.00 1,466,668 1,466,668 14.27 0.00 OWNER'S SALES TAX SAVINGS PROGRAM (22,623) (22,623) (0.22) SUBTOTAL CHECK SUBTOTAL SALES TAX 0.6% LABOR BURDEN OWNER'S PROTECTIVE LIABILITY INSURANCE BUILDER'S RISK INSURANCE PERMITS PERFORMANCE BOND SUBTOTAL SUBTOTAL 38,661 31,823 1,146,237 1,242,016 1,243,816 4,326 21,718 1,283,733 0 8,400 7,400 14,710 0.00 0.00 0.00 (0.28) 0.00 0.00 1,288,738 12.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,288,738 12.46 0.00 0 0.00 SUBTOTAL SUBTOTAL SUBTOTAL SUBTOTAL TOTAL 0.00 1,433,036 1,433,036 14.06 JAMES A 'RINGS, INC. 6 VILLAGE OF . ISCAYNE VILLAGE OF KEY BISCAYNE SITE & SITE INFRASTRUCTURE ARCHITECT: BPILLIS CANDELA DMJM MAP PROPOSAL DATE: FEBRUARY 8, 2002 PHASES 1,2,3 & 6 WITHOUT PP&L AND SOUTHERN BELL REM - SECTION DESCRIPTION THE FOLLOWING ITEMS OF WORK ARE SEPARATE OWNER ALLOWANCES WHICH ARE NOT INCLUDED IN THIS PROPOSAL AND WHICH DO NOT INCLUDE ANY CONSTRUCTION MANAGER'S MARK-UPS FOR PERMITS, TAXES, INSURANCE, BONDS, CONTINGENCIES AND OVERHEAD AND PROFIT. FOUNTAIN AT WEST MCINTYRE STREET FEATURE COLUMNS • $ EACH TRAFFIC CIRCLE ARCHITECTURAL ELEMENT PARK OAZEBO TRELLIS ARCHITECTURAL PRECAST MISC. SPECIALTIES FLORIDA POWER & LIGHT AND SOUTHERN BELL WORK PROVIDED BY OWNER TOTAL MATERIAL LABOR SUB TOTAL SUBCONTRACTORS NAME 80,000 OWNER ALLOWANCE NI0 • WORK BY OWNER 40,000 OWNER ALLOWANCE NI0 • WORK BY OWNER 126,000 OWNER ALLOWANCE N10 - WORK BY OWNER 26,000 OWNER ALLOWANCE NI0 • WORK BY OWNER 16,000 OWNER ALLOWANCE N10 - WORK BY OWNER 4,000 OWNER ALLOWANCE WIC • WORK BY OWNER 8,000 OWNER ALLOWANCE N10 - WORK BY OWNER 0 SEE ELECTRIC DUCT BANK & WATER MAIN OMP 276,000 GRAND TOTAL TOTAL AREA 102,000 SP 013P 02/08/2002 03:29 PM JAMES A. CUMMINGS, INC. VILLAGE OF KEY BISCAYNE VILLAGE OP KEY BISCAYNE SITE & SITE INFRASTRUCTURE ARCHITECT: SPILLIB CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY 0, 2002 THIS PROPOSAL 10 CONTINGENT UPON CUMMINGS CONSTRUCTING THE KEY BISCAYNE CIVIC RECREATION CENTER. IN THE EVENT CUMMINGS DOES NOT CONSTRUCT THE KEY BISCAYNE CIVIC RECREATION CENTER THIS PROPOSAL SHALL BE NULL & VOID PHASES 4 8.0 WITHOUT PP&L AND SOUTHERN BELL TOTAL AREA 102,000 SF ITVA 1 SECTION DESCRIPTION GENERAL CONDITIONS SEE WINDOW EXTEND PROJECT TWO AND A HALF MONTHS FOR INFRASTRUCTURE WOR NOTE: WORK FROM CRANDON BLVD 106' WEST ALONG NORTH VILLAGE GREEN WAY IS NOT INCLUDED AND SHALL BE PROVIDED BY OTHERS 003201SPILj SOIL INVESTIGATION DATA REPORT SY K&B NO SPED NO SPEO COORDINATION DRAWINGS PEILD ENGINEERING FINAL SURVEY NO SPEC OWNER ALLOWANCES • PURNISHNNSTALL OOMPLETE 1.ON-OITE LAN08CAPINOISODIIRRIGATION 2. FOUNTAIN AT WEST MOINTYRE STREET 3. FEATURE COLUMNS • 8 MOH 4. TRAFFIC CIRCLE ARCHITECTURAL ELEMENT 3. PARK GAZEBO 0. TRELLIS t. ARCHITECTURAL PRECAST 0. MISC. SPECIALTIES 0. COMMUNICATION DUCT BANKS BETWEEN 111.000 10. P0110E SECURITY CONDUIT 11. FIRE SECURITY CONDUCT 12. FLORIDA POWER & LIGHT AND SOUTHERN BELL NO SPEC OONBTRUOTION PHOTOGRAPHS NO SPEC QUALITY CONTROL SY OWNER 2 N0 SPEC MAINTENANCE OP TRAPPIC DRWGS. TIIMPORARY PENCE DRWG$. BARRICADES DRW08. PLASTIC DRUMS DIMS. NGNAOE DRWO$. WARNING LIGHTS 0 FLASHERS ORWGS. ALL SIONAGE & BARRICADES PER FOOT SPEC MAINTENANOE OF SIONAOE & BARRICADES S 02000 (SPIL) DEMOLITION, REMOVALS AND RELOCATION 12 COORDINATION 02/06/2002. ., PM MATERIAL NIO NIC NIC NIC NIC NIO NIO N10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 LABOR NIC NIC NIC NIC NIC NIC NIC SUB 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 2,800 O 2,800 0 0 0 0 0 30,000 NIC NIC N1C N1C NIC NIC NIC 0 0 0 0 0 0 TOTAL SUBCONTRACTORS NAME 0 0 INCLUDE IN REC. CENTER o ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 0 0 0 0 0 2,800 2,800 0 0 30,000 NIO NIC NIO NIC NIC NIC NIC NIC NIC NIC 0 0 0 IN CC'S 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 1,638 0 0 JAC JACIBALANCE IN SITEWORK' JAC/WAG NOT INCLJSEE BELOW NOT INCLJSEE BELOW NOT INCLJSEE BELOW NOT INCLJSEE BELOW NOT INCLJSEE BELOW NOT INCLJSEE BELOW NOT INCLJSEE BELOW 0 ICI. IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT RANK & WATER MAIN 0101.IN SEPERATE OMP FOR DUCT BANK & WATER MAIN NOT INCLJSEE BELOW 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,638 0 INCLUDED IN GENERAL CONDITIONS N10- BY OWNER INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK WILDCAT BONDED INCLUDED GRAND TOTAL 3/SF 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 2,000 0.03 2,800 0.03 0 0.00 0 0.00 30,000 0.25 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 1,638 0.02 O 0.00 JAMES A AINGS, INC. 1 VILLAGE OF . .ISCAYNE VILLAGE OP KEY BISCAYNE SITE & SITE INFRASTRUCTURE ARCHITECT: SPILL'S CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY 8, 2002 THIS PROPOSAL IS CONTINGENT UPON CUMMINGS CONSTRUCTING THE KEY BIBCAYNE CIVIC RECREATION CENTER. IN THE EVENT CUMMINGS DOES NOT CONSTRUCT THE KEY BIBCAYNE CMC RECREATION CENTER THIS PROPOSAL SHALL BE NULL & VOID PHASES 4 & 0 WITHOUT PP&L AND SOUTHERN BELL TOTAL AREA 102,000 SF ITEM 1 SECTION IAA .B 1.8 8.4 3.S 3.5 DRWOS. DRWOS. DRWOS. CRINGE. DRWOS. DRWOE. DRWOS. DIMS. DRWOS. DRWOE. 4 02220 (BPIL) 1.5.8.1 .2 3.2 EA DRWOS. DRWOS. 3.4.A .1 .0 3.8 A 3.11 3.7 3.2 3.3 3.10 3.11 5 02511(BPIL) 2.1 2.2 2.3 2.4 DESCRIPTION PROTECT EXISTING TO REMAIN ENVIDRNMENTAL PROTECTION TRAFFIC MAINTENANCE PILL HOLES AND HAZARDOUS OPENINGS REMOVE MATERIALS AND DEBRIS PROM 3111 SALVABLE MATERIALS REMOVE EXISTING BANKMUILDING DEPARTMENT BUILDING REMOVE EXISTING SLOG.. SOUTH SIDE OF SITE REMOVE SITE WALLS • FOOTINGS REMOVE SIDEWALKS REMOVE PPSL LIGHT POLES REMOVE PP&L POWER POLES & PULL BOXES RELOCATE FP&L POWER POLES & PULL BOXES SURFACE DEMOLITION SAWOUTTINO EXISTING ASPHALT REMOVE ASPHALT SURPAOE & BASE EARTHWORK PROTECT EXISTING STRUCTURES & PROPERTY PROTECT EXISTING STREETS & SIDEWALKS LAYOUT & AS -BUILT. CLEARING a GRUBBING REMOVE EXISTING TREES RELOCATE EXISTING TRIMS REMOVE 1 DISPOSE OF SURFACE LITTER & DEBRIS STRIP & STOCKPILE TOPSOIL REMOVE TOP 2' OF SOIL WITHIN CONSTRUCTION AREA DISPOSAL OF UNSUITABLE MATERIAL SITE FILLING & COMPACTION PROOF ROLL OUT SURFACE EXCAVATION FOR STRUCTURES BAOKPILL AND COMPACTING DISPOSE OF EXCESS MATERIALS DEWATERINO(NO COMO. PLACID IN WATER) TESTING BY OWNER PREPARATION FOR TOPSOIL ASPHALTIC CONCRETE PAVING SUBORADE STABILIZATION 12" BASE COURSE LMEROCK 8" PRIME & TACK COATS ASPHALTIC CONCRETE 1 112" TYPE 3 02/08/2002 03:26 PM MATERIAL LABOR SUB TOTAL o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 110 NIC NIC NIC NIC NIC NIC NIC NIC NIC NI0 NIC O 0 0 0 0 0 0 0 O 0 0 0 O 0 0 0 O 0 123,801 123,801 O 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 NIC NIC NIC NIC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SUBCONTRACTORS NAME INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED NONE SHOWN! NONE INCLUDED NOT INCLUDED INCLUDED IN PHASE 1 INCLUDED INCLUDED NOT INCLJBEE BELOW NOT INCLJBEE BELOW NOT INCLJBEE BELOW INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK METRO ENGINEERING INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED NIC •BYOWNER INCLUDED INCLUDED INCLUDED NOT INCLUDED INCLUDED INCLUDED NOT INCLJBEE BELOW INCLUDED INCLUDED INCLUDED NIC - BY OWNER INCLUDED INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK GRAND TOTAL VS, 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 123,801 1.21 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 JAMES A. CUMMINGS, INC. 2 VILLAGE OF KEY BISCAYNE VILLAGE OP KEY BISCAYNE SITE & SITE INFRASTRUCTURE ARCHITECT: SPN.LIS CANDELA DMJM GMP PROPOSAL DATE: FEBRUARY 3, 2001 THIS PROPOSAL 111 CONTINGENT UPON CUMMINGS CONSTRUCTING THE KEY BISCAYNE CIVIC RECREATION CENTER. IN THE EVENT CUMMINGS DOES NOT CONSTRUCT THE KEY BISCAYNE CIVIC RECREATION CENTER THIS PROPOSAL SHALL BE NULL & VOID PHASES 4 & 3 WITHOUT PP&L AND 80UTHERN BELL TOTAL AREA 102,000 SP ITEM SECTION 3.2 DESCRIPTION MATERIAL LABOR SUB TOTAL SUBCONTRACTORS NAME GRAND TOTAL 3/SP DRWOS. DRWOB. NORIIO 02114 (SPIL) 3.1 3.2 3.3 3.4 DRWOS DRWGS ORWOS DRWOS DRW IS 02130 (SPIL) 1.8 3.1 NO SPEO. NO SPIKE 3 02222 (SPIL) 1.8.8+0 2.1.A .0 3.4 02000 1.8.A.1 .2 .0 2.1.A 2.2 2.3 2.4 2.3 2.S 2.7.A 3.2 3.3 3.10 TESTING BY OWNER PAVEMENT RESTORATION NEW MEDIAN OUT AT CRANDON ELVD. MODIFY EXISTING MEDIAN CUT AT CRANDON BLVD. PORTLAND CEMENT CONCRETE PAVING 00110. SIDEWALKS, CURBS, CURBS & GUTTERS & WHEEL STOPS 00N0RETE SIDEWALKS CURBS CURBS a GUTTERS TESTING BY OWNER M 00110RETE BASE FOR PAVERS AT PIRISTATION CURB CUT 4" 00NORETE SIDEWALKS ir a 24" WIDE CONCRETE BANDS COLORED CONC. AT CURBS, GUTTERS, SIDEWALKS a BANDS CURSE AT TREB ORATES SEE SITE CONCRETE WINDOW PAVEMENT MARKING PER FOOT SPECIFICATIONS SPARE PAINT SITE SWAGE TRAFFIC SIONALIZATION EXCAVATION, BAOKPILLING AND COMPACTING FOR UTILITES PROTECT EXISTING UTILITIES, SIDEWALKS a STREETS HAND EXCAVATION DEWATERING REMOVE UNSATISFACTORY SOIL TESTING BY OWNER WATER DISTRIBUTION WATER METERS TAP TO THE EXISTING LINE8 METER DEPOSITS a SERVICE CONNECTION CHARGE* BY OWNER DUCTILE IRON WI CEMENT MORTAR LINING JOINTS FITTINGS a SPECIAL ITEMS VALVES OAST IRON VALVE BOXES FNts HYDRANTS DISINPEOTION COPPER PIPING FOR WATER SERVICE LINES 3" OR LESS DUCTILE IRON PIPING FOR WATER SERVICE LINES 4' OR LARGER THRUST BLOCKS 0 0 0 O 0 0 O 0 0 o 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 O 0 0 7,934 3,331 2,303 O 0 0 0 0 0 O 0 0 0 0 0 NO BID NO BID NO BID 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 42,190 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC•BYOWNER 0 ICI. IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 0 0 0 0 0 0 0 0 0 0 0 0 19,203 0 0 0 0 0 0 42,190 0 0 0 0 0 INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK NONE SHOWN/ NONE INCLUDED INCLUDED IN EARTHWORK 3 SITE CONCRETE INCLUDED IN SITE CONCRETE INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK NIC • BY OWNER INCLUDED IN SITE CONCRETE INCLUDED IN WTI CONCRETE INCLUDED IN SITE CONCRETE INCLUDED IN EARTHWORK a SITE 00NORRTE INCLUDED 111 SITE CONCRETE JAC INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK NOT INCLUDED BY OWNER MEOATRAN/BONDED INCLUDED INCLUDED INCLUDED NOT INCLUDED NIC•BYOWNER 0101 IN SEPERATE OMP FOR DUCT BANK a WATER MAIN 0 NIO • EY OWNER 0 101. 1N SEPERATE OMP FOR DUCT BANK a WATER MAIN 0 NIC • BY OWNER 0 101 IN SEPERATE OMP FOR DUCT BANK a WATER MAIN 0101.111 SEPERATE GMP POR DUCT BANK & WATER MAIN 0 ICI. IN SEPERATE OMP FOR DUCT BANK 3 WATER MAIN 0 (01 IN SEPERATE OMP FOR DUCT BANK a WATER MAIN 0 ICI. IN SEPERATE OMP FOR DUCT BANK d WATER MAIN 0 I01 IN SEPERATE OMP FOR DUCT BANK a WATER MAIN 0 101 IN SEPERATE OMP FOR DUCT BANK a WATER MAIN 0101. IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICI. IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 101 IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 0.00 O 0.00 0 0.00 0 040 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 o 0.00 0 0.00 0 0.00 23,067 0.21 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 42,100 0.41 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 02/08/2001 . PM JAMES A MINGS, INC. 3 VILLAGE OF T ,ISCAYNE VILLAGE OP KEY BISCAYNE SITE A SITE INFRASTRUCTURE ARCHITECT: SPILLIS CANDELA DMJM OMP PROPOSAL DATE: PEBRUARY 8, 2002 THIS PROPOSAL. M CONTINGENT UPON CUMMINGS CONSTRUCTING THE KEY BISCAYNE CIVIC RECREATION CENTER. IN THE EVENT CUMMINGS DOES NOT CONSTRUCT THE KEY BISCAYNE CNIO RECREATION CENTER THIS PROPOSAL SHALL BE NULL A VOID PHASES 4 1 a WITHOUT PP&L AND SOUTHERN BELL TOTAL AREA 102,000 SP ITEM 1 SECTION _ 3.11+13 3.12+11 DRWOS DRWGS DRW08 02720 2.1A .B 2.2 2.344 3A 3.. DRWOS. DRWGS. DRWGS. DRWOS. ORWOS. DRWOS. NO SPIO 7 02317 2.2 2.3 2A JI 3A.A .0 Al 34.6 .0 .E-0 3.3 DRWOS. DRWGS. DRWOS. ORWOS. DESCRIPTION MATERIAL LABOR SUB TOTAL SUBCONTRACTORS NAME GRAND TOTAL *ISP TESTING SY CONTRACTOR DNIINPEOTION A CONNECTION TO EXIST. WATER MAINS BAOKPLOW PRMNTORS A DDOV'S ADJUST EXISTING WATER MITER VAULT REMOVE EXISTING WATER MITER VAULTS OAP EXISTING WATER LINES PROVIDE WATER SERVICE TO FOUNTAIN PROVIDE WATER SERVICE TO IRRIGATION STORM DRAINAGE SYSTEM CORRUGATED ALUMINUM PIPE CORRUGATED STEEL PIPE W/ BITUMINOUS COATING DRAINAGE STRUCTURES BALLAST ROCK A PLASTIC FILTER FABRIC EXPILTRATION TRENCH TESTING BY CONTRACTOR ADJUST EXISTING CATCH BASINS TO REMAIN OAP EXISTING STORM SEWER REMOVE EXISTING OATON BASINS AND ASSOCIATED PIPING REMOVE EXISTING TRENCH DRAIN REMOVE EXISTING FRAME 14 ORATE AND PROVIDE NEW EXPILTRATION TRENCH T0111' BELOW EXIST'O GROUND ELEV. SANITARY SEWER SYSTEM PIPE, FITTINGS 1 MANHOLES TESTING & INSPECTION SY CONTRACTOR SANITARY SEWER FOR FOUNTAIN SOLID INTERLOCKING CONC. PAVERS 311" THIOK KEY SHAPE A RECTANO. AT EDGES EDGE RESTRAINTS SAND LAYING COURSE 1" SAND FOR JOINTS OUT PAVERS WITH MASONRY SAW TOLERANCEe 1122" OFFSET a M1" IN 10' FROM LEVEL EXPANSION 1 CONTROL JOINTS • SEALANT PILLED SOIL STERILIZER VIBRATE CONC. PAVERS INTO LEVELING COURSE SAND FILL AT JOINTS REPAIR, CLEANING A PROTECTION 00001E11 PAVER ROADWAYS CONCRETE PAVER PARKING AREAS CONCRETE PAVER SIDEWALKS COLORED PAVERS FOR TRAFFIC MARKINGS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 48,888 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT BANK 11 WATER MAIN 0 NONE SHOWN/NONE INCLUDED 01CL IN SEPERATE GMP FOR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE GMP FOR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT BANK 3 WATER MAIN 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 48,888 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NOT REQUIRED/ NOT INCLUDED INCLUDED IN PHASE 1 INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED NCLUDED IN SEPERATE OMP FOR ADMINIPOLICE BLDG NCLUDED IN SEPERATE OMP FOR ADMIN/POLICE BLDG NOLUDED IN SEPERATE OMP FOR ADMIN/POLICE 1100 NONE SHOWN/ NONE INCLUDED HOLLYWOOD STONE/ BONDED INCLUDED AS 24/8" RECTANGULAR INCL INCL INCL INCL INCL NOT REQUIRED/ NOT INCLUDED 1001. INCL INCL INCL INCL INCL INCL INCL 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 o 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 48,888 0.48 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 O 0.00 02/08/2002 03:28 PM JAMES A. CUMMINGS, INC. 4 VILLAGE OF KEY BISCAYNE VILLAGE OF KEY BISCAYNE SITE & SITE INFRASTRUCTURE ARCHITECT: (WILLIS CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY 0, 2002 THIS PROPOSAL IS CONTINGENT UPON CUMMINGS CONSTRUCTING THE KEY BISCAYNE CIVIC RECREATION CENTER. IN THE EVENT OUMMINOS D011 NOT CONSTRUCT THE KEY BISCAYNE CIVIC RECREATION CENTER THIS PROPOSAL SHALL BE NULL & VOID PHASES 4 & 6 WITHOUT PP&L AND SOUTHERN BELL TOTAL AREA 102,000 SF ITEM 1 SECTION DESCRIPTION MATERIAL LABOR SUB TOTAL SUBCONTRACTORS NAME GRAND TOTAL SI I DRWOS. DRWOS. II NO SPEC DRWOS. DRWGS. DRWOS. DM'S. DRWOS. DRWOS. NO SPEC DRWGS. CMOS. NO SPEC DRWOS. DRWOa. ORWOS. S NO SPEC NO SPEC DRWGS. 10 NO SPEC DIMS. DRWGS. 11 DN.10 DRWO$. it STABILIZED SUB -GRADE N OR 0' LIMEROOK BASE ON SITE OONCRITE PAVERS AT FIRE AND POLK=E LANDSCAPING PLANT MATERIAL FLA 140.1 0R BETTER MULCH WIND CONTROL FABRIC TREE RELOCATION MAINTENANCE UNTIL FINAL ACCEPTANCE GUARANTEE • 1 YEAR FROM ACCEPTANCE SODDING CERTIFIED TURPORASS4ST. AUGUSTINE OR KENTUCKY BLUE PLASTID EDGING 1' PLANTING SOIL UNDER ALL SOD GUARANTEE ■ 6 MONTHS FROM OOMPLETION IRRIGATION BACKPLOW PREVENTER WATER MITER HOSE BIBS FOR MANUAL WATERING CONTROL WIRING CONCRETE REINFORCEMENT, NON-STRUCTURAL WELDED WIRI MESH MATERIAL WELDED WIRE MESH LABOR AROHRECTURAL PRECAST CONCRETE CONCRETE BOLLARDS (4 EACH) METAL FABRICATIONS TREE ORATES PIPE BOLLARDS MISC. SPECIALTIES FLAGPOLES 12 ON 16 MECHANICAL DISCONNECT PLUMBING & MAKE SAFE FOR DEMOLITION REMOVE FREON & MAKI SAFE FOR DEMOLITION 13 DN.1S ELECTRICAL DRWOS. ELECTRICAL DUCT BANK 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 MC NIC 0 0 16,612 600 0 NIC N10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC NM 0 0 1,600 000 0 NIC NIC NIC N1C 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 636 0 NIC NIC 0 0 0 0 0 0 0 0 0 0 0 34,652 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC NIC 0 0 15,112 2,038 0 N10 NIC INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN PHASE 1 INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE NIC • BY OWNER INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE NIO • BY OWNER INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN SITE CONCRETE INCLUDED IN SITE CONCRETE INCLUDED IN SITE CONCRETE NOT INOLJSEE BELOW NOT (NOLJSEE BELOW IRONSMITH/JAG DIXIE METALS/JAC NOT INCL./SSE BELOW NOT INCLJSEE BELOW 0 0 0 ROGERB BROTHERS/ BONDED 0 COLTEC/ BONDED 0 34,652 FISK/ BONDED 0 ICL IN 3EPERATE OMP FOR DUCT BANK & WATER MAIN 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 20,251 0.20 2,053 0.03 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 o 0.00 34,692 0.34 0 0.00 02/08/2002 _o PM JAMES A KINGS, INC. 5 VILLAGE OF ISCAYNE VILLAGE OF KEY BISCAYNE SIT! 8 SITS INFRASTRUCTURE ARCHITECT: &PLUS CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY 1, 2002 THIS PROPOSAL'S CONTINGENT UPON CUMMINGS CONSTRUCTING THE KEY BISCAYNE CIVIC RECREATION CENTER. IN THE EVENT CUMMINGS DOES NOT CONSTRUCT THE KEY BISCAYNE CIVIC RECREATION CENTER THIS PROPOSAL SHALL BE NULL & VOID PHASES 4 & 0 WITHOUT PP&L AND SOUTHERN BELL TOTAL AREA 102,000 8F ITEM 1 SECTION L DESORIPTION DRWOS. COMMUNICATION DUCT BANK DRWG$. TELEPHONE 8 CABLE TV DUOT BANK DRWGS. PP&L MANHOLES • PURNISHED BY PP&L INSTALLED BY CONTRACTOR bRWO$. PP&L CONDWIT • FURNISHED BY PP&L INSTALLED BY CONTRACTOR DRWOS. BELLSOUTH !MANHOLES- PURN. 8 INSTALL BY CONTRACTOR DRWOS. COMMUNICATION MANHOLES- PURN. & INSTALL BY CONTRACTOR DRWOS. DRWGS. DRWGS. DRWOS. DRWOS. DRWOS. DRWOS. DRWOS. DRWOS. DRWG$. DRWOS. DRWOS. DRWGS. DRW08. DRWOS. WATERPROOFING OP MANHOLES PP&L POWER POLES • NIO TEMPORARY PP&L POWER POLES • NIO PP&L OONDUOTORS & CABLES • NIO PAD MOUNTED TRANSFORMERS • NIO STREET LIGHTING PLANTER LIGHTING PRECAST LIOHTPOLE BABES TO MEET WIND LOADING REQ. OONORETE EQUIPMENT PADS PSBR REINFORCED PLASTIC ENCLOSURES RELOCATE EXISTO LIGHT POLE6 & LIGHT POLE PULL BOXES • NIC REMOVE EXISTING PP&L LIGHT POLES 8 PULL BOXES • NIO REMOVE EXISTING PP&L OVERHEAD POLE 8 POWER LINES • NIC CONNECTION TO FOUNTAIN PUMP 8 CONTROLLER ILLUMINATION TESTING SIGNED & SEALED BY PE OONNEOTION TO IRRIGATION CONTROLLER TEMPORARY ELECTRIC DISCONNECT EXISTING 8 MAKE SAFE FOR DEMOLITION MODIFY EXTENT OP RESTORATION BY ADDING SURFACE WORK TO UNDERGR MATERIAL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 LABOR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SUB 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL SUBCONTRACTORS NAME 0 IOL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 101 IN SEPERATE OMP FOR DUCT BANK 8 WATER MAIN 0 101 IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0101 IN SEPERATE OMP FOR DUCT BANK 8 WATER MAIN 0 IOL IN SEPERATE OMP FOR DUCT BANK 8 WATER MAIN 0 ICI. IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 01CL IN SEPERATE OMP FOR DUCT BANK 8 WATER MAIN 0 NIC • BY OWNER 0 NIC • BY OWNER NIC - BY OWNER NIC • BY OWNER INCLUDED INCLUDED INCLUDED INCLUDED IN SITE CONCRETE INCLUDED NIC • BY OWNER NIC •BYOWNER NIC - BY OWNER NOT REQUIRED! NOT INCLUDED INCLUDED INCLUDED IN PHASE 1 INCLUDED INCLUDED NOT REQUIRED! NOT INCLUDED 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 GRAND TOTAL WISP 0 0.00 0 0.00 0 0.00 O 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 SUBTOTAL OHOOK SUBTOTAL SALES TAX 6.6% LABOR BURDEN SUBTOTAL OWNER'S PROTECTIVE LIABILITY INSURANCE BUILDER'S RISK INSURANCE PERMITS PERFORMANCE BOND 26,040 11,186 290,684 321,801 321,801 1,128 7,647 336,081 0 2,300 2,800 4,000 330,081 8.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 330,081 3.28 0.00 0 0.00 OWNER ALLOWANCE 2,300 0.02 OWNER ALLOWANCE 2,100 0.011 4,000 0.04 0.00 02/08/2002 03:28 PM JAMES A. CUMMINGS, INC. 8 VILLAGE OF KEY BISCAYNE VILLAGE OF KEY BISCAYNE SITE & SITE INFRASTRUCTURE ARCHITECT: SPILLIS CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY 8, 2002 THIS PROPOSAL IS CONTINGENT UPON CUMMINGS CONSTRUCTING THE KEY BISCAYNE CIVIC RECREATION CENTER. IN THE EVENT CUMMINGS DOES NOT CONSTRUCT THE KEY BISCAYNE CIVIC RECREATION CENTER THIS PROPOSAL SHALL BE NULL 8 VOID PHASES 4 & 0 WITHOUT PP&L AND SOUTHERN BELL TOTAL AREA 102,000 SF 1 ITEM T 510TION 1 DESCRIPTION t MATERIAL 1 LABOR 1 SUB 1 TOTAL 1 344,981 SUBTOTAL SUBCONTRACTORS NAME GRAND TOTAL' $ISP 344,881 3.31 0.00 0.00 0.00 0.00 0.00 344,981 3.38 0.00 6,000 0.06 0.00 348,881 3.43 0.00 6,000 0.06 0.00 364,881 3.48 0.00 16,874 0.16 0.00 370,866 3.04 0.00 (6,817) (0.00) 0.00 366,138 3.68 DESIGN PHASE FEE CONSTRUCTION PHASE FEE EXTEND PROJECT TWO AND A HALF MONTHS FOR INFRASTRUCTURE WORK CONSTRUCTION CONTINGENCY OWNER CONTINGENCY OVERHEAD • PROFIT OWNER'S SALES TAX SAVINGS PROGRAM SUBTOTAL SUBTOTAL SUBTOTAL SUBTOTAL TOTAL THE FOLLOWING ITEMS OF WORK ARE SEPARATE OWNER ALLOWANCES WHICH ARE NOT INCLUDED IN THIS PROPOSAL AND WHICH DO NOT INCLUDE ANY CONSTRUCTION MANAGER'S MARK-UPS FOR PERMITS, TAXES, INSURANCE, BONDS, CONTINGENCIES AND OVERHEAD AND PROFIT. FOUNTAIN AT WEST MCINTYRE STREET FEATURE COLUMNS • 8 EACH TRAFFIC OIROLE ARCHITECTURAL ELEMENT PARK GAZEBO TRELLIS ARCHITECTURAL PRECAST MISC. SPECIALTIES FLORIDA POWER & LIGHT AND SOUTHERN BELL WORK PROVIDED BY OWNER TOTAL NOT INCL. NOT INCL. 0 INCLUDE IN REC. CENTER 0 0 ICL IN SEPERATE GMP FOR DUCT BANK & WATER MAIN 0 344,981 6,000 349,981 6,000 364,681 16,874 370,866 (6,817) 386,138 60,000 OWNER ALLOWANCE NIC • WORK BY OWNER 40,000 OWNER ALLOWANCE NIC • WORK BY OWNER 126,000 OWNER ALLOWANCE NIC - WORK BY OWNER 26,000 OWNER ALLOWANCE NIC • WORK BY OWNER 16,000 OWNER ALLOWANCE NIC • WORK BY OWNER 4,000 OWNER ALLOWANCE NIC • WORK BY OWNER 6,000 OWNER ALLOWANCE NIC • WORK BY OWNER 0 SEE ELECTRIC DUCT BANK & WATER MAIN GMP 276,000 7 02/08/2002, .i PM JAMES A ZINGS, INC. VILLAGE Of 3ISCAYNE VILLAO/ OF KEY BISCAYNE SITE 6 SITE INFRASTRUCTURE ARCHITECT: SPILLIS CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY 1, 2002 1 GENERAL CONDITIONS SEE WINDOW EXTEND PROJECT TWO AND A HALF MONTHS POR INFRASTRUCTURE WOR NOTE: WORK FROM CRANDON BLVD 196' WEST ALONG NORTH VILLAGE GREEN WAY I8 NOT INCLUDED AND SHALL BE PROVIDED BY OTHERS 00320 (SPIL) SOIL INVESTIGATION DATA REPORT BY K&B NO SPEC COORDINATION DRAWINGS NO SPEC FIELD ENGINEERING FINAL SURVEY NO RIO OWNER ALLOWANCES • FURNISH/INSTALL COMPLETE 1. ON -SITE LANDSCAPING/SOD/IRRIGATION 2. FOUNTAIN AT WEST MCINTYRE STREET 2. FEATURE OOLUMNS • II EACH 4. TRAFFIC CIRCLE ARCHITECTURAL ELEMENT 6. PARK GAZEBO S. TRELLIS 1. ARCHITECTURAL PRECAST S. MISO. SPECIALTIES S. COMMUNICATION DUCT BANKS BETWEEN BLOCS 10. POLICE SECURITY OONDUIT 11. FIRE SECURITY CONDUIT 12. FLORIDA POWER S LIGHT AND SOUTHERN BELL NO SPEC CONSTRUCTION PHOTOGRAPHS NO SPEC QUALITY CONTROL BY OWNER 2 NO SPEC ORWOS. DRWOS. DRWOS. DRWOS. DIMS. BRWOS. MAINTENANCE OF TRAFFIC TEMPORARY FENCE BARRICADES PLASTIC DRUMS SIGNAOE WARNING LIGHTS & FLASHERS ALL SIONAOE i BARRICADES PER FOOT SPEC MAINTENANCE OF SIGMAS!! A BARRICADES S 02060 (SPIL) DEMOLITION, REMOVALS AND RELOCATION 1.1 COORDINATION 1.4.A PROTECT EXISTING TO REMAIN .B ENVIORNMENTAL PROTECTION 1.6 TRAFFIC MAINTENANCE Sat FILL HOLES AND HAZARDOUS OPENINGS PHASE 1 WITHOUT FP&L AND SOUTHERN BELL 0 0 0 0 0 38,326 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 6,700 0 0 1,270 o 0 0 0 0 0 0 0 166,000 NIC NIC NI0 P410 NIC NIC NI0 NIC NIC NIC NIC NIC NIC NIC NIC P410 N10 NIC P410 NIC 1410 0 0 0 0 0 0 0 0 0 NIC N10 NIC 0 0 0 0 0 IN G0'S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 o 0 0 o 0 0 o 0 0 0 0 0 0 0 0 o 0 72,300 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 38,321 JAC 0 ICL IN SEPERATE GMP FOR DUCT BANK & WATER MAIN 0 0 0 0 0 0 6,700 6,270 0 0 166,000 N10 PI0 NIC NIC NI0 NIC NI0 P410 JAC JACIBALANOE IN BITEWORK' JAC/WAG OWNER ALLOWANCE NOT INCLJSEE BELOW NOT INOLJBEB BELOW NOT IN0LJ8IIE: BELOW NOT INCL./SEE BELOW NOT INCL./SSE BELOW NOT INCLJSIIEE BELOW NOT INCLJSEE BELOW 0 ICL IN BEPERATE OMP POR DUCT BANK & WATER MAIN 0 ICL IN BEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICL IN BEPERATE OMP FOR DUCT BANK & WATER MAIN NOT INCLJSIE BELOW 0 0 0 0 0 0 0 0 0 0 0 0 0 0 72,300 0 0 0 0 0 INCLUDED IN GENERAL CONDITIONS P410• BY OWNER INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK WILDCAT BONDED INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED 0 0.00 38,328 0.38 0 0.00 0 0.00 O 0.00 O 0.00 0 0.00 0 0.00 0 0.00 6,700 0.00 1,270 0.05 0 0.00 0 0.00 161,000 1.62 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 72,300 0.71 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 02/08/2002 03:23 PM JAMES A. CUMMINGS, INC. 1 VILLAGE OF KEY BISCAYNE VILLAGE OP KEY BISCAYNE SITE & SITE INFRASTRUCTURE ARCHITECT: SPILLIS CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY 1, 2002 1.1 1.1 DWG'. DRWOS. DRWO$. DRWO$. DRWOS. DRWO$. DRWoi. DINGS. DRWOS. ORWGE. REMOVE MATERIALS AND DEBRIS PROM SITE AALVARLE MATERIALS REMOVE EXISTINO BANKIBUILDINO DEPARTMENT BUILDING REMOVE EXISTING BLDG.. SOUTH SIDE OF SITE REMOVE inTE WALLS & POOTINOS REMOVE SIDEWALKS REMOVE PPOL LIGHT POLES REMOVE PPOL POWER POLES 0 PULL BOXES RELOCATE FPOL POWER POLES & PULL BOXES SURPACE DEMOLITION SAWOUTTING EXISTING ASPHALT REMOVE ASPHALT SURPACE 0 BASE 4 02220 (SPIL) EARTHWORK 1.1.1.1 PROTECT EXISTING STRUCTURES & PROPERTY .2 1.2 3.3 DRWGS. DRWGS. 3.4.A .1 .0 PROTECT EXISTING STREETS & SIDEWALKS LAYOUT & AS -BUILT$ CLEARING & GRUBBING REMOVE EXISTING TRESS RELOCATE EXISTING TREES REMOVE 0 DISPOSE OP SURFACE LITTER 0 DEBRIS STRIP & STOCKPILE TOPSOIL REMOVE TOP 2' OP SOIL WITHIN CONSTRUCTION AREA DISPOSAL OP UNSUITABLE MATERIAL SITE PILLING 0 COMPACTION PROOF ROLL OUT SURFACE EXCAVATION FOR STRUCTURES BAOKPILL AND COMPACTING DISPOSE OF EXCESS MATERIALS DEWATERING(NO CONC. PLACED IN WATER) TESTING BY OWNER PREPARATION FOR TOPSOIL 1 021111 (SPIL) ASPHALTIC CONCRETE PAVING 2.1 SUMMON STABILIZATION 12" 2.2 BASE COURSE LIMEROOK II" 2.3 PRIME & TAOK COATS 2.4 ASPHALTIC CONCRETE 1 112" TYPE S 0.2 TESTING BY OWNER PAVEMENT RESTORATION DRWOS. NEW MEDIAN OUT AT CRANDON BLVD. DRW01. MODIFY EXISTING MEDIAN CUT AT CRANDON BLVD. NO SPEC PORTLAND CEMENT CONCRETE PAVING 02614 ($PIL) 00140. SIDEWALKS, CURBS, CURBS & GUTTERS & WHEEL STOPS 3.1 CONCRETE SIDEWALKS PHASE 1 WITHOUT PP&I. AND SOUTHERN BELL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC NIC NIC NIC NIO NIC NIC NIC NIC NIC NIC NIC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 286,026 281,026 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o o 0 0 0 0 0 0 0 0 0 0 NIC NIC NIC NIC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 INCLUDED NONE SHOWN/ NONE INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED NOT INCLJSEE BELOW NOT INCLJSEE BELOW NOT INCL./SEE BELOW INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK METRO ENGINEERING INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED NIC - BY OWNER INCLUDED INCLUDED INCLUDED NOT INCLUDED INCLUDED INCLUDED NOT INCLJSEE BELOW INCLUDED INCLUDED INCLUDED NIC - BY OWNER INCLUDED INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK NIC - BY OWNER 0 ICI. IN SEPERATE GMP FOR DUCT BANK & WATER MAIN 0 INCLUDED IN EARTHWORK O INCLUDED IN EARTHWORK O NONE SHOWN! NONE INCLUDED 0 INCLUDED IN EARTHWORK & SITE CONCRETE 0 INCLUDED IN SITE CONCRETE 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 280,026 2.11 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 o 0.00 0 0.00 0 OAO 0 OAO 0 0.00 0 0.00 o o.00 0 0.00 0 0.00 o o.00 0 OAO 0 0.00 0 0.00 0 0.00 0 0.00 o 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 o 0.00 O 0.00 O 0.00 0 0.00 02/08/2001 ,PM JAMES A \VIINGS, INC. 2 VILLAGE OF 3ISCAYNE VILLAGE OP KEY !ISCAYNE SITE & SITE INFRASTRUCTURE ARCHITECT: !WILLIS CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY 8, 2002 3.2 CURBS 3.3 CURBS A GUTTERS 3.4 TESTINO BY OWNER DRWOS M CONCRETE BASE FOR PAVERS AT PIRESTATION CURB CUT DRWOS 4" CONCRETE SIDEWALKS DRWOS ir 8 24" WIDE CONCRETE BANDS DRWOS OOLORED 00110. AT CURBS, GUTTERS, SIDEWALKS & BANDS DRWOS OURS$ AT TREE ORATES SEE SITE cosmic' WINDOW 02180 (SPIL) PAVEMENT MARKING 1.3 PER FOOT SPECIPIOATIONS 8.6 SPARE PAINT NO SPEC. SITE SIONAOE NO SPED. TRAFFIC SIGNALIZATION 1 02222 (SPIL) EXCAVATION, BACKPILLING AND COMPACTING FOR UTILITES 1.1.1+0 PROTECT EXISTING UTILITIES, SIDEWALKS & STREETS HAND EXCAVATION 2.1.A DEWATERING .0 REMOVE UNSATISFACTORY SOIL 3.1 TESTING BY OWNER 02550 WATER DISTRIBUTION 1.$.A.1 WATER MITERS . 2 TAP TO THE EXISTING LINES .0 METER DEPOSITS & SERVICE CONNECTION CHARGES SY OWNER 2.1.A DUCTILE IRON WI CEMENT MORTAR LINING 2.2 JOINTS 2.3 FITTINGS & SPECIAL ITEMS 2.4 VALVES 2.1 OAST IRON VALVE BOXES 2.1 PIRO HYDRANTS 2.7.A DISINFECTION 1.2 COPPER PIPING FOR WATER SERVICE LINES 3" OR LISS 3.3 DUCTILE IRON PIPING FOR WATER SERVICE LINES 4" OR LARGER 1.10 THRUST BLOCKS 1.11+11 TESTINO BY CONTRACTOR 1.12+11 DISINFECTION & CONNECTION TO EXIST. WATER MAINS IIIA0KPL0W PRIVENTORS & DDCV'S DRWOS ADJUST EXISTING WATER METER VAULT DRWOB REMOVE EXISTING WATER MITER VAULTS DRWOS OAP EXISTING WATER LINES PROVIDE WATER SERVICE TO FOUNTAIN PROVIDE WATER SERVICE TO IRRIGATION 02720 STORM DRAINAGE SYSTEM 2.1.A CORRUGATED ALUMINUM PIPE PHASE 1 WITHOUT PP&L AND SOUTHERN BELL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 22,024 13,866 7,428 45,307 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NO BID NO BID NO BID 0 0 0 0 0 0 0 113,626 113,325 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC NI0 NIC NIC 0 0 0 0 0 0 0 0 0 INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK NIC - BY OWNER INCLUDED IN SITE CONCRETE INCLUDED IN SITE CONCRETE INCLUDED IN SITE CONCRETE INCLUDED IN EARTHWORK & SITE CONCRETE INCLUDED IN SITE CONCRETE JAC INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK NOT INCLUDED MY OWNER MEOATRAN/ BONDED INCLUDED INCLUDED INCLUDED NOT INCLUDED NIC • BY OWNER 0 ICI. IN SEPERATE GMP FOR DUCT BANK & WATER MAIN 0 NIC • BY OWNER 0 ICL IN SEPERATE GMP FOR DUCT BANK & WATER MAIN 0 NIC • BY OWNER 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 101. 1N SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICON SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 101.1N SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 101. IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICL IN *EMIRATE OMP FOR DUCT BANK & WATER MAIN 010E IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 NONE SHOWN/NONE INCLUDED 010E IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN NOT INCL./SEE BELOW 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 INCLUDED 0 INCLUDED 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 04,337 013 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 113,825 1.11 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 02/00/2002 03:23 PM JAMES A. CUMMINGS, INC. 3 VILLAGE OF KEY BISCAYNE VILLAGE OF KEY BISCAYNE SITE 2 SITE INPRASTRUOTURE ARCHITECT: SPILLIS CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY $, 2002 .1 2.2 24+4 SA 2.11 DRWO$. DRWOS. DRWOS. DRWoi. DRWGS. DRWGS. NO SPEC 7 02817 2.2 2.3 2.4 a S.S.A .D .E 2.4.8 .D .ECG S.$ DRWOS. DRWOS. DRWS$. DRWO$. DRWG$. DRWO$. S NO SPEC DRWOS. oRWG$. DRW0S. DRWOS. DRWG$. DRWOS. NO SPEC CORRUGATED STEEL PIPE WI BITUMINOUS COATING DRAINAGE STRUCTURES BALLAST ROCK i PLASTIC FILTER FABRIC EXPILTRATION TRENCH TESTING BY CONTRACTOR ADJUST EXISTING CATCH BASINS TO REMAIN OAP EXISTING STORM SEWER REMOVE EXISTING CATON BASINS AND ASSOCIATED PIPING REMOVE EXISTING TRENON DRAIN REMOVE EXISTING FRAMES ORATE AND PROVIDE NEW EXPILTRATION TRENCH TO 111' BELOW EXI$T'S GROUND ELEV. SANITARY SEWER SYSTEM PIPE, FITTINGS 2 MANHOLES TEST1N0 & INSPECTION SY CONTRACTOR SANITARY SEWER FOR FOUNTAIN SOLID INTERLOCKING 00110. PAVERS $1/r THICK KEY SHAPE • RECTANG. AT EDGES EDGE RESTRAINTS SAND LAYING COURSE 1" SAND FOR JOINTS OUT PAVERS WITH MASONRY SAW TOLERANCE* 1132" OFFSET & 112" IN 10' PROM LEVEL EXPANSION & CONTROL JOINTS • SEALANT FILLED SOIL STERILIZER VIBRATE CONC. PAVERS INTO LEVELING COURSE SAND FILL AT JOINTS REPAIR, CLEANING S PROTECTION CONCRETE PAVER ROADWAYS CONCRETE PAVER PARKING AREAS CONCRETE PAVER SIDEWALKS COLORED PAVERS FOR TRAFFIC MARKINGS 12" STABILIZED $UI4ORADE r OR r LIMEROCK BASE ON SITE CONCRETE PAVERS AT FIRE AND POLICE LANDSCAPING PLANT MATERIAL FLA NO.1 OR BETTER MULCH WEED CONTROL FABRIC TREE RELOCATION MAINTENANCE UNTIL FINAL ACCEPTANCE GUARANTEE • 1 YEAR FROM ACCEPTANCE SODDING CERTIFIED TURPORAS$-ST. AUGUSTINE OR KENTUCKY BLUE PHASE 1 WITHOUT PP&I. AND SOUTHERN BELL 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 o 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1410 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1410 NIC NIC 0 0 0 128,170 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 O 0 o 0 O 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED 0 NCLUDED IN SEPERATE GMP FOR ADMIN/POLICE BLDG 0 NCLUDED IN SEPERATE OMP FOR ADMIN/POLCE BLDG 0 NCLUDED IN SEPERATE OMP FOR ADMINIPOLICE BLDG NOT INCL./SEE BELOW 0 128,170 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 HOLLYWOOD STONE! BONDED INCLUDED AS 24/8" RECTANGULAR INCL INCL INCL INCL IN01 NOT REQUIRED/ NOT INCLUDED INCL INCL INOL INCL INCL INCL INOL INOL INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED INCLUDED IN OWNER$ ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE NIC •BYOWNER INCLUDED IN OWNERS ALLOWANCE INCLUDED 114 OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED 114 OWNERS ALLOWANCE 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 128,170 1.22 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 O 0.00 02/08/2002 PM JAMES A AINGS, INC. 4 VILLAGE OF JISCAYNE VILLAGE OF KEY BISCAYNE SITE & srry INFRASTRUCTURE ARCHITECT: BPILLIB CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY 8, 2002 DRWGS. DRWOS. NO SPEC DRWOS. DRWOS. DRWOS. 8 NO SPED PLASTIC EDGING 1" PLANTING 8011 UNDER ALL SOD GUARANTEE • 6 MONTHS FROM COMPLETION IRRIGATION BACKPLOW PREVENTER WATER METER NOSE SIBS FOR MANUAL WATERING CONTROL WIRING CONCRETE REINFORCEMENT, NON-STRUCTURAL WELDED WIRE MESH MATERIAL WELDED WIRE MESH LABOR NO SPEC AROHITIOTURAL PRECAST OONORETE DRWOS. CONCRETE BOLLARDS 10 NO SPIO METAL FABRICATIONS DRWO$. TREE GRATIS DRWOS. PIPE BOLLARDS 11 DN.10 MIBO. SPECIALTIES DRWOS . FLAGPOLES 12 DN 16 MECHANICAL DISCONNECT PLUMBING & MAKI SAFI FOR DIMOLITION REMOVE FREON • MAKE SAFE FOR DEMOLITION 13 DN.10 DRUM. DRWO$. DRWG& DRWO$. DRWOS. DRWOS. DRWGS. DRWOS. DRWOS. DRWOS. DRW08. DRWGS. DRWOS. DRWOS. DRWOS. DRWGS. DRWOS. ELECTRICAL ELECTRICAL DUCT BANK COMMUNICATION DUCT TANK TELEPHONE & CABLE TV DUCT BANK PP&L MANHOLES • FURNISHED EY PP&L INSTALLED BY CONTRACTOR PP&L CONDUIT - FURNISHED EY FP8L INSTALLED BY CONTRACTOR BELLSOUTH MANHOLES. FURN, A INSTALL BY CONTRACTOR COMMUNICATION MANHOLES- PURN. & INSTALL BY CONTRACTOR WATERPROOFING OF MANHOLES PP&L POWER POLES • NIC TEMPORARY ?P&L POWER POLES • 510 PP&L CONDUCTORS 8 CABLES • NIO PAD MOUNTED TRANSFORMERS • 5I0 STREET LIGHTING PLANTER LIGHTING PRECAST LIOHTPOLE EASES TO MEET WIND LOADING REQ. CONCRETE EQUIPMENT PADS PIBER REINFORCED PLASTIC ENCLOSURES PHASE 1 WITHOUT PP&L AND SOUTHERN BELL NIC NIC 0 0 0 0 o 0 o 0 o 0 o 0 o 0 o 0 0 0 00 0 0 0 0 0 0 0 NIO 510 NIO NIO 0 0 24,680 1,200 0 NIC NIC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,860 1,800 0 NIO NIC NIO NIC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,078 0 0 0 260 600 0 118,441 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02/08/2002 03:23 PM JAMES A. CUMMINGS, INC. 0 0 0 0 0 0 0 0 0 0 0 0 0 5I0 NIO 0 0 21,430 4,078 0 NIO NIO INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE NIC •BYOWNER INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN SITE CONCRETE INCLUDED IN SITE 00NORETE INCLUDED IN SITE CONCRETE NOT INCL./SIN BELOW NOT INCLJSEE BELOW IRONSMITHIJAC DIXIE METALS/JAC NOT INCL./SEE BELOW NOT INCL./SEE BELOW 0 0 260 JACI WAO 600 JACI WAG 0 118,441 FISK/ IONDID 0 1CL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT BANK 8 WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 IOL IN SEPERATE OMP FOR DUOT BANK & WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 IOL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 0 0 0 0 0 0 0 0 NIO • BY OWNER NIC • BY OWNER NIC • BY OWNER NIC •BYOWNER INCLUDED INCLUDED INCLUDED INCLUDED IN SITE CONCRETE INCLUDED 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 28,286 0.25 6,387 0.06 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 260 0.00 600 0.00 0 0.00 118,441 1.10 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 5 VILLAGE OF KEY BISCAYNE VILLAGE OP KEY BISCAYNE SITE & SITE INFRASTRUCTURE ARCHITECT: SPILUS CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY 8, 2002 PHASE 1 WITHOUT PP81 AND SOUTHERN BELL 0 0 0 NIC - BY OWNER 0 0.00 DRWOS. RELOCATE EXISTO LIGHT POLES & LIGHT POLE PULL BOXES - NIC 00 0 0 0 NIC • BY OWNER 0 0.00 DRWOS. REMOVE EXISTING FP&L LIGHT POLES & PULL BOXES - NIC OWNER 0 0.00 DRW 0 0 0 NIC • BY OS. REMOVE EXISTING PPAL OVERHEAD POLE & POWER LINES - NIC 0 NOT IN 110 • BY BELOW 0 0.00 DRWOS. CONNECTION TO FOUNTAIN PUMP & CONTROLLER NIC NIC N1C NIC INCLUDED 0 0.00 DRW0$. ILLUMINATION TESTING SIGNED & SEALED BY PE 0 0 0 0 CONNECTION TO IRRIGATION CONTROLLER 0 0 0 0 INCLUDED 0 0.000 INCLUDED 0 0.00 TEMPORARY ELECTRIC 0 0 0 DISCONNECT EXISTING & MAKE SAFE FOR DEMOLITION 0 0 0 0 INCLUDED 0 0.00 MODIFY EXTENT OF RESTORATION BY ADDING SURFACE WORK TO UNDEROR 0 0 (30,0000 (30,0000)REDIT TO OWNER ALLOWANCE IN UNDERGROUND OMP (30,000) 0. 0.20) 0 0 0 0.000 0 0 0 47,804 23,606 003,112 974,920 994,121 8.78 SUBTOTAL 0.00 974,920 °'oo CHECK SUBTOTAL 0.00 0.00 3,107 0.00 SALES TAX S.5% 13,07 0.00 LABOR BURDEN 0.00 SUBTOTAL 994,121 994,121 8.78 0.00 0 0 0.00 OWNER'S PROTECTIVE LIABILITY INSURANCE 1,100 OWNER ALLOWANCE 1,50 0.00 BUILDER'S RISK INSURANCE 6,700 OWNER ALLOWANCE 5,70 0.01 PERMITS 11,460 11,460 0.11 PERFORMANCE BOND 0.00 SUBTOTAL 1,017,881 1,017,081 8.08 0.00 NOT INCL. NOT INCL. 0.00 DESIGN PHASE FEE 60,263 60,283 OA!CONSTRUCTION PHASE FIB O ICL IN SEPERATE OMP FOR DUCT BANK 3 WATER MAIN 0 0.00 EXTEND PROJECT TWO AND A HALF MONTHS FOR INFRASTRUCTURE WORK 0.00 SUBTOTAL 1,058,140 1,018,140 10.47 0.00 12,000 12,000 0.12 CONSTRUCTION CONTINGENCY 0.0 SUBTOTAL 1,080,140 1,080,140 10.18 0.00 12,000 12,000 0.12 OWNER CONTINGENCY 0.00 SUBTOTAL 1,092,140 1,092,140 10.71 0.00 49,141 49,145 0.48 OVERHEAD •PROFIT 0.00 SUBTOTAL 1,141,285 1,141,286 11.18 8 02/08/2002 . PM JAMES A RINGS, INC. VILLAGE OF ISCAYNE VILLAGE OP KEY BISCAYNE SITE & SITE INFRASTRUCTURE AROHITEOT: SPILLIS CANDELA DMJM OMP PROPOSAL DATE: PEBRUARY 8, 2002 OWNER'S SALES TAX SAVINGS PROGRAM TOTAL THE FOLLOWING ITEMS OP WORK ARE SEPARATE OWNER ALLOWANCES WHICH ARE NOT INCLUDED IN THIS PROPOSAL AND WHICH DO NOT INCLUDE ANY CONSTRUCTION MANAGER'S MARKUPS FOR PERMITS, TAXES, INSURANCE, BONDS, CONTINGENCIES AND OVERHEAD AND PROPIT. FOUNTAIN AT WEST MCINTYRE STREET FEATURE COLUMNS • S EACH TRAFFIC CIRCLE ARCHITECTURAL ELEMENT PARK amigo TRELLIS ARCHITECTURAL PRECAST MISC. SPECIALTIES FLORIDA POWER & LIGHT AND BOUTHERN BELL WORK PROVIDED BY OWNER TOTAL 02/08/2002 03:23 PM PHASE 1 WITHOUT FP&L AND SOUTHERN BELL (17,119) 1,124,187 JAMES A. CUMMINGS, INC. 00,000 OWNER ALLOWANCE NIC - WORK BY OWNER 40,000 OWNER ALLOWANCE NIC - WORK BY OWNER 126,000 OWNER ALLOWANCE NIC - WORK BY OWNER 26,000 OWNER ALLOWANCE NIC • WORK BY OWNER 16,000 OWNER ALLOWANCE NIC • WORK BY OWNER 4,000 OWNER ALLOWANCE NIC • WORK BY OWNER 6,000 OWNER ALLOWANCE NIC • WORK BY OWNER 0 SEE ELECTRIC DUCT BANK & WATER MAIN OMP 276,000 1,124,107 0.00 (17,115) (0.17) 0.00 11.02 7 VILLAGE OF KEY BISCAYNE VILLAGE OP KEY BISCAYNE SITE & SITE INFRASTRUCTURE ARCHITECT: SPILLN % CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY 8, 2002 PHASE 2 WITHOUT PPBL AND SOUTHERN BELL PERNWOOD ROAD FROM WEST ENID DRIVE TO WEST MCINTYRE STREET TOTAL AREA 102,000 SF ITEM _ SECTION DESCRIPTION MATERIAL LABOR SUB TOTAL _ SUBCONTRACTORS NAME GRAND TOTAL 0/SF 1 GENERAL CONDITIONS 8EE WINDOW EXTEND PROJECT TWO AND A HALF MONTHS FOR INFRASTRUCTURE WOR N0TE: WORK PROM CRANDON BLVD 105' WEST ALONG NORTH VILLAGE GREEN WAY IS NOT INCLUDED AND SHALL BE PROVIDED BY OTHERS 00320 ($PIL) SOIL INVESTIGATION DATA REPORT BY K&B NO SPEC NO SPEC COORDINATION DRAWINGS FIELD ENGINEERING FINAL SURVEY NO SPBO OWNER ALLOWANCES • FURNISH/INSTALL COMPLETE 1.ON•SITE LAND$OAPINGI$OD/IRRIOATION 2. FOUNTAIN AT WEST MCINTYRE STREET S. FEATURE COLUMNS - $ EACH 4. TRAFFIC OIROLE ARCHITECTURAL ELEMENT S. PARK GAZEBO 8. TRELLIS 7. ARCHITECTURAL PRECAST S. MISC. SPECIALTIES S. COMMUNICATION DUCT BANKS BETWEEN BLDOB 10. POLICE BEOURPIY CONDUIT 11. FIRE SECURITY CONDUIT 12. FLORIDA POWER 8 LIGHT AND SOUTHERN BELL NO SPEC CONSTRUCTION PHOTOGRAPHS NO SPEC QUALITY CONTROL BY OWNER 2 NO SPED MAINTENANCE OF TRAFFIC DRWGB. TEMPORARY FENCE DRWGB. BARRICADES DRWQB. PLASTIC DRUMS DRWOS. SIONAGE DRWOB. WARNING LIOHTS I. FLASHERS DRWGS. ALL SIONAGE & BARRICADES PER PDOT SPEC MAINTENANCE OF SIONAGE & BARRICADES 3 02040 (SPIL) DEMOLITION, REMOVALS AND RELOCATION 1A COORDINATION NIO NIO 1410 NIC NIO NIO NIO P410 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N10 NI0 NIC P410 N10 NIO NIC 0 0 0 0 0 3,104 0 0 0 0 0 0 0 0 0 0 0 0 0 000 0 800 o 0 0 0 0 14,000 NIC N1C NIC NIC NIC NIC N1C 0 0 0 0 0 0 NIC NIO 0 0 0 IN OC'S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3,014 JAC 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 0 0 0 0 0 000 000 0 0 14,000 NIO N10 NIO NIO N10 1410 NIC JAC JAC/BALANCE IN BITEWORK' JAO/WAG OWNER ALLOWANCE NOT INCLJSEE BELOW NOT INOLJBEE BELOW NOT INCLJSEE BELOW NOT INCLJSEE BELOW NOT INCLJSEE BELOW NOT INCLJSEE BELOW NOT INCLJSEE BELOW 0 ICI. IN SEPERATE OMP FOR DUCT BANK 8 WATER MAIN 0 ICL 1N SEPERATE OMP FOR DUOT BANK 8 WATER MAIN 0 KM IN SEPERATE OMP FOR DUCT BANK & WATER MAIN NIC NOT INCLJSEE BELOW 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 INCLUDED IN GENERAL. CONDITIONS P410• BY OWNER INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED 0 0.00 3,004 0.04 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 800 0.01 880 0.01 0 0.00 0 0.00 14,000 0.14 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 o 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0210131'200: 2 PM JAMES A MMINGS, INC. 1 VILLAGE OF ► ,ISCAYNE VILLAGE OF KEY BISCAYNE SITE & SITE INFRASTRUCTURE ARCHITECT: *WILLIS CANDELA DMJM IMP PROPOSAL DATE: FEBRUARY 8, 2002 PHASE 2 WITHOUT PP&L AND SOUTHERN BELL PERNWOOD ROAD PROM WEST ENID DRIVE TO WEST MCINTYRE STREET TOTAL AREA 102,000 SP ITEM SECTION DESCRIPTION MATERIAL LABOR SUB TOTAL SUBCONTRACTORS NAME GRAND TOTAL OAS? 1AJA .B 1.6 SA 8.8 L0 DRWOS. DIMS. DRWOS. DRUMS. DRWIS. DRWOS. DRWSS. DINGS. DRWOS. DRWGS. 4 02220 (SPIL) 1.0.0.1 .2 8.2 SA DRWO*. DRWOS. 3.4A .B .0 6 02111 (SPIL) 2.1 2.2 2.3 PROTECT EXISTING TO REMAIN ENVIORNMENTAL PROTECTION TRAFFIC MAINTENANCE PLL HOLES AND HAZARDOUS OPENINGS REMOVE MATERIALS AND DEBRIS PROM SITE SALVABLE MATERIALS REMOVE EXISTING BANKIIUILDIN3 DEPARTMENT BUILDING REMOVE EXISTING BLDG. a SOUTH SIDE OP SITE REMOVE SITE WALLS 1 FOOTINGS REMOVE SIDEWALKS REMOVE PP&L LIGHT POLES REMOVE PP&L POWER POLES & PULL BOXES RELOCATE PP6►L POWER POLES A PULL BOXES SURFACE DEMOLITION SAWOUTTING EXISTING ASPHALT REMOVE ASPHALT SURFACE & BASE EARTHWORK PROTECT EXISTING STRUCTURES 1 PROPERTY PROTECT EXISTING STREETS & SIDEWALKS LAYOUT & AS•BULTS CLEARING & CRUISING REMOVE EXISTING TREES RELOCATE EXISTING TRIES REMOVE & DISPOSE OF SURFACE LITTER O DEBRIS STRIP & STOCKPILE TOPSOIL REMOVE TOP 2' OP SOIL WITHIN CONSTRUCTION AREA DISPOSAL OF UNSUITABLE MATERIAL SITE FILLING & COMPACTION PROOF ROLL OUT SURFACE EXCAVATION FOR STRUCTURES BACKPILL AND COMPACTING DISPOSE OP EXCESS MATERIALS DIWATIRING(NO OONO. PLACID IN WATER) TESTING SY OWNER PREPARATION FOR TOPSOIL ABPHALTIO CONCRETE PAVING SUSORADI STABILIZATION 12" BASE COURSE UNFROCK 8" PRIME & TACK COATS 02/08/2002 03:32 PM 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 NIC NIC NIC 1410 N10 NM NIC NIC N10 N)C NIC NIC O 0 0 0 O 0 0 0 O 0 0 0 O 0 0 0 O 0 68,776 68,776 O 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 O 0 0 0 o 0 0 0 NIC NIC NIC NIC 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 O 0 0 0 O 0 0 0 0 0 0 0 NOT REQUIREDI NOT INCLUDED NOT REQUIREDI NOT INCLUDED NOT REQUIREDI NOT INCLUDED NOT REQUIREDI NOT INCLUDED NOT REQUIREDI NOT INCLUDED 1407 REQUIREDI NOT INCLUDED NOT REQUIREDI NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIREDI NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT INCLJSEE BELOW NOT MOUSSE BELOW NOT INCLJSEE BELOW NOT REQUIREDI NOT INCLUDED NOT REQUIREDI NOT INCLUDED NOT REQUIREDI NOT INCLUDED METRO ENGINEERING INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED NIC •BYOWNER INCLUDED INCLUDED INCLUDED NOT INCLUDED INCLUDED INCLUDED NOT INCLJSEE BELOW INCLUDED INCLUDED INCLUDED NIC • BY OWNER INCLUDED INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 o 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 o 0.00 0 0.00 0 0.00 68,776 0.60 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 JAMES A. CUMMINGS, INC. 2 VILLAGE OF KEY BISCAYNE VILLAGE OF KEY BISCAYNE SITE 0 arm INFRASTRUCTURE ARCHITECT: SPILL'S CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY II, 2002 PHASE 2 WITHOUT PPOL AND SOUTHERN BELL PERNWOOD ROAD FROM WEST ENID DRIVE TO WEST MCINTYRE STREET TOTAL AREA 102,000 SF ITEM SECTION DESCRIPTION MATERIAL LABOR SUB TOTAL _ SUBCONTRACTORS NAME GRAND TOTAL WS? 2.4 3.2 ASPHALTIC CONCRETE 1 112' TYPE S TESTING BY OWNER PAVEMENT RESTORATION DRWOS. NEW MEDIAN OUT AT CRANDON BLVD. DRWOS. MODIFY EXISTING MEDIAN OUT AT CRANDON BLVD. NO OPEC PORTLAND CEMENT CONCRETE PAVINO 02014 (SPIL) CONO. SIDEWALKS, CURBS, CURES & GUTTERS & WHEEL STOPS 0.1 CONCRETE SIDEWALKS 1.2 CURBS S.3 CURBS a OUTTERS OA TESTING EY OWNER DRWOS 5' CONCRETE BASE FOR PAVERS AT PIRESTATION CURB CUT DRWOS 4' CONCRETE SIDEWALKS DRWOS 12' & 24" WIDE CONCRETE BANDS DRWOS COLORED CONO. AT CURBS, GUTTERS, SIDEWALKS & BANDS DRWO$ CURES AT TREE ORATES SEE SITE CONCRETE WINDOW 02150 (SPIL) PAVEMENT MARKING 1.2 PER PDOT SPECIFICATIONS 3.0 SPARE PAINT NO SPED. SITE IMAGE NO SPEC. TRAFFIC SIONALIZATICN 8 04222 (SPIL) 1.1.140 3.1.A .0 3.1 0200 1.S.A.1 .2 .0 2.1.A 22 2.0 2A 2.1 2.5 2.1A 3.2 EXCAVATION, BAOKFILLING AND COMPACTING FOR UTILITES PROTECT EXISTING UTILITIES, SIDEWALKS & STREETS HAND EXCAVATION DEWATERING REMOVE UNSATISFACTORY SOIL TESTING BY OWNER WATER DISTRIBUTION WATER METERS TAP TO THE EXISTING LINES METER DEPOSITS 0 SERVICE CONNECTION CHARGES BY OWNER DUCTILE IRON Wl CEMENT MORTAR LINING JOINTS FITTINGS 0 SPECIAL ITEMS VALVES OAST IRON VALVE BOXES FMB HYDRANTS DISINFECTION COPPER PIPING FOR WATER SERVICE LINES 3" OR LESS 0 INCLUDED IN EARTHWORK 0 NIC - BY OWNER 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 0 0 o 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 o 0 0 0 o 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 O 0 0 0 5,140 4,440 1,837 1203 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NO BID NO BID NO BID 0 0 0 0 o 0 8,450 O 0 0 0 0 0 0 0 0 o 0 0 O 0 0 O 0 0 O 0 0 0 0 0 O 0 0 0 0 0 O 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK NO118 SHOWN/ NONE INCLUDED INCLUDED IN EARTHWORK & SITE CONCRETE INCLUDED IN SITE CONCRETE INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK NIC • EY OWNER INCLUDED IN SITE CONCRETE INCLUDED IN SITE CONCRETE INCLUDED IN SITE CONCRETE INCLUDED IN EARTHWORK A art CONCRETE INCLUDED IN SITE CONCRETE JAC INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK NOT INCLUDED BY OWNER 0 8,480 MEOATRAN/ BONDED 0 INCLUDED 0 INCLUDED 0 INCLUDED 0 NOT INCLUDED 0 NIC•BYOWNER 0 (OLIN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 NIC • BY OWNER 0 ICL IN SEPERATE OMP FOR DUCT BANK 0 WATER MAIN 0 NIC - BY OWNER 0 ICL IN SEPERATE OMP FOR DUCT BANK 0 WATER MAIN 01C1. IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 IOL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 (OLIN SEPERATE OMP FOR DUCT BANK 0 WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICL 1141 SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 o o.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 111,130 0.15 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 o 0.00 8,400 0.08 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 O 0.00 02/08/2002 .PM JAMES A MINGS, INC. 3 VILLAGE OF .ISCAYNE VILLAGE OF KEY BISCAYNE SITE 3 317E INFRASTRUCTURE ARCHITECT: SPILLS CANDELA DMJM OMP PROPOSAL DATE: FEBRUARYS, 2002 PHASE 2 WITHOUT FP&L AND SOUTHERN BELL FERNWOOD ROAD PROM WEST ENID DRIVE TO WEST MCINTYRE STREET TOTAL AREA 102,000 SP ITEM SECTION DESCRIPTION MATERIAL LABOR SUB TOTAL SUBCONTRACTORS NAME GRAND TOTAL II/SF 3.3 3.10 3.11+11 3.12+13 DRWO$ DRWOS DRWOS 02720 2.1.A .5 2.2 2.3+4 3.3 3.S DRWOS. DRWOS. DRWOS. DRWOS. DRWG$. DRWOS. NO SPEC 7 02117 2.2 !.S 2.4 JL S.3.A .0 .E 3.4.1 .D .1-0 31 DRWGS. DUCTILE IRON PIPING FOR WATER SERVICE LINES 4" OR LARGER THRUST BLOCKS TESTING SY CONTRACTOR DISINFECTION 3 CONNECTION TO EXIST. WATER MAINS BACKPLOW PREVENTORS A DOW'S ADJUST EXISTING WATER METER VAULT REMOVE EXISTING WATER METER VAULTS OAP EXISTING WATER LINES PROVIDE WATER SERVICE TO FOUNTAIN PROVIDE WATER SERVICE TO IRRIGATION STORM DRAINAGE SYSTEM CORRUGATED ALUMINUM PIPE CORRUGATED STEEL PIPE W/ BITUMINOUS COATING DRAINAGE STRUCTURES BALLAST ROOK • PLASTIC FILTER FABRIC EXPILTRATION TRENCH TESTING BY CONTRACTOR ADJUST EXISTING CATON BASINS TO REMAIN OAP EXISTING STORM SEWER REMOVE EXISTING CATCH BASINS AND ASSOCIATED PIPING REMOVE EXISTING TRENCH DRAIN REMOVE EXISTING FRAME • GRATE AND PROVIDE NEW EXFILTRATION TRENON T013' BELOW EXISTG GROUND ELEV. SANITARY SEWER SYSTEM PIPE, FITTINGS 11, MANHOLES TESTING • INSPECTION BY CONTRACTOR SANITARY SEWER FOR FOUNTAIN SOLID INTERLOCKING OONO. PAVERS 3111" THICK KEY SHAPE 1 RECTANG. AT EDGES EDON RESTRAINTS SAND LAYING COURSE 1" SAND FOR JOINTS OUT PAVERS WITH MASONRY SAW TOLERANOEr 1A2. OFFSET a lir IN 10' FROM LEVEL EXPANSION & CONTROL JOINTS • SEALANT PILLED SOIL STERILIZER VIBRATE CONC. PAVERS INTO LEVELING COURSE SAND PILL AT JOINTS REPAIR, CLEANING Il PROTECTION CONCRETE PAVER ROADWAYS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ICI. IN SEPERATE OMP FOR DUCT BANK 3 WATER MAIN 0 0 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 0 0 ICL IN SEPERATE OMP FOR DUCT BANK 3 WATER MAIN 0 0 0 ICL IN SEPERATE OMP POR DUCT BANK A WATER MAIN 0 0 0 NONE SHOWN/NONE INCLUDED 0 0 O ICL IN SEPERATE OMP POR DUCT BANK A WATER MAIN 0 0 0 101 IN SEPERATE OMP FOR DUCT BANKS WATER MAIN 0 0 0 ICL IN SEPERATE OMP FOR DUCT BANK A WATER MAIN 0 0 0 NOT REQUIRED/ NOT INCLUDED O 0 0 INCLUDED IN PHASE 1 0 0 0 INCLUDED 0 0 0 INCLUDED O 0 0 INCLUDED 0 0 0 INCLUDED 0 0 0 INCLUDED 0 0 0 INCLUDED 0 0 0 INCLUDED 0 0 0 INCLUDED 0 0 0 INCLUDED 0 0 0 INCLUDED 0 0 0 INCLUDED 0 0 0 INCLUDED 0 0 0 INCLUDED 0 0 0 NCLUDED IN SEPERATE OMP FOR ADMIN/POLICE BLDG 0 0 0 NCLUDED IN SEPERATE OMP FOR ADMlNIPOLIOE 51.00 0 0 0 NCLUDED IN SEPERATE OMP FOR ADMIN/POLICE BLDG 0 0 0 NOT REQUIRED/ NOT INCLUDED 0 0 0 0 3,417 3,417 HOLLYWOOD STONE/ BONDED O 0 0 INCLUDED AS 2.3/8' RECTANGULAR 0 0 0 INCL 0 0 0 INCL 0 0 0 INCL 0 0 0 INOL 0 0 0 INCL 0 0 0 NOT REQUIRED/ NOT INCLUDED O 0 0 INCL 0 0 0 INCL 0 0 0 INCL 0 0 0 INCL 0 0 0 11401 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 3,417 0.02 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 O 0.00 0 0.00 0 0.00 02/08/2002 03:32 PM JAMES A. CUMMINGS, INC. 4 VILLAGE OF KEY BISCAYNE VILLAGE OP KEY BISCAYNE SITE & SITE INFRASTRUCTURE ARCHITECT: SPILLIS CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY 6, 2002 PHASE 2 WITHOUT PP&L AND SOUTHERN BELL PERNWOOD ROAD PROM WEST ENID DRIVE TO WEST MCINTYRE STREET TOTAL AREA 102,000 SF ITEM I SECTION DRWOS. DRWOS. DRWOS. DRWOS. DIMS. 0 NO SPIIW DRWOS. ORWOS. DRWOS. ORWOS. DRWOS. DRWOS. NO SPEC CRWGS. DRWOS. NO SPEC DRWOS. DRWOS. ORME, DESCRIPTION MATERIAL LABOR SUB TOTAL SUBCONTRACTORS NAME GRAND TOTAL S/SF CONCRETE PAVER PARKING AREAS CONCRETE PAVER SIDEWALKS COLORED PAVERS FOR TRAFFIC MARKINGS 12" STAEILIZID SUB•GRADE r OR r LRUEROCK BASE ON SITE CONCRETE PAVERS At FIRE AND POLICE LANDSCAPING PLANT MATERIAL FLA NO.1 OR BETTER MULCH WEED CONTROL PABRIC TREE RELOCATION MAINTENANCE UNTIL FINAL ACCEPTANCE GUARANTEE • 1 YEAR FROM ACCEPTANCE SODDING CERTIFIED TURPORASSJT. AUGUSTINE OR KENTUCKY BLUE PLASTID EDGING 1' PLANTING SOIL UNDER ALL GOD GUARANTEE • 0 MONTHS FROM COMPLETION IRRIGATION EACKFLOW PREVENTER WATER METER NOSE NIES FOR MANUAL WATERING CONTROL WIRING S NO SPEC CONCRETE REINFORCEMENT, NON-STRUCTURAL WELDED WIRE MESH MATERIAL WELDED WIRE MESH LABOR NO SPEC ARCHITECTURAL PRECAST CONCRETE DRWOS. CONCRETE BOLLARDS 10 NO SPEC DRWOS. ORWGE. METAL PABRIOATKONS TREE GRATES PIPE BOLLARDS 11 DIV. 10 MISC. SPECIALTIES DRWOS. FLAGPOLES 12 DN 10 MECHANICAL DISCONNECT PLUMBING & MAKE SAFE FOR DEMOLITION 02/08/2001 t PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC NIC 0 0 6,676 0 0 NIC NIC 0 0 0 NIC NIC NIC NI0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U0 0 0 0 0 0 NIC N10 NIC NIC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC NIC 0 0 1,226 0 0 NIC NIC 0 0 0 INCL INCL INCL INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN PHASE 1 INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE NIC • EY OWNER INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE N10 • BY OWNER INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN SITE CONCRETE INCLUDED IN SITE CONCRETE INCLUDED IN SITE CONCRETE NOT INCLJSEE SELOW NOT INCLJSEE BELOW IRONSMITH/JAG NOT REQUIRED/ NOT INCLUDED NOT INCLJSEE BELOW NOT INCLJSEE BELOW NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0A0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 OAO 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 OM 0 0.00 0 0.00 0 OM 0 0.00 6,972 0.07 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 JAMES f WINGS, INC. 5 VILLAGE OF ► ,ISCAYNE VILLAGE OP KEY BISCAYNI SITE 1 SITE INFRASTRUCTURI AROHITIOT: *PLUS CANDELA DMJM OMP PROPOSAL DATE: PEINUARY $, 2002 PHASE 2 WITHOUT PP&L AND SOUTHERN BELL PERNWOOD ROAD PROM WEST ENID DRIVE TO WEST MCINTYRE STREET TOTAL AREA 102,000 SP REM I SECTION I DESCRIPTION REMOVE PRION & MAKE SAFE FOR DEMOLITION 1s DIV.18 DRWOS. DRWOS. DRWOa. DRWOS. DRWOS. DRWOS. ORWGS. DRWOS. DRWOS. DRWOS. DRWOS. DRWOS. DRWOS. DRWOS. ORWOS. DRWGS, DRWOS. DRWOS. CMS. DRWOS. DRWOS. DRWOS. ELECTRICAL ELECTRICAL DUCT BANK COMMUNICATION DUCT BANK TELEPHONE A CABLE TV DUCT BANK PP51. MANHOLES • PURNISHID BY PP&L INSTALLED BY CONTRACTOR PP&L CONDUIT • FURNISHED BY PP&L INSTALLED BY CONTRACTOR BILL$OUTH MANHOLES. PURN. A INSTALL BY CONTRACTOR COMMUNICATION MANHOLES• PURN. 5 INSTALL BY CONTRACTOR WATERPROOFING OP MANHOLES PPaI. POWER POLES • N10 TEMPORARY PP&L POWER POLES • ND PP&L CONDUCTORS & CABLES • NIC PAD MOUNTED TRANSFORMERS • RIO STREET LIGHTING PLANTIR LIGHTING PROUST LIGHTPOLE BASIS TO MEET WIND LOADING REQ. CONCRITI EQUIPMENT PADS FAIR REINFORCED PLASTIC INOLOSURES RELOCATE more LIGHT POLES S LIGHT POLE PULL BOXES • RIC RIMOVI EXISTING PP&L LIGHT POLES & PULL BOXES • RIO REMOVE EXISTING PP&L OVERHEAD POLE & POWER LINES - N10 CONNIOT10N TO FOUNTAIN PUMP & CONTROLLER ILLUMINATION 71111NG SIGNED & SEALED BY PE OONNIOTION TO IRRIGATION CONTROLLER TI MPORARY 11.107110 DISCONNIOT EXISTING S MAKE SAPI FOR DEMOLITION MODIFY IXTINT OF RESTORATION BY ADDING SURFACE WORK TO UNDEROR MATERIAL LABOR SUB o 0 0 O 0 0 0 0 0 O 0 0 0 0 0 o 0 0 0 0 0 0 0 0 o o 0 0 0 0 0 0 0 O 0 0 o 0 0 O 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 o 0 0 o o 0 O 0 0 o o 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 O 0 0 o 0 0 TOTAL SUBCONTRACTORS NAME 0 NOT REQUIRED/ NOT INCLUDED 0 0 NOT REQUIRED/ NOT INCLUDED 0 101 IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 101 IN SEPERATE OMP FOR DUOT SANK & WATER MAIN 0 101 IN SEPERATE OMP FOR DUOT BANK & WATER MAIN 0 IOL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 01011N SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 IOL 1N SEPERATE OMP FOR DUCT SANK & WATIR MAIN 0 101 IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 IOL IN SEPERATE OMP FOR DUCT BANK A WATER MAIN 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC • BY OWNER NIC - BY OWNER NIC • BY OWNER NIC • BY OWNER NOT REQUIRED! NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NIC•BYOWNER NIC • BY OWNER NIC • BY OWNER NOT REQUIRED! NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED! NOT INCLUDED GRAND TOTAL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SUBTOTAL CHICK SUBTOTAL SALES TAX 8.656 LABOR BURDEN SUBTOTAL 02/08/2002 03:32 PM 11,822 5,000 81,406 108,226 108,226 768 3,424 112,413 112,418 112,418 *18? 0.00 0.00 0.00 0.00 0.00 0.00 0.00 000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 000 0.00 0.00 0.00 0.00 0.00 0.00 1.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.10 0.00 JAMES A. CUMMINGS, INC. 6 VILLAGE OF KEY BISCAYNE VILLAGE OF KEY BISCAYNE SITE & SITE INFRASTRUCTURE ARCHITECT: 'PLUS CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY 8, 2002 PHASE 2 WITHOUT PPSL AND SOUTHERN BELL PERNWOOD ROAD PROM WEST ENID DRIVE TO WEST MCINTYRE STREET TOTAL AREA 102,000 8F ITEM ( SECTION DESCRIPTION MATERIAL LABOR SUB TOTAL SUBCONTRACTORS NAME GRAND TOTAL 818E OWNER'S PROTECTIVE LIABILITY INSURANCE BUILDER'S RISK INSURANCE PERMITS PERFORMANCE BOND SUBTOTAL DESIGN PHASE PEE CONSTRUCTION PHASE FEE EXTEND PROJECT TWO AND A HALF MONTHS FOR INFRASTRUCTURE WORK CONSTRUCTION CONTINGENCY OWNER CONTINGENCY OVERHEAD & PROFIT OWNER'S SALES TAX SAVINGS PROGRAM SUBTOTAL SUBTOTAL SUBTOTAL SUBTOTAL TOTAL THE FOLLOWING ITEMS OF WORK ARE SEPARATE OWNER ALLOWANCES WHICH ARE NOT INCLUDED IN THIS PROPOSAL AND WHICH DO NOT INCLUDE ANY CONSTRUCTION MANAGER'S MARK-UPS FOR PERMITS, TAXES, INSURANCE, SOND8, CONTINGENCIES AND OVERHEAD AND PROFIT, FOUNTAIN AT WEST MCINTYRE STREET FEATURE COLUMNS • 3 EACH TRAFFIC CIRCLE ARCHITECTURAL ELEMENT PARK GAZEBO TRELLIS ARCHITECTURAL PRECAST 0 800 800 1,350 OWNER ALLOWANCE OWNER ALLOWANCE NOT INCL. 3,887 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 110,186 1,000 120,1116 1,000 121,181 6,462 121,117 (1,898) 124,718 10,000 OWNER ALLOWANCE NIC - WORK BY OWNER 40,000 OWNER ALLOWANCE NIC - WORK BY OWNER 126,000 OWNER ALLOWANCE NIC • WORK BY OWNER 26,000 OWNER ALLOWANCE NIO - WORK BY OWNER 16,000 OWNER ALLOWANCE NIC - WORK BY OWNER 4,000 OWNER ALLOWANCE NIC - WORK BY OWNER 0 800 300 1,310 116,188 NOT INCL. 3,317 0 118,1111 1,000 120,1116 1,000 121,1111 6,462 128,1117 (1,899) 124,718 0.00 0.01 0.01 0.01 0.00 1.13 0.00 0.00 0.04 0.00 0.00 1.17 0.00 0.01 0.00 1.13 0.00 001 0.00 1.16 0.00 006 0.00 1.24 0.00 (0.02) 0,00 1.22 02/08/2002 .PM JAMES A VIINGS, INC. 7 VILLAGE OF 1 JISCAYNE VILLAGE OP KEY BISCAYNE SITE t SITE INFRASTRUCTURE ARCHITECT: !WILLIS CANDELA DMJM IMP PROPOSAL DATE: FEBRUARY 0, 2002 PHASE 2 WITHOUT PP&L AND SOUTHERN BELL FERNWOOD ROAD FROM WEST ENID DRIVE TO WEST MCINTYRE STREET ITEM SECTION DESCRIPTION MATERIAL LABOR SUB TOTAL MISC. SPECIALTIES FLORIDA POWER & LIGHT AND SOUTHERN BELL WORK PROVIDED BY OWNER TOTAL JAMES A. CUMMINGS, INC. SUBCONTRACTORS NAME 0,000 OWNER ALLOWANCE NIC - WORK BY OWNER 0 SEE ELECTRIC DUCT BANK & WATER MAIN OMP 270,000 TOTAL AREA 102,000 SF GRAND TOTAL 0/SF 8 02/0812002 03:32 PM VILLAGE OF KEY BISCAYNE VILLAGE OP KEY BISCAYNE SITE & SITE INFRASTRUCTURE ARCHITECT: !WILLIS CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY II, 2002 PHASE 3 WITHOUT PP&L AND SOUTHERN BELL VILLAGE GREEN WAY FROM WEST MCINTYRE STREET UP TO THE NORTH SIDE OF THE FIRE STATION DRIVEWAY TOTAL AREA 102,000 SF ITEM 1 SECTION 1 DESCRIPTION MATERIAL LABOR SUB TOTAL SUBCONTRACTORS NAME GRAND TOTAL. i/SP 1 GENERAL CONDITIONS BEE WINDOW EXTEND PROJECT TWO AND A HALF MONTHS FOR INFRASTRUCTURE WOR NOTE: WORK FROM CRANDON BLVD 191' WEST ALONG NORTH VILLAGE ORION WAY 18 NOT INCLUDED AND SHALL BE PROVIDED BY OTHERS 00320 (SPIL) SOIL INVESTIGATION DATA REPORT EY K1,B NO SPEC COORDINATION DRAWINGS NO SPEC FIELD ENGINEERING PINAL SURVEY NO SPEC OWNER ALLOWANCES • FURNISH/INSTALL COMPLETE 1, ON•BITE LANDBOAPINOISOD/IRRIGATION 2. FOUNTAIN AT WEST MCINTYRE STREET 3, FEATURE COLUMNS • 0 EACH 4. TRAFFIC OIROLI ARCHITECTURAL ELEMENT 1. PARK GAZEBO O. TRELLIS 1. ARCHITECTURAL PRECAST S. MISC. SPECIALTIES 1. COMMUNICATION DUCT BANKS BETWEEN BLOCS 10. POLIO/ SECURITY CONDUIT 11. FIRE SECURITY CONDUIT 12, FLORIDA POWER A LIGHT AND SOUTHERN BELL N0 RIO CONSTRUCTION PHOTOGRAPHS 110 SPEC QUALITY CONTROL BY OWNER 2 NC SPEC DRWOB. DRWOS. DRWOS. DRWO$. DRW0& DRWOS. MAINTENANCE OP TRAFFIC TEMPORARY PENCE BARRICADES PLASTIC DRUMS SIONAOE WARNING LIGHTS & FLASHERS ALL *IGNAOE 11, BARRICADES PER PDOT SPEC MAINTENANCE OP 810NA0E & BARRICADES 3 02010 (SPIL) bIMOLITION, REMOVALS AND RELOCATION 1.3 COORDINATION 02/08/200'2 .PM NIC NIC NIC NIC NIC N10 NIC NI0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC N10 NIC NI0 NIC N10 NIC NIC 0 0 0 0 2,967 2,967 JAC 0 0 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 0 0 0 0 0 0 0 0 0 0 0 0 0 400 0 440 0 0 o 0 0 1,000 NIC NIC NIC NIC NIC NIC NIC 0 0 0 NIC 0 0 IN GC'8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 400 440 0 0 6,000 NIC N10 NIC NI0 NIC NIC NIC JAC JAC/BALANCE IN SITEWORK' JAOIWAG OWNER ALLOWANCE NOT INCLJSIIiI BELOW NOT INCLJBEE BELOW NOT INCL./SEE BELOW NOT INCLJBEE BELOW NOT INOLJSEE BELOW NOT INCLJBEE BELOW NOT INCLJBEE BELOW 0 IOL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 101 IN BEPERATE OMP FOR DUO! BANK & WATER MAIN 0 IOL IN MODERATE OMP FOR DUCT BANK & WATER MAIN NIC NOT INCL./SEE BELOW 0 0 INCLUDED IN GENERAL CONDITIONS 0 0 P410• EY OWNER 0 0 INCLUDED IN EARTHWORK 0 INCLUDED IN EARTHWORK 0 INCLUDED IN EARTHWORK 0 INCLUDED IN EARTHWORK 0 INCLUDED IN EARTHWORK 0 INCLUDED IN EARTHWORK 0 INCLUDED IN EARTHWORK 0 INCLUDED IN EARTHWORK 0 0 NOT REQUIRED/ NOT INCLUDED 0 NOT REQUIRED/ NOT INCLUDED 0 0.00 2,967 0.03 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 400 0.00 440 0.00 0 0.00 0 0.00 6,000 0.06 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 OAO 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 JAMES P MINGS, INC. 1 VILLAGE OF ,1SCAYNE VILLAGE OF KEY BISCAYNE SITE & SITE INFRASTRUCTURE ARCHITECT: SPILL'S CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY 8, 2002 PHASE 3 WITHOUT FP&L AND SOUTHERN BELL VILLAGE GREEN WAY FROM WEST MCINTYRE STREET UP TO THE NORTH SIDE OP THE FIRE STATION DRIVEWAY TOTAL AREA 102,000 SF ITEM _ SECTION DESCRIPTION MATERIAL LABOR SUB TOTAL SUBCONTRACTORS NAME GRAND TOTAL 1118, IAA .B 11 3A S.1 S.0 DRWGS. DRUMS. DRWOS. ORWSS. DRWO$. DRWOS. DRWGS. DRWOC. DRWOS. ORWOE. PROTECT EXISTING TO REMAIN ENVIORNMENTAL PROTECTION TRAFFIC MAINTENANCE PILL HOLES AND HAZARDOUS OPENINGS REMOVE MATERIALS AND DEBRIS FROM SITE SALVABLE MATERIALS REMOVE EXISTING BANK/BUILDINO DEPARTMENT BUILDING REMOVE EXISTING BLDG. * SOUTH SIDE OP SITE REMOVE SITE WALLS & POOTINOS REMOVE SIDEWALKS REMOVE PP&L LIGHT POLES REMOVE PP&L POWER POLES & PULL BOXES RELOCATE PP&L POWER POLIO & PULL BOXES SURFACE DEMOLITION SAWOUTTING EXISTING ASPHALT REMOVE ASPHALT SURFACE & BASE 4 02220 (SPIL) EARTHWORK 1.8.8.1 PROTECT EXISTING STRUOTURES & PROPERTY .2 8.2 8.8 DRWO$. DRWOS. SA.A .B .0 3.• Ji 2.S 3.7 8.8 3.8 3.10 3.11 PROTECT EXISTING STREETS & SIDEWALKS LAYOUT & AS•BUILT* CLEARING S GRUBBING REMOVE EXISTING TRESS RELOCATE EXISTING TREES REMOVE & DISPOSE OP SURFACE LITTER & DEBRIS STRIP IL STOCKPILE TOPSOIL REMOVE TOP 2' OF SOIL WITHIN CONSTRUCTION AREA DISPOSAL OP UNSUITABLE MATERIAL SITE PILLING & COMPACTION PROOF ROLL CUT SURFACE EXCAVATION FOR STRUCTURES BACKPILL AND COMPACTING DISPOSE OP EXCESS MATERIALS DEWATERING(NO 00110. PLACED 1N WATER) TESTING BY OWNER PREPARATION FOR TOPSOIL • 02011($PIL) ASPHALTIC CONCRETE PAVING 2.1 SUBORADE STABILIZATION 12" 2.2 EASE COURSE LIMEROCK 8" 2.3 PRIME & TACK COATS 02/08/2002 03:35 PM NIC NIC NIC NIC 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC NIC NIC NIC 0 0 0 0 0 0 0 0 0 0 NIC NIC NIC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 32,323 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC 0 0 0 0 0 0 0 0 0 0 NIC NIC NIC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 32,320 0 0 0 0 0 0 0 0 0 0 0 0 NIC 0 0 0 O 0 0 0 0 0 0 NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT INOLJSEE BELOW NOT INCLJSEE BELOW NOT INCL./SEE BELOW NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED METRO ENGINEERING INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED NIG • EY OWNER INCLUDED INCLUDED INCLUDED NOT INCLUDED INCLUDED INCLUDED NOT INCLJSEE BELOW INCLUDED INCLUDED INCLUDED NIC - BY OWNER INCLUDED INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 32,323 0.32 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 JAMES A. CUMMINGS, INC. 2 VILLAGE OF KEY BISCAYNE VILLAGE OP KEY BISCAYNE SITE & SITE INFRASTRUCTURE ARCHITECT: SPILLIS CANDELA DMJM GMP PROPOSAL DATE: FEBRUARY 6, 2002 PHASE 6 WITHOUT PP&L AND SOUTHERN BELL VILLAGE GREEN WAY FROM WEST MCINTYRE STREET UP TO THE NORTH SIDE OF THE FIRE STATION DRIVEWAY TOTAL AREA 102,000 SF ITEM _ SECTION DESCRIPTION MATERIAL LABOR SUB TOTAL SUBCONTRACTORS NAME GRAND TOTAL 1181' 2.4 1.2 DItWOS. CItWGS. NO SPEC 02614 (SPIL) 1.1 1.2 1.3 1,4 DRWOS ORWO$ DRYADS DRWOS DRWOS 02130 (SPIT.) 1.3 1.1 NO SPEC. NO SPEC. 0 02222 (SPIL) 1.1.1+0 1.1.A .0 3.1 02660 1.11A.1 .2 .0 2.1.A 2.2 2.3 2A 2.6 2.6 2.7.A 3.2 ASPHALTIO CONCRETE 1 112" TYPE 8 TESTING SY OWNER PAVEMENT RESTORATION NEW MEDIAN OUT AT CRANDON ILVD. MODIFY EXISTING MEDIAN OUT AT CRANDON BLVD. PORTLAND CEMENT CONCRETE PAVING OONO. SIDEWALKS, CURES, CURBS & OUTTER& & WHEEL STOPS CONCRETE SIDEWALKS CURES CURBS & GUTTERS TESTING BY OWNER r CONCRETE BASE FOR PAVERS AT PIRESTATION OURS OUT 4° CONCRETE SIDEWALKS 12" & 24" WIDE CONCRETE BANDS COLORED 00N0. AT CURBS, GUTTERS, SIDEWALKS & BANDS CURBS AT TREE GRATES SEE SITE CONCRETE WINDOW PAVEMENT MARKING PER PDOT SPECIFICATIONS SPARE PAINT SITE SIGNAOR TRAFFIC SIGNALIZATION EXCAVATION, BACKPILLING AND COMPACTING FOR UTILITEB PROTECT EXISTING UTILITIES, SIDEWALKS & STREETS HAND EXCAVATION DEWATERINO REMOVE UNSATISFACTORY 8011. TESTING BY OWNER WATER DISTRIBUTION WATER METERS TAP TO THE EXISTING LINES METER DEPOSITS & SERVICE OONNEOTION OHAROEB BY OWNER DUOTILE IRON WI CEMENT MORTAR LINING JOINTS FITTINGS & SPECIAL ITEMS VALVES OAST IRON VALVE BOXES FIRE HYDRANTS DISINFECTION COPPER PIPING FOR WATER SERVICE LINES 3" OR LESS 0 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 331 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2,110 0 0 0 0 0 0 0 a 0 0 0 0 0 0 0 0 0 0 0 0 310 0 0 0 0 NO BID NO BID NO BID 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 INCLUDED IN EARTHWORK 0 NIC • BY OWNER 0 IOL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 0 0 0 0 0 0 0 0 0 0 0 0 2,811 0 0 0 0 0 0 0 0 0 0 0 0 INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK NONE SHOWN/ NONE INCLUDED INCLUDED IN EARTHWORK & SITE CONCRETE INCLUDED IN SITE CONCRETE INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK NI0 • BY OWNER INCLUDED IN SITE CONCRETE INCLUDED IN SITE 00NORETE INCLUDED IN SITE CONCRETE INCLUDED IN EARTHWORK & SITE CONCRETE INCLUDED IN aITE CONCRETE JAC INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK NOT INCLUDED BY OWNER INCLUDED IN PHASE 1 INCLUDED IN PHASE 1 INCLUDED IN PHASE 1 INCLUDED IN PHASE 1 NOT INCLUDED NIC • BY OWNER 0 I0L IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 NIC•BYOWNER 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 NIO • SY OWNER 0 I0L IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 101 IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 IOL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE GMP FOR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 I0L IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 0.00 0 0.00 0 0.00 0 0.00 0 OA0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 4,333 0.04 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 02/08/2002 ..i PM JAMES R VIINGS, INC. 3 VILLAGE OF I SCAYNE VILLAGE OP KEY BISCAYNE SITE & SITE INFRASTRUCTURE ARCHITECT: SPUN CANDELA DMJM OMP PROPOSAL DATE: PEEBRUARY 1, 2002 PHASE 3 WITHOUT FPSL AND SOUTHERN BELL VILLAGE GREEN WAY FROM WEST MCINTYRE STREET UP TO THE NORTH SIDE OF THE FIRE STATION DRNEWAY ITEM 1 SECTION 1 DESCRIPTION MATERIAL LABOR sue TOTAL SUBCONTRACTORS NAME TOTAL AREA 102,000 8P GRAND TOTA WISP 3.3 3.10 1.11+11 3.12+13 DRWGS DRWGS DRWGS 02120 2.1A .B 2.2 24+4 3.8 3.i DIMS. DRWG$. DRWOS. DRWOS. ORWOS. PRIGS. NO SPED 7 02117 2.2 2.3 2.4 A 1.3.A .D .1 34.1 .D ,S-0 3.i DRWGS. DUCTILE IRON PIPING POR WATER SERVICE LINES 4" OR LARGER THRUST BLOCKS TESTING BY CONTRACTOR DISINFECTION & CONNECTION TO EXIST. WATER MAINS BACKFLOW PREVENTORS 8 DM'S ADJUST EXISTING WATER METER VAULT REMOVE EXISTING WATER METER VAULTS OAP EXISTING WATER LINES PROVIDE WATER SERVICE TO FOUNTAIN PROVIDE WATER SERVICE TO IRRIGATION STORM DRAINAGE SYSTEM CORRUGATED ALUMINUM PIPE CORRUGATED *7EEL PIPE W/ BITUMINOUS COATING DRAINAGE STRUCTURES BALLAST ROCK & PLASTID FILTER FABRIC EXPILTRATWN TRENCH TESTING EY CONTRACTOR ADJUST EXISTING CATCH BASINS TO REMAIN OAP EXISTING STORM SEWER REMOVE EXISTING DATOH BASINS AND ASSOCIATED PIPING REMOVE EXISTING 7RENOH DRAIN REMOVE EXISTING PRAMS & ORATE AND PROVIDE NEW EXPILTRATION TRENCH T010' BELOW emirs GROUND ELEV. SANITARY SEWER SYSTEM PIPE, FITTINGS 8 MANHOLES TESTING It INSPECTION BY CONTRACTOR SANITARY SEWER FOR POUNTAIN SOLID INTERLOCKING 00110. PAVERS 3115" THICK KEY SHAPE A RECTANG. AT EDGES DOS RESTRAINTS SAND LAYING COURSE 1" SAND FOR JOINTS OUT PAVERS WITH MASONRY SAW TOLERANCE* 1132" OFFSET 811Y IN 10' PROM LEVEL EXPANSION & 0081801 JOINTS • SEALANT FILLED SOIL STERILIZER VIBRATE CONC. PAVERS INTO LEVELING COURSE SAND FILL AT JOINTS REPAIR, CLEANING & PROTECTION CONCRETE PAVER ROADWAYS 02/05/2002 03:35 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7,242 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7,242 0 0 0 0 0 0 0 0 0 0 0 0 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 IOL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICI. IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 101.111 SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 NONE BHOWNINONE INCLUDED 0 101 IN BEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 101 IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NOT REQUIRED/ NOT INCLUDED INCLUDED IN PHASE 1 INCLUDED IN PHASE 1 INCLUDED IN PHASE 1 INCLUDED IN PHASE 1 INCLUDED IN PHASE 1 INCLUDED IN PHASE 1 INCLUDED IN PHASE 1 INCLUDED IN PHASE 1 INCLUDED IN PHASE 1 INCLUDED IN PHASE 1 INCLUDED IN PHASE 1 INCLUDED IN PHASE 1 INCLUDED IN PHASE 1 INCLUDED IN PHASE 1 0 NCLUDED 1N SEPERATE OMP FOR ADMINIPOLICE BL00 0 NCLUDED IN SEPERATE OMP FOR ADMIN/POLICE 11.00 NCLUDED IN SEPERATE GMP FOR ADMIN/POLICE BLDG NOT REQUIRED/ NOT INCLUDED HOLLYWOOD STONE/ BONDED INCLUDED AS 2415' RECTANOULAR INCL INCL INCL INCL INCL NOT REQUIRED/ NOT INCLUDED 11401 INCL INCL INCL INCL 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 7,242 0.07 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 o o.00 0 0.00 0 0.00 0 0.00 O 0.00 O 0.00 0 0.00 JAMES A. CUMMINGS, INC. 4 VILLAGE OF KEY BISCAYNE VILLAGE OF KEY BISCAYNE SITE S SITE INFRASTRUCTURE ARCHITECT: SPILLIS CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY S, 2002 PHASE 8 WITHOUT FP&L AND SOUTHERN SELL VILLAGE GREEN WAY FROM WEST MCINTYRE STREET UP TO THE NORTH SIDE OF THE FIRE STATION DRIVEWAY TOTAL AREA 102,000 SF ITEM _ SECTION DESCRIPTION MA7ERWL LABOR SUB _ TOTAL SUBCONTRACTORS NAME GRAND TOTAL 1N5F DRUMS. DRWG$. DRWGS. DRWG$. DRWO$. E NO SPIV DIMS. DRWOS. DRWOS. DRWGS. DRWS$. DRWGS. NO SPEC DRWOS. DRWGS. NO SPEC ORWOS. DIMS. DRWOS. 0 NO SPED NO SPEC DRWOB. 10 NO SPEC DIMWGS. DRWO$. 11 DIV.10 DIMS. 12 ON 10 02/08/200k CONCRETE PAVER PARKING AREAS CONCRETE PAVER SIDEWALKS COLORED PAVERS FOR TRAFFIC MARKINGS 12" $TABILIZ1D SUB4RADE r OR IP LMEROCK BABE ON SITE CONCRETE PAVERS AT FIRE AND POLICE LANDSCAPING PLANT MATERIAL FLA N0.1 OR BETTER MULCH WEED CONTROL FABRIC TREE RELOCATION MAINTENANCE UNTIL FINAL ACCEPTANCE GUARANTEE • 1 YEAR FROM ACCEPTANCE SODDING CERTIFIED TURPORASS4T. AUGUSTINE OR KENTUCKY BLUE PLASTIC EDGING 1" PLANTING SOIL UNDER ALL SOD GUARANTEE • 0 MONTHS FROM COMPLETION IRRIGATION EACKPLOW PREVENTER WATER METER HOSE 1115 POR MANUAL WATERING CONTROL WIRING CONCRETE REINFORCEMENT, NON41RUCTURAL WELDED WIRE MESH MATERIAL WELDED WIRE MESH LABOR ARCHITECTURAL PRECAST 0010RETE CONCRETE BOLLARDS METAL PABRIOATIONS TREE GRATES PIPE BOLLARDS MIBO. SPECIALTIES FLAGPOLES MECHANICAL DISCONNECT PLUMBING & MAKE SAFE FOR DEMOLITION 5 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N10 NIC 0 0 8,192 0 0 NIC NIC 0 0 0 NIC NI0 N10 NIC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 800 0 0 0 0 0 NIC NIC NIC NIC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC NIC 0 0 8,792 0 0 NIC NIC 0 0 0 INCL INCL INCL INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN PHASE 1 INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE NIC - BY OWNER INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE NIC • BY OWNER INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN 811E CONCRETE INCLUDED IN SITE CONCRETE INCLUDED IN SITE CONCRETE NOT INCLJSEE BELOW NOT INCLJSEE BELOW IRONSMITH/JAC NOT REQUIRED/ NOT INCLUDED NOT INCLJSEE BELOW NOT INCLJSEE BELOW NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 o 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 7,80* 0.07 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 JAMES 1 IMINGS, INC. 5 VILLAGE OF ► .ISCAYNE VILLAGE OP KEY BISCAYNE SITE & SITE INFRASTRUCTURE ARCHITECT: SPILLNI CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY 11, 2002 PHASE 6 WITHOUT FP&L AND SOUTHERN BELL VILLAGE GREEN WAY PROM WEST MCINTYRE STREET UP TO THE NORTH SIDE OP THE FIRE STATION DRIVEWAY TOTAL AREA 102,000 SF ITEM SECTION 18 DIV. 111 DRWGS. ORWOS, CREWS. DRWGS. ORWOS. DRWOS. DIMS. DRWOS. DRWOS. DIVAS. DRWOS. DRWOS. DREGS. DRWOS. DRWOS. ORME DRWGS. DRWOS. CRINGE DRWOS. DRWG$. DESCRIPTION REMOVE FREON i MAKE SAFE FOR DEMOLITION ELECTRICAL ELECTRICAL DUCT BANK OOMMUNIOATION DUCT BANK TELEPHONE & CABLE 'TV DUCT BANK PP&1. MANHOLES • FURNISHED BY PP&L INSTALLED BY CONTRACTOR PP&L CONDUIT • FURNISHED BY PP&L INSTALLED BY CONTRACTOR BELLSOUTH MANHOLES. PURN. & INSTALL EY CONTRACTOR COMMUNIOATION MANHOLES. PURN. & INSTALL BY CONTRACTOR WATERPROOFING OP MANHOLES PP&L POWER POLES • NIO TEMPORARY PP&L POWER POLES • NIO PP&L CONDUCTORS • CABLES • NIC PAD MOUNTED TRANSFORMERS • NIO STREET LIGHTING PLANTER LIGHTING PRECAST LIOHTPOLE BASES TO MEET WIND LOADING REQ. CONCRETE EQUIPMENT PADS FIBER REINFORCED PLASTIC ENCLOSURES RELOCATE EXNIT'0 LIGHT POLES & LIGHT POLE PULL BOXES • NIC REMOVE EXISTING PP&L LIGHT POLES & PULL BOXES • NIC REMOVE EXISTING PP&L OVERHEAD POLE & POWER LINES • NIC CONNECTION TO POUNTAIN PUMP & CONTROLLER ILLUMINATION TESTING SIGNED A SEALED BY PE CONNECTION TO IRRIGATION CONTROLLER TEMPORARY ELECTRIC DISCONNECT EXISTING & MAKI SAFE FOR DEMOLITION MODIFY EXTENT OF RESTORATION BY ADDING SURFACE WORK TO UNDEROR MATERIAL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 LABOR 1 SUB 0 0 0 0 0 11,836 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL 0 SUBCONTRACTORS NAME NOT REQUIREDI NOT INCLUDED 0 11,836 FISKI BONDED 0 IOL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 IOL IN SEPERATE OMP FOR DUOT BANK & WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 IOL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 IOL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 IOL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0101. IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC - BY OWNER NIC • EY OWNER NIC - SY OWNER NIC • BY OWNER INCLUDED INCLUDED INCLUDED NOT REQUIRED! NOT INCLUDED NOT REQUIREDI NOT INCLUDED NIC • BY OWNER NIC • BY OWNER NIC • BY OWNER NOT REQUIRED! NOT INCLUDED INCLUDED INCLUDED IN PHASE 1 INCLUDED NOT REQUIREDI NOT INCLUDED NOT REQUIRED! NOT INCLUDED GRAND TOTAL $ISF 0 0.00 0 0.00 11,830 0.12 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 SUBTOTAL CHECK SUBTOTAL SALES TAX S.0% LABOR BURDEN SUBTOTAL 02/08/2002 03:35 PM 1,127 2,760 60,671 68,867 69,867 424 1,890 72,172 72,172 0.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 72,172 0.71 0.00 JAMES A. CUMMINGS, INC. 6 VILLAGE OF KEY BISCAYNE VILLAGE OF KEY BISCAYNE SITE & SITE INFRASTRUCTURE ARCHITECT: SPILLIS CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY 8, 2002 PHASE 6 WITHOUT FP&L AND SOUTHERN BELL VILLAGE GREEN WAY FROM WEST MCINTYRE STREET UP TO THE NORTH SIDE OF THE FIRE STATION DRIVEWAY ITEM SECTION DESCRIPTION MATERIAL LABOR SUB TOTAL OWNER'S PROTECTNE LIABILITY INSURANCE BUILDER'S RISK INSURANCE PERMITS PERFORMANCE BOND SUBTOTAL DEMON PHASE FEE CONSTRUCTION PHASE FEE EXTEND PROJECT TWO AND A HALF MONTHS FOR INFRASTRUCTURE WORK CONSTRUCTION CONTINGENCY OWNER CONTINGENCY OVERHEAD & PROFIT OWNER'S SALES TAX SAVINGS PROGRAM SUBTOTAL SUBTOTAL SUBTOTAL SUBTOTAL TOTAL THE FOLLOWING ITEMS OF WORK ARE SEPARATE OWNER ALLOWANCES WHICH ARE NOT INCLUDED IN THIS PROPOSAL AND WHICH DO NOT INCLUDE ANY CONSTRUCTION MANAGER'S MARK-UPS FOR PERMITS, TAXES, INSURANCE, BONDS, CONTINGENCIES AND OVERHEAD AND PROFIT. FOUNTAIN AT WEST MCINTYRE STREET FEATURE COLUMNS • 8 EACH TRAFFIC CIRCLE ARCHITECTURAL ELEMENT PARK GAZEBO TRELLIS ARCHITECTURAL PRECAST 0 600 400 876 SUBCONTRACTORS NAME 73,847 TOTAL AREA 102,000 SP GRAND TOTAL OWNER ALLOWANCE OWNER ALLOWANCE NOT INCL. 2,627 01CL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 78,474 100 78,874 600 77,474 3,486 80,980 (1,214) 79,746 60,000 OWNER ALLOWANCE NIO • WORK BY OWNER 40,000 OWNER ALLOWANCE NIC - WORK BY OWNER 126,000 OWNER ALLOWANCE NIC . WORK BY OWNER 26,000 OWNER ALLOWANCE NIC • WORK BY OWNER 16,000 OWNER ALLOWANCE NIC • WORK BY OWNER 4,000 OWNER ALLOWANCE NIC - WORK BY OWNER 0 500 400 876 73,047 NOT INCL. 2,627 0 76,474 600 78,874 800 77,474 3,486 80,860 (1,214) 78,746 SISF 0.00 0.00 0.00 0.01 0.00 0.72 0.00 0.00 0.02 0.00 0.00 0.76 0.00 0.00 0.00 0.71 0.00 0.00 0.00 0.76 0.00 OA 0.00 0.78 0.00 (0.01) 0.00 0.78 02/08/2002 PM JAMES A AINGS, INC. 7 VILLAGE OF 3ISCAYNE VILLAGE OF KEY BISCAYNE SITE • SITE INFRASTRUCTURE ARCHITECT: SPILLIS CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY II, 2002 PHASE $ WITHOUT PP&L AND SOUTHERN BELL VILLAGE GREEN WAY FROM WEST MCINTVRE STREET UP TO THE NORTH SIDE OF THE FIRE STATION DRIVEWAY ITEM _ SECTION -- DESCRIPTION MATERIAL LABOR SUB TOTAL MISC. SPECIALTIES FLORIDA POWER & LIGHT AND SOUTHERN BELL WORK PROVIDED BY OWNER TOTAL 02/08/2002 03:35 PM JAMES A. CUMMINGS, INC. SUBCONTRACTORS NAME •,000 OWNER ALLOWANCE NIC - WORK BY OWNER 0 SEE ELECTRIC DUCT BANK & WATER MAIN OMP 276,000 GRAND TOTAL TOTAL AREA 102,000 SF 8 VILLAGE OF KEY BISCAYNE VILLAGE OP KEY BISCAYNE SITE A SITE INFRASTRUCTURE ARCHITECT: SPILL'S CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY 8, 2002 THIS PROPOSAL IS CONTINGENT UPON CUMMINGS CONSTRUCTING THE KEY BISCAYNE CIVIC RECREATION CENTER. IN THE EVENT CUNNINGS DOES NOT CONSTRUCT THE KEY BISCAYNE CIVIC RECREATION CENTER THIS PROPOSAL SHALL BE NULL & VOID PHASE 4 WITHOUT PP&L AND SOUTHERN BELL PERNWOOD ROAD PROM WEST MCINTYRE STREET NORTH TO THE PROJECT LIMBS TOTAL AREA 102,000 SP I REM 1 SECTION ( DESORIPTION 1 GENERAL CONDITIONS SEE WINDOW EXTEND PROJECT TWO AND A HALF MONTHS FOR INFRASTRUCTURE WOR NOTE: WORK FROM CRANDON BLVD 106' WEST ALONG NORTH VILLAGE GREEN WAY NI NOT INCLUDED AND SHALL BE PROVIDED BY OTHERS 00320 (SPIL) SOIL INVESTIGATION DATA REPORT BY KU NO SPEC NO SPED NO SPEC COORDINATION DRAWINGS FIELD ENGINEERING FINAL SURVEY OWNER ALLOWANCES • FURNISH/INSTALL COMPLETE 1.ONJITE LANDSCAPINOISODARRIGATION 2. POUNTAIN AT WEST MCINTYRE STREET 8. FEATURE COLUMNS • 8 EACH 4. TRAPPIC CIRCLE ARCHITECTURAL ELEMENT 8. PARK GAZEBO 8. TRELLIS T. ARCHITECTURAL PRECAST 1. MISC. SPECIALTIES 8. COMMUNICATION DUCT BANKS BETWEEN BLDOS 10. POLICE SECURITY CONDUIT 11. PIRE SECURITY CONDUIT 12. PLORIDA POWER • LIGHT AND SOUTHERN BELL NO SPIRO CONSTRUCTION PHOTOGRAPHS NO SPEC QUALITY CONTROL EY OWNER 2 No SPEC MAINTENANCE OP TRAFFIC DRWOS. TEMPORARY FENCE DRWOS. BARRICADES DRWOS. PLASTIC DRUMS DRWOS. SIGNAOE DRWGS. WARNING LIGHTS 3 FLASHERS DRWSS. ALL NONAGE & BARRICADES PER ?DOT SPEC MAINTENANCE OP NONAGE R BARRICADES 3 02060 (SPIT,) DEMOLITION, REMOVALS AND RELOCATION 1.3 COORDINATION MATERIAL N10 NIC NIC 210 NIO NIO N10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 LABOR NIC NIC NIC N10 NIC N10 N10 NIC NIC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SUB 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 800 0 880 0 0 0 0 0 16,000 MC NIC NIC NIC NIC NIC NIO 0 0 0 NIC 0 0 IN 00'S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL SUBCONTRACTORS NAME 0 0 INCLUDE IN REC. CENTER 0MAN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 0 0 0 0 0 800 830 0 0 16,000 NIC N10 NIC 1110 N10 1110 NIO N10 JAC JAOIBALANCI IN SITEWORK' JAO/WAG OWNER ALLOWANCE NOT INCL./SRI BELOW NOT INOLJSEE BELOW NOT INCL./SEE BELOW NOT !NCI-JOBE BELOW NOT INCL./SEE BELOW NOT INCL./SEE BELOW NOT INCLJSEE BELOW 0 ICI. IN SEPERATE OMP FOR DUCT BANK 4 WATER MAIN 01CL IN SEPERATE OMP FOR DUCT BANK 3 WATER MAIN 0 IOL IN SEPERATE OMP FOR DUCT BANK A WATER MAIN NOT INCL./SEE BELOW 0 0 INCLUDED IN GENERAL CONDITIONS 0 O NIC. SY OWNER 0 0 INCLUDED N EARTHWORK O INCLUDED N EARTHWORK 0 INCLUDED N EARTHWORK 0 INCLUDED N EARTHWORK 0 INCLUDED N EARTHWORK 0 INCLUDED 04 EARTHWORK 0 INCLUDED 04 EARTHWORK 0 INCLUDED 04 EARTHWORK 0 0 NOT REQUIREDI NOT INCLUDED 0 NOT REQUIREDI NOT INCLUDED GRAND TOTAL WWI 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 800 0.01 880 0.01 0 0.00 0 0.00 16,000 0.16 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 040 0 0.00 0 0.00 0 0.00 02/0812002 PM JAMES A #RINGS, INC. 1 VILLAGE OF ,ISCAYNE VILLAGE OF KEY BISCAYNE SITE & SITE INFRASTRUCTURE ARCHITECT: SPILL'S CANDELA DMJM IMP PROPOSAL DATE: FEBRUARY 2, 2002 THIS PROPOSAL IS CONTINGENT UPON CUMMINGS CONSTRUCTING THE KEY BISCAYNE CIVIC RECREATION CENTER. IN THE MINT CUMMIN08 DOES NOT CONSTRUCT THE KEY BISCAYNE CMC RECREATION CENTER THIS PROPOSAL SHALL BE NULL & VOID PHASE 4 WITHOUT FP&L AND SOUTHERN BELL FERNWOOD ROAD FROM WEST MCINTYRE STREET NORTH TO THE PROJECT LIMITS ITEM SECTION IAA .1 1.6 SA i.6 1.S DRWGS. DRWOS. DRY/GS. DIMS. DRWGS. DWG'. ORWOS. DRWOB. ORWOS. DRWOS. PROTECT EXISTING TO REMAIN ENV1ORNMENTAL PROTECTION TRAFFIC MAINTENANCE PILL HOLES AND HAZARDOUS OPENINGS REMOVE MATERIALS AND DEBRIS FROM SITE SALVABLE MATERIALS REMOVE EXISTING BANK/BUILDING DEPARTMENT BUILDING REMOVE EXISTING BLDG. 0 SOUTH SIDI OP SITS REMOVE SITE WALLS A FOOTINGS REMOVE SIDEWALKS RIIMOVE PP&L LIGHT POLES REMOVE PP&L POWER POLES & PULL BOXES RELOCATE PP&L POWER POLES & PULL BOXES SURFACE DEMOLITION SAWOUTTINO EXISTING ASPHALT REMOVE ASPHALT SURFACE & BASE DESCRIPTION MATERIAL LABOR SUB TOTAL SUBCONTRACTORS NAME 4 02220 (SPIL) EARTHWORK 1.1.1.1 PROTECT EXISTING STRUCTURES & PROPERTY .2 PROTECT EXISTING STREETS & SIDEWALKS 1.2 LAYOUT M AS4UILTS SA CLEARING & GRUBBING ORWGS. REMOVE EXISTING TREES DRY/OS. RELOCATE EXISTING TRIES 4.4A REMOVE • DISPOSE OP SURFACE LITTER S DEBRIS .1 STRIP & STOCKPILE TOPSOIL .0 REMOVE TOP 2' OP SCR WITHIN CONSTRUCTION AREA DISPOSAL OP UNSUITABLE MATERIAL S.1 SITE PILLING A COMPACTION A PROOF ROLL OUT SURFACE 8.S EXCAVATION FOR STRUOTURII 1.7 EAOKPILL AND COMPACTING 1.S DISPOSE OP EXCESS MATERIALS 8.0 DEWATERINO(NO CONC. PLACED IN WATER) 8.10 TINTING IY OWNER 1.11 PREPARATION FOR TOPSOIL S 02211 ($PIL) ASPHALTIC CONCRETE PAVING 2.1 SUIORADI STABILIZATION 12- 2.2 BASE COURSE LMEROCK 6- 2.3 PRIME & TACK COATS NIC NIC NIC NIC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC NIC NIC N10 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 O 0 NIC NIC NIC O 0 0 0 0 0 0 0 0 12,761 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC 02/0812002 03:41 PM JAMES A. CUMMINGS, INC. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC NIC NK! 0 0 0 0 02,762 0 0 0 0 0 0 0 0 0 0 0 0 NIC 0 0 0 0 0 0 0 0 0 0 NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED! NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT INCLJSEE BELOW NOT INCLJSEE BELOW NOT INCLI8E1 BELOW NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED GRAND TOTAL METRO ENGINEERING INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED NIC - BY OWNER INCLUDED INCLUDED INCLUDED NOT INCLUDED INCLUDED INCLUDED NOT INOLJSEE BELOW INCLUDED INCLUDED INCLUDED NIC - BY OWNER INCLUDED INCLUDED 14 EARTHWORK INCLUDED IN EARTHWORK INCLUDED W EARTHWORK INCLUDED IN EARTHWORK TOTAL ARIA 102,000 SF W/SF O 0.00 O 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 62,766 0.02 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O MOO 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 2 VILLAGE OF KEY BISCAYNE VILLAGE OF KEY BISCAYNE SITE & SRI INFRASTRUCTURE ARCHITECT: SPILL* CANDELA DMJM OMP PROPOSAL DATE: FEBRUARYS, 2002 THIS PROPOSAL NI CONTINGENT UPON CUMMIN08 CONSTRUCTING THE KEY BISCAYNE CMC RECREATION CENTER. IN THE EVENT CUMMINGS DOES NOT CONSTRUCT THE KEY BISCAYNE CMC RECREATION CENTER THIS PROPOSAL SHALL BE NULL & VOID PHASE 4 WITHOUT FP&L AND SOUTHERN BELL FERNWOOD ROAD PROM WEST MCINTYRE STREET NORTH TO THE PROJECT LIMITS TOTAL AREA 102,000 SP REM SECTION DESCRIPTION MATERIAL LABOR SUB TOTAL SUBCONTRACTORS NAME GRAND TOTAL IMF 2,4 ASPHALTIC CONCRETE 1 1/Y TYPE S 3.2 TESTING BY OWNER PAVEMENT RESTORATION DRWGS. NEW MEDIAN OUT AT CRANDON BLVD. DRWOS. MODIFY EXISTING MEDIAN CUT AT CRANDON BLVD. NO SPEC PORTLAND DEMENT CONCRETE PAVING 02114 (SPIL) 00110. SIDEWALKS, CURBS, CURBS & GUTTERS & WHEEL STOPS S.1 CONCRETE SIDEWALKS 3.2 CURBS 3.3 CURBS 1 GUTTERS 1.4 TESTING BY OWNER WIGS r CONCRETE IASI FOR PAVERS AT PIRESTATION CURB CUT DRWOS 4• CONCRETE SIDEWALKS DRWOS Ir & 24" WIDE CONCRETE BANDS DRWOS COLORED 00110. AT OURS*, GUTTERS, SIDEWALKS & BANDS DRWOS CURES AT TREE GRATIS SEE SITE CONCRETE WINDOW 02110 (SPIL) PAVEMENT MARKING 1A PER FOOT SPEOIFIOATIONS Li SPARE PAINT 110 SPEC, SITE SIONAGE 110 SPEC. TRAFFIC SIONALIZATION S 02222 (SPIL) EXCAVATION, BACKPILLING AND COMPACTING FOR UTILITIS 1.1.140 PROTECT EXISTING UTILITIES, SIDEWALKS 1 STREETS HAND EXCAVATION $.1A DIIWATIRING . 0 REMOVE UNSATISFACTORY SOIL S.1 TESTING BY OWNER 0200 WATER DISTRIBUTION 1.S.A.1 WATER METERS .2 TAP TO THE EXISTING LINES .0 METIR DEPOSITS 11 SERVICE CONNECTION CHARGES BY OWNER IAA DUCTILE IRON WI CIMINT MORTAR LINING 22 JOINTS 2.3 FITTINGS a SPECIAL ITEMS 2.4 VALVES 2.1 OAST IRON VALVE BOXES LS PRE HYDRANTS 2.7A DISINFECTION 3.2 COPPER PIPING FOR WATER SERVICE LINES r OR LESS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7,400 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2,240 0 0 0 0 NO BID NO BID NO BID 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 INCLUDED IN EARTHWORK 0 N1C • BY OWNER 0 IOL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 0 0 0 0 0 0 0 0 0 0 0 0 18,312 0 0 0 0 0 0 0 0 0 0 0 0 INCLUDED 11 EARTHWORK INCLUDED IN EARTHWORK NONE SHOWN/ NONE INCLUDED INCLUDED IN EARTHWORK & SITE CONCRETE INCLUDED 1N 81TE CONCRETE INCLUDED 1r EARTHWORK INCLUDED IN EARTHWORK NIO • BY OWNER INCLUDED IN SITE CONCRETE INCLUDED IN SITE CONCRETE INCLUDED IN SITE CONCRETE INCLUDED IN EARTHWORK & SITE 00NORITE INCLUDED IN 81TE CONCRETE JAC INCLUDED IN EARTHWORK INCLUDED W EARTHWORK INCLUDED 111 EARTHWORK INCLUDED 111 EARTHWORK NOT INCLUDED EY OWNER NONE SHOWN/ NONE INCLUDED NONE SHOWN/ NONE INCLUDED NONE SHOWN/ NONE INCLUDED NONE SHOWN/ NONE INCLUDED NOT INCLUDED WO • BY OWNER 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 NIO • BY OWNER 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 NIC•BYOWNER 0 ICL IN SEPERATE OMP FOR DUCT BANK 11 WATER MAIN 0 JCL IN SEPERATE OMP FOR DUCT BANK A WATER MAIN 0 IOL IN *EMIRATE OMP FOR DUCT BANK & WATER MAIN 0101. IN SEPERATE OMP FOR DUCT WANK & WATER MAIN 010E 111 SEPERATE OMP FOR DUCT WANK & WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0101. IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 o o.00 o 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 18,835 0.10 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 o o.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 o.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 02/08/2002 ?M JAMES A. 'RINGS, INC. 3 VILLAGE OF JISCAYNE VILLAGE OF KEY BISCAYNE SITE 0 SITE INPRASTRUCTURE ARCHITECT: SPILLIS CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY 3, 2002 THIS PROPOSAL is OONTIWOENT UPON OUMMINOS CONSTRUCTING THE KEY BISCAYNE CNN! RECREATION CENTER. M THE EVENT CUNNINGS DOES NOT CONSTRUCT THE KEY BISCAYNE ONTO RECREATION CENTER THIS PROPOSAL SHALL BE NULL & VOID PHASE 4 WITHOUT PP&L AND SOUTHERN SELL PERNWOOD ROAD PROM WEST MCINTYRE STREET NORTH TO THE PROJECT LIMITS TOTAL AREA 102,000 SF ITEM SECTION DESCRIPTION MATERIAL 3.3 3.10 3.11+11 3.12+10 DRWGS DRWOS DRWOS 02720 2.1.A .5 2.2 2.IM 3.3 3.1 DRWO$. DRWOM. DRWOS. DRWOS. DRWOE. DRWOE. No SPEC 7 02117 2.2 23 2.4 A 1.3.A .0 .E 3A.B .0 .E-0 3.3 ORWGS. DUCTILE IRON PIPING FOR WATER SERVICE LINES 4" OR LARGER THRUST BLOCKS TESTING EY CONTRACTOR DISINFECTION & CONNECTION TO EXIST. WATER MAINS BAOKFLOW PREVENTORS & DDCV'S ADJUST EXISTING WATER METER VAULT REMOVE EXISTING WATER METER VAULTS OAP EXISTING WATER LINES PROVIDE WATER SERVICE TO FOUNTAIN PROVIDE WATER SERVIOS TO IRRIGATION STORM DRAINAGE SYSTEM CORRUGATED ALUMINUM PIPE CORRUGATED STEEL PIPE W/ BITUMINOUS COATING DRAINAGE STRUCTURES BALLAST ROOK & PLASTIC FILTER FABRIC EXPLTRATION TRENCH TESTING BY CONTRACTOR ADJUST EXISTING CATON BASINS TO REMAIN OAP EXISTING STORM SEWER REMOVE EXISTING CATON BASINS AND ASSOCIATED PIPING REMOVE EXI$TMIO TRENCH DRAIN REMOVE EXISTING FRAME 0 ORATE AND PROVIDE NEW EXPILTRATION TRENCH T013' BELOW EXIST'O GROUND ELEV. SANITARY SEWER SYSTEM PIPE, FITTINGS & MANHOLES TESTING 0 INSPECTION BY CONTRACTOR SANITARY SEWER FOR POUNTAIN SOLID INTERLOCKING OONC. PAVERS $ 1M" THICK KEY SHAPE & REOTANG. AT EDGES EDGE RESTRAINTS SAND LAYING COURSE 1" SAND FOR JOINTS OUT PAVERS WITH MASONRY SAW TOLERANCE'. NAY OFFSET & iir IN 10' FROM LEVEL EXPANSION & CONTROL JOINTS - SEALANT FILLED SOIL STERILIZER VIBRATE CONO. PAVERS INTO LEVELING COURSE SAND FILL AT JOINTS REPAIR, CLEANING 0 PROTECTION CONCRETE PAVER kOADWAY8 LABOR SUB TOTAL SUBCONTRACTORS NAME O 0 0 010L IN SEPERATE OMP FOR DUCT BANK A WATER MAIN O 0 0 010111 SEPERATE OMP FOR DUCT BANK 0 WATER MAIN O 0 0 0 IOL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 0 0 0 JCL IN SEPERATE OMP FOR DUCT BANK 0 WATER MAIN O 0 0 0 NONE SHOWN/NONE INCLUDED 0 0 0 0101 IN SEPERATE GMP FOR DUCT BANK 0 WATER MAIN 0 0 0 0 ICL IN SEPERATE OMP FOR DUCT BANK 0 WATER MAIN 0 0 0 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN O 0 0 0 NOT REQUIRED/NOT INCLUDED 0 0 0 0 INCLUDED IN PHASE 1 O 0 0 0 NONE SHOWN/ NONE INCLUDED 0 0 0 0 NONE SHOWN/ NONE INCLUDED O 0 0 0 NONE SHOWN/ NONE INCLUDED O 0 0 0 NONE SHOWN/ NONE INCLUDED 0 0 0 0 NONE SHOWN/ NONE INCLUDED 0 0 0 0 140111 SHOWN/ NONE INCLUDED 0 0 0 0 NONE SHOWN/ NONE INCLUDED O 0 0 0 NONE SHOWN/ NONE INCLUDED O 0 0 0 NONE SHOWN! NONE INCLUDED O 0 0 0 NONE SHOWN/ NONE INCLUDED 0 0 0 0 NONE SHOWN/ NONE INCLUDED 0 0 0 0 NONE SHOWN/ NONE INCLUDED 0 0 0 0 NONE SHOWN/ NONE INCLUDED 0 0 0 0 NOLUDED IN SEPERATE OMP FOR ADMINIPOLIOR BLDG 0 0 0 0 NCLUDED IN SEPERATE OMP FOR ADMIN/POLICE BLDG 0 0 0 0 NCLUDED IN SEPERATE OMP FOR ADMIN/POLICE BLDG O 0 0 0 NONE SHOWN/ NONE INCLUDED O 0 0 0 O 0 •,801 8,806 HOLLYWOOD STONE/ BONDED O 0 0 0 INCLUDED AS 24/6" RECTANGULAR O 0 0 0 INCL O 0 0 0 INCL. 0 0 0 0 INCL O 0 0 0 1101.. O 0 0 0 INOL O 0 0 0 NOT REQUIRED/ NOT INCLUDED O 0 0 0 INOL O 0 0 0 1101 O 0 0 0 INCL O 0 0 0 INCL O 0 0 0 INCL GRAND TOTAL $,SP 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0,806 0.07 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 02/'08/2002 03:41 PM JAMES A. CUMMINGS, INC. 4 VILLAGE OF KEY BISCAYNE VILLAGE OF KEY BISCAYNE SITE & MI INFRASTRUCTURE ARCHITECT: WILLIS CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY 8, 2002 THIS PROPOSAL NI CONTINGENT UPON CUMMINGS CONSTRUCTING THE KEY BISCAYNE CMC RECREATION CENTER. IN THE EVENT CUMMINGS DOES NOT CONSTRUCT THE KEY BISCAYNE CIVIC RECREATION CENTER THIS PROPOSAL SHALL BB NULL & VOID PHASE 4 WITHOUT FP&L AND SOUTHERN BELL PIRNWOOD ROAD PROM WEST MCINTYRE STREET NORTH TO THE PROJECT LIMITS TOTAL AREA 102,000 SP ITEM 1 SECTION DESCRIPTION MATERIAL LABOR SUB TOTAL SUBCONTRACTORS NAME GRAND TOTAL 0/1111 DRWGS. DRWOS. DRWGS. DRWO$. DRWOS. S NO SPEC DRWOE. DRWOS. DRWS$. DRWO$. DRWOS. NO SPEC DRWOS. DRWGS. NO SPEC DRWOS. DRWOS. DRWOS. CONCRETE PAVER PARKING AREAS CONCRETE PAVER SIDEWALKS COLORED PAVERS FOR TRAFFIC MARKINGS 12" STABILIZED SUB -GRADE r OR r LIMEROCK EASE ON SITE CONCRETE PAVERS AT FIRE AND POLICE LANDSCAPING PLANT MATERAAI. FLA 110.10R BETTER MULCH WEED CONTROL FABRIC TREE RELOCATION MAINTENANCE UNTIL FINAL ACCEPTANCE GUARANTEE • 1 YEAR FROM ACCEPTANCE SODDMO CERTIFIED TURFORASWT. AUGUSTINE OR KENTUCKY BLUE PLASTIC EDGING 1' PLANTING SOS. UNDER ALL SOD GUARANTEE ■ 8 MONTHS FROM COMPLETION MRIGATION BAOKPLOW PRI VINTER WATER MITER HOSE BIBS FOR MANUAL WATERING CONTROL WIRING II NO SPEC CONCRETE REINFOROEMINT, NON-STRUCTURAL WELDED WIRE MESH MATERIAL WELDED WIRE MESH LABOR NO SPEC ARCHITECTURAL PRECAST CONCRETE D*WGS. CONCRETE BOLLARDS 10 NO SPEC DRWGS. DRWGS. METAL FABRICATIONS TREE GRATES PIPE BOLLARDS 11 DIV. 10 MO. SPECIALTIES DRW08. FLAGPOLES 12 DIV 18 MECHANICAL DISCONNECT PLUMBING 0 MAKE SAFE FOR DEMOLITION 02/06/2002 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC NIC 0 0 7,740 600 0 N10 N10 0 0 0 NIC NIC N10 NIC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 760 900 0 0 0 0 N1C NIC NIC N10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 638 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC NIC 0 0 8,490 2,028 0 NIC NIC 0 0 0 INCL INCL INCL INCLUDED IN EARTHWORK INCLUDED N EARTHWORK INCLUDED IN PHASE 1 INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE NIC • BY OWNER INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE NIC • BY OWNER INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN SITE CONCRETE INCLUDED IN SITE CONCRETE INCLUDED IN SITE CONCRETE NOT INCLJSEE BELOW NOT INCLJSEE BELOW IRONSMITH/JAG DIXIE METALS/JA0 NOT INCLJSII:E BELOW NOT INCLJSEE BELOW INCLUDED IN PHASE 6 INCLUDED IN PHASE 6 0 0.00 0 0.00 o 0.00 o 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 o 0.00 o 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 o 0.00 0 0.00 0 0.00 o o.00 O 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 9,607 0.08 2,493 0.03 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 JAMES A. RINGS, INC. 5 VILLAGE OF K SCAYNE VILLAGE OF KEY BISCAYNE SITE 1 SITE INFRASTRUCTURE ARCHITECT: !WILLIS CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY 2, 2002 THIS PROPOSAL IS CONTINGENT UPON CUMMINGS CONSTRUCTING THE KEY BISCAYNE CMC RECREATION CENTER. IN THE EVENT CUMMINGS DOES NOT CONSTRUCT THE KEY BISCAYNE CIVIC RECREATION CENTER THIS PROPOSAL SHALL 8E NULL & VOID PHASE 4 WITHOUT PP&L AND SOUTHERN BELL PERNWOOD ROAD PROM WEST MCINTYRE STREET NORTH TO THE PROJECT LIMITS TOTAL AREA 102,000 SP 1 MI SECTION 1 DESCRIPTION MATERIAL LABOR SUB TOTAL SUBCONTRACTORS NAME GRAND TOTAL 815P 13 DIV.10 DRWOS. DRWGB. DRWOS. DRWOS. DRWGS. DRWGS. DRWGS. NMI. DRWGS. DRWO$. DRWS$. DRWOS. DRWS$. DRWOS. DRWGE. DRWOS. DRWO$. DRWG$. DRWOS. DRWO$. DRWO$. DRWOS. REMOVE FREON & MAKE SAFE FOR DEMOLITION ELECTRICAL ELECTRICAL DUCT BANK OCMMUNIOATION DUCT BANK TELEPHONE & CABLE TV DUOT BANK PP&L MANHOLES • FURNISHED BY FP&L INSTALLED BY CONTRACTOR PP&L CONDUIT • FURNISHED BY FP&L INSTALLED BY CONTRACTOR BELLSOUTH MANHOLES. PURN. & INSTALL BY CONTRACTOR COMMUNICATION MANHOLES. FURN.1 INSTALL BY CONTRACTOR WATERPROOFING OP MANHOLES PP&L POWER POLES • NN1 TEMPORARY FP&L POWER POLES • 1110 FP&L OONDUOTORS 11► CABLES • NIO PAD MOUNTED TRANSFORMERS • 1110 STREET LIGHTING PLANTER LIGHTING PRECAST LIOHTPOLE BARN TO MEET WIND LOADING REQ. CONCRETE EQUIPMENT PADS FINER REINFORCED PLASTID ENCLOSURES RELOCATE EXIST'G LIGHT POLES • LIGHT POLE PULL BOXES . N1C REMOVE EXISTING P'SL LIGHT POLES & PULL BOXES • 1110 REMOVE EXISTING PP&L OVERHEAD POLE & POWER LINES - NIO CONNECTION TO FOUNTAIN PUMP • CONTROLLER ILLUMINATION TESTING SIGNED A SEALED BY PE CONNECTION TO IRRIGATION CONTROLLER TEMPORARY ELECTRIC DISCONNECT EXISTING & MAKE SAFE FOR DEMOLITION MODIFY EXTENT OF RESTORATION BY ADDING SURPACE WORK TO UNDEROR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 INCLUDED 114 PHASE 2 0 0 NOT REQUIRED/ NOT INCLUDED 0 IOL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 IOL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 IOL 1N SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 IOL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICI. IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0101. IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE OMP PON DUCT BANK & WATER MAIN 0 1CL IN SEPERATE OMP FOR DUOT SANK & WATER MAIN 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIO - BY OWNER MC - BY OWNER NIC • BY OWNER 1410. IY OWNER NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED WIC • BY OWNER N10 • BY OWNER N)0 • BY OWNER NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED o 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 SUBTOTAL CHECK SUBTOTAL SALES TAX 8.11 LABOR BURDEN SUBTOTAL 02/08/2002 03:41 PM 16,800 7,266 88,024 112,080 112,080 1,027 4,888 118,078 118,078 1.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 118,071 1.18 0.00 JAMES A. CUMMINGS, INC. 6 VILLAGE OF KEY BISCAYNE VILLAGE OF KEY BISCAYNE SITE & SITE INFRASTRUCTURE ARCHITECT: SPILLIS CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY 8, 2002 THIS PROPOSAL 11 CONTINOENT UPON CUMMINGS CONSTRUCTING THE KEY BISCAYNE CIVIC RECREATION CENTER. N THE EVENT CUMMINGS DOES NOT CONSTRUCT THE KEY BISCAYNE CIVIC RECREATION CENTER THIS PROPOSAL SHALL BE NULL & VOID PHASE 4 WITHOUT PP&L AND SOUTHERN BELL PERNWOOD ROAD FROM WEST MCINTYRE STREET NORTH TO THE PROJECT LIMITS REM 1 SECTION DESCRIPTION MATERIAL __ LABOR SUB TOTAL OWNER'S PROTECTIVE LIABILITY INSURANCE BUILDER'S RISK INSURANCE PERMITS PERFORMANCE BOND SUBTOTAL DESIGN PHASE PEE CONSTRUCTION PHASE FEE EXTEND PROJECT TWO AND A HALF MONTHS FOR INFRASTRUCTURE WORK CONSTRUCTION CONTINGENCY OWNER CONTINGENCY OVERHEAD & PROFIT OWNER'S SALES TAX SAVINGS PROGRAM SUBTOTAL SUBTOTAL SUBTOTAL SUBTOTAL TOTAL THE FOLLOWING ITEMS OF WORK ARE SEPARATE OWNER ALLOWANCES WHICH ARE NOT INCLUDED IN THIS PROPOSAL AND WHICH 00 NOT INCLUDE ANY CONSTRUCTION MANAGER'S MARK-UPS FOR PERMITS, TAXES, INSURANOE, BONDS, CONTINGENCIES AND OVERHEAD AND PROFIT. FOUNTAIN AT WEST MCINTYRE STREET FEATURE COLUMNS - 8 EACH TRAFFIC) CIRCLE ARCHITECTURAL ELEMENT PARK GAZEBO TRELLIS ARCHITECTURAL PRECAST 0 SUBCONTRACTORS NAME 1,300 800 2,300 122,478 OWNER ALLOWANCE OWNER ALLOWANCE GRAND TOTAL 0 1,300 800 2,300 122,478 NOT INCL. NOT INCL. 0 INCLUDE N RIO. CENTER 0 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 122,476 2,000 124,476 2,000 126,471 6,681 132,488 (1,883) 130,186 80,000 OWNER ALLOWANCE NIC • WORK BY OWNER 40,000 OWNER ALLOWANCE NIC - WORK BY OWNER 126,000 OWNER ALLOWANCE NIC - WORK BY OWNER 26,000 OWNER ALLOWANCE NIC - WORK BY OWNER 16,000 OWNER ALLOWANCE N1C - WORK BY OWNER 4,000 OWNER ALLOWANCE NIC - WORK BY OWNER TOTAL AREA 102,000 SF 122,478 2,000 124,478 2,000 126,478 5,681 132,168 (1,883) 130,186 WSP 0.00 0.01 0.01 0.02 0.00 1.20 0.00 0.00 0.00 0.00 0.00 1.20 0.00 0.02 0.00 1.22 0.00 OA 0.00 1.24 0.00 0.00 0.00 1.30 0.00 (0.02) 0.00 1.28 7 02/08/2002 PM JAMES A 'RINGS, INC. VILLAGE OF .SCAYNE VILLAGE OF KEY BISCAYNE SITE & SITE INFRASTRUCTURE ARCHITECT: BPILLIS CANDELA DMJM COMP PROPOSAL DATE: FEBRUARY 0, 2002 THIS PROPOSAL M CONTINGENT UPON CUMMINOS CONSTRUCTING THE KEY BISCAYNE CMC RECREATION CENTER. IN THE EVENT CUMMINGS DOES NOT CONSTRUCT THE KEY BISCAYNE CIVIC RECREATION CENTER THIS PROPOSAL SHALL BE NULL & VOID PHASE 4 WITHOUT PPSL AND SOUTHERN BELL FIREWOOD ROAD FROM WEST MCINTYRE STREET NORTH TO THE PROJECT LIMITS ITEM 1 SECTION 1 DESCRIPTION t MISC. SPECIALTIES PLORIOA POWER & LIGHT AND SOUTHERN BELL WORK PROVIDED BY OWNER TOTAL. 02/08/2002 03:41 PM MATERIAL LABOR SUB JAMES A. CUMMINGS, INC. TOTAL 0,000 0 270,000 SUBCONTRACTORS NAME OWNER ALLOWANCE NIC - WORK BY OWNER SEE ELECTRIC DUCT BANK & WATER MAIN OMP GRAND TOTAL TOTAL AREA 102,000 SP qSP 8 VILLAGE OF KEY BISCAYNE VILLAGE OF KEY BISCAYNE SITE & SITE INFRASTRUCTURE ARCHITECT: SPILLIS CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY 0, 2002 PHASE 0 WITHOUT FP&L AND SOUTHERN BELL TRAFFIC CIRCLE & BALANCE OF NORTH VILLAGE GREEN WAY TOTAL AREA 102,000 SF ITEM f SECTION 1 DESCRIPTION MATERIAL LABOR SUB TOTAL SUBCONTRACTORS NAME GRAND TOTAL Mr GENERAL CONDITIONS SEE WINDOW EXTEND PROJECT TWO AND A HALF MONTHS FOR INFRASTRUCTURE WOR NOTE: WORK FROM CRANDON BLVD 1115' WEST ALONG NORTH VILLAGE GREEN WAY 18110T INCLUDED AND SHALL BE PROVIDED BY OTHERS 00320 (SPIL) SOIL INVESTIGATION DATA REPORT BY Kali NO SPEC COORDINATION DRAWINGS NO SPEC FIELD ENGINEERING FINAL SURVEY NO SPEC OWNER ALLOWANCES • PURNISHANSTALL COMPLETE 1.ON-SITE LANDSOAPINSIOODARRIGATION II. FOUNTAIN AT WEST MCINTYRE STREET 3. FEATURE COLUMNS • 8 EACH 4. TRAFFIC CIRCLE ARCHITECTURAL ELEMENT 8. PARK GAZUO 8. TRELLIS 7. ARCHITECTURAL PRECAST I. MI$O. SPECIALTIES II. COMMUNICATION DUCT BANKS BETWEEN BLDOS 10. POLICE SECURITY CONDUIT 11. FIRE SECURITY CONDUIT 12. FLORIDA POWER a LIGHT AND SOUTHERN BELL NO SPEC CONSTRUCTION PHOTOGRAPHS NO SPEC QUALITY CONTROL BY OWNER 2 N0 SPEC DRWOS. DRWOS. DRWOS. DRWO$. DRWO$. DRWOS. MAINTENANCE OF TRAFFIC TEMPORARY FENCE EARRIOADEU PLASTIC DRUMS $I0NA0■ WARNING LIGHTS & FLASHERS ALL NONAGE a BARRICADES PER PDOT SPEC MAINTENANCE OP SIONAGE & BARRICADES 3 02000 (SPIL) DEMOLITION, REMOVALS AND RELOCATION 1A COORDINATION 02/08/2002 PM NIQ NI0 N10 NIC N10 NIC NIC NIC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC NIC NIC 1110 NIC NI0 NIC NIC 0 0 0 0 0 1,034 0 0 o 0 0 0 O 0 0 0 O 0 0 700 O 770 0 0 O 0 0 21,000 NIC NI0 NIC N1C NIC NIC N1C 0 0 0 NIC 0 0 0 0 0 0 IN 00'S 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8,034 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 0 0 0 0 0 700 770 0 0 21,000 NIC NIC NIC NIC NIC NIC N10 NIC JAC JAC JAC/BALANCE IN SITEWORK' JACANAG OWNER ALLOWANCE NOT INCLJSEB BELOW NOT INCLJ$EE BELOW NOT MCLJSEE BELOW NOT INCL./SEE BELOW NOT INCLJSUE BELOW 1101 INCLJSEE BELOW NOT INCLJSEE BELOW 0 1C IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 I0L IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0101. IN SEPERATE OMP FOR DUCT SANK & WATER MAIN NOT INCLJSEE BELOW 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 INCLUDED IN GENERAL CONDITIONS 1110- BY OWNER INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED 0 0.00 0,034 0.08 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 700 0.01 770 0.01 0 0.00 0 0.00 21,000 0.21 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 JAMES A kAINGS, INC, 1 VILLAGE OF , ,ISCAYNE MAGI OP KEY BlSOAYNE SITE a SITE MPRABTRUCTURE ARCHRECT: /PLUS CANDELA DMJM GMP PROPOSAL DATE: FEBRUARY 3, 2002 PHASE 3 WITHOUT PPAL AND SOUTHERN BELL TRAFFIC CIRCLE & BALANCE OF NORTH VILLAGE GREEN WAY TOTAL AREA 102,000 OF ITEM SECTION DESCRIPTION MATERIAL LABOR SUB TOTAL SUBCONTRACTORS NAME GRAND TOTAL WW1 1A.A .B 11 3A 3.S 3.0 DRWOS. DRWS$. DRWIS. DRWOS. DRWSS. DRUMS. DRWOS. DRWOS. DRWGS. DRWOS. 4 02220 (SPIL) 1.3.8.1 .2 Si 3.3 DRWOS. ORWOS. 3.4A .3 .0 3.1 A 3.3 3.7 3.3 3.3 3.10 1.11 3 021111 OWL) 2.1 2.2 2.3 PROTECT EXISTING TO REMAIN ENVIORNMENTAL PROTECTION TRAFFIC MAINTENANCE FILL HOLES AND HAZARDOUS OPENINGS REMOVE MATERIALS AND 01111113 FROM SITE SALVAELE MATERIALS REMOVE EXISTING IANIVBUILDING DEPARTMENT BUILDING REMOVE EXISTING 31.00. a SOUTH SIDE OF SITE REMOVE SITE WALLS & FOOTINGS REMOVE SIDEWALKS REMOVE 'P&L LIGHT POLES REMOVE PP&L POWER POLES 3 PULL BOXES RELOCATE PP&L POWER POLES 3 PULL BOXES SURFACE DEMOLITION SAWOUTTING EXISTING ASPHALT REMOVE ASPHALT SURFACE S BASE EARTHWORK PROTECT EXISTING STRUCTURES 3 PROPERTY PROTECT EXISTING STREETS • SIDEWALKS LAYOUT 3 AS-BULTS CLIIARMO 3 GRUBBING REMOVE EXISTMO TREES RELOCATE EXISTMO TREES REMOVE 3 DEPOSE OF SURFACE LITTERS DEBRIS STRIP 3 STOCKPILE TOPSOIL REMOVE TOP 2' OF SOIL WITHIN CONSTRUCTION AREA DISPOSAL OF UNSUITABLE MATERIAL SITE FILLING 3 COMPACTION PROOF ROLL OUT SURFACE EXCAVATION FOR STRUCTURES BAOKFILL AND QOMPA0TIN0 DISPOSE OF EXCESS MATERIALS DIIWATERMQ(NO 00110. PLACED IN WATER) TESTING BY OWNER PREPARATION FOR TOPSOIL ASPHALTIC CONCRETE PAVING SUBORADE STABILIZATION 12" EASE COURSE LMIIEROCK r PRIME 3 TACK COATS NIO NIC NIC NIC 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC NIC NIC NIC 0 0 0 0 0 0 0 0 0 0 NIC NIC NIC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 o 0 0 43,043 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC NIC NIC 0 0 0 0 48,041 0 0 0 0 0 0 0 0 0 0 0 0 N10 0 0 0 0 0 0 0 0 0 0 NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED! NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NOT INCLJSEE BELOW NOT INCLJSEE BELOW NOT INCL./3211 BELOW NOT REQUIRED/ NOT INCLUDED NOT REQUIRED! NOT INCLUDED NOT REQUIRED/ NOT INCLUDED METRO ENGINEERING INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED NIO - SY OWNER INCLUDED INCLUDED INCLUDED NOT INCLUDED INCLUDED INCLUDED NOT INCL./SEE BELOW INCLUDED INCLUDED INCLUDED NIC - BY OWNER INCLUDED INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 40,043 0.47 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0,00 0 0.00 0 0.00 0 0.00 0 0.00 o 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 02/08/2002 03:42 PM JAMES A. CUMMINGS, INC. 2 VILLAGE OF KEY BISCAYNE VILLAGE OP KIK BISCAYNE SITE 11SITE INFRASTRUCTURE AROHITEOT: SPILLIS CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY 8, 2002 PHASE 4 WITHOUT FP&L AND SOUTHERN BELL TRAFFIC CIRCLE & BALANCE OF NORTH VILLAGE GREEN WAY TOTAL AREA 102,000 8F REM SECTION DESCRIPTION MATERIAL LABOR SUB TOTAL SUBCONTRACTORS NAME GRAND TOTAL 818E 1.4 ASPHALTIO CONCRETE 1 1/2' TYPE 8 2.2 TESTING BY OWNER PAVEMENT RESTORATION DRWO$. NEW MEDIAN CUT AT CRANDON BLVD. DRWOS. MODIFY EXISTING MEDIAN OUT AT BRANDON BLVD. NO SPEC PORTLAND DEMENT CONCRETE PAVING 02414 (SPIL) 00110. SIDEWALKS, CURBS, CURBS & GUTTERS & WHEEL STOPS S.1 CONCRETE SIDEWALKS 0.2 CURBS 8.3 CURBS • GUTTERS 2.4 TE8TIN0 BY OWNER DRWOS M CONCRETE BASE FOR PAVERS AT PIRESTATION OURS OUT DRWOS 4' CONCRETE SIDEWALKS DIMS lr & SP WIDE CONCRETE BANDS ORWOE OOLORED 00110. AT OURS., GUTTERS, SIDEWALKS 2 BANDS ORWOS CURS. AT TREE ORATES SEE SITE cowman WINDOW 02880 (SPIL) PAVEMENT MARKING 1.8 FIR FOOT SPECIFICATIONS 8.8 .PARE PAINT NO SPED. SITE SIGNAGE NO SPED. TRAFFIC SIGNALIZATION 8 02222 (SPIL) EXCAVATION, BAOKPILLINO AND COMPACTING FOR UTILITEB 1.8.640 PROTECT EXISTING UTILITIES, SIDEWALKS & STREETS NAND EXCAVATION 2.1JA DEWATIRINO .0 REMOVE UNSATISFACTORY SOIL 3.8 TESTING BY OWNER 02810 WATER DISTRIBUTION 1.II A.1 WATER MITERS .2 TAP TO THE EXISTING LINES .0 MI 1 IR DEPOSITS & SERVIOE CONNECTION CHARGES BY OWNER 11.A DUCTILE IRON Wl OEMENT MORTAR LINING 2.2 JOINTS 2.3 FITTINGS & SPECIAL ITEMS 2.4 VALVES 2.1 CAST IRON VALVE BOXES 2.8 FIRE HYDRANTS 2.7A DISINFECTION 3.2 COPPER PIPING FOR WATER SERVICE LINES 3' OR LESS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 334 0 0 0 0 NO BID 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 o 0 o 0 o 0 0 0 0 0 0 0 0 0 642 300 0 0 0 0 0 0 0 0 NO BID NO BID o 0 0 1,072 0 0 o o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 O 0 0 0 0 0 0 0 0 INCLUDED IN EARTHWORK 0 NC • EY OWNER 0 ICL IN SEPERATE GMP FOR DUCT BANK & WATER MAIN 0 0 0 0 0 0 0 0 0 0 0 0 0 1,320 0 0 0 0 0 0 4,072 0 0 0 0 0 INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK NONE SHOWN/ NONE INCLUDED INCLUDED IN EARTHWORK & SITE CONCRETE INCLUDED IN SITE CONCRETE INCLUDED 111 EARTHWORK INCLUDED IN EARTHWORK NIC•BYOWNER INCLUDED IN SITE CONCRETE INCLUDED IN SITE CONCRETE INCLUDED IN SITE CONCRETE INCLUDED IN EARTHWORK & SITE CONCRETE INCLUDED IN SITE CONCRETE JAC INCLUDED IN EARTHWORK INCLUDED 111 EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK NOT INCLUDED BY OWNER MIGATRAN160NDED INCLUDED INCLUDED INCLUDED NOT INCLUDED NIC - BY OWNER 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 NIC • BY OWNER 0101.111 SEPERATE OMP FOR DUCT SANK & WATER MAIN 0 NIC • BY OWNER 0 IOL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0101.111SEPERATE OMP FOR DUCT BANK & WATER MAIN 01CI. IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0101.111 SEPERATE OM? FOR DUCT BANK & WATER MAIN 0101.IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE OMP POR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 1,731 0.02 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 4,072 0.08 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 o 0.00 0 0.00 0 0.00 O 0.00 02/0$/2002 PM JAMES A AINGS, INC. 3 VILLAGE OF , .ISCAYNE VILLAGE OP KEY BISCAYNE SITE & SITE INFRASTRUCTURE ARCHITECT: SPILLS; CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY 3, 2002 PHASE 3 WITHOUT PP&L AND SOUTHERN BELL TRAFFIC CIRCLE & BALANCE OF NORTH VILLAGE GREEN WAY TOTAL AREA 102,000 SF REM 1 EMOTION 3.1 3.10 3.11411 5.12+13 ORWSS CMOS ORWOS 02720 2.1.A .B 2.2 2.344 3.3 SA DRWOS. DRWGS. CRWOS. DRYADS. DRIB'S. ORWOS. NO SPEC 7 02117 2.2 2.3 2.4 3.3.A .0 .1 SA.0 .D .14 3.1 DRWOS. DESCRIPTION DUCTILE IRON PIPING POR WATER SERVICE LINES 4" OR LAR0ER THRUST BLOCKS TESTING BY QONTRAOTOR DISINFECTION & CONNECTION TO EXIST. WATER MAINS BAOKFLOW PREVENTORS 3 DDCV'S ADJUST EXISTING WATER METER VAULT REMOVE EXISTING WATER METER VAULTS OAP EXISTING WATER LINES PROVIDE WATER SERVICE TO FOUNTAIN PROVIDE WATER SERVICE TO IRRIGATION STORM DRAINAGE SYSTEM CORRUGATED ALUMINUM PIPE CORRUGATED STEEL PIPE W/ BITUMINOUS COATING DRAINAGE STRUCTURES BALLAST ROOK a PLASTIC FILTER FABRIC{ EXPILTRATION TRENCH T117IN0 BY CONTRACTOR ADJUST EXISTING CATCH BASINS TO REMAIN OAP EXISTINO STORM SEWER REMOVE EXISTING CiATCN BASINS AND ASSOCIATED PIPING REMOVE EXISTING TRENCH DRAIN REMOVE EXISTING FRAME a GRATE AND PROVIDE NEW EXFILTRATION TREN0N TO 1S' BELOW EXISTS GROUND ELEV. SANITARY SEWER SYSTEM PIPE, PITT1N00 s MANHOLES TESTING • INSPECTION SY CONTRACTOR SANITARY SEWER FOR FOUNTAIN SOLID INTERLOCKING CONC. PAVERS $11S" THIOK KEY SHAPE 3 RE0TAN0. AT EDGES EDGE RESTRAINTS SAND LAYING COURSE 1" SAND FOR JOINTS OUT PAVERS WITH MASONRY SAW TOLERANCE• 1132' OFFSET A 1h" IN 10' FROM LEVEL EXPANSION 3 CONTROL JOINTS • SEALANT FILLED SOIL STERILIZER VIBRATE 00110. PAVERS INTO LEVELING COURSE SAND PILL AT JOINTS REPAIR, CLEANING t PROTECTION CONCRETE PAVER ROADWAYS MATERIAL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 LABOR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SUB TOTAL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14,470 0 0 0 0 0 0 0 0 0 0 0 0 SUBCONTRACTORS NAME 0 I0L IN SEPERATE GMP FOR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT BANK &. WATER MAIN 0 ICL 114 SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 NONE SHOWN/NONE INCLUDED 0 101 IN SEPERATE OMP FOR DUCT BANK & WATER MAIN o 101. IN SEPERATE OMP FOR DUCT BANK 3 WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT BANK 3 WATER MAIN 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NOT REQUIRED/ NOT INCLUDED INCLUDED IN PHASE 1 INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED 0 NOLUDED IN SEPERATE OMP FOR ADMIN/POLIOE BLDG 0 NCLUDED IN SEPERATE GMP POR ADM/POLICE BLDG 0 NOLUDED IN SEPERATE OMP FOR ADMIN/POLIOE BLDG 0 NONE SHOWN/ NONE INCLUDED 0 14,470 HOLLYWOOD STONE/ BONDED 0 INCLUDED AS 2-3111" RECTANGULAR 0 INCL 0 INCL 0 INCL 0 INCL 0 INCL 0 NOT REQUIRED/ NOT INCLUDED 0 INCL 0 INCL 0 INCL 0 INCL 0 INCL GRAND TOTAL 1/5F 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 111,473 0.10 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 O 0.00 0 0.00 O 0.00 0 0.00 0 0.00 02/08/2002 03:42 PM JAMES A. CUMMINGS, INC. 4 VILLAGE OF KEY BISCAYNE VILLAGE OF KEY BISCAYNE SITE • SITE INFRASTRUCTURE AROHITICT: *PLUS CANDILA DMJM OMP PROPOSAL DATE: PEBRUARY 0, 2002 PHASII I WITHOUT FP&L AND SOUTHERN BELL TRAFFIC CIRCLE & BALANCE OF NORTH VILLAGE GREEN WAY TOTAL AREA 102,000 SF REM I _ SECTION DRWOS. DRWGS. DRWOS. DRWOS. DRWOS. II NO SPED DRWOS. DRWGS. DRWOS. DRWOS. DRWOS. DRWG&. NO SPEC DRWOS. DRWGS. NO SPIW DRONE. ORWOS. DRWOS. S NO SPEC No EPIC DWG'. 10 NO SPIO DRWOS. DRWOS. 11 DN.10 DRWOS. 12 DN1i DESCRIPTION OONORIIITI PAVER PARKING AREAS OONCRETI PAVER SIDEWALKS COLORED PAVERS FOR TRAFFIC MARKINGS 12" STABILIZED SUB4RADE r OR r LMNBROCK SASE ON SRI OONORIIITE PAVERS AT FIRE AND POLICE LANDSCAPING PLANT MATERIAL FLA N0.1 OR BETTER MULOH WEED CONTROL PAERIO TRITE RELOCATION MAINTINANOI UNTIL FINAL ACOIPTANCE GUARANTU • 1 YEAR FROM ACOIPTANOE SODDING CERTIFIED TURPORASS-ST. AUGUSTINE OR KENTUCKY BLUE PLASTIC 1001110 1• PLANTING SOIL UNDER ALL SOD GUARANTEE • 0 MONTHS FROM COMPLETION IRRIGATION SAOKPLOW PRIVENTER WATER METER HOSE SIBS POR MANUAL WATERING OONTROL WIRING CONCRETE REINFORCEMENT, NON-STRUCTURAL WELDED WIRI MESH MATERIAL MILORD WIRE MINH LABOR ARCHITIOTURAL PREOAST CONCRETE CONCRETE BOLLARDS METAL FABRICATIONS TREE GRATIS PIPE BOLLARDS MO. SPECIALTIES PLAOPOLIS MECHANICAL DISCONNECT PLUMBING i MAKE SAFE FOR DEMOLITION MATERIAL NIC NIC 1110 NIC _ LABOR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC NIC NIC NIC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SUB NIC NIC NIO NIC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL NIC NIC NIC NIC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SUBCONTRACTORS NAME INCL INCL INCL INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN PHASE 1 INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE NIC • BY OWNER INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE NIC - BY OWNER INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN SITE CONCRETE INCLUDED IN SITE CONCRETE INCLUDED IN SITE CONCRETE NOT INCLJSEE BELOW NOT INCL AEI BELOW NOT REQUIREDI NOT INCLUDED NOT REQUIRED! NOT INCLUDED NOT INCL./SEE BELOW NOT INCL/SEE BELOW NOT REQUIRED! NOT INCLUDED NOT REQUIRED! NOT INCLUDED GRAND TOTAL' fl/SP 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 000 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 o 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 02/08/2002 . .PM JAMES A JIINGS, INC. 5 VILLAGE OF I ISCAYNE VILLAGE OF KEY BISCAYNE SITE S SITE INFRASTRUCTURE ARCHITEOT: SPILL'S CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY 3, 2002 PHASE $ WITHOUT PP&L AND SOUTHERN BELL TRAFFIC CIRCLE & BALANCE OF NORTH VILLAGE GREEN WAY TOTAL AREA 102,000 8F ITEM 1 SECTION 13 DIVAS DRWS$. DIMS. DRW08. DIMS. DRWOS. ORWSS. DRW08. DRWG& DRWOS. ORW08. DM'S. ORW08, DRWG$. ORWOO. DRWGS. ORW08. DRWGS. DRW08. ORW0$. COWS. DRWOS. DRWG$. DESCRIPTION REMOVE FREON A MAKE SAFE FOR DEMOLITION ELECTRICAL ELECTRICAL DUCT BANK COMMUNICATION DUCT BANK TELEPHONE 3 OAKS TV DUCT BANK PP&L MANHOLES • FURNISHED BY PP&L INSTALLED BY CONTRACTOR PP&L CONDWT • FURNISHED BY FM INSTALLED BY CONTRACTOR BEL&SOUTH MANHOLES• FURN. S INSTALL BY CONTRACTOR OOMMUNIOATI0N MANHOLES• PURN. 8. INSTALL BY CONTRACTOR WATERPROOFING OF MANHOLES FPSL POWIR POLES • NIC TEMPORARY PP&L POWER P01E8 • NW 'P&L CONDUCTORS S CABLES • NIO PAD MOUNTED TRANSFORMERS • NIO STREET LIGHTING PLANTER LIGHTING PRECAST LIOHTPOLE BASES TO MEET WIND LOADING RIO. 001401/71 EQUIPMENT PADS POOR REINFORCED PLASTIC ENCLOSURES RELOOATE EXIST'O LIGHT POLIO & LIGHT POLO PULL BOXES • NIO REMOVE EXISTING PPSL LIGHT POLES & PULL BOXES • NIO REMOVE EXISTING PPS& OVERHEAD POLES POWIR LINES • NW CONNECTION TO FOUNTAIN PUMP & CONTROLLER ILLUMINATION TESTING SIGNED & SEALED BY PE CONNECTION TO IRRIGATION CONTROLLER TEMPORARY 11.107110 0)800NNE0T EXISTING & MAKE SAFE FOR DEMOLITION MODIFY EXTENT OP RESTORATION BY ADDING SURFACE WORK TO UNDEROR MATERIAL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 LABOR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Sus 0 0 33,973 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL 0 0 33,073 FISKI BONDED 0 101 IN BEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICL IN BEPERATE OMP FOR DUCT BANK i WATER MAIN 0 101 IN BEPERATE OMP FOR DUCT BANK S WATER MAIN 0 101 114 BEPERATE OMP FOR DUCT BANK • WATER MAIN 0101 IN BEPERATE OMP FOR DUCT BANK S WATER MAIN 0101 IN BEPERATE OMP FOR DUCT BANK i WATER MAIN 0 101 IN BEPERATE OMP FOR DUCT BANK & WATER MAIN 0 101 IN SEPERATE OMP FOR DUCT BANK B WATER MAIN 0 NIC- EYOWNER 0 NIC•BYOWNER NIC•BYOWNER NIC • BY OWNER INCLUDED INCLUDED INCLUDED INCLUDED IN SITE CONCRETE INCLUDED NIO •BYOWNER NIO • BY OWNER NIC - EY OWNER NOT REQUIRED! NOT INCLUDED INCLUDED INCLUDED IN PHASE 1 INCLUDED NOT REQUIRED, NOT INCLUDED NOT REQUIRED! NOT INCLUDED SUBCONTRACTORS NAME 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NOT REQUIRED, NOT INCLUDED GRAND TOTAL =/BF 0 0.00 0 0.00 33,873 OAS 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 MOO 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 SUBTOTAL CHECK SUBTOTAL SALES TAX S.1% LABOR BURDEN SUBTOTAL 02/08/2002 03:42 PM 393 882 132,433 133,393 133,393 28 388 133,803 133,803 1.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 133,803 141 0.00 JAMES A. CUMMINGS, INC. 6 VILLAGE OF KEY BISCAYNE VILLAGE OF KEY EISCAYNE SRS IL SITE INFRASTRUCTURE ARCHITECT: SPILLIS CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY 8, 2002 PHASE 8 WITHOUT PPAL AND SOUTHERN BELL TRAFFIC CIRCLE & BALANCE OF NORTH VILLAGE GREEN WAY TOTAL AREA 102,000 SF ITEM SECTION 02/08/200: DESCRIPTION OWNER'S PROTECTIVE LIABILITY INSURANCE BUILDER'S RISK INSURANCE PERMITS PERFORMANCE BOND SUBTOTAL MATERIAL DESIGN PHASE FEN OONSTRUOTION PHASE FEE EXTEND PROJECT TWO AND A HALF MONTHS FOR INFRASTRUCTURE WORK CONSTRUCTION CONTINGENCY OWNER CONTINGENCY OVERHEAD & PROFIT OWNER'S SALES TAX SAVINGS PROGRAM SUBTOTAL SUBTOTAL SUBTOTAL OUSTOTAL TOTAL THE FOLLOWING ITEMS OF WORK ARS SEPARATE OWNER ALLOWANCES WHICH ARE NOT INCLUDED IN THIS PROPOSAL AND WHICH DO NOT INCLUDE ANY CONSTRUCTION MANAGER'S MARK-UPS FOR PERMITS, TAXES, INSURANCE, SONDS, CONTINGENCIES AND OVERHEAD AND PROFIT. FOUNTAIN AT WEST MCINTYRE STREET FEATURE COLUMNS • 1 EACH TRAFFIC CIRCLE ARCHITECTURAL ELEMENT PARK GAZEBO TRELLIS ARCHITECTURAL PRECAST PM LABOR SUB TOTAL 0 1,000 700 1,720 137,223 SUBCONTRACTORS NAME OWNER ALLOWANCE OWNER ALLOWANCE NOT INCL. 6,863 0 IOL IN SEPARATE (IMP FOR DUCT BANK & WATER MAIN 143,071 1,600 144,671 1,600 146,070 8,673 162,660 (2,280) 160,380 80,000 OWNER ALLOWANCE NIC • WORK SY OWNER 40,000 OWNER ALLOWANCE NIC - WORK BY OWNER 126,000 OWNER ALLOWANCE NIC - WORK BY OWNER 26,000 OWNER ALLOWANCE NEC - WORK BY OWNER 16,000 OWNER ALLOWANCE NIC - WORK BY OWNER 4,000 OWNER ALLOWANCE NIC - WORK BY OWNER NOT INCL. 6,863 0 GRAND TOTAL 118E 0 1,000 700 1,720 0.00 0.01 0.01 0.02 0.00 137,223 1.81 0.00 0.00 OM 0.00 0.00 143,070 1.40 0.00 1,600 0.01 0.00 144,671 1.42 0.00 1,600 0.01 0.00 141,071 1.48 0.00 0,673 0.06 0.00 162,060 1.10 0.00 (2,200) (0.02) 0.00 160,380 1.47 JAMES P 'MINGS, INC. 7 VILLAGE OF ISCAYNE VILLAGE OP KEY BISCAYNE SITE & 0RE INFRASTRUCTURE ARCHITECT: $PI.LIS CANDELA DMJM IMP PROPOSAL DATE: FEBRUARY 0, 2002 PHASE 6 WITHOUT PP&L AND SOUTHERN BELL TRAFFIC CIRCLE & BALANCE OF NORTH VILLAGE GREEN WAY REM _ SECTION DESCRIPTION MISC. SPECIALTIES FLORIDA POWER & LIGHT AND SOUTHERN BELL WORK PROVIDED BY OWNER TOTAL MATERIAL LABOR SUB JAMES A. CUMMINGS, INC. TOTAL TOTAL ARIA 102,000 SF SUBCONTRACTORS NAME GRAND TOTAL $ISP 6,000 OWNER ALLOWANCE NIC - WORK BY OWNER 0 SEE ELECTRIC DUCT BANK & WATER MAIN GMP 276,000 8 02/08/2002 03:42 PM VILLAGE OF KEY BISCAYNE VILLAGE OF KEY BISCAYNE SITE & SITE INFRASTRUCTURE ARCHITECT: SPILLIS CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY 8, 2002 THIN PROPOSAL 10 OONTINOENT UPON CUMMINGS CONSTRUCTING THE KEY BISCAYNE CIVIC RECREATION CENTER. NI THE EVENT CUMMINGS DOES NOT CONSTRUCT THE KEY BISCAYNE CIVIC RECREATION CENTER THIS PROPOSAL SHALL BE NULL & VOID PHASE 1 WITHOUT FP&L AND SOUTHERN BELL VILLAGE GREEN WAY PROM MCINTYRE STREET TO THE TRAFFIC CIRCLE TOTAL AREA 102,000 SF ITEM SECTION DESCRIPTION MATERIAL LABOR SUB TOTAL SUBCONTRACTORS NAME GRAND TOTAL 818F 1 GENERAL OONDITIONB NEE WINDOW EXTEND PROJECT TWO AND A HALF MONTHS FOR INFRASTRUCTURE WOR NOTE: WORK FROM CRANDON BLVD 108' WEST ALONG NORTH VILLAGE GREEN WAY 18 NOT 110LUDED AND SHALL BE PROVIDED BY OTHERS 00320 (SPIL) SOIL INVESTIGATION DATA REPORT BY KAB NO SPEC NO SPEC COORDINATION DRAWINGS PALO ENGINEERING PINAL SURVEY NO SPEC OWNER ALLOWANCES • FURNISH/INSTALL COMPLETE 1.01417E LANDSOAPINGINODIIRRIOATION 2. FOUNTAIN AT WEST MCINTYRE STREET 8. FEATURE COLUMNS • 8 BACH 4. TRAFFIC CIRCLE ARCHITECTURAL ELEMENT 8. PARK OA21B0 8. TRELLIS 7. ARCHITECTURAL PRECAST S. MISC. SPECIALTIES 8, COMMUNICATION DUCT BANKS BETWEEN 111.005 10. POLICE SECURITY CONDUIT 11. FIRE SEOURfl'Y CONDUIT 12. FLORIDA POWER & LIGHT AND SOUTHERN BELL NO SPEC CONSTRUCTION PHOTOGRAPHS 140 SPEC QUALITY CONTROL BY OWNER 2 NO SPIO DRWGS. ORWON. ORWGS. DRW08. ORW08. DRWGS. MAINTENANCE OF TRAPPIC TEMPORARY FENCE BARRICADES PLASTID DRUMS SI0NA0E WARNING LIGHTS & FLASHERS ALL NONAGE & BARRICADES PER FOOT SPEC MAINTENANCE OF SI0NA0E & BARRICADES 8 02080 (SPIL) DEMOLITION, REMOVALS AND RELOCATION 1.3 COORDINATION NIO 110 110 NIC 110 N10 NIC 1410 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC NIC NIC NIC NIC NIC NIC NIC 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 1,800 0 1,880 o 0 0 0 0 15,000 NIC WIC NIC NIC NIC NIC NIO 0 0 0 NIC 0 0 0 0 0 0 IN 00'8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,538 0 0 0 0 INCLUDE IN REC. CENTER 0101. IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 0 0 0 0 0 1,800 1,880 0 0 18,000 NIC WIC NIC NIC NIC NIO 1410 NIC JAC JAC/BALANCE IN SITIWORK' JACIWAG OWNER ALLOWANCE NOT INCLJSEE BELOW NOT INCLJSEE BELOW NOT INCL1811 BELOW NOT INCL./SEE BELOW NOT INCL./SEE BELOW NOT INCLJSEE BELOW NOT INCLJBEE BELOW 0101. IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 IOL 1N SEPERATE OMP FOR DUCT BANK & WATER MAIN 0101. IN SEPERATE OMP FOR DUCT BANK & WATER MAIN NOT 1NCLJ811 BELOW 0 0 INCLUDED IN GENERAL CONDITIONS 0 0 NIC- BY OWNER 0 0 INCLUDED IN EARTHWORK 0 INCLUDED IN EARTHWORK 0 INCLUDED IN EARTHWORK O INCLUDED IN EARTHWORK 0 INCLUDED IN EARTHWORK 0 INCLUDED IN EARTHWORK 0 INCLUDED IN EARTHWORK O INCLUDED IN EARTHWORK 0 1,538 WILDCAT BONDED O INCLUDED 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 1,800 0.02 1,850 0.02 o 0.00 0 0.00 18,000 0.11 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 1,838 0.02 0 0.00 02/08/2002 PM JAMES A MINGS, INC. 1 VILLAGE OF , ISCAYNE VILLAGE OF KEY BISCAYNE 811E & SRI INFRASTRUCTURE ARCNITECT: SPILLS CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY S, 2002 THIS PROPOSAL 18 CONTINGENT UPON CUMMINS* CONSTRUCTING THE KEY BISCAYNE CIVIC RECREATION CENTER. IN THE EVENT CUMMINGS DOES NOT CONSTRUCT THE KEY BISCAYNE CHIC RECREATION CENTER THIS PROPOSAL SHALL BE NULL & VOID PHASE f WITHOUT FP&L AND SOUTHERN BELL VILLAGE GREEN WAY PROM MCINTYRE STREET TO THE TRAFFIC CIRCLE TOTAL AREA 102,000 8P REM I SECTION DESCRIPTION MATERIAL LABOR SUB TOTAL SUBCONTRACTORS NAME GRAND TOTAL Sit? 1AA .8 1.1 2.4 2.1 5.S ORW08. ORWGS. ORW08. DRWOS. DWG'. DIMS. DRWOS. DRWGE. DRWOS. ORWOS. PROTECT EXISTING TO REMAIN ENVIONNMINTAL PROTECTION TRAFFIC MAINTENANCE PS.L HOLES AND HAZARDOUS OPENINGS REMOVE MATERIALS AND DEBRIS PROM SITE SALVABLE MATERIALS REMOVE EXISTING BANKIBUILDING DEPARTMENT BUILDING REMOVE EXISTING BLDG. Q SOUTH 8101 OF SITE REMOVE SITE WALLS S FOOTINGS REMOVE SIDEWALKS REMOVE FPSL UGHT POLES REMOVE PPSL POWER POLES & PULL BOXES RELOCATE PP&L POWER POLES a PULL BOXES SURFACE DEMOLITION SAWOUTTINO EXISTING ASPHALT REMOVE ASPHALT SURFACE 0 BASE 4 02220 (SPIL) EARTHWORK 1.5.8.1 PROTECT EXISTING STRUCTURES S PROPERTY .2 2.2 0.3 DRWGS. ORWGS. 2.4A .1 .0 2.I A 3.1 2.7 0.S 2.1 2.10 2.11 PROTECT EXISTING STREETS & SIDEWALKS LAYOUT 0 AS.GUILTS CLEARING 0 GRUBBING REMOVE EXISTING TREES RELOCATE EXISTING TREES REMOVE R DISPOSE OF SURFACE LITTER & DEBRIS STRIP 0 STOCKPILE TOPSOIL REMOVE TOP r OF SOIL WITHIN CONSTRUCTION AREA DISPOSAL OF UNSUITABLE MATERIAL SITE FILLING & COMPACTION PROOF ROLL CUT SURFACE EXCAVATION FOR STRUCTURES BAOKFILL AND COMPACTING DISPOSE 0? EXCESS MATERIALS DEWATERING(NO CONC. PLACED IN WATER) TESTING SY OWNER PREPARATION FOR TOPSOIL I 02111 (SPIL) ASPHALTIC CONCRETE PAVING 2.1 SUBORADE STABILIZATION 12" 2.2 BASE COURSE LIIYIEROCK r 2.3 PRIME & TACK COATS 02/08/2002 03:44 PM NIC NIC NIC NIC O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC NIC NIC NIC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC NIC N10 0 0 0 0 71,250 0 0 0 0 0 0 0 0 0 0 0 0 NIC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC NIC NIC 0 0 0 0 71,210 0 0 0 0 0 0 0 0 0 0 0 0 NIC 0 0 0 0 0 0 0 0 0 0 INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED NONE SHOWN/ NONE INCLUDED INCLUDED IN PHASE 1 INCLUDED IN PHASE 1 INCLUDED INCLUDED NOT INCLJ8EE BELOW NOT INCL./SEE BELOW NOT INCLJ8EE BELOW INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK METRO ENGINEERING INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED NIC - BY OWNER INCLUDED INCLUDED INCLUDED NOT INCLUDED INCLUDED INCLUDED NOT INCL./SEE BELOW INCLUDED INCLUDED INCLUDED NIC - BY OWNER INCLUDED INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK 0 0.00 0 0.00 o 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 71,250 0.70 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 JAMES A. CUMMINGS, INC. 2 VILLAGE OF KEY BISCAYNE VILLAGE OP KEY BISCAYNE SITE & SITE INFRASTRUCTURE ARCHITECT: SPILLIS CANDELA DMJM OMP PROPOSAL DATE; FEBRUARY S, 2002 THIS PROPOSAL IS CONTINGENT UPON CUMMINGS CONSTRUCTING THE KEY BISCAYNE CIVIC RECREATION CENTER. IN THE EVENT CUMMINOS DOES NOT CONSTRUCT THE KEY BISCAYNE WIC RECREATION CENTER THIS PROPOSAL SHALL BB NULL & VOID PHASE 8 WITHOUT FP&L AND SOUTHERN BELL VILLAGE GREEN WAY FROM MCINTYRE STREET TO THE TRAFFIC CIRCLE TOTAL AREA 102,000 SP ITEM 1 SECTION 2.4 3.2 DESCRIPTION MATERIAL LABOR SUB TOTAL SUBCONTRACTORS NAME GRAND TOTAL $fsP DRWOS. DRWOS. NO SPEO 02114 (SPIL) 3.1 3.2 3.3 3.4 DRWOS DRWO$ DRWG$ DIMS DRUMS 02110 (SPIL) 1.3 3.i No SPEC. N0 SPEC. 0 02222 (SPIL) 1.0,640 6.1A .0 3.0 02800 1.S.A.1 .2 .0 2.1.A 2.2 2A 2r4 2.4 2.11 2.7A 3.2 ASPHALTIC CONCRETE 1 1/2" TYPE $ TESTING BY OWNER PAVEMENT RESTORATION NEW MEDIAN OUT AT CRANDON BLVD. MODWY EXISTING MEDIAN OUT AT CRANDON BLVD. PORTLAND CEMENT CONCRETE PAVING OONO. SIDEWALKS, CURES, CURBS & GUTTERS & WHEEL STOPS CONCRETE SIDEWALKS CURBS CURBS & GUTTERS TESTING BY OWNER S" CONCRETE BASE FOR PAVERS AT PIRESTATION CURB OUT 4" CONCRETE SIDEWALKS ir & 24" WIDE CONCRETE BANDS COLORED CONC. AT CURBS, GUTTERS, SIDEWALKS & BANDS CURES AT TREE ORATES SEE SITE CONCRETE WINDOW PAVEMENT MARKING PER MOT SPECIFICATIONS SPARE PAINT SITE MONAOE TRAFFIC SIGNALIZATION EXCAVATION, BACKPILLING AND COMPACTING POR UTILITES PROTECT EXISTING UTILITIES, SIDEWALKS & STREETS HAND EXCAVATION DEWATERING REMOVE UNSATISFACTORY SOIL TESTING BY OWNER WATER DISTRIBUTION WATER METERS TAP TO THE EXISTING LINES METER DEPOSITS & SERVICE CONNECTION CHARGES BY OWNER DUCTILE IRON WI CEMENT MORTAR LINING JOINTS FITTINGS & SPECIAL ITEMS VALVES CAST IRON VALVE BOXES FIRE HYDRANTS DISINFECTION COPPER PIPING FOR WATER SERVICE LINES 3" OR LESS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 474 0 0 0 0 NO SID 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o o o 0 o o 0 0 0 0 0 0 o 0 0 0 0 0 0 0 o o 0 0 0 0 0 0 0 0 0 0 3,080 380 0 0 0 0 0 0 0 0 NO BID NO BID 0 0 0 42,150 0 0 o 0 0 0 0 0 0 0 o 0 0 0 0 0 o 0 0 0 O 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3,854 0 0 0 0 0 0 42,150 0 0 0 0 0 o INCLUDED IN EARTHWORK 0 NIC • BY OWNER 0 ICI. IN SEPERATE GMP FOR DUCT BANK & WATER MAIN INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK NONE SHOWN/ NONE INCLUDED INCLUDED IN EARTHWORK & SITE CONCRETE INCLUDED IN SITE CONCRETE INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK NIC • BY OWNER INCLUDED IN SITE CONCRETE INCLUDED IN SITE CONCRETE INCLUDED IN SITE CONCRETE INCLUDED IN EARTHWORK & SITE CONCRETE INCLUDED IN SITE CONCRETE AO INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK NOT INCLUDED BY OWNER MEOATRAN/BONDED INCLUDED INCLUDED INCLUDED NOT INCLUDED NIC • BY OWNER 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 NIC • BY OWNER 0 ICL 1N SEPERATE GMP FOR DUCT BANK & WATER MAIN 0 NIC • BY OWNER 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICL 1N SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 IOL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0!OLIN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0ICON SEPERATE GMP FOR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE OMP POR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE GMP FOR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 1,021 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 42,150 0.41 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 O 0.00 0 0.00 0 000 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 o 0.00 O 0.00 0 0.00 02/08/2002 PM JAMES P MINGS, INC. 3 VILLAGE OF , SCAYNE VILLAGE OP KEY BISCAYNE SITE & SITE INFRASTRUCTURE ARCHITECT: *PILLIS CANDELA DMJM OMP PROPOSAL DATE: PIERUARY 1, 2002 THIS PROPOSAL IS CONTINGENT UPON OUMMINOS CONSTRUCTING THE KEY BISCAYNE CMO RECREATION CENTER. IN THE EVENT CUMMINGS DOES NOT CONSTRUCT THE KEY BISCAYNE OMC RECREATION CENTER TH1B PROPOSAL SHALL BE NULL 0 VOID PHASE 1 WITHOUT ?P&L AND SOUTHERN BELL VILLAGI GREEN WAY PROM MCINTYRE STREET TO THE TRAFFIC CIRCLE TOTAL AREA 102,000 SF 3A 3.10 3.11+13 3.12+11 DRWOS ORWOS DRWOS 02720 2.1A .B L2 2.344 3.3 3.3 DRWGS. DRWGS. DRWOB. DIMWGS, DRWOS. DRWOS. NO SPEC 7 02617 2.2 2.3 2.4 3.3.A .D .1 0.4,11 .D .E-0 3.S DRWO$. DESCRIPTION DUCTILE IRON PIPING POE WATER SERVICE LINES 4' OR LARGER THRUST BLOCKS TESTING BY CONTRACTOR DISINPEOTION 1 CONNECTION TO EXIST. WATER MAINS BAOKPLOW PREVENTORS & DDOV'S ADJUST EXISTING WATER METER VAULT REMOVE EXISTING WATER METER VAULTS OAP EXISTING WATER LINES PROVIDE WATER SERVICE TO POUNTAIN PROVIDE WATER SERVICE TO IRRIGATION STORM DRAINAGE SYSTEM CORRUGATED ALUMINUM PIPE CORRUGATED STEEL PIPE WI BITUMINOUS COATING DRAINAGE STRUCTURES BALLAST ROCK & PLASTIC FILTER FABRIC EXPILTRATION TRENCH TESTING BY CONTRACTOR ADJUST EXISTING CATCH BASINS TO REMAIN OAP EXISTING STORM SEWER REMOVE EXISTING CATOH BASINS AND ASSOCIATED PIPING REMOVE EXISTING TRENCH DRAIN REMOVE EXISTING PRAMS 1 GRATE AND PROVIDE NEW EXPILTRATION TRENCH T013' BELOW EXIST'G *ROUND ELEV. SANITARY SEWER SYSTEM PIPE, PITTING& & MANHOLES TESTING 11 INSPECTION BY CONTRACTOR SANITARY SEWER FOR FOUNTAIN SOLID INTERLOCKING 00140. PAVERS 411• THICK KEY SHAPE & RECTANG. AT EDGES EDGE RESTRAINTS SAND LAYING COURSE 1" SAND FOR JOINTS OUT PAVERS WITH MASONRY SAW TOLERANOEa 1112' OPPSR 111" IN 10' FROM LEVEL EXPANSION 1 CONTROL JOINTS • SEALANT FILLED SOIL STERILIZER VIBRATE CONC. PAVERS INTO LEVELING COURSE SAND PILL AT JOINTS REPAIR, CLEANING & PROTECTION CONCRETE PAVER ROADWAYS MATERIAL FTABOR SUB TOTAL O 0 0 O 0 0 0 0 0 O 0 0 0 0 0 O o 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 O 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 O 0 0 0 0 43,014 0 0 0 O 0 0 O 0 0 0 0 0 O 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SUBCONTRACTORS NAME 0 IOL IN FOR DUCT BANK & WATER MAIN 0101 IN POET DUCT BANK & WATER MAIN 0 MIN FOR DUCT BANK 0 WATER MAIN 0 101.1N FOR DUCT BANK 8. WATER MAIN 0 NONE SHOWN/NONE INCLUDED 0101. IN FOR DUCT BANK & WATER MAIN 0101. IN FOR DUCT BANK & WATER MAIN 010E IN FOR DUCT BANK & WATER MAIN NOT REQUIRED/ NOT INCLUDED INCLUDED IN PHASE 1 INCLUDED INCLUDED INCLUDED IN01.UDE0 INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED INCLUDED 0 NCLUDED IN SEPERATE OMP FOR ADMINIPOLICE BLDG 0 NCLUDED IN SEPERATE OMP FOR ADMIN/POLICE BLDG 0 NCLUDED IN SEPERATE OMP FOR ADMIN/POLICE BLDG 0 NONE SHOWN! NONE INCLUDED 0 43,004 HOLLYWOOD STONE! BONDED 0 INCLUDED AS 2-118' RECTANGULAR 0 INCL 0 INCL 0 INCL 0 INCL 0 11101. 0 NOT REQUIRED/ NOT INCLUDED 0 INCL 0 INCL 0 INCL 0 INCL 0 INCL SEPERATE OMP SEPERATE OMP SEPERATE OMP SEPERATE OMP SEPERATE OMP SEPERATE OMP SEPERATE OMP GRAND TOTAL Nap O 0.00 0 0.00 O 0.00 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0A0 0 MOO 0 0.00 0 0.00 O 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 43,034 0A2 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 O 0.00 02/08/2002 03:44 PM JAMES A. CUMMINGS, INC. 4 VILLAGE OF KEY BISCAYNE VILLAGE OF KEY BISCAYNE SITE & SItl INFRASTRUCTURE ARCHITECT: !WILLIS CANDELA DMJM GIMP PROPOSAL DATE: FEBRUARY 8, 2002 THIS PROPOSAL. IS CONTINGENT UPON CUMMINGS CONSTRUCTING THE KEY BISCAYNE CIVIC RECREATION CENTER. IN THE EVENT CASINOS DOES NOT CONSTRUCT THE KEY BISCAYNE CNIC RECREATION CENTER THIS PROPOSAL SHALL BE NULL 8. VOID PHASE 0 WITHOUT FP&L AND SOUTHERN BELL VILLAGE GREEN WAY FROM MCINTYRE STREET TO THE TRAFFIC CIRCLE TOTAL AREA 102,000 SF ITEM _ SECTION DESCRIPTION MATERIAL LABOR SUB TOTAL SUBCONTRACTORS NAME ORWOS. CONCRETE PAVER PARKING AREAS DRWOS. CONCRETE PAVER SIDEWALKS DRWOS. COLORED PAVERS FOR TRAFFIC MARKINGS DRWO$. 12" STABILIZED SUS -GRADE DRUMS. r OR r LIMIEROCK BASE ON SITE CONCRETE PAVERS AT FIRE AND POLICE $ NO SPEC DRWOS. ORWG*. ORWGS. ORWOE. ORWOS. NO SPEC DM'S. DRWOS. NO SPII O ORWOE. ORWGS. MOWS. 0 NO SPEC NO SPEC DRY/GS. 10 NO SPED ORWGE. DRWGS. 11 DIV.10 DRWG*. 12 DN 18 02/08/2002 LANDBOAPINO PLANT MATERIAL. FLA N0,1 OR BETTER MULOH WEED CONTROL FABRIC TREE RELOCATION MAINTENANCE UNTIL FINAL ACCEPTANCE GUARANTEE • 1 YEAR MOM ACCEPTANCE SODDING CERTIFIED TURPORASS4ST. AUGUSTINE OR KENTUOKY BLUE PLASTIC EDGING 1" PLANTING SOIL UNDER ALL SOD GUARANTEE • 0 MONTHS FROM COMPLETION IRRIGATION BAOKPLOW PRBVENTER WATER METER HOSE SIBS FOR MANUAL WATERING CONTROL WIRING 00NORETE REINFORCEMENT, NON-STRUCTURAL WELDED WIRE MESH MATERIAL WELDED WIRE MESH LABOR ARCHITECTURAL PRECAST CONCRETE CONORIL7E BOLLARDS METAL FABRICATIONS TREE ORATES PIPE BOLLARDS MRSC. SPECIALTIES FLAGPOLES MECHANICAL DISCONNECT PLUMBING & MAKE SAFE FOR DEMOLITION PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC 810 0 0 8,772 0 0 810 NIC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 0 0 0 0 0 0 0 0 0 0 0 NIC NIC 0 0 860 0 0 1410 NIC 0 0 0 NIC NIC NIC NIC 0 0 0 0 0 0 0 0 0 a 0 0 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIC NIC 0 0 0,022 0 0 NIC NIC 0 0 0 INCL INCL INCL INCLUDED IN EARTHWORK INCLUDED IN EARTHWORK INCLUDED IN PHASE 1 INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE NIC - BY OWNER INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNER* ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE NIC - BY OWNER INCLUDED IN OWNERS ALLOWANCE INCLUDED IN OWNERS ALLOWANCE INCLUDED IN SITE CONCRETE INCLUDED IN SITE CONCRETE INCLUDED IN SITE CONCRETE NOT INCLJSEE BELOW NOT INCL./SEE BELOW IRONSMITH/JAG NOT REQUIRED/ NOT INCLUDED NOT INCL./SEE BELOW NOT INCL./8E11 BELOW NOT INCLUDED RAND TOTAL I p8F 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 O 0.00 10,774 0.11 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 O 0.00 JAMES A MINGS, INC. 5 VILLAGE OF BISCAYNE VILLAGE OF KEY BISCAYNE ORE & SITE INFRASTRUCTURE ARCHITECT: SPILL'S CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY S, 2002 THIS PROPOSAL IS CONTINGENT UPON CUMMINGS CONSTRUCTING THE KEY BISCAYNE CIVIC RECREATION CENTER. IN THE EVENT CUMMINGS DOES NOT CONSTRUCT THE KEY BISCAYNE CHIC RECREATION CENTER THIS PROPOSAL SHALL BE NULL & VOID PHASE 1 WITHOUT PP&L AND SOUTHERN BELL VILLAGE GREEN WAY PROM MCINTYRE STREET TO THE TRAFFIC CIRCLE TOTAL AREA 102,000 SP REM_ SECTION DESCRIPTION MATERIAL LABOR SUB TOTAL SUBCONTRACTORS NAME GRAND TOTAL SW 13 Oft 10 DRWGS. DRWOS. DRWOS. DRWo$. DRW.S. DRWOS. DRWOS. DRWOS. DIMS. DRW00. DRWOS. DRWOS. DIMS. DRUMS. DRWOS. DRWOI. ORWGS. 01113011. DRWGS. DRWOS. DRWOS. DIMS. REMOVE FREON A MAKE SAFI FOR DEMOLITION ELECTRICAL ELECTRICAL DUCT BANK COMMUNICATION DUCT BANK TELEPHONE & CABLE TV DUCT BANK PP&L MANHOLES • FURNISHED BY PP&L INSTALLED BY CONTRACTOR PP&L CONDUIT • FURNISHED BY PP&L INSTALLED BY CONTRACTOR BELLSOUTH MANHOLES. PURN.1► INSTALL BY CONTRACTOR COMMUNICATION MANHOLES. PURN. & INSTALL BY CONTRACTOR WATERPROOFING OF MANHOLES PP&L POWER POLES • NIO TEMPORARY PP&L POWER POLES • NIO FPSL CONDUCTORS 1► CABLES • NI0 PAD MOUNTED TRANSPORMIRO • NIO STREET LIGHTING PLANTER LIGHTING PRECAST LIGHTPOLE BASES TO MEET WIND LOADING RIO. CONCRETE EQUIPMENT PADS FIBER REINFORCED PLASTIC ENCLOSURES RELOCATE EXIST'. LIGHT POLES S LIGHT POLE PULL BOXES • NKI REMOVE EXISTING FPS& LIGHT POLES & PULL. BOXES • NIO REMOVE EXISTING FPSL OVERHEAD POLE & POWER LINES - NI0 CONNECTION TO FOUNTAIN PUMP S CONTROLLER ILLUMINATION TESTING SIGNED & SEALED EY PE CONNECTION TO IRRIGATION CONTROLLER TEMPORARY ELECTRIC DISCONNECT EXISTING S MAKE SAFI FOR DEMOLITION MODIFY EXTENT OF RESTORATION MY ADDING SURFACE WORK TC UNDEROR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 37,142 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 37,142 FISK/ BONDED 0 101 IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0101 IN SEPERATE GMP POR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE GMP FOR DUCT BANK & WATER MAIN 0 101 IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0101 IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICL IN INMATE OMP FOR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 NIO - BY OWNER NIC - BY OWNER NIC•BYOWNER NI0 • SY OWNER INCLUDED INCLUDED INCLUDED NOT REQUIRED/ NOT INCLUDED NOT REQUIRED/ NOT INCLUDED NIC • SY OWNER NIC • SY OWNER NIO - BY OWNER NOT REQUIRED/ NOT INCLUDED INCLUDED INCLUDED IN PHASE 1 INCLUDED NOT INCLUDED NOT REQUIRED! NOT INCLUDED 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NOT INCLUDED 0 0.00 0 0.00 37,142 0.37 0 0.00 O 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 SUBTOTAL CHICK SUBTOTAL SALES TAX 1.6% LABOR BURDEN SUBTOTAL 02/08/2002 03:44 PM 8,241 3,810 214,834 227,880 227,880 101 2,178 231,218 231,208 2.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 231,218 2.27 0.00 JAMES A. CUMMINGS, INC. 6 VILLAGE OF KEY BISCAYNE VILLAGE OP KEY BISCAYNE SITE & SITE INFRASTRUCTURE ARCHITECT: SPILL'S CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY 8, 2.002 THIS PROPOSAL IS CONTINGENT UPON CUMMINGS CONSTRUCTING THE KEY BISCAYNE CNIC RECREATION CENTER. IN THE EVENT OUMMINGS DOES NOT CONSTRUCT THE KEY BISCAYNE CNIC RECREATION CENTER THIS PROPOSAL SHALL BE NULL & VOID PHASE 8 WITHOUT FP&L AND SOUTHERN BELL VILLAGE GREEN WAY FROM MCINTYRE STREET TO THE TRAFFIC CIRCLE ITEM 1 SECTION DESCRIPTION OWNER'S PROTECTNE LIABILITY INSURANCE BUILDER'S RISK INSURANCE PERMITS PERFORMANCE BOND SUSTOTAL MATERIAL DESIGN PHASE FEE OONSTRUCTION PHASE FEE EXTEND PROJECT TWO AND A HALF MONTHS FOR INFRASTRUCTURE WORK CONSTRUCTION CONTINGENCY OWNER OONTINOINCY OVERHEAD & PROFIT OWNER'S SALES TAX SAVINGS PROGRAM SUBTOTAL SUBTOTAL SUSTOTAL SUBTOTAL TOTAL THE FOLLOWING ITEMS OP WORK ARE SEPARATE OWNER ALLOWANCES WHICH ARE NOT INCLUDED IN THIS PROPOSAL AND WHICH DO NOT INCLUDE ANY CONSTRUCTION MANAGER'S MARK-UPS FOR PERMITS, TAXES, INSURANCE, BONDS, CONTINGENCIES AND OVERHEAD AND PROFIT. FOUNTAIN AT WEST MCINTYRE STREET FEATURE COLUMNS • 8 BACH TRAFFIC CIRCLE ARCHITECTURAL ELEMENT PARK GAZEBO TRELLIS ARCHITECTURAL PRECAST LABOR SUB JAMES P 'MINGS, INC. TOTAL 0 2,060 1,800 3,616 238,634 SUBCONTRACTORS NAME OWNER ALLOWANCE OWNER ALLOWANCE GRAND TOTAL. 0 2,060 1,800 3,616 235,834 NOT INOL. NOT INCL. 0 INCLUDE IN REC. CENTER 0 0 ICL IN SEPERATE OMP FOR DUCT BANK & WATER MAIN 0 236,634 3,000 241,834 3,000 244,634 11,008 266,542 (3,836) 261,808 60,000 OWNER ALLOWANCE 110 • WORK BY OWNER 40,000 OWNER ALLOWANCE NIC - WORK BY OWNER 126,000 OWNER ALLOWANCE NIC - WORK BY OWNER 26,000 OWNER ALLOWANCE 110 - WORK BY OWNER 16,000 OWNER ALLOWANCE NIC • WORK BY OWNER 4,000 OWNER ALLOWANCE NIC - WORK BY OWNER TOTAL AREA 102,000 SF 238,834 3,000 241,634 3,000 244,634 11,003 268,042 (3,836) 211,808 NW 0.00 0.02 0.02 0.03 0.00 2.34 0.00 0.00 0.00 0.00 0.00 2.34 0.00 0.03 0.00 2.37 0.00 0.03 0.00 2.40 0.00 0.11 0.00 2.61 0.00 (0.04) 0.00 2A7 7 VILLAGE OF ISCAYNE VILLAGE OF KEY BISCAYNE SITE ♦ SITE INFRASTRUCTURE ARCHITECT: SPILLIS CANDELA DMJM OMP PROPOSAL DATE: FEBRUARY 0, 2002 THIS PROPOSAL IS OONTINGENT UPON CUMMINGS CONSTRUCTING THE KEY BISCAYNE CHIC RECREATION CENTER. IN THE EVENT CUMMINOS DOES NOT CONSTRUCT THE KEY BISCAYNE CNIC RECREATION CENTER THIS PROPOSAL SHALL BE NULL & VOID PHASE II WITHOUT FPSL AND SOUTHERN BELL VILLAGE GREEN WAY FROM MCINTYRE STREET TO THE TRAFFIC CIRCLE ITEM SECTION DESCRIPTION MISC. SPECIALTIES FLORIDA POWER & LKIHT AND SOUTHERN BELL WORK PROVIDED SY OWNER TOTAL 02/08/2002 03:44 PM MATERIAL LABOR Sus JAMES A. CUMMINGS, INC. TOTAL 8,000 0 276,000 SUBCONTRACTORS NAME OWNER ALLOWANCE NIC - WORK BY OWNER SEE ELECTRIC DUCT BANK & WATER MAIN OMP ORAND TOTAL. TOTAL AREA 102,000 SF WSF 8 Department of Management Services Village of Key Biscayne Recreation Center Site & Infrastructure List of Drawings February 4 2002 CIVIL DRAWINGS C1.1.00 C1.1.01 C1.1.02 C1.1.03 C1.1.04 C1.1.05 C1.1.06 C2.1.00 C2.1.01 C2.1.02 C2.1.03 C2.1.04 C2.1.05 C2.1.06 C3.1.00 C3.1.01 C3.1.02 C3.1.03 C3.1.04 C3.1.05 C3.1.06 C3.1.07 C4.1.00 C4.1.01 C4.1.02 C4.1.03 C4.1.04 C4.1.05 C4.1.06 C5.1.00 C5.1.01 C5.1.02 C5.1.03 Location Plan Demolition Plan - Village Green Way Demolition Plan - Village Green Way Demolition Plan - Village Green Way Demolition Plan - Fernwood Road Demolition Plan - Fernwood Road Demolition Plan - West McIntyre Street Location Plan Geometry Plan - Village Green Way Geometry Plan - Village Green Way Geometry Plan - Village Green Way Geometry Plan - Fernwood Road Geometry Plan - Fernwood Road Geometry Plan - West McIntyre Street Location Plan Grading & Drainage Plan - Village Green Way Grading & Drainage Plan - Way Grading & Drainage Plan - Way Grading & Drainage Plan - Grading & Drainage Plan - Grading & Drainage Plan - Street Grading & Drainage Plan - Street Location Plan Underground Utilities Plan Way Underground Utilities Plan - Village Green Way Underground Utilities Plan - Village Green Way Underground Utilities Plan - Fernwood Road Underground Utilities Plan - Fernwood Road Underground Utilities Plan - West McIntryre Street Location Plan Electrical, Telephone & Communications Plan - Village Green Way Electrical, Telephone & Communications Plan - Village Green Way Electrical, Telephone & Communications Plan - Fernwood Road Village Green Village Green Fernwood Road Fernwood Road West McIntyre West McIntyre - Village Green 08/03/01 08/03/01 08/03/01 06/29/01 06/29/01 06/29/01 09/25/01 08/03/01 08/21/01 08/21/01 08/21/01 09/25/01 08/21/01 09/25/01 08/03/01 09/25/01 08/21/01 08/21/01 09/25/01 08/21/01 09/25/01 06/29/01 08/03/01 09/25/01 09/25/01 08/21/01 09/25/01 09/25/01 09/25/01 08/03/01 09/25/01 09/25/01 09/25/01 CIVIL DRAWINGS (cont'd) C5.1.04 Electrical, Telephone & Communications Plan - Fernwood Road C5.1.05 Electrical, Telephone & Communications Plan - West McIntyre Street C6.1.01 Details C6.1.02 Details C6.1.03 Watermain Profile C6.1.04 Notes C7.1.00 Location Plan C7.1.01 Traffic Marking Plan - Village Green Way C7.1.02 Traffic Marking Plan - Village Green Way C7.1.03 Traffic Marking Plan - Village Green Way C7.1.04 Traffic Marking Plan - Fernwood Road C7.1.05 Traffic Marking Plan - West McIntyre Street C8.1.01 Traffic Maintenance Plan C8.1.02 Traffic Maintenance Plan C8.1.03 "Phase 1" Plan C8.1.04 "Phase 2" Plan C8.1.05 "Phase 3" Plan ELECTRICAL DRAWINGS EE0.1.01 Fixture Schedule, Calculation Schedule & Details EE0.1.02 Electrical Site Utilities - Details & Specifications EE 1.1.01 Demolition Electrical Site Plan EE1.1.02 Site Lighting Plan 'Area A' EE1.1.03 Site Lighting Plan 'Area B' EE1.1.04 Site Lighting Plan 'Area C' EE 1.1.05 Photometric Plan 'Area A' EE1.1.06 Photometric Plan 'Area B' EE 1.1.07 Photometric Plan 'Area C' EE1.1.08 Electrical Site Utility Plan IRRIGATION DRAWINGS I1 R.O.W. Irrigation Plan - Zone 1 I2 Irrigation Plan - Zone 2, 3, & 4 I3 Irrigation Notes and Details LANDSCAPING DRAWINGS L1 R.O.W. Planting Plan - Zone 1 L2 R.O.W. Planting Plan - Zone 2, 3, & 4 PROJECT SPECIFICATIONS DIVISION 2 - SITEWORK 02050 Demolition, Removals and Relocation 02220 Earthwork 09/25/01 09/25/01 06/29/01 08/03/01 09/25/01 08/21/01 08/03/01 08/21/01 08/21/01 08/21/01 09/25/01 09/25/01 11/02/01 11/02/01 11/02/01 11/02/01 11/02/01 08/22/01 08/22/01 08/10/01 08/10/01 08/10/01 08/22/01 08/10/01 08/10/01 08/10/01 09/25/01 09/19/01 09/19/01 09/19/01 06/05/01 06/05/01 JAC Date OP "1/01 JAC Date ( )1 DIVISION 2222 02511 02514 02517 02580 02660 02720 2 - SITEWORK (cont'd) Excavating, Backfilling and Compacting for Utilities Asphaltic Concrete Paving Concrete Sidewalks, Curbs, Curbs and Gutters, and Wheel Stops Solid Interlocking Concrete Pavers Pavement Marking Water Distribution Storm Drainage System OTHER DOCUMENTS Response to Request for Information #PC002 Revised Phase 2 Site and Site Infrastructure Improvements (Phasing Plan) JAC Date 08/17/01 JAC Date 08/17/01 JAC Date 08/17/01 JAC Date 08/17/01 JAC Date 08/17/01 JAC Date 08/17/01 JAC Date 08/17/01 10/31/01 Rec'd via fax 1/31/02 Act ID Activity Description Org Early Early Dur Start Finish IRE STATION 1100 CONSTRUCTION OF NEW FIRE STATION 90 13FEB02 1110 SUBSTANTIAL COMPLETION 1120 PUNCH LIST 1 31JUL02 22 31JUL02 18JUNO2 31JUL02 29AUG02 DMINISTRATION & POLICE 2100 CONSTRUCTION OF NEW ADMIN. & POLICE STATION 2900 RELOCATE&DEMO.EXIST.POLICE/ FIRE&INSTALL S.PARK. 2119 SUBSTANTIAL COMPLETION 2120 PUNCHLIST 90 13FEB02 18JUNO2 33 19JUNO2 02AUGO2 1 29AUG02 29AUG02 22 30AUGO2 30SEPO2 SITE,UTILITIES &STREETS -PHASE I (FIREIADMIN/POL) 2106 PERMITTING 2107 OWNER APPROVAL OF GMP & AMENDMENT TO CONTRACT 2108 COMPLETE SITE,UTILITIES&ROADS WORK@FIRE & ADMIN. 2109 UNDERGROUND ELECT. & WATER WORK 2110 MCINTYRE & VILL.GRN. ROADS & WALKS WORK 2114 VILLAGE GRN CIRCLE & EAST TO EXIST.ROAD & WALKS toted Start ropet Finish ,ala Date on Data 13WEB02 264E1403 02 2 IZ) Primavera Systems, Inc. ----- ------------- - Early Aar Prograls Elar liwarviarawtiarmaralf Critical Arlivity KST1 15 06MAR02 26MAR02 90 27MAR02 30JUL02 64 27MAR02 24JUN02 64 17APRO2 15JUL02 44 22MAY02 22JUL02 2002 FV;A'M J'J'A SAO N 2003 DJ CONSTRUCTION OF NEW FIRE STATION T SUBSTANTIAL COMPLETION PUNCH LIST J!AIS.I_ CONSTRUCTION OF NEW ADMIN. & POLICE STATION i/Oar RELOCATE&DEMO.EXIST.POLICE/ FIRE&INSTAL *SUBSTANTIAL COMPLETION iMPUNCHLIST 30 13FEB02* 26MAR0241111WPERMITTING ,OWNER APPROVAL OF GMP & AMENDMENT TO CONTRACT ,COMPLETE SITE,UTILITIES&ROADS WORK@FIR UNDERGROUND ELECT. & WATER WORK rffmliff MCINTYRE & VILL.GRN. ROADS & WALKS WORK ' VILLAGE GRN CIRCLE & EAST TO EXIST.ROAD & y JAMES A. CUMMINGS, INC. VILLAGE OF N IISCAYNE CIVIC CENTER CIVIC CENTEIN .,OMPLETION SCHEDULE Sheet 1 of 3 Act Activity ID Description 2111 EXTEND VILLAGE GREEN ROADS & WALKS TO W. ENID 2115 PHASE I LANDSCAPING, IRRIGATION & BRICK PAVERS 2112 WEST ENID ROAD & WALKS WORK Org Early Early Dur Start Finish 44 19JUNO2 19AUGO2 52 19JUNO2 29AUG02 44 28JUN02 28AUG02 2113 FERNWOOD ROAD & WALKS SOUTH OF 44 28JUN02 28AUG02 MCINTYRE FINAL COMPLETION FIRE & POLICE/ADMIN. 9999 FINAL COMPLETION tn)rd Stint tn.et rinlah ,la pore ,nr n,le nnrEnn7 7nSFrn3 tirrnn7 net rnn7 Ptltnttvera Sy+trm ,Inc _ — Farly nar rtnnr.aa Rat (;rUlf al ArIlvlty KSt4 1 01OCTO2 01OCTO2 2002 F M'A M J' J A y JAMES A. CUMMINGS, INC. VILLAGE OF KEY BISCAYNE CIVIC CENTER CIVIC CENTER COMPLETION SCHEDULE SIONDJ !EXTEND I PHASE I LANDSCAPING, IRRIGATION & BRIG WEST ENID ROAD & WALKS WORK FiM 2003 A1M J J 1-gri FERNWOOD ROAD & WALKS SOUTH OF MCIN ,IEFINAL COMPLETION Seel 2 of 3 Cumrliinc�s IJ)1►1111 Act ID Activity Description Org; Early Early Dur, Start Finish RECREATION CENTER 5075 WASA & COUNTY PERMITTING 5076 VILLAGE PERMITTING 5065 RELOCATE OFFICES &DEMO. EXIST. VILLAGE HALL&BANK 5100 CONSTRUCTION OF REC. CENTER 5110 SUBSTANTIAL COMPLETION 5120 PUNCH LIST 4106 PERMITTING 4108 SITE, UTILITIES & STREETS WORK @ REC. CENTER 4109 FERNWOOD UNDRGRND.,ROADS&WALKS 4110 VILLAGE GRN. UNDRGRND.,ROADS, MCINTYRE TO CIRCLE 78 13FEB02 31 MAY02 78 13FEB02 31 MAY02 22 19JUNO2 18JUL02 289 19JUL02 27AUG03 1 28AUG03 28AUG03 20 29AUG03 25SEP03 66 13FEB02* 15MAY02 88 29APR03 28AUG03 44 29APR03 27JUN03 44 30JUNO3 28AUG03 INAL COMPLETION RECREATION CENTER 11999 FINAL COMPLETION rojeet Star teleet Flnlah 'Ha nate ,nn nate 13►FR02 Primavera Systems, Inc. Early Rat '' r Rar iiirwwwwwarearsamppromarf Ctitfr•,I Artivity KSt4 26SEP03 26SEP03 2002 2003 FM1A M'J J A S!ON�D J F'MIAIM1 J ! J !A ffirMaiwiff WASA & COUNTY PERMITTING AraillWVILLAGE PERMITTING RELOCATE OFFICES &DEMO. EXIST. VILLAGE HA CON SUBSTANTIAL COMPLETION PUNCH LIST A s it If 1 , 1 1 1 411 1WPERMITTING JAMES A. CUMMINGS, INC. VILLAGE OF K ISCAYNE CIVIC CENTER CIVIC CENTER.,OMPLETION SCHEDULE SITE ki/MFERNWOO irmiirVILL FINAL COMPLETION Sheet 3 of 3 Al c f1 S l 1 t} (1 Qualifications and Clarifications Where conflicts may exist between these Qualifications and Clarifications and the listed Contract Drawings, Specifications and Architect's letters of direction, these Qualifications and Clarifications shall govern. 1. The Owner Allowances are sums of money established for a particular item of work which scope and description are not sufficiently defined to allow for pricing by Cummings. These Allowances are inclusive of all labor (unless otherwise indicated), payroll taxes and insurance, material, sales and use tax, equipment, services, general requirements, insurance, bond and fee. The following items of work are included as Owner Allowances: Owner Allowances A. Permits B. Builders Risk Insurance C. Landscaping, Irrigation & Sod $ 10,000.00 $ 10,700.00 $ 225,000.00 2. The costs included in this proposal are as specifically identified in this proposal and are as specifically shown in the enumerated contract documents and do not include any unknowns, incomplete design and/or conflicts which may result from the completion of the contract design documents. 3. This proposal is based upon the assumption that construction of the Recreation Center will begin at final completion of the Fire Station and the Administration/ Police Building. Any additional work required as a result of a delayed start in the construction of the Recreation Center is not included. 4. In the event Cummings does not construct the Recreation Center, the GMP proposal for Phases 4 and 6 of the Site and Site Infrastructure will no longer be applicable and shall be rendered null and void. This work would be performed simultaneously with the Recreation Center by whoever is the contractor. 5. Phasing has been included in accordance with the enclosed phasing plan. 6. All proposals are based upon the work taking place during the time frames established in the enclosed schedule. 7. Permit fees are included as an Owner Allowance of $10,000.00. 8. Builder's Risk Insurance is included as an Owner Allowance of $10,700.00. 9. Construction of the traffic circle and North Village Green Way to within 195 feet west of 2 Crandon Blvd is not included. All work from Crandon Boulevard 195 feet west along North Village Green Way shall be provided by others. 10. Art In Public Places including all required infrastructure shall be provided by others. DIVISION 2 - SITEWORK 11. In that a geotechnical report was not prepared specifically for the Civil & Site Infrastructure, this estimate is based strictly on the Subsurface Soil Exploration as prepared by K&B Consultants Inc. for the Administration and Police Building. Site preparation does include the removal of the existing top two feet (2') of existing soil within the area of construction. All costs required to remedy and modify existing unknown subsurface conditions, including unsuitable and/or contaminated soils are not included. 12. All existing trees which are in conflict with new construction shall be demolished and removed from the site by Cummings. 13. Demolition of the existing Village Hall and bank is included. 14. All FP&L and Southern Bell costs including but not limited to the removal and/or relocation of FP&L light poles, power poles and pull boxes are not included. 15. The sanitary sewer servicing the Administration and Police Building as shown on sheets C4.1.01 and C4.1.06 was previously included in the GMP proposal for the Administration and Police Building and is therefore not included in this proposal. 16. Solid interlocking concrete pavers similar or equal to those manufactured by either Paver Module or Tremron are included. 17. All pavers for the sidewalks are included as 4" x 8" concrete pavers. All pavers for the roadways are included as both 4" x 4" and 4" x 8" concrete pavers. All concrete pavers for the sidewalks and the roadways are included as 2-3/8" thick. 18. With the exception of the handicapped parking spaces, all pavement markings in areas to receive concrete pavers are included as colored concrete pavers. All pavement markings for handicapped parking spaces located in areas to receive concrete pavers are included as painted. 19. All pavement markings on asphalt paving are included as painted. 20. Landscaping, Irrigation and Sod are included as an Owner Allowance in the amount of $225,000.00. 21. Topsoil is included under the sod as two inches (2") thick. 3 22. All required reinforcing steel and welded wire mesh are included as regular plain steel and bright welded wire mesh. 23. Concrete sidewalks where indicated as colored are included as key coral colored concrete with a medium broom finish. 24. By adding the surface work to the electrical duct bank and water main GMP, the extent of restoration has been modified therefore a credit of $25,000.00 has been included towards the Owner Allowance for restoration previously included in the Electrical Duct Bank And Water Main GMP DIVISION 5 - METALS 25. Tree grates are included as cast iron with a black enamel finish similar or equal to those manufactured by Ironsmith Architectural Products Model M4836 and M6058. DIVISION 16 - ELECTRICAL 26. The furnishing of manholes and conduit for FP&L duct banks is not included. WORK PROVIDED BY OWNER 27. Threshold inspector and special inspector services. 28. County, city and other governing municipalities and agencies fees and charges and all impact fees, utility connection and usage fees. (Permit fees are included in the GMP as an allowance.) 29. Quality control testing. 30. Tree relocation. 31. Removal and/or relocation of existing trailers and other portable type facilities. (Demolition of the existing facilities is included.) 32. Asbestos abatement and removal of other hazardous materials in existing facilities. 33. Furniture, Fixtures and Equipment (FF&E). 34. Removal, replacement and/or restoration of existing unknown utilities. 35. Detention tanks and disposal wells. 4 36. The cost of the water meters. 37. Traffic and/or pedestrian signalization. 38. All required Florida Power & Light and Southern Bell work including connection fees. 39. Art In Public Places including all required infrastructure WORK NOT INCLUDED 40. The following items of work are separate Owner Allowances which are not included in this proposal and which do not included any construction manager's mark-up for permits, taxes, insurance, bonds, contingencies, overhead and profit. A. B. C. D. E. F. G. H. Fountain at West McIntyre Street Feature Columns Traffic Circle Architectural Element Park Gazebo Trellis Architectural Precast Concrete Miscellaneous Specialties Florida Power & Light and Southern Bell $ 60,000.00 $ 40,000.00 $ 125,000.00 $ 25,000.00 $ 15,000.00 $ 4,000.00 $ 6,000.00 See Duct Bank GMP WORK PROVIDED IN ELECTRICAL DUCT BANK & WATER MAIN GMP 41. FP&L duct banks, Bell South duct banks and communication duct banks. 42. Water main under Village Green Way. 5 WE5T ENID DRIVE 1110 SUBSTANTIAL COMPLETION 1120 PUNCH LIST ADMINISTRATION & POLICE 2100 CONSTRUCTION OF NEW ADMIN. & POLICE STATION 2900 RELOCATE&DEMO.EXIST.POLICE/ FIRE&INSTALL S.PARK. 2119 SUBSTANTIAL COMPLETION 2120 PUNCHLIST Act ID FIRE STATION Activity Description 41111, Org Early Early Dur Start Finish 1100 CONSTRUCTION OF NEW FIRE STATION 90 13FEB02 18JUNO2 1 31JUL02 31JUL02 22 31JUL02 29AUG02 90 13FEB02 18JUNO2 33 19JUNO2 02AUGO2 1 29AUG02 29AUG02 22 30AUGO2 30SEPO2 SITE,UTILITIES &STREETS -PHASE I (FIRE/ADMIN/POL) 2106 PERMITTING 2107 OWNER APPROVAL OF GMP & AMENDMENT TO CONTRACT 2108 COMPLETE SITE,UTILITIES&ROADS WORK@FIRE & ADMIN. 2109 UNDERGROUND ELECT. & WATER WORK 2110 MCINTYRE & VILL.GRN. ROADS & WALKS WORK 2114 VILLAGE GRN CIRCLE & EAST TO EXIST.ROAD & WALKS 30 13FEB02* 26MAR02 15 06MAR02 26MAR02 90 27MAR02 30JUL02 64 27MAR02 24JUN02 64 17APRO2 15JUL02 44 22MAY02 22JUL02 2002 F J fFJM Zoos A M J J A S . l 1 1 1 1 11 I 1 1 1 1 1 111.J 1 L1 ,_1 1 1 1 1 I ' CONSTRUCTION OF NEW F11RE STATI N 1' I I SUBSTANTIAL COMPLTIQN ifiriPUNCH LIST CONSTRUCTION OF NEW ADMIN. Fit P(LI( 1111111FROLOCATE&DEIVIOEXST.P0(11/ F SUBSTANTIAL OOMPLTI9N 111111/ PUNCHLIST ,PERMITTING ,OWNER APPROVAL OF GMP & AIVMEN,DMNT, T9 CQNT IA T CQMPLETE SITE,UTILITIES&ROADIS IVORK Fl E 111111111.1FUNDERGROUND ELECT. & WATER WI MCINTYRE & VILL.GRN. ROADS& VILLAGE GRN CIRCLE & EAST T y Project Start Project Finish Data Data Run Date 13FEB02 26SEPO3 13FEB02 06FEB02 0 Primavera Systems, Inc. awigniMMIIIIINW Early Bar Progress Bar Critical Activity KST4 JAMES A. CUMMINGS, INC. VILLAGE OF KEY BISCAYNE CIVIC CENTER CIVIC CENTER COMPLETION SCHEDULE Sheet 1 of 3 A E .KS MIdRK 1 IST1R0fD umm in9s 11 LAct ID 2111 Activity Description EXTEND VILLAGE GREEN ROADS & WALKS TO W. ENID 2115 PHASE I LANDSCAPING, IRRIGATION & BRICK PAVERS 2112 WEST ENID ROAD & WALKS WORK 2113 FERNWOOD ROAD & WALKS SOUTH OF MCINTYRE Org Early Early Dur Start Finish 44 19JUNO2 19AUGO2 52 19JUNO2 44 28JUN02 44 28JUN02 29AUG02 28AUG02 28AUG02 FINAL COMPLETION FIRE & POLICE/ADMIN. 9999 FINAL COMPLETION 1 01OCTO2 01OCTO2 2002 F MIA M J[ J A S0[N D J FPM 2003 A M J J A S I i I I 1 1 l 1 L I l l l l l l I l 1 1 1 L I 1 11_Ll L 1 LL,L_LJ L',.111 1 1 1 1 1 11 1 L-J.I l IEXTENp VILLAGE GI�E N ROA S ALKS { PHASE I LANDSCAPING, IF�RI 'ATION & BRI 1 1 WEST ENID ROAD & Wi ILKS WORK K FERNWOOD ROAD j& V1'AL S ' OUTH OF MC 14 1 lifFINAL COMPLETION Project Start Project Finish Data Data Run Date 13FEB02 26SEPO3 1FEB02 EB02 AMIIIMININIMIN Early Bar allalMMINIME, Progress Bar Critical Activity KST4 JAMES A. CUMMINGS, INC. VILLAGE OF ' BISCAYNE CIVIC CENTER CIVIC CENT, ;OMPLETION SCHEDULE Sheet 2 of 3 0 Priouwera Syste. , rnc. Act ID Activity Description RECREATION CENTER 5075 WASA & COUNTY PERMITTING 5076 VILLAGE PERMITTING 5065 RELOCATE OFFICES &DEMO. EXIST. VILLAGE HALL&BANK 5100 CONSTRUCTION OF REC. CENTER 5110 SUBSTANTIAL COMPLETION 5120 PUNCH LIST Org Early Early Dur Start Finish 78 13FEB02 31 MAY02 78 13FEB02 31 MAY02 22 19JUNO2 18JUL02 289 19JUL02 27AUG03 1 28AUG03 28AUG03 20 29AUG03 25SEP03 SITE, UTIL & STREETS -PHASE II & III (REC.CENTER) 4106 PERMITTING 4108 SITE, UTILITIES & STREETS WORK @ REC. CENTER 4109 FERNWOOD UNDRGRND.,ROADS&WALKS 4110 VILLAGE GRN. UNDRGRND.,ROADS, MCINTYRE TO CIRCLE 66 13FEB02* 15MAY02 88 29APR03 28AUG03 44 29APR03 27JUN03 44 30JUNO3 28AUG03 FINAL COMPLETION RECREATION CENTER 11999 FINAL COMPLETION 26SEP03 26SEP03 2002 F M_IA[_M'J7J;A1SO N1D . 1 1 1 1 l i l 200'.. J [F MUA1MI.1 L.1 A s 1 1 1 1 I l _1 1 1 1 11 1 111 1 11 1 1 1 1 1 L1_1 1.1171) 11 ( tJ_1 WASA & COUNTY PERMITTING VILLAGE;PERMITTING RELOCATE OFFICES &DEMQ. XIST.1' 1 PERMITTING SUBSTANTIAL IOMPLETI9N LIT L N 11 r1 N SI E illegri I FERN OO VI L F!N L C M LE'TION I I Project Start Project Finish Data Date Run Data 13FEB02 26SEP03 13FEB02 06FEB02 allIBRINIIIIIMIIIIIWr Early Bar APIIIIIIIIINIMBININSW Progress Bar allIIIIIINNINNINIIINWCrftical Activity KST4 JAMES A. CUMMINGS, INC. VILLAGE OF KEY BISCAYNE CIVIC CENTER CIVIC CENTER COMPLETION SCHEDULE Sheet3of3 Cummings 0 Primavera Systems, Inc. _ I F LRNWO, -------------------------- I l l i l . , l i VILLAGE e L�r 47.7 DRAWING C1101 I e L 161 0 , 1 f f Ir - - `r --1 - ' JI -- — di -1 I� 1_1.1 I I - I i r \\- CRVOOhr 8°41EEVgRO \`; z W ;AGENDA ITEM DRAWING C1 105 DRAWING CI 1 02 LOCATION PLAN N 0 40 80 120 DRAWING C1 1 03 VILLAGE OF KEY BISCAYNE CIVIC CENTER Key 8.scoyne Flor,dO Sp,ll.s Candela D111s1 wa ...as w.... Carr t.w• Iw.w ]l,6. ,., 0116.4•4 oak f.. 00..•• s•6 r... 0 unreel 6C •6066 1666, • OS 01 0370126 ,»y 064 hoot* 66 AK 21 2001 61110 r0e CY/ e•WSI 3 601 CI 00 6e.•• 1.76.0 A. 'Age.; f o,•,w..r- C 6L6rer .0006 No 191: -wsa M, -t6, 110;,6, .1K NOTES ull 0J014+n. CO1.1•(0100* suMa• 01 0010 010101[135 .NC 0(1<C1 NC .111. 11 1000 1 01511(: 11(0 .M( 401 S(0.0 :00.^ ui tl*C . 01 •010C(110F o1 (110 llN3 I0(15 BII+ I(1 DC.Oil•f•.I Of RUe11C *01(0 S .ilm1 IIt LAIN.: 5 C0NS1RUC1101. Or 1100.1 1.,1 OR r*C (E0' 01 101 111511(0_ SUVA: ;0115 111511.0 v.vrufV .e.4D(..O 01111115 .4 +N 013 +1.'0)410 105(0 f Itor : J 1.51 - c(. (w( -'i Z Cif "I Clti u zi7 (i�:�:• '<- 0 t 1 MCYXv( [ - 1' ▪ DD Q Sv uric '.._,_101001 [USING C-) i µ011 .C( / 0 1.50 ^ ;L.'''. . £000 .I WBS VDNO �I 1 NNO0( /00 AFtOYtM[µ" ii,ll L. CW17/ i 4 i.1 SL.1Rs-w I} - 0 1 T 1 ce . ,f(c.v n5. vo(n vole L(1151wf Par( of .' 10 Of 0•10 S.IICV1 j?t,C-Cltt i .SSRMµ1C''/ 1N0,1.S(-t, ,1 -1 •f•• - 4111)*. illt - 1 - _ 0< *0*0 0 / :•�Cui 1(1510(4 CUM, 10 'OBE( ROLE to II[Y .SR(0110< ..v((E01 CO(CRC1( $101(71* C0NCICIC 51.0 COBB (ND CU11(R CURB 04011 001110 LEGEND _-I �_ T io5:ii:OURS /I I I ` L..�(115IwG 0(7(Yf(1 10 IICN.10 L-- - J ......: . ...... _J 1 R.5( ✓41 -. 1 `- f 11511(6 10010 r 10 IIYu1. (01511(4 v.v[NENI IO If1C 11 1 5 1000(.10 X11 MATCH LINE • STA 4140 FOR CONTINUATION SEE C1 1 03 DEMOLITION PLAN VILLAGE GREEN WAY N 0 20 40 60 • VILLAGE OF KEY BISCAYNE CIVIC CENTER Key Biscayne. Rondo Spills Candela DUN .I..Rtw.t. W+.1( Nrw.t M Y.I. OMI.... W.l G.IIm 11••••• MI t MOWN. aR (0. (1WP MM Iy1(O, Loom 0K UM 141.01 07211113E I1( 00% herd ■t 1014 11.1•01 401Le rat 014 Mat 7.7111 C1.1.02 Imel No. N ow bowls R.C111.NL N Mnn► W ER►IW Law ler 7117 1lepere Weer (10CM/I.00S7 LECEND 0.5190 11 0(6+I6 R(02 v( 01504210 000100NI C0..0101! 1X0100000 CONE 06rt 000. cu0l 6001 :0',15 .411• SC .1B MATCH LINE • S1A 11.00 FOR CONTINUATION SEE C1 104 R(YOV( I, ,I , B I( ih S1 Al+B AS0060 TIC I , SURFACE 0X0 OW --. 1 1601' 41(+ Culr(3 RL010( .06001,E SIO(RAI. S0NCUI *1000 •I '" 1 (NTENt INC OF 1 / j.1 •ry ROAD 1 9 y`, R(Y0v( I CONCRIIE SOH trAIR PI6001 CURB I I .-____ t 0. 1,1 I I y T \ . g y. f,yI611 NY(NI ID L.40 R160.1 11E CViIIR R(00v' CURB 110 11.11110 0051100 L(NI 10 RI tow 0(00011 CURB --(0151160 510(0 AA 10 REYY9 00 (1131100 I BUi10160 1 --'rr \ I01511NC R'JI 'UIIOINC r ,• Ol1CF ._ L (Komi i1 0001,1513, 110« p 'I I u1s,16iioEia: S"I , 1 �,S0NCU10 R1Y6 / -1 - ^SOLAR f, 51A1F RFYOP( 11 - '10 {[3000 J C0 [PEI[' ., Y05( 00000111 / St 0131 RLuOvI RI ,:,,,( --F/- COWIE IL p SIO(NAIA I ( �:A1'.0°,0,41 :'o: ulsu3c 1 j� G61t D16t /,/1 MANS • Ilc:ooI'c 1 �. PL 6001 1500 \ `- Bas[ lM( ,1 01, /0011001 -t 1 11101 501( 5[01002 �RINOv( 1 CURD \ COOC AIII �P,60v[ cooco 1 N SONRI 9011 (1IS1IN0 605000, [11511110 5,010100 l f(YOv( 10 "I.I. % Rot 10 Y(YYY S0NCU1 µ"c5011 �- R(R0v[ CRM o Bs[ (AWING 1100 ((MCL GUIT AND GUI TER 10 R(YAIM r [usluc 0000014 (0(S 10 RitiA,E.EtN ' 1 ASOAII, A' At D 0(YOX. I I - REMOVE 00001(11 I1 1µa9 110 160 'N -_C O,t aS41000:1 I Or 1011D006iSU001 li I 11*61N Y[61 Li0 -506(01 t0 ..+ �._.. 4160 Op1BICG .. v -1[0OY( 500010 1siN0l*0 .. ., •. ;� xa11LR(IL 100(000 00.0 �AS4 .-I W 0(LON( 0A10N10 Aµl.'NO [OOZING.: ' ,0 00NF CONCRL1C:05.05' �0u - 9(00001 CO. 2100 110((5 0(000( C0Y3 0101 0(00( 3(0001 C.O. Lola 1(NC( (0151110 6000 50060 002( 10 REMAIN NOTES 1 011( IW01Y00WN 011100(0 (0090 500010 11 6000 NY(NI(ROS .0 41.41C9 WC 00110 09110 I0 2000 EXISTING 11((1 N( 301 100911 C0010WA1( l(9OVLL 00 0(10001100 00 (1151006 10((1 9173 10( DE,N10(01 Or OVOCK 00.05 1,1016 INC/61101005 003511001100 00(0 1(6001 IK 100 (NO 00(1 06 ,N( 001STIN0 16100CE SONS.(ooSlWG 0,N(3(NlS 090X006(0 611LIII(S 110 owl 010 MN00N(0 (0000011031 DEMOLITION PLAN VILLAGE GREEN WAY N 0 20 40 60 VILLAGE OF KEY BISCAYNE CIVIC CENTER Key B1100NM• Flwlda :p11111 Candela D111111 +1,w«10., OyY1*600 rW,.O NR 001Br 10„•1*, WY 1.1 rM.. 3060, 00 IM *Km. MI W ,0000.- 1003 olvra 13.01. 001 51313 Y 01-01 022m111 IM dm (*0.01130 10.2000 02K[D f01 Car /(1761 2,7001 01.1.01 N3R. Nom L3 tiLap PC 5.36313.6' C.0('I'39' Lsr0 Rs 21000 '310/.33 0.40/ 1106007•SNI NOTES 1100 N 000 i NA SE 11x( 0 15 00 -[1151x11 COI t0 1(u4x— 3 et E 0 1 (uS11K PRfIN[U1 l+. 10 00000 -7 LEGEND (1151x0 10 0(x01* 0(000( 4SM4I1C 000(0(x1 000[00 00 110[ 140 1100CR(l0 St4e COO 000 GU11(0 11000 041(0 101100 I1 5... ..._• _ 01000E C 510(040 ([501x0 0014(1 001101 10 0(00,0 0.0100 7 (1511100 510(041 0(0 150xSURr 000 000(001 01(OG(11fdy Trj /001$111 040(0001 10 0(10010 5 (01Sivx0 CWa 10 0(04x— (050loot (110x0(041 (1511x1 0µ1E1 GUTTER 10 11E110111 500[0 •i / / // \ �� i� \ 1 1 / I(0a0( 5'5x41 l' 1\ // '''''.,,>'-- [00[000 SURI 4I 1.\ 0x0 B0S( S. 1 v SIT[ 11110000 NON OA141010 'RON SURY(1 (0 1010 •00(x11005 000 x00UC0 1OC 001[0 00044 IS 2000 (II(1103 0RE(5 /RI 001 00000 C00R010A7( 1E 0004 00 REl0C0,10x Of 01151,x1 II('S 0110 1441 000011120111 Of *00110 00055 011010 105 0UIL011: S CONS, RUC:10,. 00(4 0(0000 100 101 100 1(11 of ix( 10151101 5001100 501.5 1/051101 P00(0(015 00050[x(0 01µG1111 109 •01 0L0 000000000 /000001,005 DEMOLITION PLAN VILLAGE GREEN WAY ( N 0 20 40 60 VILLAGE Of KEY BISCAYNE CIVIC CENTER Key Biscayne, flo da Sp(llls Candela UM114 +Nwxlxn Cx1*0nu1 fl O 4P1 000(11 0.I, (r* S*R11x IM W 00,30 1. On.. al w MON+1 MI 0•.11* L1ww 441 00111.1 SMe' 701 I-01 a1 07700' 011* 014 /10(111 m 0-10.11 006 0,1001 MUCO EOa CU C1.1.03 Ow* 1100wm ♦Lg1.1E 7101010 WEITLe (00100. M 9!!5 70ecom 000000.' 132152442.25-4 5K NOTES 500401 4003 (101(10100 0( _- ` 0000 —, N W 10 0(x001 151001(( .✓ 0000 -, E ri Y 10 05 I 2 500401 4003 Cl.((11100 00 1000 — 1 L 0.001011 io 0(000G.01, 1-0(000( AS/00l1 50 C 0(1(01=. • '0' 100 11S - - :�0 :e:t:..-_ y y.. .�..%^,••--110000(t1 COI 000 Gip 1(0 �Y Y-4+ X00' 1/0001 10(0(0 DIJON "04 (0.001 If Si0(•0100 (015(003 30000(70 5,04 10 W -500001 7 -00.-.- 1(0000( • 400(1(05 54(0010 — 0(0000 C00C1(If 5401 MATCH LINE • STA 11.00 FOR CONTINUATION SEE G1 1 01 10( 0 LEGEND 0(00001 COMM 1( 00r( 005000. 011700 0103 (0 1(0000 (1(50001 (0 1(004(1 1(000( 05/10/703 00000101 C01C0111 SW0St. COK.(I( 5010 0000 000 Cv,,t., 4001 0001(1 1011[1 1 500(61 4000 ((011x,4*( 01 (0011 1-111S1,03 lP.rl07- ------'��--- --- 7 • 11000( 5000110[ 5011100( 000 1051 (00101 001 ((030 -300 (((5(014 3,00.10*1(4000(((0(1 11001 (( `04 (10 10 0110000 (01( 100(0 10(1 Col 0000(010 (P10 .00(0 P0(1 010.0441 (O0(0117 5,0(041 G (0151100 00000(01 10 (1040 1 O O i C - i — i — L) 1 -r W -- - 'w ERNW000 ROAD IL •0002 311 t ¢ U 1 U 1,1( 10(0100(1000 0110400(0 (100 SAW If 0000 11010(0005 000 00x0[1 003 001E0 01111 10 2000 I (1101001 I1(ES at 0101 Se01e 30010000I( 1[00,001 00 1(10(01100 0( (015(100 (00((5 011x 100 0(.001x101 Of 101110 00005 1 Wm, 101 00,10,00 5 C00StR1C100 080 0(.000 101 (OP 100 (I(' 01 000 (0151.00 Suer ACE S0..5 (0051100 .0,01.21015 .00,000(0 J11 11,(' 0000 001 010 .000000(0 0000001100; DEMOLITION PLAN FERNWOOD ROAD N 0 20 40 60 VILLAGE OF KEY BISCAYNE CIVIC CENTER Key Bncoyne, Flo(d0 Splllls Candela D14111 ....+.1100 1.1.•••01 •IRR.n0 i 0...00 (.1..00 Ca. 0... 00..0 1000. 00 4011MM 40011•• COW., SIy Ilona Lxn.. 10f 111111100 510.( IAe 0-0►40 02211(( 1111 ply h.IRI s-941 1IE *2001 MO F01 VIP C1.1.04 Uwe. bowls A 100. P 0,0.110000 WC.p*e.' (100..1 1. SIM t1yc1.11 Mfr (y5SoI7 3.1.34 Sr.' 1,(11 050011 lIC 010(0(01 200(0111 500(•41 CO.2.(IC '100 CURD 100 60••10 01.0 114(1( LEGEND ((611.6 10 .(040 ((000( Qy I a /--�- __ ;nCt IRt .640(01 11, S11.00I •0�` (111. • 2l R(11M( 010010( c[.I(.L of or O / SIIUAC( wD usL RD"0 ,1,.l l- a.L( :a.:=. 2/2... 2 r O7 W, POLE 1000 ; IX. �sl......... .4(e00l*( 0 ((0 015000.(0061 0 \1 `' ; (0511f 70.1 MA0(0(01 SA.CVI ((000( ROWO0(ROUIG - Y ,1 S.011 100 1141 /' (III, 101C WSW', • D 01.0G-/� •4L ,0 110 0 � H 0(000[ 0001 000(0 000[ ((052.00 5100001( '0 R(Yx. L((151106 010(0[01 10 R(M(11. 0(0001 ((151106 O *1005 e 1 (UD.4 RN wo .[1100[ (5104110 SU1n((. 0 3152 00[ 007;b014,001 01 0,5011!.0,5011!..'Z. 041 001116 0 45 5[0�.'[i O0C RE1[ 0ILOCAI[ 1.61 1,00(0 0011 - 1161,11C, 00((0101 10 00114. (*0 1,0 4000 6[X1(01011 02 ` 110.0 -(1.6(10 ((111112 Oct Or 0010. k ` s. 10 SR(YY.OR---J ((610.6 2110! C.055044 10 11(114/ s SA0CVI [(1511w6 PO(00Ls 10 I( 000 NOTES 1 5011 10011111114. 001/0100 0000 SV00(- 51 010.0 0l0(11I(10S 1.0 0A.11C, 1.0 001(0 0011, 7 1000 7 Ci61106 12(65 M1 001 5(0e* C00.011111C 000004 0. ((1061110. Or ((15(0116 I11(ES 001. NC 0(00000(111 01 0110(1( 00(05 3 011..1 1.1 3WL0.65 C3.5 11061100 .0(0 ((11000 1.1 20. 100 1R1 04 10( ((1011016 (00006( 50(5 ((152m6 ..9•/40 30,(D 1110111(5 1.0 1.1 Ol0 101(00.(0 rOur031105 500011( 40x6 (041 0(04((1 4011(0 010.Cu1 100.6. (0C( 01 0000(( 11 0400 VILLAGE OF KEY BISCAYNE CIVIC CENTER Kg? lNMF*.fbrido Spills dsd.4 DMJI - Imps Mow. Opal NW 1111_0 Rs MAIN.. IMO IO.. 111.0 u0( NMI 9.0.10.4 .4 1141114/1 11111e 0.1. LIMP arc ».2•7•1 PPM) ra 0(r 01.1.05 Now 0000000 A Lq..02 ►.MRr.R6 Co.Cg11.. Leone 4 Ma Irl/re *per (!0S(µ1 :'h0 DEMOLITION PLAN FERNW00D ROAD N 0 :0 40 60 5002 ONG 009(5(51 4(0150 1000 AS•1...11C /ACC 000 OAS( Kul 01000 SERlw( M a PO4(H 001 Y4N WA : 9N2.-TINU- A JN STASEE c.141• 5„, 7 5 .1I'! 1 f 1 0(0001 (WISING 1000..000110.05 UOwC FORMATCH LINE . CONTINUATION SEE C7 1 02 000599( r y..., �„� x � "� 1.151100 sroE•4A 41.1119 10 Nuu, W AWA •4l l I 11111.14.1"1. 5•'•• �•, �J•'+ � 10 R[YRIN M 0101 ♦11x0111( �I -1115 •..K Ill[ SYl+.1111 *Y.f�:II ►, 11 'y ftlF larrW'tIC , ( O IFYov[ cOr(a11[ r I \i ID RtYUY 1 I -I 1 srot..L. SAM ACE w0 Int I ` ( I 1 1 91111!` 1' (( T•" �• `','t'}f}. H4Dv[ 00501(1[ •I(u�.Y rf 01051 I 41011 +11H 0x0 Sro(044 00�� [.1100 1A9(0(xi •-- _ _ M1I Of CURB WD :4 i(R C,9 I(YY0 fa+tut ."w i1Sh' 601+001 7 }� SA0Cu1 If RIO. 11 WS( R(40v( Ivu VCn• raft (t':•i�:1111{ '--+' r- / `011511050 tulle [1151100 0.0[0[x1 W Y �III.:1�.... ID R10'I' D R[Y.Ix �SA0CU1 Eta.* CIAO 6.00051 tO SR(Y01x 1jR0 'L• .h..,N�-. R[u0,i .OxC RC i[ SLAB - V - -'-•. 10105(0 (*Oil*•YMOAKIOC - TM/NAIL MO 1000 I i I 00000( 000( (M(ON.NC SARCYI O (0001 CO 0Yl .111 -'•--• I!YON(iONCRCI[ '•"' _ _ _ _ OASf IW( NATCH LINE--.-STA 13.00 CONTINUATION SEE CI 1 04 000001 0.Aw 1_ 00x(1 BEYOr1 (0000(10 SRI(04' •f 000( 06Iw 1.( SORT AC( A00 OAS( (1(40 0(000( Cx.O 1111 r(x(f-• LEGEND (.151100 10 014411 T-•44C-.1NT,YRE =S -TtEF - ` (OIS10C 000(0(01 10 0[11.0 00000( ♦615µ1K P.(.01 (000000( 600040 00000(1( SLY CIAO 050 CU11(I CIA0 044(0 0511[0 000(01 I 45100 vA.[0(xt 10 0040.01 -. 500041 1[0105 ]501041tr I :: -• JM[1C( 000 IOC - • /{(00050 =KR= 1C4001 ASPN.L Ia SW(YIL0--7 • ^1 OWN ACE 0101 505E s 1' KITOWT( 1 I 0'555 • 1010 00 . t 000001 0 001110 SIAI AC( AO 0045 2 - J �, �•t 4001 IPt1 1,001 POII •rOJ_ • 0(005( (0000 31505 ifNCC (IASI (L. 'e �"-- gas( 1.11 A MATCH LINE • STA 9.00 FOR CONTINUATION SEE Cl 1 01 e(SOK ASP(((Et.e- • •50001CL pO.JALC 0(400( AS0.0111( 5001 A(1 . 0 0051 NOTES 5,11 10(010001.05 001.00(0 1000 SUR*•I 01 10110 AR001(ROS .0 000001 1110 001(0 APR11 11 7000 LMvovfei e' Af YDVC reel MCNt_P4lt`� (1 00 7 (.05100 10([5 *00 001 511000 00000..,1 0(4004 OR R(L0Ca110x 01 [11511010 1011: 01,0 100 01 PO.iu[O1 OF 000010 00005 ] 0511x. IN[ IVl0.0 5 000511001100 00(0 0(4001 104 TOP 100 1111 OF 1N( (010100 5110100[ 5050 1015'100 000(40015 00/500000 4110111(5 A00 W9 010 084100//0 10t.0.,0,, -00500v(( 010 001 CM""' f00(0 I(*O0[ 00500111 00(0000 5,1511x0 1011 LICOI - POL( 10 0(400 1[400( CMO. 11x. ((NC( 000001 P51.0,11K 00NC0(I( 5900 AU .xo OAS( A(0001 00000(15 SLABS RI 400 COx(R(10 510004. 00400( ♦605411( 004000( 5000 ACC xD BASE 0(0005 *411 GUI ((R R(Y0*1 (0000(10 51000.10 000005 00000(1[ SLAB 1(000( CNA. 40. 0(x01 0(4000( 5041 51:01 0017 000010 C0NC0(1( / Sm(+ALA R[00v[ A50NAITIC 10000(11 SURFACE AND 0551 0740*( VALLEY 00111(0 1E40*C 00x[0(11 SW00o10 540001 IE4001 CNA=1150 1050( M*0*C C.A. 101 0[000 v -�__Cj ✓ � 1 1 1 ALIGN0 1 wt. 1=1 mss.+cu( [110 1114( 510(+40 10 R(4YN j (451150 0111(0 GUM. 10 0(4045 R. (.IS1YC CVRO[ ,00 10 I(Y.. SA00Y1 ([(SIwL 1.vF 4(x1 10 1(004x7 Jl 64 500001 0(400( 001Lt1 G411(0 (.151100 PA*(4151 10 P144N SA+cut (9151100 000(4(51 10 0(YYSI 01 61 lD 0005001 I (0000(10 r S10(wAI. , CUI 111 IL tf ►1011•,( 000(0[01 i 10 mow/ rJ / 050000 Cues1 1 1150 04(/50 5.•001 10`', `500001 I 'II 11 I r•( r n I ' � I 04 90 GALEN DRIVE L 1 000[0[x1 TO 0(440 7 SAYCVI 0000*( CONCR(I( BEY.. .0441a 5UR10(( 01,0 IASI I [IIS 11x0 0(0105 CURD A00 CL/11(0 10 •(4.11. 9.01 _100 DEMOLITION PLAN WEST MC INTYRE STREET i stinms- N 0 2040 60 ( VILLAGE OF KEY BISCAYNE CIVIC CENTER Key Oscar/ rIoo Splll(t Candela DMA .110050500. 10500 Y 10••50 .00 0..1.E 004,1••• MM C.M.. rw.M 11010 • 105 1,05.1. 1.11 1...»5.1 Me IM.M 4e... . 5xee1 ro. .401 Owe Doh 0171097 000(501 h ARi 2!.001 6000 000 G" AAU0.151 1.1000 6(0050500 15.1001 C1.1.06 9.1 NR MY. %WI. ALe*..P1 00400gs0 Went.Y teen YB.I 11006 •!8[1051( % t . (1050047-3554 •oaf 1NG 04 DRAWING C2 1 01 II i • I 1 1 1 I 1 I 1 r ---- -=- - - -- -- I I .DRAWING 1 1C2 1 06 DRAWING C2 1 05_1 LOCATION PLAN N 0 40 80 120 DRAWING C2 1 02 DRAWING C2 1 03 VILLAGE OF KEY BISCAYNE CIVIC CENTER Key &scarne.Flo do Smliu Candela DMJM .1.-. brown., e..e... fN MI.. 4M.r CMS.. Ms DM IN \M... WS N. CMM., Dee Mr l..eiw .K YO 411141 037a• era Ode hate. alt row auto rat Cel =At 3.3001 C2 1.00 Mahe• aea..a a U0e.1 [ 14.1..r. GII.y.r. Itw.w Ma 3110 iWl.wr %Paw 00514.7 3551 «, PAVING MATERIALS NOTES 1 510[0µ[ 1([40(01 • 00[([101 4• , (' 000010 0 00,11 • Ca00 0[0 • 041(00 105.1. *1000 • •000(, 400( • 1400^10 17• :00100010 ▪ (0100 •(• (004 • f 0150 00054 11450 1 0100[5100 aft 00 • dal( rY1 • [0100 • 1011(04 • 0010(0 00.10s1oa( • 01 00014.• '•4110 •(0 400 (400(041 tit 45400•. 0000 .015010.0 ,. a3 10 10401. 004(1,001 0001 • 0000 040 (011(1 • C0100 •(• 00001 • 11X154 00000 11415* 1 00 110011 000.01 51415 • 041(01µ • (0100 • .411(00 • 0010(4 0001001000 1001 51101001 0010! RED 400 CM01C04 44 0100100 0000 000000 (0(0 51011 (000(001 • C000 4110 001101 • C0100 0(1 00104 • (0454 00004 14150 11(0 LEGEND (060000 t0 .(*4110 MATCH LINE • STA 11.00 FOR CONTINUATIO{N SEE_ C2 —104 •— —.— }i — 101 00000500 041(1 Cut Ito 11(0 *504411[ !00100001 00000(00 510(040 (00(0(10 000(0101 (00[0(10 5141 Cute 000 0.010. 0100 0µ1(f 11110(0 I I SEMENEE 10....%/4:'• %,34V,V143559%Y1 00001500 Calp1 Slew .00 [1151+,[ 51(0400 0' [10001(11 0(01010: 000105(0 a' Cure 11 slrOip, 1 005(0 00000(1( 140(0 0000(00 Mita 1000100[0 00' 45M1µ 9C 1(0004[[ 000 r 110(40 [ 0450 I 000100(0 1• (100 (1111•00 0040140 0011(0 1.0 00010151301100 �JI 000000(0 (00(000 14 040(0 501 .31, �- rRpPOS(D CO 00[10 -131 444(0 Row.. c 1 50010 15000 10(0 0 00151 00) 001100 re0000(0 0•' .10( 000(01 0( 0400 000000(0 ryry,, 0S0M41110 50Rf 0(( 000 0' 110(0000 0050 00000510 [000!010 00001 0011040 10 4 1,0 00 OUli13 0 151100 (01.0 Of 000(00 I L I 1 1 PR000SIED (OMCR(I[ / 10010 01000010 (0000(0 0' CURD ( 00OPO5[D CO0C0(l( 040[0 / /( �r ,*o,00 Lilt 40005[0 01 r 41:+ 0(0 [3 NOTES t 511[ 10f 000,0100 01140(0 00011 WRYER 00 0010 0100010005 400 M*MUC• INC 001[0 00011 10 7001 t •l%J y.w('A^'WA '1 • O {OUIrs•n5.00`IL(iµ7 { (54(1051 •\ s`•J : •�: • Z R•. ,n�` a��� .1.r 1(54-)440, 0 •4� ':4.. �4 PRO OM 1" COB 00D 0011(R PRO 0500 000[0(10 P01 0 51000010 000005(0 (00(0010 00000 0000100, j0(LI 1� GEOMETRY PLAN VILLAGE GREEN WAY 0 20 40 GO VILLAGE OF KEY BISCAYNE CIVIC CENTER Kea 015cayne Hondo 5011115 Candela DNJ71 AMMO. left 040••••••0 M.,.,•• 0 . 0. C•Inr. G•1 C.M•. 01.0+ 131)4 3 334 e01M.0 OM W 0}5•.41 AM .10.0(5X'024 9001 (110 4-01.01 0.5000 WIN 0401 1100.• 1 • 0.0.01 02.1.01 9.01110 0.0. 000x10 µ Lr01. ►f .0.40.0 5.1(4100.0* Lome W 71005 tow.. %gro • (305)07 1554 ( NOTES 3.1E 1.(01401100 011,01[0 1104 WIPED 17 0040 APYEot(10S W0 •00.10,3 i0 Urn II 0000 LE ;END ((151SC 10 R(4.0 x01 0300.11K 00,00(0, (OK•(I( 110110• DK1(1( RAPER IOW1� JJJ (o•cq 1r 1•r(• 1a•0,00 Wn ‘0.0•1;3 000(0 SIq Rµ!> CORM R( Iav(01M1 COW( Sul1 0000 µM COI Ire (410 YµLI• (4(,(0 L _-. EzifinerM V PR .S10µ 7,0.5010 040 1 11.01 0•S( i 1001140 5100 L ,: I i ----000 X1913144(-. r YS. 41___""..6_".6 o6 - P10000300 1l •0I(( 11 *PK 41 P0000 *0000*(REIf MYv05(D 0 412(!11 0R 1M(004µ 1000059 t" 0OR0 —110105(0 COKP(I7 0400! 00R0w0 APIA ,-0 17000500 / 1107 Cu110! 000005(0 v 4101 GUM. 0(5 00 1U00 L•2 `4' ` J 001 • 00110 17 •• PROMO µ1l7 LuCOna ( r0. '•�1a� PPOP05(O RCA[1[ PA (0 :•Rent APE. 1— f 7 DTI• 10005(0 R' CURB 170•03.(30:3:1100 0(9005(0 000: PEI( aAvEP 5i0[1µ0 CUII �- 1j .�%i a•�Iw\:I ( - ./.10;0,;(; t4 [1KIwL , p 11'0010' ♦�� 0 ;k��•I ^/.• 1" i •4Y(KYi 0R 0.01[0 17 40040(10 0000 '�R•e QQ �� '� (ry9a0 •• 101 01001(0 \:••: \���• 7 "' PROPOSED DOMEIER •µ1[v GUIIER 00 7 •410-10 IDp 1.4000 MATCH LINE • ST 4.4 FOR CONTINUATION SEE C2 1 03 PROPOSED 0 OMB D LULIll ((000500 00000(1 0A0(11 SM(RALA v 51 00 71 11 AuCM tap (000 00 1,3 C 11114I I 300 00010.1(0 0000(10 14(1.4• 0 I' 71.(/1000 1.1( e 00 0.10 00 114 00 GEOMETRY PLAN VILLAGE GREEN WAY Ike (3 0 20 40 60 PROPOSED 0/(• A510µ I I0 COOKIE I( SUR, ICE 000 r tS(10C( 005 1001050 (00CR(If P AYER 100.01,1 O 1000100 I' CUR, WO CO 7(1 O .70 DI 10.0)17 •00(1 510(101 VILLAGE OF KEY BISCAYNE CIVIC CENTER Key B12c0yne. rlo(Ido Sp1111s Candela NM 4eR1•w•* I1l..0..R (12...1 PM R•ylw (,1•W0 Cw4 bYlarw,•w SY t1. 131.444 WI 1.. a 044' a1. nor. 14..1. a.0 111.4 Seel Kw 4-0141 411. Oek 7121[ 21 711( 120001 000 1004S1 7.7101 oars 7101 C2.1.02 100111114. IWO %MM ALg1.P! Ml•1.w. G10R111••7 L4110 M• 7115 140010111wee 0!051.40'7550 (1301 1110 0 I •T — 1 W ' G W 1 NSa Z z; vILLg'G£ JZi .U— 2 , PR0POS CWe° I R•1S DO O' 6' U1 6,6,0 COI(' 00000110 I le 000P(SErut GV 2110 NOTES 1110 011101/09t 011.1410 1101 SOW 11 1010 •Rl4tfIER0S 660 1RMrt1 wC 001(0 01104 10 7000 LEGEND (1151114 10 1(1010 POOPOitS (0141(1 P•r[O SAI R6lO P1OP0S(D CONCRETE PR.(R P6ORMIC 6116 PROPOSED 6' CUR/ PROPOSED 7 740000 001I(0 — are $0114114 000(14(11 (014010[ S(1(•Ol0 (114110(1 P1101 N (014101( 10001 14*1,4K 01(0 CCK*I1( 160(0 SM1o401 00ICKY( P•00•[.t C0K0[tt KM CON 010 (011(0 014 1 r*4t1 ca1(1 C- EISEMBEEMI PROPOSED 6 CM 61D 0011(1 PROPOlCD (00(0010 144E1 40.0S•• 7—P001001000MER( 1( PAYER 0,00040• 1---P411RwO 110POS[0•1CO0CREYE. Y(P• R —P1010000 0 .µl(, PR010S(0 6• CUR1 R Ilt• 00 A D 06.1 • 6. 60 0 IR 0000 R 10001 610/0400 1. 0401 POOPO EC COYCR(1( PRv(R 0000x07 161[ 010 46 1 ( 10070 (D �y, RSVSRI IIC SV/1 µ[ POOPOS[0 6' C00e 0x0 1' 4••(00(0 001E 0x0 C011(11 0.0001[0 •- 5141.40 00000(10 count 140110E 100 61. 400004 1 •S( 40 10 1111100 MAR 4660 Or .VON 10 1061 0I 07 GUI11R µICS S•CR 01 1000 � x110 106, 01 v 1117 0011(1 . 40D 1 P0070510 0 1100eµ. OD . 1000 .0/001100 ;6. 4,131 CV1.111 R 1000 — 0007001• Orc•: Ra. ilVPICAL 4.4 0 0 tJ GEOMETRY PLAN VILLAGE GREEN WAY 717 N 0 20 40 60 VILLAGE OF KEY BISCAYNE CIVIC CENTER Key &scoyne, Floo,do Sp61h1 Candela UM •6411w.M 060.000•••. 0 w 0•..r 00U.w. 1..0. 46.64.100.* as 1.1 ae1W .r Y. 1010...11440 IWW Yw• ••f a.t1L sheet no. 1.01-01 Won 14060 Ow 01a116 MK 21.1011 KSOI1 100 C . annum 20. 7001 C2.1.03 Mow Rsvb Alai. PI PreNlws Gdtromer 101••166. SB05 tRIyL11M n•Iw (505)167 5551 E•a1 " z V') `--/10105[0 % 8 1430 $ Ky1 I\" " ,�� 1 a00 1" (181 OC[ 015( �� 110105[0 C0*C0(S( 11.01 IWIK NS!! 140103!0 2 10.00 **I(, if 7310 00.00 00" " 3070  100105(0 4' C111 *00 Cu11(0 500 110103(0 08(1[3 GU/110 000005(0 140 03(0 .' C0.(1( 1 510( Y " 0/000300 .- C0K1(I0 (1131.110 100030 Fl MATCH LINE � STA 11.00 FOR CONTINUATION SEE C2 101 " 10105[( S Cut 0 0 (011(0 8 140003(0 .- COKOC If 310(04. \ Sq 1 JO 0 \\\ LIf0103[t l" D 1'' COO(080111Il 0 1 0,4 14000'3(0 EtOts Ub( I[ 3011lf[ 1 lw ..O10S[D 100(0(11 011(0 3I0(14" -- 1  W 1 (.1 z NOTES 3111 lor014*1108 0111(0(0 (000* SUw,l1 01 " 00C M4(00005 *8C 844003 .1 011(0 10011 11 2000 LEGEND 1138 [1151(0* 10 0(80(8 K" Melia 110 0.0(8.!1 000(0(11 510(" 1(1 00801011 180(0 00.0.41 COMMIE .0810 1110(8[ 14[1 C08C1(t[ Il8(0 510(0.11 COMM 1( /..(11(x1 COMM 1[ 51.1 C.10 .80 [011(8 COS 0.8[1 CUIIII C GEOMETRY PLAN FERNW000 ROAD N 0 20 <0 60 1'65 177.'1,.'eZ.1 1"," .. .411 frl MESSMER VILLAGE OF KEY BISCAYNE CIVIC CENTER Key &copse. F(o do Spills Candela ,D11111 ...1..,.. Imp*, _riot( w 0.44.. W.1.. I.8( f.... M... 441 tl 11118...m1 4* 40...1 ]Om *40.. 0w" 840 alas s_0 *400 4-00.01 030 b.. 0410 00.11" 1000 1101951 21.11101 0(�%1(01(0 23 T001 000 C2.1 04 Der cc. War .bale 8.1090. " 1 palms, .^,eii*}1... Lwow ca 3195 1.01...1. Reba 13n)f00.35511 I.(4 NOTES WE 0,4000.100 001101(0 000,1 SURVEY 00 0010 E00•1I01(R0S 000 01100 4C 011(0 APRR 0 7000 LEGEND cusulc 10 1(441 01 0 .0..(110 .10(4(0, 00000(10 50(040 COK1II( 0AV(4101 C00CRE1( SON CUM APO Cu,,CR CIAO 0001/5 0411(1 ---- — ---- I MEMOS • Er. 2; O 1 Aze O � C U 0 � ••Au[ltE1A cut rtR 000005(0 C0001(1('010(1 PAP0100 AREA J E� �rµRo.os(D 1y,- uP4uvt 0(10((4 0 e- tw[ROC1 IAS• ® 001 .00005(0 f CURB 000+00(0 • (01(0(11 000.05(0 r41fi Cuilfl-�-� / rRNwO" I\ aR0POS1D +'/1- 150811 TIC 0001004 AND 6 (40100. 0.01- PROPOSED 6/ COI —� PROPOSED 6- C00CR(If SIDE 041 010005E0 6' (u0e 0 EWER I—e-PROCOSED .' C0ACRE If 90E1uA GEOMETRY PLAN FERNW000 ROAD E L®r"fl N 0 20 60 60 • VILLAGE OF KEY BISCAYNE CIVIC CENTER Key &scayae. fbflda Sp1INs Candela DIM ••Mr.. 14.••••'16 10.•0400 MI 11y.W 1 0 0* 4..00 e.51p Mr 551U 101 •Mr.•1.0 is w 001.•11 010 w MOM Opel TM 6.0e-01 0721.1 000 0100 0.6(ec1 • e•1e•al 1001 71.1001 alto (M C r r 0010061 7, 1005 M000t 0(.101( C2.1.05 IY.OK %NWM 11600 -►E *00110 WEyOpu loon 001.: 700!5 1000.0.1 11ae1. 0054447 11!56 L11(11 •0000x0 [000017( 100(0 PM.6K ..(4 6y1 yfll( SYR(IC( H6.44(000* 1000840(0 6• (IMO 440 00MS(0 6' ■4(0AR0 1(l{ BATCH LINE • STA 137-6b CONTINUATION SEE C2; MATCH FOR CONTINla1 ON SEE C2 1.05 6* "1 +. 50 I *0005(0 "0"" 640(*40 .0: 840135(0 0 0000 840105(0 I. on 6 P 840.0510 CONCRt 1( 1.14,1540[44. t I • j 1 0•S 00 m - �1 •5 I 1 1.0x,0( IROIOy[;RCA C00CRC 1[ 101[0 I .•1100 S 1 A 410{ ^ - Z $ I.OPOS(0 CORM,' *4770 0040001 • + E. 00•04.1151-; 1 - *00005(0 CO;(11(10 0(70 *80(R0 0,0E•11.0 ' 441. 0.150 OPOS(0 CONCRETE PA R I • 50 \ 510(046 07(0 A 6• C0400(71 045E Mt 760 75 0(C 6 8(451 7175(7 co.cit. FORM NTINUAII� STA 1! 00 6 ram 570(0610 SEE C2 i 0? • *OOPOSE0 RANK tl RIM 170041481 04 NOTES 0.7E 08000(184* 001.11(0 (000 S00*l7 Sr 00.0 M.(et0MT ARO .*0Cr 1(0 041(0 Anil 10 1000 4f[701(157J PROPOSED [040017( 04.00 *00000(0 CONC.(It *8410 010(040 -'-- • 177.' 10 P0500010 C041411( * 8016 SO(R*.-- *R0000(0 CORM1( Ira/ 0.11010[ AREA 040700(0 6' 05)00 0.100011 • (5 Gu11(1 110000(0 40100U(--� P6(11 510(1040 P R0000(0 6• CURB 1P • 105 . 1600. 0[01 1114 11 l(CA71 ,. r. 104 60 187.5 }1 00- .R0P0S(0 CO.00(I( Pw(0 51010411 000.0000 .0.0.400( 1- 1-. 0 5 00 PROPOSED 01 *01( *80(05(0 CDRCRCI( 740(6 •400x1[ • [ [R 540(040 .09.4. 840E 0510 0' . -/ 11 ' *0705:0 fOxC RE I( Ia�k 641( 5(0 P0r(R A.44C 46(0 -/ /0010110 O'U'1Q .�I LOro010 *R0P05(D IE- /1 CURB GOnu 04l(7 101041 PROPOSED 6" *070510 CO.c.(I( .A0(0 0[.00.5 -' __ 84000.1 •0p1 j �. CUM 080 00000510 01004TH 11•01[AE1 - 14110[0 MATCH LINE • STA 9.00 FOR CONTINUATION SEE C2 1 01 17(0 LEGEND ((*0140 10 0(880 01* 6000.(/11 080(1(81 10410(7( 010(01[0 CORtOC1( rIR(100A00AV' 11 1 C0*CR(t( *00(0`800x10 60(4 C0RCK 1( rv�I CO*CR(t( *80(0[01 (00(0(11 Sloe CURB 440 147110 0001 4,1117 CUMI(R 4-J L 1 MINEBEEST P*Omm 5(0 60 14[ sot1 ACE O•C6 005110 r-°. .60705(0ARC0(.8CR('( PARER 001x1 I1( MOr05(0 v EE(1 Cu, I(* 1(50.05(0 COxf O(,, •AVER 80800 A5 *000.105(0 *0074* MO 1910(0 PROPOSED 6 000* MD (011(0 *RD*05(0 CORERS TE *0.01 51)(041 1w1,S 01 00000(70 OAT( 0,0 r 1(f CU,0'4 0(1 0 f111,1NG P.0POSlD 4 C0x(61l1 5107.•44 ,*0701(0 4• core D LU,11• \ .S00 •500 PROPOSED 0" 7 14• CO00.E10 04040 *000500 DPW." CURS AR0 (0011(0 581(8 RAMS AR0 41808001 00 10( (01S11NG lM Of PUTTER 00000500 000CR0I(• P64CR 540(640 07(0 4 1 000[0(70 060( 158015 Of COKREI( SASE *00005(0 CORM 10 ((*1 0 A 00 IS* 4584' 1 if 50 000.05(0 CZ 74 0101 C1; CO0CRE'E , 0.6170 R ,6 50 1. -PROPOSED 6SP0*47K A\\` C08CRE1C SU*, ACE • 0 *81(0OC(7SII*G � \ 840 4• COMMIE 740(0410 --7100------ - 04 56 Z 45 0( f o GALEN DRIVE L-_,--„, '--,4000S(0 *5P0411C (00(0(10 S1M0*C( 400 L4(R000 005( ,0 847(0 [01ST*( 0 4150 V I 0 4 00 % 0 16 S0 E / 700000(0 4- (00[0(77 510(.46 µ11N *00005(0 C(0140 v00 400 GUI I(* 0100 0.04 0) *0705(0 I. CUM 000705(0 45/84110 (00(0071 3*17*0( 470 14(00(0 tai( 10 841[0 (5121 RAC 040105(0 CO*CR(I[ 0ARC0 *11)(0A41 0.00 0 0[0(11 45( 4.( 00 PROPOSED 6• CURS 4X10(451 1ODU 11 11 0. I [ 1RANSIIR/8 11 r-1/410 y • G1• UlTTER to GEOMETRY PLAN WEST MC INTYRE STREET N 0 20 40 60 VILLAGE OF KEY BISCAYNE CIVIC CENTER Key B.ocorne. Flood0 Sp41Ls Candela DIM 4r..R.R4. 06#..0.4 *804804 684 byw6 440.4#. CwN 460•• E4.. 74 1641444 848 M. n04R4. 1.1 75.•y6 lr•.A. 4t 41114 44041 C2.1.06 04.1.* RM40* 0.1500 P( Ir*fmoR G.0G10•.R. 18+000 M 31003 Imp...14.84 (3031441 - 1001 f� I (DRAWING C3 01 1 ------------ I I 11 r LFNwuiD ---------- r L - --- ir ro 1 ------------------------------- ORAWING C3 1 05 (DRAWING C3IO2 LOCATION PLAN N 0 40 80 120 DRAWING C3 1 03 VILLAGE OF KEY BISCAYNE CIVIC CENTER Key 8tscoyne. %tdo Splits Candela D1011 Mwlwt $ v —•w PI fl .M I...... I.1*tikgmen.GM C.M. /...r. m>. t.re.r..•• 41.1. nnwn aw IWM. I-.ew •.c - Wet roe 1-0901 03714 ••• Owe Re,' 6511 (0 td C11D e110A1 !.2001 C3.1.00 Now %boo Ale0.. eC 1�l4. Wrap., , Lew+ Ile %1995 1earrard w.Orlir (505Mt7 555r See NOTES 0110 .100011(04 00!*40(0 re0* 5014(1 O1 1010 110Se1110S +400 14001* MC 011(0 010 0 0000 7 u unman WS 10 *1 •111011 210,'41 .01x4 Dory.. 0[0 MC 401 11(0 *14..110 0011.111 CO000CI( 500044 01111 0010104 0(04[101( 04110 0440.1 400* (0001111 4411.(.1 (01(1010 1'4110 56(.01 r COKOf 11 410 COO 1110 (411111 0411 11,4011 4.1111 100* (1(04101 51w. 11010(21L LE ;ENS (121.00 10 0(1*1 771 ( EANSEERINE 41040500 In 1 r Of 04' C.4 01f10111•100.8 1R(*0* • .0010rot 5E0 0 104 1e(X0. 1•• 0 4 en l (0(5(0 ([11[511*( 0*00(� i (021.( 1110( 40000510 1451 (*C( 01 444(0(011 0415(0 0 0410( 4R000S(0 10$1 (00( Of 400(0[*!! (02111 . ..(111* 1 15, 100405(0 50 ! ' Of N' C 1 0 (4!1(1041104 i*(0(4 Kr I Y 1C*u0 .021100 111.14 MATCH LINE • STA 14•40 FOR CONTINUATION SEE C3 1 03 - 1 0 514 1 40.5115 1111 1011.6 2_1(1 10.00 n 00 11.1100 400005(0 101 Of Cutt(5 0040[ 1( 1 11 VILLAGE OF KEY BISCAYNE CIVIC CENTER Key B1cayne, Florida 0 11.00 11.00 13421. PROFILE • VILLAGE GREEN WAY scut *00 - 20 ((11 1 .7 GRADING AND DRAINAGE PLAN VILLAGE GREEN WAY 0 20 40 60 • Splits Candela MUM M..*.•. 1.....•r r 1-20 000 1../. Peewee tw1 C•1•r. 7•.* UV is0040•. 4004 Me Panel ?y0 MI10• I...M 4*4 IAr &eel 7,40 .0041 0370 100 Mw 105[11 a 05.01 MOQ }O. 7001 ISSUED 000 C • M1C1057 3. 7101 OOC.SIr 71, 7101 C3.1.02 ll.1e aWrN A le". Pt ►fMeeO.l GXO(.00 0 (cow ILL 1001 1W110010.100* 13015047-:551 1 I 1 [DRAWINGC3101 1 -------------- r-- -------------------- -------- --- DRAWING C 3 1 05 -- LOCATION PLAN N 0 40 80 120 DRAWING' C3 1 02 DRAWING C3 1 03 VILLAGE OF KEY BISCAYNE CIVIC CENTER Key Moyne. Fiord° SQJhs Candela OKAY w. a•Y•r l.U..r W.i a.W. fl )mY t.. CII ..44 ww lei flf.... 3SIO wrM. law .K - 9ea1 file •-0.01 -Me 04e Ja( w.20d' 691(0 1d 011. N1 St 2.2001 C3.1.00 ,. 114.001 A. Lop., h okno. C.0C'rea le000.0e !M3 1wobee twee 1505,0.1 155 W N 0. O -I or LS or W1 - W V, - 1~ 7. 04(- 400 141[1 31151xG cu0e 1[(1 440 14,7[1 [*1011x4 •4810411 •$0005(0 C41Cx 045/ 101 01x(051 ,74 14.13 SO f to 116 0( 1/00/0340D 0Wi. WC Of 11,4.001 r ualxc ce4a ----- 1-- - 1100005(0 00010 -- (0C V ( 06 •41(,(011 - ` _-__- -4-- •1C 001 1 -..__ 14 5113 .64142 i 01 50 0(414747 CO0V( _1,_ _-__ I_. 11.44 02 15.00 u.1* 31 14-w / �- 3113111E 54.51001 5(0(0 / •o0000SNo 41Cx 4161•$ 1 • �K((t 410 (1Cx /�--�,.-/{- 7116111[ 50(•41• / 11(1 4.0 •4`Cx // (*164x, V4 11 !.1 G011(1 m • 1[11 4x0 WO" [*1SIxC 5/01/1414 ' xii 1 •x0 4sICH 11(8 xc 14 Lui ll4 NOTES 1 611C x(01141101 001410(0 1004 7,IOV(T OT 1000 M•(I.1(1105 AND 1410[1 /KC 041(0 O01( M 3000 ,01,41,• 1140 CUR! 440 C 1 1(4 COB 4411(1 04111• 5PO/ 1'(44104 C41C4 1451 31010 51.10 101 •00005(0 LQ O( CO UP GRAD( u 4 P __. _ _ --------- --{_ --_ ^r 1 10/)4 _ - I --- MS 4xL�C(FI(Ol M( 1040(-.� .-+-J'� 14.4( 31 111 4.t (4(441[15 111(0 '0 14 4 10x.. (SCQI1 4[0164. 04144 K En /KCVO) LEGEND (t.11.c 10 0(1411 J 1411 / VILLAGE OF KEY BISCAYNE CIVIC CENTER Key BIOCOyne, yl011do Splllu Candela' DMJM 484.144148 141•••••'•4 11.41W M- t*_ 4.144e1• llw-P 14 MOW 44x 41 *Ma, PM n__ 411/+ .4t 14144 x4544 (51 --I 1. (0 PROFILE - VILLAGE GREEN WA) 6701( 1011 1' 20 8(111 P•f ( 00 16.43 14 17 00 GRADING AND DRAINAGE PLAN VILLAGE GREEN WAY N 0 20 40 60 515.0 lie 440-01 0• 0.y 01 PAC H, 7001 MIRO 600 x1Ce31 21, HIM C3.1.03 0404111. 1M Mho%434/1.! 4•111t1Rn GiEnfore L041100 Ns. 3040'3 10yfM4 1•JR* 1703(44. 3 5,01 ZL SI-1%___" Ire - 51— E70 9 10 00 151100 1{" '113(0 S(•( 084 It 010. •1 > ` L:17 4(01 940 410/[41 •0010(01 • (tl$!ML Ir j 51'079 5(91(1 1 71.3 (151130 ti" 37000 3(410. l- d it J�^ SI I I 3(1544 (L 171"10 13 0 401100 (1 031 _Y 017113 599!1, I(0 WO 7 -J- C0157r0 009071 C+10. 00513 0 fl ) 10 0(0000 1' µ7r00 5(0(1S [l 130 0(000[ 0- 57040 5(0(4 704041 191900 0044 5.11_ �`F 4 4i MATCH LINE - S A 11.00 FOR CONTINUATION SEE C3 1 01 r 1 iL_ii 100 ( 1 1 10 t4 014001 (07C0 01SI (4040 0 510790 ((7710 (1751010 09(040 11(000( f07S7Mt !9140 0W CRllf 0001301 000 V S !0000!7 1000( V5( 5730 9(73 001051 100 40 (19021011SO 74 !RAW 13 1 (0011 411005 1114 IM 000005(0 CUR0 040 CV71(0 (0039ML 0(01(0(1441 60.00 -- 10.3050 13OPOSIO Of (011(0 60001 0 100 f (115140 (4S1 (000 Or 7914(4(01 83413( 791 040, —7073-2-30 C IS °, X51(0* 5[470 C - ' FERNw000 ROAD ; N w _ 0 3717 NOTES Silt *1604011041 017910(5 1004 5000(1 01 !000 400141(005 090 414140, i14C 041(0 APRIL l0 0000 1 4l ($(0110: VER 70 17( (01090 0(X010 14!10; 0A1L4 01 0)9 IN C' D 1 LEGEND 11(4 E11510% I0 9(003 44(• *5014.,110 040[4(41 -� (0M(4(I( 510[04(4 —_-- I COMC RI tf 7.0(R 00400.7 I { 17a.....i� r;jY.4.+_ 01300!(11 79441 798301X0 09(1 !00000[ 0.r(N10t 0040!01( 7910(, 510(0479 00001(1( 0410 470 GUI I(4 0080 0111(0 CU17(0 57901 (700.!1% Ufa 04344 510%5E340 1K 13 )0 55 t- I •1 51 1 000 11 00 71'00 11 DO 73.1102 VILLAGE OF KEY BISCAYNE CIVIC CENTER Key 6sc0rne. Fl0r"da PROFILE - FERNWOOD POAD SCOI( 00* 1- 11 4(911 1' GRADING AND DRAINAGE PLAN FERNWOOD ROAD =mow= N 0 20 40 60 Spdhs Candela DUN .101__0079 0839000% 79344x1 110 90497.. totem. Co. (.91. /Iwo. 10 90083 M0 M. 01004, 10, !I4r.w 0.,400 0190 0000)1 1-01.01 Ir1 0910 31111( ».2007 RS8(0 1079 011(031 27. 2001 $(797(40(0 25. 2004 C3.1.04 110711 x000711 & La m, P E Ortoolooro Cwl(p1+f) LAO_ 01 3(100 Iw•10l 71000* 1305830' 30 5«, NOTES 1 3.11 451 010 .0.011103 0 54110^,", 00 0400000 J14 0 1000 2 u 6(00106 0((50 t0 1a 141!114 Cobol._ 0001[4 0044 4 971 00002 LEGEND (0151,14 10 0(0.1. .1' .5Mµ04 05011111 COK0110 00(141'�� '7' 00070;12 1.01. 00.10011 ) \'C 0106 1( 0400. 0010110 .1124 1(1 007.0 011[1101 `. (0105 11 050(0 00(.40 00/0/111 S1.0 (1100 500 01111• L J I 'f 4064 ..x (ilY 1 ( ( FZEIERESSEI 1 6 -A 51 000000(0 OP 00 C01110 0100( 1(1 0 30.7 /0090510 IV 07 C0t1(1 00.00 11' (0131114 2(01(01 10( G0.0( 5.73 04 04.13 1 10111000 0.010 R000S(2 (.St e (DC( 07 r.v(u(rt1 -1 /T I 1 0 3017 _/ 0 - o- 04.5000 tf 1710 ' 01 0017! - 1 13.1101 10.00 15.00 00 17 30 01 17 03 PROFILE - FERNWOOD ROAD 3041 .00 r 20 v011 I. 2 GRADING AND DRAINAGE PLAN FERNWOOD ROAD N�0 VILLAGE OF KEY BISCAYNE CIVIC CENTER Key Bscoyne.fordo SpJtls C.ndel6 DY34 1...5.5* lapoorrog5.5.. M hyb 0.11.4.. 545 Y10w 11.1. '1 H 011044 MN 4. 015.' swe n5.h 10..1e 401 S 4.00-01 031• Y99 On. 511 4 0401 301( 70.7001 1130(0 (00 CA9 tows( 1.7111 yIW51 11, 7111 03.1.05 01011 150101 0.1000. 11 h.11s1. O.4E.p... ,lens 0. 3006 1.1.1uae 9m94r 130504.7.3034 .k. MATCH CONTINUATIONLINE • STA 14.75 - SEE CJ i 05 Ii LI51N6 �'•" 4 SINN/ i o 1. 0.0(0 ANN(01 TCH LINE • STA 13.00 ONTINUATION SEE C3 1 04 1 .101 •'/ LECLND LINING IO 0(611 f ';. 11(6 11.6(6(30 _111(01 SS(040 601[1(1( 0.601 00.00*, (0010.011 two 000,12 001. COON It •.*(6031 01000(1( *.*(t td(..1• 601(0(10 514 0000 402 :ull(t 0011 1410, CV(1(0 0.01 001, 101 CANN INN nor 240 .01 -1 ( .5..=11+9 00*0.( 611601E 10 $SOCURO (610 MATCH LINr FOR CONTINUATIONSSA 11.0 EE I n2 MATCH LINE • STA 9.00 FOR CONTINUATION SEE C3 1 01 00f 01111. .0• (011t(tt 10 F1J51N0 (n1rs�--- "--5 Ens 11,1 11- 510011 (.33 ( 1 r It El 1I • . [ 1N( -rte- L I 9 (L • �1 00 rton0( *n1 1)0 _ 1 1x1( NOTES $N( INUt1agw 00(06[0 *00* SOROE, e1 FORD 40,4[01(005 410 61611(1 N0 01110 10011 11 2000 *L1 (1(0400 SKI 10 IN 1A10y1 0(0(1(0 stRR4 NOW (1 (120 696r00 INTYRE STREET 0E14,1 (USING CAICx 9.516 y,[1 .w0 0(6090 M ((15110 S' S10R6I1'S1 I.vE VExI ---5(600 . 0 1066011 �•• (112(161 (11r6 1(10+( 50x0 61.10 0010 1 _ f* 09100 _501(0 100(0 060 PROPOSED 00 t - gOp1.1io« 15/0 is 41 6*1((6 ` 510E 01 • [5 1E1 119 Of OVII(R Of PROPOSED CORM ARO 60(1(0 S.AE1 6((1 ..10 6110* 1115016 EH OF 601IER (1(90140* 60*6(0(f0 0(1110 Os[0 6111 C1( 1SmAll 1151.6 111 of 6V11ER >' ELE6Al01 nn I • 1/1 A1C*�il$I Nt 1611(6 0110! p.vE PE 61 (1151166 50 ((006 5(0(0 (1151160 1• 5(036 SERER rE'(115111C 2. I I s(0R0 SECT. II 0 1 [L 1 41 ti 6 (1 1104 won __ 1(0000 1315111 01' PIPE -0(EI .609 .156 110(116 PR9(l(R' (115116 20' $1011* 5(6(0 .111(116.10 (115(166 Nvf I61 0(01.1.0'4; *.*6* (1(11116 0010 .10[6011(0 010 (.0(60.1 If 00__ ------- 45 $2 GALEN DRIVE ti NY 2, , 10 21 .. .6 E 1 12 N x 119 (l 1 1106 S L Mr (l 1 11 1t .1(6 E1151N6 611(♦41ER 0001 .0 60 0 0151101 1.(06061 NEE, 11(11 (11 1 15(Nt C�Oe *10 6V11(1 p 00416(6( 1(15011 2*• 51010 {{{{ 6611 5E0E0 11f 00t • it (0( 1 (5N6PRUE, 66(1(0 *00 jl i, 50(.41 '14 HH ii *1.0 keens A- 1.01. P t ** l* r C2.((11104,4 110(10. 010 1105 .7 155 T.MrrOe 4rOs tg11. GRADING AND DRAINAGE PLAN WEST MC INTYRE STREET N 0 20 40 60 VILLAGE OF KEY BISCAYNE CIVIC CENTER K.t eiiu1Y01. FlondO SpaW Candela DMA 4_03.._0 6.(1.•-40 16.11. NO 0030(.. O.u.A4 Co., Col* PO..r 310 I1 a11MN. Itw 6. Ml, - •w,W t..." ale MOM 511.[ file .4001 Der SSW 012 P..(. ry1( 21. 2001 ISS*O 301 00(1101 1 2000 /1101(11 00. 2eel SCn260(0 2$ 2001 C3.1.06 %Oft 5301 0- 4 f11OPO1tO 10100 441TIR 4040( (41 (001 .14 C(4Ii4C1l 5440(-• 10 00 —2! S [013104 1440( 1410!0310 •0010 (DC3 01 ofrfmtmli 0.31 50 (.I 1 0 (040 0155. 11.65 01 001 41 041. II 40 01 .1 11 00 J 11 00 PROFILE - WEST ENID DRIVE SC *if 400 r 20 0(01 2 400000(0 (N Of COII(4 4000( (4 1 SI -0 (115(111. [040[ (400,05[0 104(4 IOC( Of 040(0(001 Mr - --- —__I— _11.0.20 itt 4.20 022 111 [015(016 4040[ 344040140 100(0 [D6( 0f 0401.(011 014 40 ------------- St ((00(0(100( 60406 0.12 (3 151 -- 11.» 24 11.00 i -- [' %In4fSD�•D(1 ----- �(DTiIDr us'teau4o —(1151111[ 0033( 000400(0 40414 _RCC! -V [.510211!10 10201 la (0 LIP 0[51 (4 [ 4 ! SW ( 04001 00(0 03 10000 0 S0ui0 00 105100000 100[4 — — -=_i_1115,214 — (1115,2004 W11/101M 4540( 7 VILLAGE OF KEY BISCAYNE CIVIC CENTER Key &scoyne. Flor¢k 20.4( 20 61 --- 20(531100' I(0011104[0 sou 4 4 40 030- 4 4 1000 Or [slaou4D `00(1 Of •.13110.01 .13110.0eo 0 C 4411 -- 22(12 44 (sl 22,1 25 133 Spldts Candela D1119 ...n...... t+...w (u..•'e w 0.044 4.1...00 0.000 c..`. rr.r 1000 1.1 10100.4 .ar I.. 104441 UM .I.... 1.A... 440 Weft 10.00 PROFILE - WEST MC INTYRE STREET 1(41( 000 r 20 001' r 2 22 -Da 21.00 22.6( 30 GRADING AND DRAINAGE PLAN WEST MC INTYRE STREET N 0 20 40 60 • SOW 1140 4-00-11 001 Dar 0utr 0..100 3101 ?LAP too rat CAP C3.1.07 1200100 vow 4r.a atop 4£ 4000041. (S.a£r�1MWr (sum 00 3145 (0.14401 440041 [303102 1034 1 1, .0 [DRAWING C4 101 _ VILLAGE_ z I I r- • ; DRAWING C4 106 /1 iN _ (DRAWING C4 1 05 LOCATION PLAN N 40 80 120 DRAWING C4 1 02 J DRAWING C4 103 VILLAGE OF KEY BISCAYNE CIVIC CENTER Key B&sttyne, Flada Splits Candela J IN 4..enw..e 00..4 .,...w4 yy,w erw.. Owl 4r .b... 231N rw sw« Yaw Onoce CI Nsr 31 <.1 Tee 4-01-0 rue sr. 032 Amt n not asap ree too 43131151 3,100, 04.1.00 001110 e...a.. 110 0,10 .1411 ► C holes= c -l1 pme, lows w 3115 ie,.euwy rnser 31051147-!551 <ee MATCH LINE • STA 1 .00 FOR CONTINUATION SEE C4 104 NOTES t VI( 0010.111* 010x(0 010. S*0*0t 0' 000 alxtx:1005 awe *AMC( l* 0.1(0 Oa% 4. 700 7 X06 *01005 '11.1 0.00 01416 /Wm '23( 011010.101103100(111 1 6(51 0. 0 000 00 010[+ 10 410 000 11EI.10 OM(IR 6)R[ b .(5106111 COtl106 ((1a10 10( C0ft0K101 90001 .011114 0( (100(1 (40000* O *11405 100 ..t 00 vl((Cfl(0 (1 116 1100[1 3 M 4(00 (.(S 1'11' R 1149 4 001,15 cita R1 (00161[00 * 9x((00 1(04(0 (0M COT IK [0.0141005 (.4x00( 4 all ((l*4106 4000 10 0( x.1101 01'04'4 411C4 D01*I 0 621 IRO v0 - S 00 (10[01•[(0 [0000.2.1'0.5 *00 '(001•x01.1 Duty 1.0 Sf 1101 Yx 111 •0 6111 •141 7•••s t •I Out su o• •••4 051 o- ,414(0 ( 00 It 0L . rat 10 4 DUCT (t(v.106 90.0 4415 () 41 YNgR( 0100 0010 LEDEND 051110 10 R(0.'* ((• •50.414 0.0(0(01 01001111 90(04• • Oman 11 *.011 0000.00 [0011 0av11 ***•M6 001(4 011.01111( R 11 *00400 0K1(ft 000(0 5004* 0000011( 004 -- 060 .4 Del'(1 0000 .4((1 (0110 tat 0010.10* 410.1401 1110/144 O*IC 000. C0x4Yx4a10* DOCt 00+0• (2((0.40( 0040+ 1001 1 1 I,, .. . � , ,.I EBEIRIENE 51 S( (M- (01510/4 7.' D I 0 i001(0 x411 nsn.c 7.- 011 WRIER 110111 (u0»110 1T 00I .01(0 YAW 1011 11;1 (11511[ 00110106 10041 ( /OH A0YO11511AI10x 011 (10011x6 05. 5(000 510(1 y sS"ice 1( �R1l0 Cll. ss a0 S 5 500DUIIS 0011 (1051116 6- 0/011000 SM. S•4O _ _ __ 1 4(511[4 I 1(11004 O 1, 110/ O L 030 0.j I '3.0 14 Or MI (1(0(01lv5 O i 0" O I Oa O 1 030 0 I 070 ( :123: O I O 1175 0 «*1100 1.41100 51 *14.5o 1,0D OVOID 0,0«f01R,01 6011 b0C0 DR i0C5 + w0 0 7*I 1 010x01( 0(L1S001x1 -\ -2 4 CO.Oulli tat ll SO MO*OSlO 0- PLUG 1 T/ MOWS 000005(0 1' 01 * 1 (CORI 1 r 1 •al(R lA( (---- - 2 1io00N012,5 *00000(0 0' 1 I- 1(0 1 (0000500 V 1 7'1-10000115 6410 yr( 5*01 I v 1 0.0005(0 1011 .101•.1 000-010 10(01, 16 4 C0.0U'IS 1[010UMC,II00S1-7 Y ICx Old 0R 001 0*1100 0�R1 AI*1 o•*'r�MCS 11150 1010 010 1 1111 0(R •5 4 5 *a0*05E0 1. x101 01101 010( 0110 0000 ;EWER 0(0*110(01 (*51.(01 5100 4- 5L) O 10 0 .r 01 U Q W ti (n (n • O - J _ Sr - 14 4 CC O I0.* 7 0001 tuvalo.3 -I L 1 11051/44 1 1(0(0104 i C0.0ANCJI(C.s 030 010 00.0 030 030 03o 1070 O 11340 f1 11300 UNDERGROUND UTILITIES PLAN VILLAGE GREEN WAY N 0 20 40 60 VILLAGE OF KEY BISCAYNE CIVIC CENTER Key Biscayne, Hand* Splits Candela DM1M *.al0uvv n*•ww 11••'14 M M1. W'.••* 61.4.11.0.1...10•004 =Or 1*1 04.Nl MI a 010•.1 RIM IMi llr.n 4.[ .4M 91« r1. 4.6-01 032„• 0101 061 1004* 1 410101 3.260 41051 20, 2601 1410(4(1 25.261 (*I e* C4.1.01 9.4 ea Mow 101.0 ♦loge.►L 14.4000m. 04(001... 1aNN 1►' 305 761./010 IO.IM 2305144. 3150 Al( 1110 NOTES 511E 16f00la•1D6 00 ,1000 (006 100(0+ 01 r ORO 460010035 060 +(000(1 .4 0.1(0 0401 K 2000 t00(04t4M 010'115 1100[ 0f(6 00140[0 181 11( 1131 004.5E MI COWd .001000 01.1(1 0O MC101[Ci (041((0 650(0) 00000.1000 001 0011201455 Or [105144 (0001005 00(01(0 14 (4000:101 50011 0501010 14 (001 10(010.00 01,1105 1001 001 0 4101[041 U6 MAC, 1 RM 01011( [WS 1601 62 00010 00 00004(0 01MC 0211600(000 9.11 aI 0000040 10 14 C41IR.CIO 06 01 I4 C00000010.1 (0000.( 1 Al [*(001005 0100 00 14 00,006 010010 0000(0 2(0000 Of 0/10(001 ._ _\ / S r0. ft I C i4C0l C1.6U00C .0005 .00 10 CI N N 1166S6 CI RS [4001 slf 000.0100 CS 00. •0 10 000 104 0f NCt (100011005 S•o00 tw65 () �® \ 5(( 00.4010 r110t LEGEND (0051160 10 R(00Aa R(• .100011 00(10[01 00000(11 50(0010 COR.fRE1( 4A.(. 24.01 C1KR011 00010 041000 ORE. (00(0111 000(6(01 000(0(11 40((11 00(00. 0 to.a(11 Sla - E_ --� CON .10 0011(1 (Lln 040(1 0401(1 1001 0(00600 Cad VW PM 110(1 L0( 56466 0(01. 000 •nM. Mt (l(C1.I*t 01001 SPIN C0116001Ca1100 put( 0060 ((((0606( S0C0 1wf --S( SAO s• (0.00015 1!401 000►0010 111 l ( M 2.• 0 (04 (0f001R(g0 10011(11 i I Q 0 0- C0(0YIIS 4114t4L' ( 1 .0t(001R005(0 .110R 1SD i 01f 00I. Df 700- C 0 R 1 0 0000(( 111.414 f• C.001S Inu- IR0005(D UO 1 01 t • 0 r (1 f 1l 10.110 r. 1111 ��" MATCH LINE STA 14.40 FOR CONTINUATION SEE C4 103 000005ED 50 l Or 20 C . R 1010 IRA 100. I4[6Cn ----- UNDERGROUND UTILITIES PLAN VILLAGE GREEN WAY N 0 20 40 60 o1 4,4 1'(015'00 VILLAGE OF KEY BISCAYNE CIVIC CENTER Key encnyDt, Flofldo Spol[s Candela DMEM •.006.100 000.00••10 6...400 0141 borer 011.40. rani Cain tiW 3: 10 00W.. 4410..0014001 ■ t PM.. la*. ARC NMI 4.0(-01 037' 440 0111 h.6 00(0 (01 4 000010 2. 2001 10(1000 2t 241 0(01(60(1 2s. 2000 C4.1.02 Ant as. Now 11.004 A La01.02 ►,11001 W[00r0r Lr400. 110 31(3 10R10e6 /RMo4• 13053(0.7 3334  5.1-5 la://7! " 'i, �� Aat.r" ��. 11[0 .5011/(11[ 000(0[01 tOKI(It S9t541 CM 010 6015(0 dM 5511(5 6055011 !I5 0.011514 6010 a.111 COwuu0.11011 000' Itu1 0E1tr.M/t 0,41 WI LEGEND C./SII[ 50 0(0545 11(5 _(1 c 00r0Sr.0 C u. Iu1/ j/ / ..p5os(9 /. 1( /1 //0 /,/,` ro5 o1/av / (/o 9 c , NOTES SIt( .5!000.1100 0510/( 5500 0Cu0.11U 51 (000 010(01(100 4440 040, 5P111 11 2000 100[5010100 u101I(S " 4/[ 50(0 001.00 I4 5K SSI .1. Olt NOb010000.0" 151 5 0*11 00ss ((C(051ML 041.5,5 40404( .0 RTPG(01i t5110lC.6 111G11(O M 00.1151C151 Sall .5(E551M IK EMT O0[1100 01 u11IOS 1..1 W K 44(0 (0 !, 1.6 500001 M V((0 'XI 1141 1111. 05110 51 DW*QD OUI11 C00S1- 10( 9411 t 5[1.510 !I 1K '0/11[151 055 11 10[ :0/1401510 (15(050 4 a. 1.1/.10.6 51101 10 54. .01011. CCU ,/ 451[w (0504 OF 0011/00491 UNDERGROUND UTILITIES PLAN VILLAGE GREEN WAY N 0 20 40 60 VILLAGE OF KEY BISCAYNE CIVIC CENTER Ke1 glltWene, Fil01do Spillts Candela OWN oast.... utps..^01 r1.05r 111 1..11" " 61w.a 4.4 4... MY 9.5111' 5A 544 a04. 0115145 11w1r 40. aat 01101 94 fat 0-0sa1 5715 r1 a IIw 1 C4.1.03 tom isms. " Laic al �%10101w00 Od(nplw 0 eleiner4 *MOW / ,y.. NOTES SMIRK •.0(0 1 i / F St 5. - 5 013333.C 1*- Silt 3 SI,.0 i �. `1 .1a- 5'00. 1 •- 1(•10 i 1. }••.,.. r (3 \ NI 1311 D. C W N`� (.6133.(. 30. 0 I 0 •11(0 MIS (161104 10- Nip - St_ 1E2 16/1 W 13 *031. 040 1 1 [rlSuc ID' C I• •411(0 04401 ia1(0My 0. 0". 7 5' �� 0*0u033 (fro 110011 SOW (.01110 70-(30051 510(03 St MATCH LINE • 5 A 11.00 FOR CONTINUATION SEE C4 101 011SII0C 0000104 0 5• C059■IS Ir1L1 CR ini 101.11033 ,B,SINNtioat +( 0O33 0050 0CS :• UDMlounS 4305* 31 _ 1 i0 8001, 01(0 031[ j r 5 0011DUK 0..0 111 (1 1 '01\ (.111.4 11' StDOu _100(8 6.1(0),4• C 105 1 /- I11SII0L 15 / 1144110 Sf •(0 c ( ERNwOOO ROAD 1 `1[.:. 1 1 0 z t a o . 441(3* L-11111100 I(Ilr.M01 0001 01111 ne(0 00110001 )S COOIR I Silt IIM ORR.Irol 3014.(0 1001 SUh(0 01 0000 ,44(3314003 00* %Ate31 1334 DAM *004 (0 2000 7 1300 10100 MOMS 0W[ a(u 0011(➢ 1000 11( 3430 016/34( If 1010104100[4ER. 00001 0C AMC: 00(10 341( •0 3450001(00 100 CD■QCIKSS 7 BMOC 000106 00[.1(0 1K 00110ICI* 5* 41 41913101 3K (343 0345101 Or *1(31(5 llu1 *01 34 105.4.1(➢ 00 136 3 0X01 3 010 1111101 3065 IxA? *34 110101 OR 0414[0 WNW) Ca61000101 9(311 34 340403 01 1K (00R4 0* ON *0 14 40110410115 (10064. C 41 31(041106 34110 10 11( 051000. 340011. ('*3(4 434130131+n 1011001 �_�v� 10* CLICItICOI C0*0U*IC111015 *NO 11.101.011[ DUCT 0.000 1110330 5(3 0010100 C510) _ 0 100 100 01 /UCI (I(v*LG05 500.0 1005 101 511 D.5�1.c 03 03 LEGEND 1/151100 10 R(031. 333• *Y0n 110 .1(.1.1 401(0(11 510(140-- - 443040(11 •ARRA RO*00A0 00030(30 004(0 .4001),4 *0(0 000C11(1( PArf1f01 (0*0*11( 0*v(0 510(003* 400441113 530* (300 *00 000110 CURB v*Lift 0031(8 1$01 (1(4130. COD, 00501 51080 5(018 l0( 5001/110 500(5( 10* 11113(31 100 (4(011104 0101 0014 40110001*1101 Duct amx. 1(1(.1100( OKCI OARS J IMINDOEia UNDERGROUND UTILITIES PLAN FERNWOOD ROAD N 0 20 40 60 St • VILLAGE OF KEY BISCAYNE CIVIC CENTER Key 86toyac. Flada Sp1I111 Candela DI1114 1 1rw1«. arrry •.1...0505 l■ M*41 [WOMAN ( l* 4•10.t Mersa 3 ,10M4w 1■I 3.1 VW, MIN floe. 105.10 1K OMOS Awl 140 +-00-01 W 0.11 03 A• •601 2000 6 0 0500 301131 3. 2001 *0605 11 2001 31►1100[11 2* 2001 C4.1.04 00..(1. Mow 10■1 l* 2.1.010.•C /refetwr1 C.d(0000■ Wow 00 31015 104200•0 Nolo. (30310032 30 NOTES 7000 01000.7(011 011.140 1000 0000(7 I1 100, o040(7001 A.0 0003707 4/0 0.1(0 Art • 7000 1.000000 In HES owl I(!0 m1I9 0001 14 0[37 0.41 W 010.1b0 (00(00.000 .0 1001((1 (10011 ((}0L 0 0(5001®001 (0 C000(CIKSS O( (16100 MOab4 .0(07(0 I4 707(00'10 9181 =1010 74 (1001 0(00107 7 0011(05 (((07 007 S[ (0(1((70 r 116 000071 UDA ST14/00N9Vu I( evert (00 M 141 OS PAO CO 0 (b1 CAMAC1011 00 .1 c044104.0 (0011 4l (((00101( 0(((0 00 1(( 0010007 010M'C 00+0[4 LW. ��a *17, 1 fro. 11((1I1(µ co llo11r0.S .110 It 111VON( 0001 1 4111( /.1001 SC( )n010C ❑I A 11(0 .3741.0 0.0(0(70, LEGEND (1.,1w7 10 4[001« x(. 7040(11 31(0077 00004 1( 0,7(0 10.00ir 404•(1( 400(0 r0.1r6 44. 004((( 7,0(04»1 C044(( 440(0 540000 (0.71071 004 001 W0 0010(0 CMI 01(110 70(1(0 %M 1((00(07 CAM 000 77000 1/411 170 SOMA 5041 100 0A00 lee (0(71,10* 0001 001 C0000ICo100 307' 00.0 ([100004 604' 1.4 J 1.• 14A, 34000'1• 1 I ISHISMICEI —S7 SAO 0' of T ; INr (7 1 33 ' C.Jf f �(tlflna tl• SI0I0 (� s[4+ ,--MS1 :u• cn x ' p t el r co.ouls `_(usnxc- J,�_.IN R 1 1217 13' S1o+Y �y t�11- ` �S(1(R T 1.-'Z 1 -cam �T�:�` ^`� .� �- 1 /-----.1115.117 007 10 V v i`_ , s _'� a -ry a RN`= ...:-1:-... u, «7 ,� °00 ` a ,111, •x[1151 w7 Rp `5`.(P ' Y :""f IAN A� I+1511x7 .-\ :,T---- !—✓_ /f( I C:ti(y1.:�� ;➢ 00 01, .i 10 •(044. 00NS1 (1(5114 ..1[011MA 1•W71 10 (4 IA01 0S 701 (0 xll\ _ 1 4 7 `�_ �011x 14 [oxs tl UC 0007 Or Ixl xfr CU0) _ - _. .♦ ,.- " I \�eoeos[o o.o «a«Ito )' mn�o1: ��T+.xPO+N St( +/00(0107 '1):,,,:74:',1;00—;A:80.4.: c(x1[0�..,1»CS _ yvl� 51 i.151�xG 144 1015 1S' 5100 Stria S I0x 01 0 33 « 000 (1 0 I' `0 ±INV 01 1 1 37 0x0 01 1 1000 UNDERGROUND UTILITIES PLAN FERNW000 ROAD N 0 20 40 60 VILLAGE OF KEY BISCAYNE CIVIC CENTER Key 61scayne• Fle(Ido Spdbl Candela MN ..w4.s10. M e.yw x10.0•. C 0 GO. 1.x0. 101 100(744 An 00 000001 43 01.0101 0.0.01 ..0 Mat fad Tile 4141 076( %6,1061 64[0 (a 731( 40651 3.301 AIC(61 30.10( StIntliSCS 15.2001 C4.1.05 11.01 Aram MA"TL A10ew Ritnp•er bow lb. 3M13 telrMrw 060(1 OD5$47. 5030( UA, STq CON HE ', N"TION jr 1 i• r; 1 r 1 fl •.1,' .1 _ 0•* I I II Tr.HLINE•Sri 1300 ION fINUATION SEr r4 1 04 1110 *10,1411( Pk( of MT ['OCAS') SKK•0* C0K0[ 1( .0((11 *000..0 COW"( I( 0*V0* 01[10[ 0010 C000C1( 0.0(0[.1 1 01KK11 000(* 5((04* ow* It stag COOS 04, 04110* (00I S10r $0,01 u1 54.1011 004(0 .1a. 42[0 0.4 [4.((10104 00:1 furl [00000,01,0. D,C• Saw 1(1(3.1011( DUC1 6110 14.75 r4 ,05 1i II 01.005 LEGEND (*1510[ 10 1(0.1* 5. 00000(10 I} .• C0*00,'i C011110111b0,51 0000.5 .0001[15 0000000 000(1 00 MM10*0 CO 000110[ 10S(01S 00 *15'1001, 1U* 004[ UM -}--y-� IS I. COM0u11 Ic01a0wC0)1 $I 7 5- (011010101(0 01 00 * • 1 EMINISMI E SI SAM -- = MATCH FOR LINE (OR TIN AT1261 c11C4 i v 1 5• COr0U.11 WEST MC INTYPE STREET 'r •ii ,%`Tt'• ,•" {-'-: [(.17TR 11>fl!f, ^ ?� (.• ^1400 11 •' [(x010.15 10 0004., 3110x51 • 0.0114 a 0 . • •.It. 1•w( _ COMMIS 1[.000 10011 , ;/•� ` 000.05(( 1. Dl M t Slot. 01 Oka (.4,• x161IITT �*0Al .351 toot I' MATCH LINE • STA 9.00 FOR CONTINUATION SEE C4 1 01 NOTES 511[ 14(0*001104, 001.0[0 1*00 5411011 01 [000 04(11[105 *00 0.440. 0C 0x(00 *004 11 )000 7 1.411X1C0(000 (000 4101(0 ns( 1(01 0!101'[0 M 1 LN1(CI `10 014140 WO.M00 n00F0t ( 0 (0 041 1M(SS011 [1111.. (1000(* O4.*( 1010.000( [00146 00[0100 Ilt (044041* 9'41 410(*000 11( (0.( 10(.100 Or W(41(0100 101 9 0110:1(0 11 1105 "*011(1 1 011 0000• INS Iwo 14 MP(M 00 0.0•[00 0NC C01St4f.19N 904.1. 4 R311!0 0' .1t :[11100100 00 *1 14,[ COr10G,0K (a(*S( 1 all 01f031C00 1(001 10 114 .40000 .0001(0 411(4 0*r100 [( 0)1 0 411 5 100 (*((11,0.1 C0110yr1C1110*S 300 1(1(0'•0x( 031' 03.05 M00. SCI 030040 05 05 { 100 •0. 01 (401 [([5.11015 5.1045 'PUS O 1 ((t 500.1: 0* 01 *(1100[ x6 1 N[1(0 (AIM 0(1( m0IV011 0 O*, Y i (1. 1[10 11 10R ( 0 / ;r 1 VILLAGE OF KEY BISCAYNE CIVIC CENTER Key I1ncoynt. nor 1d0 Spillis Gnd*la UMJM u.•.4,•«• y{1•r.W N•I0W 40 Mw 0Ne.0. 6r..11.••• In...0,10,... an si.• MM..- as row.... 3.: NMS (11511x6 5104* 0(0E0 (115106 7 IP 01 0 ' M 0. 400000 S• 010 5.011* SC.( R O11(RI ro 11.015 - 0,0010 5/1101 *.11(10 fS1 01•(R5) roll 010 (*15106 0100* St1(1 01.00 - - - - - Isrr GALEN/ DRIVE r YL 1 1061 I JIN * 14, El I I) 1( 1 /(e."---; -� ,715 Iry (l 119[ f //I xi UNGEROROUND UTILITES PLAN „_ST MC INTYRE STREET 40 60 511 04* .-0001 03111' *90( Oak 011.00, 4401 1-0301 1110 (1. 1181 155 (0 (0t .1141St 3.1001 300151 21.2001 S1►1044 25 2001 C4.1.06 91014 100► *.04o04 & L*0*.►1 *0.10..111 6.0(.0.1.• Lena 00. 31(10 7MOea N 1000 1305140 3.•3( .601 ?I•.0 103 DRAWING i C5 1 01 1 DRAWING C5 1 05 z Q i ;1 ' �, I 1 1 1 ! \ , t I 1 ' y� A. • /-* ' ll LOCATION PLAN DRAWING C5 1 04 N 0 40 B0 120 DRAWING C5 1 02 VILLAGE OF KEY BISCAYNE CIVIC CENTER Key Becarne.fbrdo Spills Candela DYJY wart.w Weser Mrr M soy. Pane. fret e.M.. Irrr At 1M MNeN NM M, *MOO rr IeteY amt. cat 44444{ Skeet Me NAM 3, XV %re Dr her OUP asuD rte err C5.1.00 See et Now kiwis &LamPt rtsNesew q.lJeyeer I,cwrte , S15rS Uweer 4.. (3054447 5556 NOTES WI ..0.1.14. 00•0W0 4100 Sue0(' 0' 1 W .0.C.1(OOt v0 iII C' wC 0.010 AM 4 7111 Nam1 .A.1 400 0014[0 ,44 10 4.101000 1 .,C .4001(2, 0011411! 4 4944 11tR 0, I01(CMSS Or (m10c poQ. AVM .0 190001 4((011. 10'0«:' MOM Kean 0. 04111104. sou(O 116 KJ1.1 (5110. 00 pa0(1 141 441 0( AR( OD P .6 mn. la( 14, At 04000 1M 00420 OM - 1 '4 CO..•.('00 20 .' 0,610,414" 5401 le0.41(0 r 1.e 120144(1171, (0001. 1 a' OU u.M. Up '0 14 .1164* 441[ 1( .1115.4 0414 0 •7. SC.O' 1110 LEGEND (.4110' 10 •(.4414 MATCH LINE • STA 11.00 FOR CONTINUATION SEE C5_1 _14 14 we• .140.1111 •w(•(.1 COKE [( 000.40 L0K1t tit 4.040 104000' [OKH1[ 01011 •155.0 .0(4 cOKH1( •10104.11 20411( 10 000(0 (0(0.10 100421(1( Mee -_ 20 * 44 WI It. 2000 041(1 tut0(0 (I(2111[µ DO(' 1101 tOernmC11*0* putt 1..0 1(1(.000( 011(1 0.00 {' . ./,,f4: ENEVEREla arle=4 0? F L t I ' 1 03 i 11 - -� ►: (x410° 6.490104 roLlC' w( n..510111oY 6 5 (a.Uu'15 1141i A421 \ I(` -0 3 15 4 e1«0 110910. *Uoy .YO 011.* 1 --- _ ter -•0 0 11 0 0 0 12.0!,10.04,15 « r.000s00 (•0 1104 •° 1e.110Y xAO •04 , 24 . 2*4 p 1 7 1«1, - . e nlsou --.. ���e 5 1nt' - • _)0• 7 . COYo41S 4.1 d(11u000uUui1S 1 - 1(4;0 1(4;0 101 1014°0''1 nlusou,«1 . 17. 1'/(( 10«044''2 _ - 1(41( 1 C. 1100 0• 0.'wu.1� UI 0+A401 1«1 0.*ai�1CS 00 • ELECTRICAL, TELEPHONE AND COMMUNICATIONS PLAN VILLAGE GREEN YLAY 10 60 0 20 VILLAGE OF KEY BISCAYNE CIVIC CENTER Key Biscayne fordo Splits Candela OM111 1444*. 40.4..4 • 04.1 Ole W r C...•... («.i c.... A...4 m 7401.... r1' * 1714• ar from 1114....0 4116 Skeet 414 010000 3. 700' bre pwe 03 PTO 11SYt0 100 cm a0WS7 21.2001 1(/1(00[0 21 2001 C5.1.OT 0344 OMr A 1.00•.•( /rNmOw G.1fj4'0n Lame 110 ]101 /5660/00 104.004' 1301)417-- 510 " 11(0 NOTES 1,l( 02/0/00100 041 (ode 1100 (Or( + 3t 0010 10,(*I030, 020 0.000 10C 02" (1 000 2 }000 } Won/10101IIOtS 1(r( an, MI.0(2 ,001 14 0[St 2.241( 02011(00010 001101L 20100 are *0 Or(CI (00(10 (SUM 0 4gOOLMO+ 100 C004C42Sf tl ((G'0C (01p000110(l1CD IN 101104100 Yell 2(011* t.( [(Kt lOC4t01 O 00(11(S 1141 W+ R 4RC1[D R 1230 V00LCI 0 10 123L I OR 1 t NC11 01.1010SIv I,( 0 ON 1 CO15 4110 0I t0 [0116[100511401 At (1(01100 1(111 10 14 0(10.0 000[II. 40140 02101 0, 40320,01 LEGEND tap. 10 011401 1(. .110414 11,(0(01 (40(1(11 510(04[ (40(00[( Pup (000011 14040(02( .11(1 0011100 40(" 104011 1( 0101.101 COMM.( Paolo mom( 001011[1( SUM C0a0 011 (01110 (400 .4041 0/11(1 (1((1044 OYCI IoM (014040020230 �I(0 4000 11110001( 0.(I 0000 ' 'z '1 u S' COMmtS 1(011 } s (000(0(05 11. Ft (01911 001[ 1111? r 0' C0+0u10S 1.7 11(2 2 0 0 0 1111 }9' C0000(0 ((Otto 1 V 1 (01511r( ulna. 104( r 0 1 2200011 ,e(1.20., ., ELECTRICAL, TELEPHONE, AND COMMUNICATIONS PLAN VILLAGE GREEN WAY N 0 20 40 60 VILLAGE OF KEY BISCAYNE CIVIC CENTER Key &sto rwe. Florldo Spilka Candela DNH 0..r121w t" " " " " ^+ 012..0{ � 02.002 61..11. 610 (201.1. rr.r s r0 Y11140 a� m 211420 1100 M. Y 14.. r 2 K �R. 50101 t4 406051 f taw 037 0o 041 h1r ISSIRO COO C O �% 04(090 20. 7000 (301(04(0 03 7401 C5.1.02 Sant re rIM ROOM & LMO rf Mime. G((.0n0" term 00 31105 Iowans *100 ()03$.7 3556 1 10 10 I MATCH LINE • S A 11.00 FOR CONTINUATION SEE CS 1 01 — r00POS10 PDXn [(X(11 rat 00 (s._, .01( 0,0 .01 l.( 2 5. 00000117 ((PIA E 1 50 75 5• (0001013 4P2 (*0511X0 11013 00 1 Ii_7 -1 H 4100 C(N1(*U.( 1 Of MI 011 iN 101,ufti 10(1 • 5' 00000117 Irr11 011 1.E M I.UA110N X1151101100 10E OWL [KC *MHOS 1 • 5.001100115 12rt 1 FERNW00D ROAD (.IS 01X0 1[E(rrorE 0uC1 Out 111(1 0.11051 If 10•[1 NOTES 511( 01201111/111011 0e1.N1(0 1100 701011 11 1.0110 MY(N1(10S .00 N.NUCI INC 0.1(D *004 4 0000 7 40(1100010 LAM WK 1(00 WALL 1100 M K51 a4.1£ X00010100a(K0. 01K1 110/ 01010(1 (*L1lO 0151[ 10 I1y0AUt, fa* C91R(CIKi 7 (r61K 0001106 Ia(A10) 11( C0NOIILI00 SMN1 00(0*041 M (1X1 100010 OF u5(11ES 1.01 00.1 H 107(11(0 IF 116 4(OLC1 5 AM' 300111 0015 101! 011( WON 0t 001.0(0 0.2040 I O = 00611.(101 SKYE K RN.I® Iv IK 0001130100 0R AI — 100 0001'1007 00•(06( I — V 60 (1(V4106 /VCR 'D 'K 0.0001 710((1( KRECM (AIIM (I 021 40001 I C w r VI (.^) O yy—w - L O 0E0 [CENT) (EIS [*IS ZINC 10 0(51111 0(11 0$0011'10 1,0[X001 00x00(( 5101(AU 0000011[ 0040* 000000* C0NC1(q e*o0* 1,10110 w[. 000011 '0 0.000101 CONCI(11 .0001 :10(.0E0 00001E 1 71.1 0301 AND 6011(0 CURE 041(1 031•(0 011C1.1(µ 00(1 IA01 CON11U'1U•1a0 03(1 10X0 10011001 0001 1AN* 1 ELECTRICAL, TELEPHONE, AND COMMUNICATIONS PLAN FERNW000 ROAD N 0 20 40 60 VILLAGE OF KEY BISCAYN CIVIC CENTEF Key Bncayne. rior1Ca Spllln Candela DUI( rook.. brow.., nr1 II1 Imp* two. 010 errs r.1. to 4110. on. *1r ,5ar•1 1 Iw Ur•r rr[ arm> Owl Lae 000037 0.2001 Mr kW 0 (Oa cm, F/21IIIDUSI 11.2101 s(emm.r(( 25,}0al C5.1.03 00.0111 aaa 37.11 rfther. CX1Gjaw lama Ile !M la*/aU *enter 00513*, Sect NOTES VI( M 360.301 OW .030 1000 0000U' 01 1360 (0rtot(*CS 010 00wCt CK 0al(0 .P0■ 6.7000 1 .1e(110'0•6 340r.eS wM NM Stott 1110, 10 ts1 molt 100001St .0f.00 OfPR 010 ,(3(10ttt OOM PIP .6 VCYOrSPO, 101 COIRCMS 00 ( IK (p0106 PKA130 IIC 37100:3( 41K. tiv 10(�IP K IIItrICS .MI Wt K 00333(3 0' 1115 Pe MC ( 0O 10101 (363 11.1 Of 1100603 3000(3 al 000 1 01P MIl1 K 360,[0( 0• "6 % Irt (0....C30S (110'00 0 LL 4(1.106 Kan .0 IH 0.IPY 4(3630 3 3 . }_ a.' �I QW(• / per; i �•• c ns — z Q 0 31(0 .s11(3tK .330(11 (30(0(33 1010(3 0 (0303 I( rapt 00(0*.' (01(0333 Rt(0 0(0003 atU t00tlq 13 000(3401 ' (00(0(30 0(030 50(0(3' (00(1( 1( UP (Ma .M 310(0 300 0*0(0 3033(0 (1CCi0KK !Kt 0(011 00m01K0100 00(3 SNP I(1(PPP 10K1 OUP LEGEND n,stl.c •3 3(..34 Pt MitINEM 1."'"'" • t t 5 t0 "roV #1000S(01f01l 00010 -- i f• (a�1ms_ r 30101111 Ill ‘,f-.. .111— t-lI 00600(01,0 00004D 1.s.,+3 1(Ir•.ol.c 1 EtEi'- VILLAGE OF KEY BISCAYNE CIVIC CENTER Key a'tscoyne. Flo do Sptllts Candela Dd1Y awwn+a OC.a••r0 w•01a• 00 Me• Curt, 404 0331...03.34. Nips*. an •. POW 036 r1.r.0. 11.. a.3 1111361 ELECTRICAL. TELEPHONE, AND COMMUNICATIONS PLAN FERNW00D ROAD imessonc• Lamet N 0 20 40 60 nett nee 0110013 1.1001 Imo Mk 633130 Rd C 1J worst n 1101 ^ SEPTUM b toot C5.1.04 11036 90036 ♦ Law. 1t Proton.. caragror Lee. 00. 3003 10000136 Sfumw( 33ii1•• 5w' 1 - NR'�n OR Cps N FINUA 108 SEE C5 �$ slit I ' I H LINE •` STA -- 00 ONT7NUATION SEEI C5 1 03 11(8 610081 •IIDI Is 00(1 x0 .9 .1 0,5(/15 ON 145I CM( 181801 �6 . CMOUIS 4PII (4P 1:4:(08•"e4t j 4(0 00LC00 110 1091• - LEGEND 1/171816 10 8(81(8 8(• •7•.MIK ••1414181 [01011 11 5.014.18 COKKq 1491. 1080.6_ 1010111( 9.4(1 P•10MC 4114 c0K0(I( 14•(10I 10KK11 8 01(1.880 CM1K4t 714 [000 401 CI•I111 Cw0 +•Cllr cunt/ 10([110.8 1011 01,10 C 0wu1IC 41108 I1 01 1.48 ,(118801 7•,C ON, L EMSEMIIM C C 1 11c0wu1 un4' [0800114. 0 11 4' CONDO? IC0800008110 54 7 0' CONDUITS 114000) I ORMATCH E INE •CONTINUA ONSSt.r4-11 c 32 6 0 00(008100 1(.11 (.4 1 1 0 67 10 6116 6 4- CONOINI ICa. o.1,Cil10a 1L1 11 14.:( 118( • MATCH LINE • STA 9.00 FOR CONTINUATION SEE C5 101 WEST MC I NOTES INTIRE STREET ;n( w1008.11ON 011*80(0 1008 508111 R• ,N6 •01•(81(•05 •09 u*rlUC0 IWC 0.,10 8861 11 7000 v.011C•000 01.1100 448 118 001NC0 1488,14 1151 498 a( 8 0011410 801 810 018(0 880 40[81101 (.04(9 47SU4 .0 015>04144.0• (00 C0001C181S5 01 (151801 1010104 400110 INC 10110410 *MA K,C101 µY 1101 (4Mt (OC410M 00 WUIC Ina 46 R of RC((D 01 116 910101 1 11I 0(0 01 IKS 1(041 101 8000.. 00 0.060 0A`.0 1:06180[10. 71.41 If 119.0(0 10 10( [08104100 OR AI (4 10819011005 181 111 9 81 04 MIEN 10 114 ..81,Oµ4 6100, Ir_ ..001Cµ 04.00 0711x C 901 :1.444 : 1,60 ELECTRICAL, TELEPHONE, ANC :0VMUNICATIONS PLAN WEST VC INTYRE STREET N 3 20 40 60 :, 00 - - - - - 85 10 G LEN DRIVE ii' l '7 8 VILLAGE OF KEY BISCAYNE CIVIC CENTER Key Biscayne, Floods Spsllls Candel* DMA 4464§“hn 4444.41 118 84,14 6•441,•••6•44.64.....11...s. IA1188•. 4111*• 016884. M 0181.1 L4.•.. •K 1*4•11 V10 84*. 406001 3 1001 W Me ISSOCO 100 0 0 /w aaWSl 11, 1001 0[(0(810 I0, 1001 C5 1.05 am 1111110 AL811.PL Pesters • ate/'01 (111110 01 3001 111.1.4 VM 17008847 sect r 50 SO .•1 SO }• Ir }•/ S SO IE IC1Ky0[I( - PN0 4. sae 00 1(1 r 140020710 4011( 1 /4. 144 14 Salt fV 4m a a.� V*0*( la( •r P f0 [0011 1 r SM0 r-0,112 1 iC0i0rNCtis i( -1 I _ 1 54 SO S So JY - 11 } 150, (0000E10 0(00000 I. 0000 t0 7 \\ �. 14111 GViI(1 1\ \ -0. 49(00(0 0(00( 110 t 04101V1'2,11 00005'0 1,0 N CVI1(0 40(0[ 51 WEST MC INTYRE S1REE_T I CRANDON BOULEVARD TO VILLAGE GREEN WAY) .ls KO '6 12 10 {• t11Et0t. 0050 1 r4 *l, 4• M/ r 100(00(1 / 4050 4 2,01(00(0 00002 OAS( 0121 1' 2510 tr 0 50 - 17 0' (04002* DA5( 0- CUSS 0- 11.(90(0 0201 09020510 lm 01 401200 40000 1N 0 11 WEST MC IN TYRE. STPLET ( VILLAGE GREEN WAY TO IERNW000 ROAD) .100 SASE 2(01 -A- 24 50 I S1 a Se 1 r S r 11 I lr T I 1 COWIN It KS •, 1012100 0 K0� (0002010( 1[0000 I 0 -([1 1 I -or (000CPER rAVl15 DID -0010 CONCOCT( iN 1f 000.0 -it; Irr 1• 1.41(0060 401E 0• (170 0. 14K00(0 400E 0420(00 1. 100( SK1 4000 15000510 LOP K MOHO 6000( 1C 0 el } V0Ir(0010(0 O (• 1111(00(1 SASE {• 200. 0. 2091020 0051 VILLAGE GREEN WAY (WEST MC INTYRE STREET TO CIRCLE) 500 50 *IS DAS( 1001 •r- 1 1100 I I 470 a 1 0 Ir I lr r r Ca(K2( PANE AS 00(0 LL\ OOCO('( 0(51 .1-"5740-1 CO0 (0000(20 , -010.:41--\ 1/ i .'' •2,1 . (092011( 000005 0(0 "'Ft 0. 10101:. 0000E 1011(0 { :011 f / 2011(0- 1. 640;.1 • IVE0.:A 0025E T 0• tp(00Ck 105E 0• (10111 000 Wt1E0 11,°171(I l9 Or (017(0 4010( 1(1 01 !TILLAGE GREEN 'NAY (WEST ENID DRIVE TO NEST MC INTYRE STREET) 0025 l• *+*4000 1021 • CUPO I. 1.11010C11 4040 1(241 1110 0400 y CO*44111 -T_.-- f+_ ANN NOW vitt, 004 (J. - .. ib C 1011 11 ''i0` *01 It 005[0 x +40000 5E0, 7(0. 401. ME ,O1 S.20 EP1(A 7 0112*[ CAC00' M R1M N- E* 144 s -- 141' 11.0!*I(0 pL•k .1[r Iri1j C �AY' n '0 0[10 ;(0C ^ I �: It6' 100• ' ff• --� 1 So '.m.' 6414 6414 t J 111 100 4 A IN 041.: , - 2 1(. S *0'' " . J Inr<• »-r=.� 440.. ! wi 1.1N N 1.121..•!1‘_•"-±2M• I OrEGITL INAL SECTION L__ 119-- I TRANSVERSE SECTION .1 110 114 04141 *01 101„ 01.0 0 Co 11 10( POONA 10 (V* 10}2 11 4.01 a • 40('912 04.(014RN win WAN 0001(0 w O*0(*R 0 CE �IIW 51.4 (011:(41N't(204' 00 AMoi C '1 0 1� 4(021.1 .00, 1 INS 0R1M0 11421'4 IN NA r( '2 r2 N IR 0 NCn l00 N CN 1112 a (000405 411. 14 s 145 CXFILTRATION TRENCH ,r [I 0'- I x S '0I'14KI Cl,N /1/ 2' VALLEY UUT1ER 015 MEDIAN CUPS AND GJTT" `J 6 CURB 015 6" CLIP?, AND GUTTER 415. -fit 0010000E 0 0A`I - (1(N': RUC I ION 10040 00(15 - 111 0014" `-0040,0E 111 5Q' �00EVOl D(v 12(11 •YO' [1. 5-140 Cwt 002 ASP, IC 91110100 00 1 C N*C1E1: . S + ' *' ?',610-0; aSgj f Cti}- 'es1ec, 1 OAS.- ^ .51 74 002 04[ °( 0110 tita(;1u.1 `\`(0/¢110 "I_ 9202(1 PAVEMENT RESTORATION DETAIL " CAPOSC012A11(000KNE1 p1.. 20 CAN, u 0 *.w CURB RAMP DETAIL x15 0, C*CKI0 c 00200100(7 I+d Fri.( 'CJ- OLCS t VS( 'Ter SJ • 2005 4 012(110 ON 01*0 110 (A14rbt0. JO KY Al 200 CAL0C*lh 10 51011 2100X4 004 AS 09[0 ( USE 1001 i.' 001015 0,(01 C/CK10 00400(002 +!U'S 0(0 2102(11 00100.(02 5 At mil' o C�S W'S 951, fi'SM0011 'MSx CONCRETE PAVEMENT JOINT 11.5 0v ' AN 4 0014 SEC110N .-004[04 0 020 Sy Potr r *00001 Imps cr 110011}00 5112,0 e ASPHALT PAVEMENT ..210 ./CA 1( PS 1440 9-000 rrQ y 'r 11204100 1 5194121 PAVER SECTION .25 HANDICAP PAVEMENT SOMBOL 125 00044 NC SW, ON l9 1rC11a1100 ally 1(0105 (0 •�� a 0001E 001 "-5- 5'. :000 5504 *051 1 P � 1.O110E / 3,071.110047500 'n'01000('20 1 'rANDIOAP PARKING SIGN 002.0 M..F (VD0 SP NC '5 10 00* ON .Yx NAV 0 ?MCC 4l 0UE 00/27090 .1;10 1('1(C,4 Sr NY. 20 MLR *0'-04 '00(421 'x41 •M 0 414(2.92 4M12 1A•o0410 MN 001( C0*1i •450 24 074,15 f 140 0 w ..5E+ 4 2,t 110100 0010//1000 0 EACH 000000 v1.1 904: E C0V92111Y, 4(900 5. K0[ •711 *0 SNN- !( rt•5:-0 00 X0112(1 001 4 *1120(01 11}0[-00100 S011(00.4 14 02(002(0X4 00`400. IY 0CC(5S741N OA '4 .00200 90400 1' MAIM 11.007 N0,0 _Apt 0-'0 :AI SOMA NO 100100 •520 10. x10(2 9121 05.015 4001,. In KS 119( 000 /0 ' 0104 i . :CLOWN 004** 24 1wC :J 104100 Of 4 7000(1(0' 00 ra,toci0floo Saw 044 VILLAGE OF KEY BISCAYNE CIVIC CENTER Key (*score. Fie do Spllhs Candela DMA .400 0000 t..-,.• 1200* s AV. 4* Comte... 0000 m4 444»4..« r 010/44, MVO 10000000 rr*** *K 0111 She 4* DETAILS 4-00.1 00000 haste• ik Pa( 21 }OK KWIC 000 C. C6.1.01 9.0114 Now 000000.E 4.N.PE h.0.Pra* (.*001411 49000.14 SMS :.0110. 1KSM JOS)44' 1050 'ell 2501 r D 400. 00408.04 PAVERS SAND 1(0, 4' 46[80014 I.5(. / 7 vN (0 6• cua /// Guit(I!— 4• 4IY(,0C14 ,14( —� 1- 1.40RO(* 8.11 10 1801405(0 Iv OF (011(14 CR•p( I( 1 81 'NEST ENID DRIVE 1415 10 1y 1114111114 4440401E 6816•([ 14811/1 (IR OF 08411FIR AD[ 1E 4 81 a- 103000 OAS( 75 00 0 50 DACE( 10 PAYERS HOu53 1 6- CM I" t18(ROCA 6AS( GUI 2 .814(0 I1 * FERNWOOD ROAD • 415 03 .14 �f 111PICA()--, Fill 40(4 NOS 1([1140 MIMIC 414,13[441 CU0 0.011"(4 1iC / 1 SURF Act f[ [4 4040 Rn(1 NP1 06(10( 1 1 IS[( 0(144 8101411 (180 10010 1 14164 Sl((V( 6 fru! • 408046 /0•115 M 840449 1111X111 1484401[( 306 1(1 ((06681 A I4C[ 13.10 48(4 OF +N[ 00NRKE 140E CONFLICT MANHOLE Nis 11444*[ 0 G14AI( 68¢ 160 Dup1 81 004.04[1014(( 0 TYPE "A" CATCH BASIN NIS I 0 sue SING *40 C6v(R /*1014(0 10 44180[ 11 C011106006 f.L .. 1 6'C C: 0 -1 3([1100 a A 3(1 SC6(Cv1( 400 SL•+ J--64117 i•4 Al 17• C C t. 131 6 1 1 6 SE( SC3(004( 10 rG CRAC400TR , 0NTRA.r C0 �L 1 800111043 •1 RE161ORC1vC 6415 5E44 TC0(Out1 /„--•1 1 6 0 1 ( + •. .1• ' 0014 TYPE "B" CATCH BASIN --- N1z tT� A 1 C I I ( (CC[R, F I C 3 !tar. Aj4 0' D I 1" i 1' .3 /11/14.4 •1 1 1• C 1. O 5 1- 0' •5 1 (• ( '6 0. 6 1• 1• I .� 614Y� •5 1 L' ! 1' Y 7 4 Y •5 0 6• MANHOLE 415 1 •5 06'CCE'AJ 22 5ECip. A 0, SCAB 6 ,- 0001110344. •5 RCN*ORCCVG OARS 510 506(2040 •5 A /•C 4 1 11 T PE "C' CATCH BASIN 34;3 ORA144AG( 91 00440 03.4443(0 OR*NAGE u 5 r 0630E 340 GROIE OR 415 r r*o. ND A COVER 0004 •1e .0004. I CAIC0 60518 Ir141 -I ISF 5430 - 6016 7 081014 68118 10141 -4• U5, 5130 6016 3 CAICN 18540 1114E r 1.15E 5530 FRAAE 340 u5E 6133 GR4TC 4 CATCH IASI. 1014E '1' u5E 5105 ERN[ 340 USE 6436 CRATE 5 081114 1836 1014E '1' 05, 5103 1143( MAO uSF 6433 CRATE 6 CATc. 64940 IT14( •A• 451 5130 - 11046)---,4, 7 C*1CR 10518 •A• UV U 5130 6016 8 CAMP 6.040 1014E 'A' 1(544 5130 - 6016 9 CAMP 14044 1011E •1' 4401 5105 FRAME 330 u5E 6198 CRATE IO CA10N 03518 1014[ -1' us; 5105 10.84 AND 445E 6436 GRAMS 1 41(6 BASIN 1014[ 'C' u5E 0406corm*F E 310 UV 64311 ORATES F2 C37CR IASI. 1314E '1' US44 0105 FIN( 340 LAS 61.1 004[0 13 *3400144 0000 '0' 004 340 M 0364040 1014( '0• u5E 310 45 68*N0(( 1,11E -0' vsr 340 16 I 1484801[ 6014[ '0' USf 310 • 1) 1DOI ITP1 -0 1 031 A3 3 5160 08 ( 10 451 6310 GRATE 16 CAIC6 /ASM 101444 "1• US. .105 622, 19_.. _ _ *366010 TOPE -0- u5E 310 • '00804 coot(. OF COv'1 2 6' AWAY FROM CE81fe CF 518001011/ VILLAGE OF KEY BISCAYNE CIVIC CENTER 'ley B.Scoyne. Fb[160 Spills Candela OMJM .*4.61.4. 164.6.•.10 14'.661.1 440 24.414 1.1.6x. (444 C.4M. M4. .1434 311. fit 5604. w 1.6 •x4441 Leo 511.01 lire DETAILS 4 01 04 032111/11 Paw Owe 000103114 51101 4194[ 29 7001 1310E0 4408 G Y 14 ARGUSI 3 2000 C6 1 02 9+.113 Rem 0o4ot@ 4.qt? 31.1e1DT :1ri[+(YR91 lame 5k 3099: 1(850318 CAMAS •0.144• •666 " (11(16 24 5101* 1(2[1 I2R 1 1 1j 1" -Jr _ _ 1 111 l 11 11 last 11( '2'J - _ _._ 75 1. (0*p011S 1100 16Okl.tVflar011 001(1 1011 1. (061(705 1C0.1 100C. PROPOSED 1. 02 NMI OM 0( M1wR11 .e 27x2(*( 1117$( 1R( (70020x01112 *100201 222 RS 1 S 20020x0 4' Cal( R.101 3000x0 1. 1 4- r(( (72020x0 0. 011 01121 112 280(70010 r PERO 1102010 r 01(7 5111111 71(* ta( y` C.010 �� NOTES 1111 MIDR2" IpR 01111.10 PRO. SURY(1 11 1000 0101120$ 7p 0700[1 23 0.130 .1011 ( 1000 1 1164100.011 711n1s " 271 QR 0111(1 110 M f31 .11(0LLE 11002.1170 ,rot "moo*. ap RpR[CI 00(02 aK 10 7SROAIII 102 CO SECIRESS O p611c Waal W0(5 iK 071/1W1711 9.0 bQR121 IRE 0.C1 EOM* If 01111($ 021 Y1 1 11(CI(0 i 0115 01115.371 S 00 OW, 1147 1w1 R 10040 O 011700 "/IC 306111!:00* A" 0a 1 122*10 n IK :(11.13101 a 11 IK C00.00011/004 " 1l 111771616 r7u 10 70; 0.1010 c00QIC 712110 0.0W O 05 031:1 5 1r DRaRK C(l05 " d d0.0 PROPOSED 3100(---1 " * L ti t PROJECT SITE r L -1' t, ,I i_1 LOCATION MAP 13.1( 1'-100 TIJ 1./ _ .0 - a _2.l__ -- _ -1- [11113 120217 1 (7R0(705[0 r 011 Ra101 27111 I '; +t. t PROPOSED r hOCJ ry(0(7OS(0 r 1 r I(( atits 2.00 1.00 t1 6 " _ IS L�� I " ` 5 e oo ll 1 / PROPOSED .1' C 6- 17(7(77*2 SLE(0( -PROPOSED 1. 1.(7216 7717( n.00 1 WATER MAIN PROFILE SC .1 001 r 10 7(77 1 7 v n >0 an Fn VILLAGE OF KEY BISCAYNE CIVIC CENTER Key &scoyne. rlordo Splllls Candela DMill 1..70.7," 0.1." " .0. 20." 21 1n . [ c.1" . fM.h .1. 112 , . 13 .1., WO /Yr. 1..... 12 1110 50..1 (re I WATER MAIN PROFILE 5-R 01 721 020 037n11x Propel R0 4 15 01 n(7( n :001 ISSUED 101 : 2 (7 000251 5. 2001 5(21(21(1 *1 1.01 C6.1.03 92.120 100 800210 atop. 22 11.201227 :.. D [ 1./..2 11211 110 :1095 ;e1p,u,e 2v,r.2 3;051(" " 2.554 STANDARD REOUIREMiENT$ WATER AND SEWER CONSTRUCTION (GS 0 5) 1 4LL 0t1(4K2 00 (41101 0.0(0 105 11013[1 50. 1( IN ST. CI .0[01040 0,10 14( 11400(0(022 4 4,4 x4400103 001(0 M] 500(0 0(4.011( RI ARO 5041 CONE 00* 20 1114 11004001 04. 24(0((.1000 ..01.h( 0 O4 1*! •111 10( 03.01.3*: 011401 STOP 4.44443 401 All 001(4415 2 00450 one 0410 000 1041 11 • 0. 44 O Ml 00 l0( 444151 1441 1( 00314.1(0 (0044111( 0114 10• R)(1 IM(3 ADO r. 3 4 43 1410 000(3 f0( O5o101(S 40 1R!(( 44x(0 5041 0( 0314100 C0Y41(1( 1010 {• 100 MRS 100 0, 2 4.1x2 10523 • 41. /M(( YON NM( C000CI015 1010 40(3501( 1843511(3,44 *u0S 54811 NAx( A 5401 Off 6012 w Mel 1ALK 41 l4( 4004 4 (0(40 5 4t 01411? 3131(12 041 1( 340(0001(0 01 0CC0R0WC( *110 0(14110(X( 5 4 410 0 10 5 { 41 4*I(e KICK 011 11 05141(0 IT (N( 1141 040( 101(1 040 4(x(4 0(1010(x1 100101011 I0 40400041( CN00(5 Nor( 11(0 004.10 • MY (15.0( 04040(0(021 01100(4 41O 1004(1001 5040 00 AS 10040(0 OT 040( C100144 f0( 1(4..10(01 4 14. 04M0001AI( TAT 400,0, *1 0 141101144104 I4 3001040( 044. 0(401401 11400005 • 000)13100 0(51 Col 0 00411 004(0110* 01115141 10 *0040( FOR a 10(C0051RUf1104 0(100 M 411 pp1 10 440405(0 From, 0 30.1101(1404 •0,1.01 On( cat, 0020 00 101 MOO 10 (140440 • 104)340 4(11.1(! Olt 001(01 All 14311105 .0010x(0 1! 105 440110(01 0 4100 0(0100(0(1» 4 1111 4(0111103 0(143• 01141 II M 00000403( 0(10 100 S140p/05 4O 0(000(0(0?S O 1004 0(000000 00(0 105 4100(34 mu NO! Of 30.5140(0 AS (*001114( WON 004 .CC(RI4 C( 4 111 541*0* 01 14( 0(4111X(441 *0 )MIN 14 10110111.6 *1100(011 *4( 0(C(M1 40 0101(0 e2 10 44010(X1 114 (0C•(015. 1(040(0 424 coout0(14'3 0004 00 *010450 Of 140 111 •15401( 00 4 040 1.0 • 01.111102111141 t(IIto OR 0110471 11( 1(14(1 4(4((0(411 6 11K10(00 convent e00 113 04(OKl natter?, '4* •.5.401.0 44 •x111 11• I )6` 50002. 54004( 10444140X1 4 4l 0.1(0 0401115 04 10001(0 IT A (40(45(0 511114(!00 44011 4 •1110011. 0000 0041 1110 1(00 440 5(4(0 I1 . 001110211 202600 4 (0440((0 4 0(0004 4.0 (0005(0 01 100 100118614 00 Of M070 3 400 001(1 • r0* 00.11 430 5 100 00130 000 4 PI M 11.1044 M0A(CI1( 310(03)4 1101 4 142$ )14 .44(4 . 100 1x(0 40 5 000 ro*c( 01 ore 5 LEMON 1110011 0(000(0 (4 4* 001(0 010x05 4 41 00 (0(3100 40e. (0710[ 444024440 0446 l0 0( 44.4 01 44//01301 rotas "ix 10 3410314 10 (034401( al .(001030 103.410.5 400,1( 010 05141 011004 *40* MINKS 4010* •0 10 O 10 43004x(0 ►.(110 44 00004 414 0*0I 4 5001111(0 10 00•.50 103 4l a(0 4040110.5 410e 10 0440*4 4 441(4 04 0x(0 440411 014115 040N 1(00(51 '2 R(11 010(100( 1020140. al( 103 PI 0440 .N0 1041(0 100 00.0(04100 TO (01400 001 01.0 14410 0(0(41 W 04000( 044( 011 Of 1(400X(0 41 11144004 (000(0 NO(R 40 CKU0510(01 4.1 •4( [040.[40. K 4(0102100 (e IV (1010( 0003 4 10 9f( •0XC( 01(01(0 004( 0(4205 (10 .1006 01N WATER "AS -BUILT" REOIUIREMFNT5 (GS 0 5ti AI 4X44 00041 (740N Dr 01 *111!1 A0* 111( C0$lI0,(I0R TN.II 501.)1 • •4F 0IIlr' x110 11- 1 14. 1114 1 *0 INIC0x(SS1 FOR 4*C), 0.01. 0 0103 110( I(R03 x10,1) 01130 HAS 40. 50010 41 S(1l(0 44 R(C4S1(0(0 5*Rx(7OR 4 000)0(0* 0f 1((000 000 E00RT(0 01 101 (0*)10:100 1 011 of 411015 15 1(000(0 11 104 0(44)0(X11 1 •A1 11011' 100041 a 0'1 f(" 020 10 NR 0141 O I0 WORD 'AS 111111-* IAR0( 4(01(03 c 1111( 00111 01114 0100110(x1 (0 X404(0 .00 0(11)4(X) 10000100 ( 11(((0110 scut 10 4( I- 10 00111/001411 40 I' 1 r(011C4LT • e 5101(2 00403104*P( 5(4omA1( 407(0 4D 1(0(0 4004(0 ( 514110. 041* 5100106 011,1 000 11 4(0x.0001 1(7(0(X11( 40111 4 ( 01 10 (14 1 00 10 Fo0 C0011H*0US11 IO (0 01 YAW 041 01 OF 4,0( a (43(0(01 If 4T. 1(0 10 4(0x4(111 0(((001(( 401*) 0(0114! Alt 30.1100 0165 110 1(0C 101( 01 010 (IC ) I 41 '410105(0` 1400144.))04 10 If 1(40x(0 *R0* X.I.O :(00100 3(10 •11 loft l• 10(00041104 00(1(01(0 0 0104)X35 3 044(1 "AS Inn IS' *USI ,*CL000 O PLAN 100x143 514( 410 01(041 of 01951 *44. 0(74((110*.$ u 01. 518(10* Of 14x)3(5 X10041$ 000 111105 al 10( (*10(1X( 147 P(Pf(*010*100 10 111 000 Al 44,44 .40 (1/0 Or 5(0044(4 02 0100 *X614 AND 021(3110, 07 PIP( If ANY e 100114( 50000 100 Of (.000 ANo 704 04 14( (0(a01100$ .I (4(41 700 S1*110N AND At AN? (01(41 114 GRAD( 1011. c0R4(500NU,*3 :10710*.) 147( 00 441(114 Of 10( 430 0(1(01*(( 10 414 • 044880 SCAM .A! I( 04)11(0 440? ..*51 4( .44004(0 11 1(*4 0(44370(01 4..0. 10 40(PM.I10N 0f 00101x(5 DADE COUNTY HEALTH DEPARTMENT NOTES 14802 A 44.( Of 0050 00000.0 5105. 4014041 (001 NC I0(.1(O 114 50144 AS 541.1! 201 44..5 (N*IRA10N plus# 11443)(5 ,1( 0025 7 .fVl1 D rif .40!0110 144481(0 4111011 402(4 4416 00 101 11445 5 0)1110 7 410.1( I0 *001441 YAWN 140100'0070014'1 (101 441 9544 00 9(10(0'01.100.01 0 04(5 447(3, 54)011(11 f 1010 *.* 0151 00.1 4 0 1101 4011(4 11007(11 1ROU 44(441 l•(i 00 (104106 4 5(00 1((5 461.500 1001445 051 10 0 1(111(01(40110000 041x((0 ..•(1 0046 00,01 (1#T 10[0.1 010011 10(0 11(6 04 00 045 0 .003 '0144 0121 a 00(413110 TLC 4( A 11 .0x1 p4 001020 ON DI(•1C100 51001• 170000 10(5 *C 01(101 ( O4 001(1 140 502401(01 O C 6 000!44(7 00 0010 0435 Wvl 44 0.15'0140 0 f(11 a 01(111[104 5 5(11(4111(045 11MQ515M41 00'11 0 N0(1 4(4403( (R41 WATER YAK LEGEND 1101 (01511143 10 0(*,IN 0( * 01440,0110 1.0(11(*? CONC.( II 510(010 ( 30031(1( 4.4(0 0000.04 CONC.(II (*l(. 400(443 *430 00000(1( 40(201 30x34(11 1844(0 5100.0111 1 (ONC.(I( Su* CU0E 000 3011(1 CURD vu((: 4011(. 5401 (LEA.! * 31100 OAS% STOW 1*(R 1om 54701 100 (11 001(0 110 C 0' rte SAN VILLAGE OF KEY BISCAYNE CIVIC CENTER Key Biscayne F(p41do Spills Candela tIMJI1 Open** /0014y 4.••44. M.1G0•. 1...••• 01.1. 111. 1 .4.11* 100.`•.44 In 14.4 ..( MOM 9011 110 NOTES 50-01 143000e 032002{ 101401 No Jul( 1/ 2001 115400 (4 (144 014b0 21.3001 C6.1.04 , 515.4414 Maw 40.1!0 4.104.4 E 0010140 0003/00 !.404 Fb 1010 1414541 \nee (•T(+).4' :556 pRAWING C7104j DRAWING] C7 1 01 ------------------------------- w' z Q I I O 0 'O • CRANDON B0U1fvARD J l \ I DRAWING I C 7 1 02 DRAWING (C7 1 03 LOCATION PLAN 4p 0 VILLAGE OF KEY BISCAYNE CIVIC CENTER Key &SCOyne. FIOtdo Spllhs Candela DMJM we Dour. 4trwe. tw.i t.ww .M.r TAU ]M.. •"n..r �.... .g ut xeal sh, I'. aac N 1001 Nwe b.l. 632W94 hood 651[0 roe CAP ,u,61 3, 2001 c7.1 00 I.Itt leerro A ta0. hi1.t.O Cwa[pe.t IICfMf IN O1l15 TegM. NY.M COSW7•:555 Ina LEGEND (41110 10 R(OMR MATCH LINE • STA 11.00 FOR CONTINUATION SEE C7 100 4011 avow to I.e(a(04 Cestettl 111'141 4000:0(1( I.rl[ fans.:.014 \ CMCI(51 IN(1 110[011( [NMI( /44112010 J 4001150(1( !ty CM1 .040 CU"(0 01.11 *00(54 005.01 r — I l MINIMA • (1151111[ 1040 I1.e 1011[1 1 1n( .UY1w514.1g0 0,00(5(0 '1100. 1C. 1111 11 `-0e0P05(0 'x11 IRUCMS' SIGN r I 400105(0 50 1 I Or 4 50050 DOUBLE 001,05 2 NOTES 5112 .I ORU.(Ian 0014x(0 1R0U WW1 01 room 0a0(xl(00T w0 0,000400 MC 01'ED ualt 111 0000 4l 70*15 40 SIGNS 5114, C 00060 nix In( R(CV1R(U(x'S Or ,x( M0nu4 01 UOIF0*Y '1M(IC C0x4R01 0044000 3 Ini 1110111! U*.1NCS to rot. lACC 001(0 *00 000 1(01 00 x1505 1'0( 1 51141 5( 0!141.20 1111. (010.(0 444(00 11 .DIC.1(0 .00 1141 TRAFFIC MARKING PLAN VILLAGE GREEN WAY u 0 20 40 60 VILLAGE OF KEY BISCAYNE CIVIC CENTER Key eascaynt.Flondo Splits Candela DSJI( 0.41.4.1. w..n.r Pw...e Il*1..r 41.440.41 C.11.. no.. 9114 WS 04111144. 4111 1.0 '91144.910 1144 Lwow..K 0101 LK 21 1001 Dl1RA7a Wm Dole hme[( Ib O rOder IT\ 410.51 202021 C7 %M lle awn Raaw% top i! Prey. C.lt.gn► lswe 1b. 3116 1111/.0* lyyn (X5..7 `..1j0 .1(0 NOTES SII/ Mia..110. 01'.0(0 100.. SOatl 11 1000 .ar(at(000 •M OwOC• wC 00•(0 wa 8 1000 LEGEND Is iffy 01(11.1 0(0 .5..011[ e.r(.(.I 011000/1 •r*C.Ya COUCII(IC 0..(0(41 C0K011( S7 01 001/ 010 C011(0 000/ .Y1(, 401710 I. _ .•c. r:1 00000SCO SO ( r 0008(( 1(1100 MATCH LINE STA 14.40 FOR CONTINUATION SEE C7 103 TRAFFIC MARKING PLAN VILLAGE GREEN WAY VILLAGE OF KEY BISCAYNE CIVIC CENTER Key 96ceyne, Fbrdo Spillis Candela DYJl4 010 1.•...• n...... C..r Own Mr. 001. 118 1.1 s. awa 1w SM.1 to. Lc 71 7001 onion 1r ow M(Iat w 650[0 710 GO WGUS1 1, 1N1 07.1.02 New NOW!. lUla 00 M1.II.1 . Gdl7.aw LteM! Ip SILS '.87.001 Mew (!011.47.1111 nt 2. c{ _t '- 7— QI �z• t • Q C.)! CC NOTES l pot .r 0.11411011 Wi •111(0 1Ma 50..(. Or 1000 MN( 01110S •110 (0•110(0 111C NM/ OR O 1, /000 LEGEND 1010 (IKll00 10 000 0 0(1 AylMiI t•C 040(0(111 UMW( 1AY(1 1040740 coin tt OArt LIMN( Alta t01c1ttt 144 e1M 4b (0tlt( (011 0µl0 OP r(0 L_ L_ I ( { J { ' J ENIMMINIMA ET -1 0.000510 5 11 Or 4- 50110 0001([ (01.00 010005(0 14' went 100 ea 00005(0 '5100 0 s*G11 / // TRAFFIC LARKING PLAN VILLAGE GREEN WAY N 0 20 40 60 VILLAGE OF KEY BISCAYNE CIVIC CENTER Key Biscayne, flordo Sptpls Caod.Ia DMJM IN ONO. Orr. New calm. I1... ITN 1111 r « Nei 10. 0w.4t I4ee her. Una.. fiat ewe Stoat Mime L0E 71 0001 LIMA?, W Owe Mpct w ^Pa'ASt 71.7011 C7.1.03 41.. Aiwa A Lew PL Ora/wr G1(..wer Laws. N N70S irswre Minim 0 C0Ma7 :Su 11O•OS10 '5,05' s6M IR1 11 PROPOSCO 2.' NMi1( STOP 2021 wIP0S10 50 ( r 0 I' S010 OOPS( 1l1.1.0. J i 1 CRI(IPIC •NlD0C FERNw00D ROAD MATCH L NE • 5 A 11.00 FOR CONTINUATION SEE C7 1 01 NOTES 1 511( 1M101NSI.ON OIla1M10 /RON WW1 IT 0000 5MN(N11.0S .50 N.NVC• 'MC 251(9 NPON 12 2000 LEGEND 11(5 [IIS,INL '0 9(N.IM 0111 a55M,(11C P.YCN(N1 COMCMCI[ (1010505 (0009(1( 55.1! R00(5.! 1 CONCN( II 551(9 IMAMC 5915 C0NC0(1( 550(0 (1010501 CONCOCT( Pa1(MIN1 ` CONGO( If (550 (1111 *N0 01(1(0 CORO 5,55(5 (01111 n— --n C TRAFFiC MARKING PLAN FERNWOOD ROAD NJTay"?z:11,202-,5.024 ONESSIMISSIO VILLAGE OF KEY BISCAYNE CIVIC CENTER Key &scoyne. Florida Splllls Candela DMJM ..u..«.N. 5,00.010,8 N•`W 100 5.wM. I..r.a.. C..al 40,0 .11...5 000. n.. tM OOIN., WM 0..0004? (.11 1I..i...•.•w.oat 0110 SM..I 0* 1l[ „ 200, •331Ie1$ Niue We Row.' N. 0940 FOR CAP 1(050 12. 2001 S(PlI110G1 25. 2001 • Sheol MID C7.1.04 Now 0 0sl.♦1001 PE awe._ CI.I(•y . . -tow M. IMO Torpor* *wow 1]OSM"; 30% 1... 4H0 7. wet SM. 0911 9_r 11 ---- MATCH LIVE- • SiA 03.00 FOR CONTINUATION SEE C7104 NOTES I S11( 1/Nl*i00 0$I0aN0 9001 100910 Si 1010 YWRIt101 0ep .10009 .11C DAM Yee CHIN r L_ _ 0000(1(0 00 19 Or .• 1010 00001( 9[110. 910905(D 1100 1111 RI 11 990905(0 1. •011[ S009 NR 0.000;(0 010. 0109 r rr 090005(0 2. 0*1 5100 191 9o•r 19.1 r 9009001D 00 r 1 00 .' 00' �0 00ul.1 •t. n. MATCH LINE STA 9.00 FOR CONTINUATION SEE C7 1 01 11(0 0P1uUK 9491411, (01(1(10 10(0919 000(1(10 09000 0000009 CO1CR(1( 900(0 9190101: Alt!. CN(R(IC 009(0 S0(040 (01(1(1( 90.41(11 _ C0K0(1( 510* tort A90 uu0,99 COI LEGEND 0115110c 10 R(0u9 1 r 11( r 1 `ADIOS r;/,/,)990190:(0 11' OW(f; X0(0* tN, 7 z/ TRA«IC MARKING PLAN WEST MC INTYRE STREET N 0 20 40 60 1 00 ' ----- 15 92 GALEN DRIVE VILLAGE OF KEY BISCAYNE CIVIC CENTER (.0 9ncoyne. Florida Swills Candela DM1M ,00 11.,w er.•r• CAW GMr. /Irma .115. tIe 1K 14 rem r10M.1 lft• tlrma 0b,r 00C MINS 'r,e1 IMe L0 H 2001 ter Or, 03144141 Preset I% 69.0 (p1 GNP - 15.2001 0 JSt 2( 2001 %P1tl ll 21,2001 C7 1 05 seow w9.e 1e044410 A.o(t RE 1.00.00.010 C..it+p9e0 rte w SA1'. Ie1/M•< •0,e01r 1;(5;001 2036 " 1 j ( .(,0W SSO _��  ' I 1" r 0X1111( 000110 y / ' 7 J DI IOM Kit. ��`' /0011114 1[SI :, i tot__'4.I'' � 1 // , I l J. RE a ELE104.' .144 Srnc(h 0 (1110 00 0 I 011001 SWM 101411141 :04IN _i; 1 I O(IDM SI.M 100100 [S1 \�� 011041 0464 .401X114[ SOVIx I ����1i1 I ���� 4 MCC:: w l y l i�� ,`\��I ( r. oOCT . I ��y I ��_ 11 i 11 r \ '014 1.0.1001 0(3 1541(1 '+ O (1001 14G' �% 01X11GU l,  0( !GO SO S 101411x0 SOV'. 1(( 011tH B' ��OR+1.04 CE 107  \ I��1yI 1 �� Df IDUR ;1LN 'I .Ii sOrX 11X[ 50utX 101( 101 fru( 0 I+M0X'*D( MIX St(u01 1CX1 Al 416x1 011th Itr11 *0X*MC( *Ott. 4(00* /*1.(L Pt WIC NUM 1*01 (10$x100( OW *I wCN1 Ow, 1111 1 X[ 0rou0 01101 101 lupix(1 4lfOf1M*11OM 14 I0S ARL* (4D C04511UC1104 M0(00 00 1 IN( 1.10101 SPACING 1(INEI.4 0(440(5 f(11 *0(04.4 101t1� (0115111015 S0*11 et (01l� 10 *01 S0(E0 11101 18140 OUT 101 00E01(0 ?NAn 50 (01 403 100 1001 10A0RICA0(S 7 S1000*0 (01 0(0K(5 040�3(t 10 11*KL 1.4(5 SO�( 1( 50 (0R H*SIK 00000 FOR 750" (*(0(0(1(0 41 00 0(00(10 �l 14(10(0 *00 1001IC*0ES SX�3 0000(1 11111 (007 00(1 000 u0 r0(1 071 DETAIL "A" MIS TRAFFIC MAINTENANCE PLAN N 0 80 150 240 " VILLAGE OF KEY BISCAYNE CIVIC CENTER Key encore, Flonda Spoln Candela D9JY ....nett . 1e1.rwty ne..r0 141 Iw*eu lane**. GAY 4.e4" ? ri& iN14 1110 lel 4MX14dile *00 1111.1*? 1100 'Mere l ea ISM Duvet /Me IM...�%.o 2 7101 077130/10 IwM DO* 14" 0c1 Ns 09.1.01 Peet I* Nwe Rebels I. Lope 01 Fyf004en Cid(lglw 11*0we re. 3905 Tw00rcu '1Meaw 105.047 1554 WEST' 0 ---- 10 d3 z r W 1W q 0, Raw �>s �T l Cc WO* e0, 0n6e Ins (floc( .001,05(0 14 70 661RK60f ..Ip— •0R.00G 1,+10 65 PC0 0001 1110(1 f0� • / / Jj p\ I i r WEST ENID DRIVE In0011R. 0. •m( 01161. le. 31OI.0 CAI( 1(5110060. { •.Cr. Cu 111111. 1(0(1 ( 00 1111 ]. 101 C0.4nOr 1 111111 311010,6 011_, n000001 H- 1000 MAW 7.• al./(IIR .0431K MueS 0110. (I.Sn1K MIMIC 11(01 41 0(. 0001 WW1 600 ---\ 13{ 10611 1Y 1111[ 0111. SC6 11 _1. -11100.03(3 1 1 1 14001C&01 01111 1r G 11(01 13 030 ' 1001 MoD(. 600 1100.03(0 0110 1( 1lo 9100 CAD[ 1000,116 11601 /5 P(1 1 1m014 600 —_ DETAIL "r6" 0,15 TRAFFIC MAINTENANCE PLAN T M 0 en an nn VILLAGE OF KEY BISCAYNE CIVIC CENTER Key &scaynes Flmdo SprII s Candela DM IW l...6111I1.. ( D., MM. 511. 70 4066.06 MM. 19IM.M Lr OD. Wore 640 MOOD Wei 1.1.1 *woe 1. (000 =PM woe 0Me P..1111. C8.1.02 SWtR 00 0wr0 LUeLP( worm.- cy4teerer lrcrel Ms 711!3 0000101 Woe,/ 0051.47-3556 FP\ NO limn 1341 I( ..01 04 .M.St fi , -\ l iiriTW' WEST =i f J 1 V- / / • WEST ENID DRIVE i` /4% • /2'22222 • CO 010.0 12300 [rt I.L Out! uw 03.1, 00 .M' 0r •3423 co nun 0333. L / 4 '1 r---•rs 1 a 1 = 3 coo on -a "PHASE 1" PLAN VILLAGE OF - KEY BISCAYNE CIVIC CENTER Key ffsroyr.e, Flondo Spolis Candela D14111 4..w..,. w....3■ .3..e ..O h..1 [....w C..M e..4.. rw.. 11.1. 311. 1.19.1.... 4S 241 dam.. Me 3Nr.4. W... 8.t 1e[.N ST/e0 1«e Moe... 2 20171 (3732010 We 0.k holed lb. C8 1.03 Mon. %b.. 4.leee ►L hMene. .70.1treprefir Lreg1 413 32012 4.epM..e N3. 13020847.3028 ii Pr.,.: i3 WEST ENID DRIVE 1;• i h I • rya. "..x' , // "PHASE 2•" PLAN VILLAGE OF KEY BISCAYNE CIVIC CENTER Key Biscayne: Flm.do Soillis hadela D11111 .e 4..31. 4..31. Q. 4w ..n.. 131,1. Mi t. i le.. ON 3...a w.l 1.0 M.\ 31...3. A33 NOM Lee. Nat an..aw ,,,0a 03213171 .We DM Mod a. C8.1.04 a... Rana 4 L.0.0 .et,..s . Gi4yw eaa.. 31Ms 7 ..e:... %ow 0031447.3234 Y= .a d 3 *1 1, 31 10r I !d 1r1"-- l _!�_� 1 1 1 j�n_ s°M1`0:1i(e 0111 0000 iO4n1 DFR MIST 11 I C0110CI 10 C01P(0 11 060(6 0,10( tij 1/44 1111et 0..7 IS/. WEST ENID DRIVE 11 • 170.1(1 '0 CAPP(0 flow 50001 L1•0 II(1(I V.D[R 000001 11 ...04C1 10 CAPPED :00. 0010 '01n1 J'•)(R 01000 11 f—� L _1sen� ! / /1 _1/ If lj )n /1 i 007 1 UI110 00,v1 "PHASE 3" PLAN VILLAGE OF KEY BISCAYNE CIVIC CENTER Key 8ii acne. ilaMo Splllls Candela DMMM .n......... y..r 6,_ . r 0•.?.. e.....e• ...GAMIC nary M. LA e1 000,4.. M., 1.. 00600 n MS en* M..O.. 11. OWNS Shed r.,. 108..0w 0 2001 03211111% The Os. h.(e.l Ib C8.1.05 Symons • v.. Rawsl. 0. Low .0 aanw. CWC, n.s .KM.. 11. 51115 *tape. eo.es I`.05Ma! X551