Loading...
HomeMy Public PortalAbout06.June 2023 Pending Project Report (PDF)Click on the Case # link to see more detailed information and any associated documents. Please contact the Department of Community Development and Planning for any questions at (617) 972-6427. Watertown, MA Planning Board and Zoning Board Date of Report: 06/13/2023 Recently Submitted Applications Case # Street Name Street # Project Description Status Hearing Date ZBA-2023-05 Arsenal Way 480 Special Permit/Site Plan Review and Amendment (#01-32SP) to allow a portion of the existing parking to be replaced with a 5 to 6 level parking garage that will support the parking needs of the existing office/lab R&D building on site and the proposed Watertown Mall Transformation Project. The site changes also include updated landscape and pathway connections. Submitted/Incomplete TBD PB-2023-01 Arsenal St 550 Master Plan Special Permit with Site Plan Review for the Watertown Mall Transformation Project (parcels of land including 446, 458, 500 and 550 Arsenal St). The new mixed-use redevelopment, carried out in phases, will include laboratory/R & D, retail, office, commercial and amenity space within 8 buildings, with supporting structured and surface parking. Petitioner proposes to replace gross floor area of approximately 415,000 square feet in existing buildings with approximately 974,000 square feet in new buildings while increasing open space and making site and public realm improvements. Submitted/Incomplete TBD PB-2023-02 Mt Auburn St & Grove St 705 64 Two Sign Special Permits to create a campus signage master plan for this combined 12.5+ acre campus with appropriate and consistent identification, wayfinding, and directional signage. Submitted 7/12/2023 ZBA-2023-06 Brookline St 30 Special Permit Finding to increase roof height on a portion of the existing structure for construction of a bedroom and full bath within non-conforming front and rear yard setbacks. Submitted 7/26/2023 Click on the Case # link to see more detailed information and any associated documents. Please contact the Department of Community Development and Planning for any questions at (617) 972-6427. Pending Applications Approved/Denied Applications Case # Street Name Street # Project Description Status Hearing Date ZBA-2023-03 School St. 90 Special Permit and Special Permit Finding to construct a dormer on the third floor, increasing pre-existing non-conforming half-story, and to convert the existing two-family to a three-family by converting the basement living space to a third unit in the Neighborhood Business District. Approved 5/24/2023 ZBA-2023-04 Bigelow Av 61 Appeal ZEO determination made to deny a request to demolish the existing structure and issue a building permit for a steel frame structure without the provision of additional details or plan, to be used for the previous use of Light Industry. Denied 5/24/2023 Case # Street Name Street # Project Description Status Hearing Date ZBA-2023-02 Main St. (and 2-10 Cross St. and 53 Pleasant St.) 104-126 Special Permit with Site Plan Review to redevelop five lots (including the Salusti Building, post office, and adjacent one-story retail building on Main Street, reuse of the brick row houses on Cross St, and the parking lot and a two-family on Pleasant St.) into a new mixed-use development. The project will include about 6,000 s.f. of first floor commercial/retail space along Main Street, 143 apartment units and 5 townhome units (within the existing brick rowhouse building) and there would be a two level 154 parking space garage with 2 handicap surface parking spaces. Pending Continued ZBA 6/28/23