Loading...
HomeMy Public PortalAboutA 2017-11-14 PLANNING COMMISSION DATE: November 14, 2017 TO: Honorable Chair and Members of the Planning Commission FROM: John Yonai, Director SUBJECT: Plaza Mexico Residences (Mixed Use Residential) Applicant: Isaac SJ Eun Property Owner: 3000 E. Imperial, LLC. Request: The applicant requests approval of Site Plan Review Permit No. 2017-07, Major Variance No. 2017-03 and a Specific Plan Parking Management Plan to authorize the development of a 348-unit residential building with 26,417 square feet of retail/commercial space. 1. RECOMMENDATION Staff recommends that the Planning Commission take the following actions: A. ADOPT Planning Commission Resolution granting Site Plan Review Permit No. 2017-07 subject to the incorporated Conditions of Approval and Adopting Mitigated Negative Declaration, dated October 18, 2017 and Mitigation Monitoring Plan B. ADOPT Planning Commission Resolution making the required findings and granting Major Variance No. 2017-03 2. PROJECT SITE LOCATION AND ASSESSOR’S PARCEL NUMBER The project site is located at 3000 E. Imperial Boulevard in the City of Lynwood (the “Site”). The Tax Assessor’s Parcel Numbers (APN) is 6169-003-017. SPR 2017-07 VAR 2017-03 2 Planning Commission Staff Report November 14, 2017 Proposed Project Site 3. GENERAL PLAN AND ZONING Table 3.1 below indicates existing City of Lynwood General Plan and Zoning Land Use Designations for the proposed Site and surrounding area. Table 3.1 – Existing General Plan and Zoning Information (Exhibit 1) Surrounding Site Locations Existing Land Use General Plan Designation Zoning Designation Proposed Project Site Vacant Specific Plan Area Town Center District (Specific Plan) North Vacant Commercial Heavy Commercial (C-3) South Residential Specific Plan Area Specific Plan Area East Commercial/Retail Specific Plan Area Specific Plan Area West Manufacturing Uses Specific Plan Area Town Center District (Specific Plan) SPR 2017-07 VAR 2017-03 3 Planning Commission Staff Report November 14, 2017 The Site is currently vacant. To the east of the Site is the Plaza Mexico retail center. The land uses to the west of the Site include an auto body repair shop, glass manufacturer and a recycling facility. To the north of the Site are Imperial Highway and commercial uses. Beechwood Avenue is to the south of the Site. Several single-family homes and small multi-family buildings exist along Beechwood. Table 3.2 – Proposed General Plan and Zoning Information Table 3.2 below indicates the proposed City of Lynwood General Plan and Zoning Land Use Designations for the proposed Site and surrounding area. Surrounding Site Locations Proposed Land Use Proposed General Plan Designation Proposed Zoning Designation Proposed Project Site Mixed Use Residential No change No change North No development proposed No change No change South No development proposed No change No change East No development proposed No change No change West No development proposed No change No change The proposed project consists of the construction of a 348-unit mixed use residential development along with 26,417 square feet of commercial/retail space (the “Project”). There is no General Plan or Zoning Designation proposed for the Site. There are no other proposed projects on the Site at the current time. 4. PROJECT BACKGROUND The Site was first developed by Grayson Heat Control, a manufacturer of heat control devices during the 1930s. Grayson was acquired by Robert Shaw-Fulton Controls, Co. during the late 1930s or early1940s. Following Grayson/Robert Shaw-Fulton, Whittaker WM R Co., acquired the Site in 1955. The Site was subsequently listed in the 1960 City Directory under the names Telecomputing Services, Telecomputing Corp Whittaker Controls Division, and Whittaker Controls Div. of Telecomputing Corp. Manufacturing. The Site was subsequently purchased by the Kanowsky family in 1963, which owned the property until it was acquired by Gold Realty Company in 1970. Allied Industrial Components and Allied upholstery Manufacturing, Inc are listed as the occupants in 1970 and Brea Datsun and K&K Office Furniture in 1985. Regent Officeworks, Inc. SPR 2017-07 VAR 2017-03 4 Planning Commission Staff Report November 14, 2017 purchased the K&K business in 2004 and used the Site for furniture manufacturing operations. 3000 E Imperial, LLC acquired the property in 2006. Toxic Substance Remediation Due to poor industrial and environmental practices of the early owners/developers of the Site, it was identified by the Department of Toxic Substance Control (DTSC) as a remediation site. During investigations conducted from 2004 through 2010, volatile organic compounds (VOCs), semi-volatile organic compounds, total petroleum hydrocarbons (TPHs) and metals were found in soil above levels acceptable by DTSC. VOCs, trichloroethylene (TCE), and perchloroethylene (PCE) contamination was found in groundwater above standards enforced by DTSC. The groundwater contamination extends off-site beneath the adjacent property to the west at Beechwood Street and extends about 900 feet southwest of the property. VOCs are solvents commonly found in paint thinners, gasoline products, dry cleaning processes, commercial and industrial processes and frequently occur as contaminants in the environment. TPHs are a mixture of chemicals made mainly from hydrogen and carbon found in crude oil. PCE and TCE are solvents typically used for degreasing and cleaning metal parts. After review of possible cleanup options, DTSC selected, Enhanced in-situ Bioremediation (EISB) and Zero Valent Iron (ZVI) injections as the primary groundwater treatment methods. In addition, ERH will be used to cleanup the VOCs in groundwater similar to the process used for soil remediation. EISB uses the injection of an electron donor solution through emulsified vegetable oil and a microbial culture (KB-1®) into groundwater to enhance the rate and extent of biological reductive dechlorination of VOCs. EISB can also indirectly cleanup non- chlorinated compounds such as gasoline range total petroleum hydrocarbons (TPH-g) and benzene, by using these compounds as additional electron donors. The property owner, 3000 E Imperial, LLC, entered into a CLRRA Agreement in July 2007 and completed a Site assessment by November 2007. The property owner envisioned to redevelop the Site with a mixed use, high-density, project. The proposed project, Plaza Mexico Residences, consists of commercial use on the ground/first floor and approximately 348 residential units above the commercial floor. The Department of Toxic Substance Control (DTSC) approved the Response Plan by June 2011 and the plan was implemented soon thereafter. The Response Plan proposed to soil vapor extraction to remove contamination in soil, in-situ treatment of contaminated groundwater, soil excavation and offsite disposal to address limited pockets of metals contamination and to file a land use restriction to monitor residual concentrations of the SPR 2017-07 VAR 2017-03 5 Planning Commission Staff Report November 14, 2017 contaminants of concern in soil and groundwater. In 2012 the property owner proposed a pilot study to use electric resistance heating to accelerate the cleanup. DTSC subsequently reviewed and approved the study and remediation method. A Removal Action Completion Report (RACR) for Area 2 was approved by DTSC in April 2013. A site wide RACR was approved by DTSC in April 2015. An Addendum to the RACR (March 2016) was submitted to DTSC. The addendum presented a supplemental evaluation which concluded that residual concentrations of contaminants of concern do not pose a health risk to potential future residents on the second or above floor. DTSC determined that the property in its present condition is suitable for commercial use on the ground/first floor and residential units on the second floor and above, provided that the final building(s) design (as approve by the City) are provided to DTSC for review. The property owner is required to file a land use covenant with Los Angeles County Recorder that limits the use of the Site as described in the above paragraph and is required to continue to monitor residual concentrations of contaminants in groundwater and soil under DTSC oversight. 5. PROJECT DESCRIPTION The applicant requests that a Site Plan Review Permit with Parking Plan and Major Variance be granted to authorize the construction of a residential mixed-use development on a 3.6 acre site (156,380 square foot lot) in conjunction with the Plaza Mexico Development which consists of 40.28 acres. The Project includes 348 residential units and 26,417 square feet of commercial/retail space (see Site Plan - Exhibit 2). The commercial and retail uses are proposed on the first of six stories. The proposed residential units would be distributed among four building levels as follows: Residential Level 1 (3rd story of building) (80 units) 3 - Studio Units with areas of 558 square feet 38 - One-Bedroom Units ranging in area from 650-657 square feet 37 - Two-Bedroom Units ranging in area from 904-974 square feet 3 - Three-Bedroom Units ranging in area from 1,209-1,248 square feet Residential Level 2 (4th story of building) (84 units) 40 - One-Bedroom Units ranging in area from 650-657 square feet 42 - Two-Bedroom Units ranging in area from 904-974 square feet 2 - Three-Bedroom Units ranging in area from 1,209-1,248 square feet Residential Level 3 (5th story of building) (92 units) 46 One-Bedroom Units ranging in area from 650-657 square feet 44 Two-Bedroom Units ranging in area from 904-974 square feet SPR 2017-07 VAR 2017-03 6 Planning Commission Staff Report November 14, 2017 2 Three-Bedroom Units ranging in area from 1,209-1,248 square feet Residential Level 4 (6th story of building) (92 units) 46 - One-Bedroom Units ranging in area from 650-657 square feet 44 - Two-Bedroom Units ranging in area from 904-974 square feet 2 - Three-Bedroom Units ranging in area from 1,209-1,248 square feet Residential Site Plan (2nd Floor) Building Design and Profile The building exterior reflects modern Mexican design with motifs in Spanish culture, employing traditional plaster walls with recessed punched windows and vibrant colors. The exterior is articulated with vertical towers creating landmark iconic elements along the façade, demarking the entry points and major circulation elements. The building is approximately 675 feet by 230 feet and six stories in height. SPR 2017-07 VAR 2017-03 7 Planning Commission Staff Report November 14, 2017 Building Profile (Imperial Blvd.) Landscaping and Open Space Landscaping (planter areas within interior courtyards) will occupy 10,570 square feet of the Project site. The landscape palette will be drought tolerant, native plants. The various courtyards on-site will have landscape themes to create an interest and varying landscape pallet reflecting several regions in Mexico. Approximately 200 square feet of open space is proposed per residential unit. A landscaping plan has been prepared by applicant (Exhibit 2) which is a part of the permit application and approval request. Location and Access The Project is located within the Lynwood Transit Area Specific Plan– Town Center District. This area occupies approximately 315 acres that generally encompasses the following: properties located along Long Beach Boulevard from Virginia Avenue to Norton Avenue; along Imperial Highway from Alameda Street to Martin Luther King Jr. Boulevard; the approximately 50-acre Plaza Mexico shopping center; the Long Beach Boulevard Green Line Station and Long Beach Boulevard/Interstate-105 Freeway Ramps; industrial uses located along Alameda Street just south and north of Interstate- 105; the St. Francis Medical Center; and, existing residential and commercial uses located along Beechwood Avenue, Sanborn Avenue, Mulford Avenue, and California Avenue. The Specific Plan concentrates and prioritizes development of key opportunity sites along major roadway corridors, existing industrial and hospital districts, and SPR 2017-07 VAR 2017-03 8 Planning Commission Staff Report November 14, 2017 existing neighborhoods in the study area. In addition, the Specific Plan is intended to facilitate transit-oriented community design by promoting complete streets, expanded transit services, and enhanced transit services and enhanced pedestrian and bicycle linkages throughout the Specific Plan study area. Vehicle traffic will access the proposed parking garage from Imperial Highway from the north and Beechwood Avenue from the south. Pedestrians access the commercial/retail shops through various passages ways between the segments of commercial space. Parking The Project includes a Parking Management Plan (Exhibit 3). Parking is proposed on the ground commercial/retail level and the first two residential levels. Level One Commercial/Retail Parking – 181 parking spaces (comprised of 177 spaces with dimensions of 9’ x 18’ which include 6 Handicap spaces. Also, there are 2 tandem spaces coupled with 2 spaces dimensions of 9’ x 18’, totaling 4 tandem spaces) Level One Residential Parking – 72 parking spaces (comprised of 40 spaces with dimensions of 9’ x 18’, 29 tandem spaces with dimensions of 9’ x 16’, 3 tandem spaces with dimensions of 9’ x 15’). Retail/Commercial parking on the ground floor residential spaces are proposed to be “After Hours” residential guest parking as shared parking which is promoted by Lynwood Transit Area Specific Plan. Level Two Residential Parking – 452 parking spaces (comprised of 317 spaces with dimensions of 9’ x 18’, 129 spaces with dimensions of 9’ x 16’ (C-1 as tandem), 3 spaces with dimensions of 9’ x 17’ – 6” (C-3 as tandem), 3 spaces with dimensions of 9’ x 15 (C-2 as tandem). There are 3 Handicap spaces). Major Variance The Project requires three major variances from applicable development standards. The property owner (applicant) has requested increased building height, from three stories (max) to six stories and reduced unit size and open space requirements. The requests and the applicant’s justification for each request is summarized in the table below. Current Development Standard Proposed Development Request Applicant Justification Building Height: 2-3 Stories Proposed Building Height: 6 Stories The Project provides much needed new rental housing in SPR 2017-07 VAR 2017-03 9 Planning Commission Staff Report November 14, 2017 Lynwood. It will create an important catalyst for modernization and development of this important area, and, in conjunction with the existing adjacent Plaza Mexico retail center, it will create a village center for Lynwood. Located adjacent to the intersection of Lynwood’s two major thoroughfares and with immediate freeway access, this site is the logical choice for a more dense mixed-use project. By lining the ground floor along Imperial and State with retail shops, it creates an extension of the adjacent retail center, creating a new sense of pedestrian interaction in the area. In order to be able to create this mixed-use atmosphere, and for the project to be financially viable, the density shown in the drawings is necessary versus the limitations indicated in the new specific plan. In addition, the allowable building height for this location has been 190 ft for the past 10 years, and the allowable height for the adjacent properties, part of the master planned development, is 100 ft. The current height proposed is 75 feet. It is basically a 4-story residential structure with two levels of parking above ground required for the 4 levels of residential. This is basically two levels of parking above grade with Four levels SPR 2017-07 VAR 2017-03 10 Planning Commission Staff Report November 14, 2017 of residential above the parking. Open Space: 300 square feet per unit. Proposed Open Space: 200 square feet per unit. We believe the 300 sq ft requirement is excessive for a mixed-use project of this type, and that the 200 sq ft is more than adequate from a market standpoint for an urban environment such as this. For example, Los Angeles City requires only 100 sq ft per one-bedroom unit and 125 sq ft per 2-bedroom unit. The fact that the courtyards are interconnected allow people to wander from one courtyard and open space to another, allowing tenants to have a variety of open space options and activities within the project. We intend to also have multiple interior options and spaces and amenities to extend and expand tenants living space environment. Additionally, we will be providing multiple seating options within the courtyards to allow additional socialization and activity spaces other than tenants residential units. We also have a Pool area, Fitness room, Lounge area, Multipurpose rooms and public restroom spaces for Residential tenants. Minimum Unit Size: 700 square feet Proposed Minimum Unit Size: 500 square feet We believe a minimum gross floor area of 750 sq ft is a suburban standard, building high density in a transportation corridor can and should be more efficient SPR 2017-07 VAR 2017-03 11 Planning Commission Staff Report November 14, 2017 to accommodate all housing needs and budgets. We are in a Transit Oriented Development area in an urban setting. Studio units in the 500 sq ft range and one- bedroom units in the 600 sq ft range are very common in today’s modern updated projects to meet all budget level requirements. They give more options to people to meet their budget. We will still be providing the same level of finish and a high level of finish even though the residential unit might be smaller. 6. CALIFORNIA ENVIORNMENTAL QUALITY ACT (CEQA) Pursuant to CEQA (Public Resources Code §21000 et seq.) and the State CEQA Guidelines (Title 14, California Code or Regulations, Division 6, Chapter 3, §15000 et seq.), the subject application is a “project” that is subject to environmental review. Staff conducted an Initial Study to analyze the scope and scale of potential environmental impacts of Project development and operation. The Initial Study was based on CEQA Guidelines (2017) Thresholds of Significance pertaining to the following mandated topics: aesthetics; agriculture and forestry resources; air quality; biological resources; cultural resources; geology and soils; greenhouse gas emissions; hazards and hazardous materials; hydrology and water quality; land use and planning; mineral resources; noise; population and housing; public services; recreation; transportation and traffic; tribal cultural resources; and, utilities and service systems. The environmental analysis for the Project relied on the City of Lynwood General Plan, the City of Lynwood Transit Area Specific Plan, the previously-certified Lynwood Transit Area Specific Plan Program Environmental Impact Report, City of Lynwood Municipal Code, and technical studies noted in the Bibliography to this document to address in detail the effects or impacts associated with Project construction and operation. The Initial Study is a public document used by the decision-making lead agency to determine whether a project may have a significant effect on the environment. If the lead agency finds substantial evidence that any aspect of the project, either individually or cumulatively, may have a significant effect on the environment, regardless of whether the overall effect of the project is adverse or beneficial, the lead agency is required to SPR 2017-07 VAR 2017-03 12 Planning Commission Staff Report November 14, 2017 prepare an Environmental Impact Report. If the lead agency finds no substantial evidence the project or any of its aspects may cause a significant effect on the environment, a Negative Declaration shall be prepared. If the lead agency recognizes the Project may have a significant impact on the environment, but that by incorporating specific mitigation measures to which the Project proponent has agreed in advance the impact will be reduced to a less than significant effect, a Mitigated Negative Declaration shall be prepared. In reviewing site specific information provided for the Project, the City of Lynwood has analyzed potential environmental impacts created by this project and a Mitigated Negative Declaration has been prepared pursuant to the provisions of CEQA (Exhibit 4). Based on the CEQA Guidelines (2017) Thresholds of Significance, the City has determined a Mitigated Negative Declaration is the appropriate environmental documentation for the Project and, as a result, has stipulated Mitigation Measures pertaining to aesthetics, air quality, geology and soils, noise, recreation, transportation and traffic, tribal cultural resources, and utilities and service systems will ensure all identified environmental impacts will be reduced to, and maintained at, a less than significant level. 7. DEVELOPMENT STANDARDS CONSISTENCY ANALYSIS The Project is subject to the City of Lynwood Municipal Code (LMC), Chapter 25, Article 10 – General Development Standards. The General Development Standards apply to all zones, unless otherwise indicated. These standards provide a minimum or maximum standard and may be modified by more stringent standards in the particular district(s) in which the Project is located. Table 7.1 below indicates the applicable General Development Standards and whether the Project complies with these standards. Table 7.1 – General Development Standards LMC Section Development Standard Consistency Analysis 25-20-4(A) All dwelling units shall have a minimum gross floor area of seven hundred fifty (750) square feet. The minimum dwelling unit width and depth shall be twenty feet (20'), measured from the exterior of the structure and excluding garages, porches, patios, eaves, cabanas, and bay windows,. No; however, the applicant has requested a variance to allow for reduced gross floor area. If the variance is granted, the proposed unit size will follow the requirements of the code. 25-20-4(B) Siding material shall consist of stucco, wood, brick, stone, or decorative concrete block. Synthetic materials of a similar appearance and equivalent Yes. The Project is conditioned to meet this requirement. SPR 2017-07 VAR 2017-03 13 Planning Commission Staff Report November 14, 2017 durability shall be permitted. Exterior siding shall extend to a point at or near grade. However, if an approved solid wood, metal, concrete, or masonry perimeter foundation is used, the siding need not extend below the top of the foundation. 25-20-4(C) Roofing materials shall be Class A as defined by the uniform building code. Yes. The Project is conditioned to meet this requirement. 25-20-4(D) Utility hookups and an area shall be provided to accommodate installation of a clothes washer and dryer. The hookups and area shall be provided within the primary structure or within an enclosed accessory structure. Yes. The Project is designed with utility hookups on-site. 25-20-4(E) Areas for trash receptacles and recycling containers shall be provided as required by the City of Lynwood. Yes. The Project includes trash receptacles and recycling containers areas. 25-20-5(A) Open Space Requirements: All multi-family developments with ten (10) or more dwelling units shall provide a minimum of three hundred (300) square feet of a combination of private and common usable open space per unit. No; however, the applicant has applied for a variance to reduce the required open space requirements. If the variance is granted, the proposed unit size will follow the requirements of the code. 25-20-5(B) Trash Receptacles: Trash receptacles and recycling containers shall be provided as required by the City of Lynwood. Yes. The Project is conditioned upon the use of trash and recycling containers as required by the City. 25-10-2 All properties within the City shall be kept and maintained in a clean, neat, orderly, operable, and usable condition. This requirement applies to buildings, paving, fences, walls, landscaping, water, earth, and any other structures or natural features. Yes. The Project is conditioned to maintain the property in accordance with the code requirements. 25-10-9(A) Dedication And Improvement: 1. A certificate of occupancy shall [?????] SPR 2017-07 VAR 2017-03 14 Planning Commission Staff Report November 14, 2017 not be issued for any site, building, or structure until all required dedications and improvements abutting rights of way for the site, building, or structure have been made to the ultimate right of way shown in the general plan and as determined by the city engineer. Improvements shall include, but are not limited to, curbs, gutters, sidewalks, paving, street trees, traffic improvements and drainage. All improvements shall be constructed to the specifications and in a manner prescribed by the city engineer. All on-site and off- site improvements shall be approved and accepted by the city engineer prior to issuance of a certificate of occupancy. 2. In lieu of dedication, the city council may accept an irrevocable offer to dedicate and improve. Such agreement shall be signed by all persons having any right, title, interest, or lien in the property, or any portion thereof, to be dedicated. The signatures on such offer shall be acknowledged, and the agreement shall be recorded in the office of the Los Angeles County recorder prior to issuance of a certificate of occupancy. 25-10-9(D) Agreement To Improve: 1. In lieu of the required improvements and if in the best interest of the city, the city council may accept from any responsible party an agreement to make the specified improvements within a specified time period. 2. Such agreements shall be accompanied by security deposits SPR 2017-07 VAR 2017-03 15 Planning Commission Staff Report November 14, 2017 which may include cash, negotiable bonds, or savings and loan certificates, letters of credit, or other security as authorized by the city engineer. The security deposit shall equal the cost of the agreed upon improvements. Where savings and loan certificates or deposits are deposited, the owners thereof shall assign the certificates to the city and administration adjusted for inflation as determined by the city engineer. Such deposit and assignment shall be subject to and in compliance with the provisions and conditions of this zoning code. 3. If the estimated cost of the improvements equals or exceeds one thousand dollars ($1,000.00), the applicant may file a corporate surety bond (improvement bond) with the city in lieu of the deposit. Such corporate surety bond shall guarantee the adequate completion of all of the improvements in a penal sum equal to the estimated cost. 4. In cases where the stipulated time within which improvements were to be made expires, the city council may grant additional time as it considers appropriate. Granting of additional time shall include recalculation of improvement costs and security deposits. The extension must be granted prior to expiration of the time limit. 5. Should the responsible person fail to complete any improvement within the agreed upon time, the city council may determine that the agreed upon improvement is SPR 2017-07 VAR 2017-03 16 Planning Commission Staff Report November 14, 2017 incomplete and may cause a portion of the deposit or surety bond to be forfeited to the city to complete or correct the work. Such forfeiture shall not exceed the amount required to complete the agreed upon work and expenses incurred by the city as a result of the default. Not less than ten (10) days prior to such a determination, the city shall serve the person with written notice. If the written notice is delivered by mail, it must be sent by certified mail and shall be served not less than twenty (20) days prior to the determination. If after ten (10) days the city has not received the return receipt or the letter is returned to the city “refused”, the same shall be sent by regular first class U.S. mail and a declaration of mailing completed and filed. 25-10-9(E) E. Adequate Rights Of Way: The city council may grant a modification to the provisions of this section, thereby relieving the applicant from compliance with all or a portion of the provisions thereof, subject to the following findings: 1. That relieving or partially relieving the applicant’s development from providing the required dedications and improvements is consistent with the general plan and the best interest of the city of Lynwood; and 2. The required improvements are included in a budgeted city project which will be complete prior to the start of the applicant’s development or within an approved assessment district and SPR 2017-07 VAR 2017-03 17 Planning Commission Staff Report November 14, 2017 the improvement can be more effectively provided by the city; or 3. The required construction would create a temporary drainage or traffic problem that can be avoided by delaying the improvement to a later date as part of comprehensive improvements to the area; or 4. The city engineer determines current improvements to be satisfactory. 25-10-11 Landscaping shall be provided, irrigated and maintained as required by the development services director, pursuant to this code and the policies of the city general plan, each of which may be amended from time to time. Yes. The Project includes a landscape plan, prepared in accordance with this section. 25-10-13(C) Exterior colors shall consist of neutral or earth tone colors for buildings and structures. Trim and architectural features may consist of brighter colors. Upon construction of a new residence or second story addition, all structures on the property shall require authorization of city approved colors. The Project includes a color scheme consistent with the adjacent Plaza Mexico shopping center. The proposed color pallet is subject to Planning Commission approval via the Site Plan Review Permit. 25-10-14 All roof appurtenances including, but not limited to, air conditioning units and mechanical equipment, shall be shielded and architecturally screened from view from on-site parking areas, public streets from a point immediately adjacent to the site, and adjacent residentially zoned properties. Solar water heaters shall be exempt from this requirement. Yes. The Project is conditioned to meet this requirement. 8. SPECIFIC PLAN DISTRICT DEVELOPMENT STANDARDS SPR 2017-07 VAR 2017-03 18 Planning Commission Staff Report November 14, 2017 The Project is subject to the Lynwood Transit Area Specific Plan. The intent of the Town Center District land use designation is to provide an urban form that can accommodate a vibrant, walkable, and urban mixed-use environment that supports public transportation alternatives and provides commercial retail to serve local and regional communities. It also includes entertainment uses and a variety of urban housing choices in an area currently developed with Plaza Mexico and the immediately surrounding properties. Up to 2,500 dwellings at densities of approximately 60 dwelling units per acre, up to 950,000 square feet of commercial uses, and a 350-room hotel are envisioned within this land use designation. The Town Center District will also provide a connection to the adjacent Metro station. Lynwood Transit Area Specific Plan Land Use Map Table 7.2 below indicates the applicable Town Center District Development Standards and whether the proposed project complies with these standards. Table 7.2 – Town Center District Development Standards LTASP Section Development Standard Consistency Analysis 3.3.5 Parking Management Yes. The proposed number of parking stalls, size and style do not comply with the parking standards specified in the SPR 2017-07 VAR 2017-03 19 Planning Commission Staff Report November 14, 2017 zoning code. However, the Lynwood Transit Area Specific Plan allows for developments within the plan to develop a site-specific Parking Management Plan (Exhibit 3). The Project includes a site- specific Parking Management Plan. 2.5.1(B) Primary Building shall be placed in the shaded area as shown in the Specific Plan building diagram (unless specified otherwise by a Site Plan Review). Yes. The Project is consistent with this requirement. 2.5.1(C) Balconies, bay windows, chimneys, cantilevered rooms and eaves may encroach into required setbacks as identified below and as may be further limited by the California Building Code (CBC). 1. Balconies: 6’ max. into street build-to line and rear setback 2. Bay windows, chimneys, cantilevered rooms, and eaves: 3’ maximum into all setback area identified in Diagram A. 3. Stoops, patios, gardens, balconies, and outdoor dining may be located in the setback and are encouraged along the street edge Yes. The Project is conditioned to meet this requirement. 2.5.1(D) 1. Maximum building length shall be 200 feet. Longer buildings shall be approved by Site Plan No; the proposed building length is 675 feet x 230’feet. However, upon approval of the Site Plan Review Permit, the building length and architectural elements SPR 2017-07 VAR 2017-03 20 Planning Commission Staff Report November 14, 2017 Review. 2. At least 50 percent of the wall plans of the exterior walls along public streets shall vary in depth and/or direction through the use of cornices, recesses, ecological elements or overhangs. 3. Wall offsets shall be a minimum of 1 foot for every 25 feet of length. 4. 50 percent of the facades shall be articulated by use of a change in plan, color, arrangement of facade elements, or a change in materials to break up the building mass. 5. A flat building facade shall incorporate details such as window trim, window recesses, cornices, changes in material, color or other design elements in an integrated composition. 6. Building materials on the ground floor shall be high quality durable materials. 7. There shall be the same or a greater level of detail and articulation on the ground floor as on the upper floors of the building. will be approved. 2.5.1(F) Taper Area: Two stories for Primary Building (25 percent of building foot print may be three story) No; however, the applicant has requested a variance to allow for additional building height. If granted, the Project will be consistent with the requirements of the code. 2.5.1 (F) Floor to Floor: 15’ min. SPR 2017-07 VAR 2017-03 21 Planning Commission Staff Report November 14, 2017 and 20 max. ground floor for shop front frontage type; 18’ max. ground floor for all other frontage types; 12’ max. and 9’ min. second floor and above. 9. MAJOR VARIANCE FINDINGS The variance procedure is provided pursuant to section 65906 of the California Government Code to grant relief from zoning provisions when, because of special circumstances applicable to a property, including size, shape, topography, location, or surroundings, the strict application of the zoning code deprives such property of privileges enjoyed by other properties in the vicinity and under the identical zoning classification. A. That there are exceptional or extraordinary circumstances or conditions applicable to the property which do not apply generally to other properties in the same vicinity and zone. The Site is approximately 3.59 acres but is irregular in size and disproportionately narrow in width in relation to the length and potential uses that can be developed on the Site. In addition, the close proximity of the Site to Interstate 105 Freeway essentially bisects the general area and a contributing factor to the irregular size of the roads and streets in and around the Site. The Site is also identified by the California Department of Toxic Substance Control as a contamination site and the applicant-owners have been subject to substantial and mandatory remediation. Thus, the Site’s irregular shape, close proximity to Interstate 105 Freeway and mandatory contamination remediation, constitute exceptional and extraordinary circumstances or conditions applicable to the Site which do not generally or otherwise apply to other properties in the same vicinity. B. That such variance is necessary for the preservation and enjoyment of substantial property rights possessed by other properties in the same vicinity and zone, but which is denied the property in question. The Site as a Department of Toxic Substance Control contamination site, required substantial remediation. The nature of the remediation requirements also places certain limitations on any potential development design. The Site’s limited design opportunities, irregular shape and close proximity to Interstate 105 Freeway, all make and support the requested variances necessary for the preservation and enjoyment of substantial property, development, and possessory rights of the applicant-owner, which are SPR 2017-07 VAR 2017-03 22 Planning Commission Staff Report November 14, 2017 otherwise possessed and enjoyed by other property owners in the same vicinity, and further away from Interstate 105 Freeway. The Site is also adjacent to parcels designated for higher story buildings. Increasing the proposed building stories from three (the maximum size under existing zoning) to six, affords the applicant-owner the same development rights that the surrounding property owners have. The failure of the applicant-owner to currently realize the same types of mixed use development opportunities afforded to smaller and adjacent properties, warrants the granting of the requested variance. Therefore, by granting the requested variance, the Site can be developed in accordance with the goals of the specific plan Town Center District and will preserve the development rights of the property, which are currently afforded to the surrounding property owners. C. That the granting of such variance will not be materially detrimental to the public welfare or injurious to properties or improvements in the vicinity. The height of the building, reduced open space or reduced unit size, will not be detrimental to the public welfare or injurious to properties or improvements in the vicinity. D. That in granting the variance, the spirit and intent of this zoning code will be observed. The Lynwood Transit Area Specific Plan provides for transit oriented development in the City. The proposed project meets the intent and spirit of the specific plan by providing commercial and residential uses. The reduction in unit size and open space will not impact the overall design and function of the building. The increased height is consistent with the surrounding areas in the Town District as the core area of the district allows up to six stories. E. That the variance does not grant special privilege to the applicant. The variances, if granted, will not grant special privilege to the applicant. The zoning code allows for variances of development standards for any project that meets the general requirements or findings of a variance. F. That the variance request is consistent with the general plan of the City of Lynwood. The Lynwood Transit Area Specific Plan Town Center District is intended to help develop an urban form that can accommodate a vibrant, walkable, and urban mixed-use environment that supports public transportation alternatives and provides commercial retail to serve local and regional communities. The Project is consistent with intent of the specific plan area. SPR 2017-07 VAR 2017-03 23 Planning Commission Staff Report November 14, 2017  Goal 1: Promote Transit-Oriented Development Near the Metro Green Line station. The variance request will not change the overall project development. The Project will expand the accessibility and improve the aesthetics of the Town Center district. The Project will help increase pedestrian movement within the area and reduce automobile reliability by providing retail and residential uses on the same site.  Goal 2: Allow for Flexibility in Land Uses. The variance request will not change the character of the overall Project. The Project will provide a mix of uses that accommodate the changes in the market.  Goal 3: Consolidate Uses and Create New Development Sites. The variance request will not change the character of the overall Project. The Project will provide a mixed-use development that will encourage development in the surrounding areas.  Goal 4: Enhance Pedestrian Comfort and Safety. The variance request will not change the character of the overall Project. The Project will increase facilities, add connections and multiple opportunities to safely and conveniently travel throughout the district via foot, bike and public transit.  Goal 5: Enhance Recreational Opportunities. The variance request will not change the character of the overall Project. The Project will provide landscaped plazas, open space and enhanced pedestrian corridors.  Goal 6: Improve and Facilitate Additional Housing. The variance request will not change the character of the proposed Project. The proposed 348 units will help improve the existing housing stock within the City.  Goal 7: Create a Sustainable Community. The variance request will not change the overall development components of the Project. The Project will meet the necessary sustainable infrastructure and facility requirements of the specific plan. . The variance request is generally consistent with the goals, policies and programs of the City’s General Plan, land use element and housing element. 10. ECONOMIC AND FISCAL IMPACT SPR 2017-07 VAR 2017-03 24 Planning Commission Staff Report November 14, 2017 The proposed project will create 348 residential units for up to 800 new residents. The new residents will make an estimated economic impact of 15 to 20 million dollars (estimated earned income). As such, its projected that the new residents would spend between 2.3 and 3 million dollars each year with local businesses. The proposed project will include 26,427 square feet in retail/commercial space. These new retail/commercial uses will generate approximately 60 new jobs in the City and $120,000.00 in sale tax revenue. The proposed project, as designed, has an estimated market value of 100 million dollars, which will generate approximately 1 million dollars in property tax revenue. The City will receive a portion of the estimated property tax revenue. Therefore, the project is estimated to contribute, an additional $100,000.00 in annual revenue. Based on the economic and fiscal analysis above, the proposed project will have a positive fiscal impact on the City with an estimated contribution of $23,220,000.000, annually. 11. LEGAL DESCRIPTION The Project will occur on a legal lot. The Site is a legal lot described and shows as follows: LOTS 2 TO 32 INCLUSIVE, LOTS 59 TO 64 INCLUSIVE, LOTS 67-72 INCLUSIVE AND LOTS 75 TO 80 INCLUSIVE IN BLOCK 5 OF MODJESKA PARK, IN THE CITY OF LYNWOOD, COUNTY OF LOS ANGELES, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 9 PAGES 142 OF MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. LOTS 65, 66, 73 AND 74 IN BLOCK 5 OF MODJESKA PARK, IN THE CITY OF LYNWOOD, COUNTY OF LOS ANGELES, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 9 PAGES 142 OF MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. EXCEPT FROM SAID LOTS 65, 66, 73 AND 74 OF THE NORTHERLY 30 FEET THEREOF. ALSO EXEPT THEREFROM AN UNDIVIDED ONE-HALF INTERST IN AND TO THE OIL, MINERAL AND OTHER HYDROCARBON SUBSTANCES UNDER SAID LAND AS GRANTED TO CARL C. KANOWSKY BY DEED RECORDED FEBRUARY 18, 1970 IN BOOK D-4637 PAGE 86, OFFICIAL RECORDS. 12. CONCLUSION Based on the information presented above, staff finds that the Project as proposed is consistent with the applicable zoning regulations. SPR 2017-07 VAR 2017-03 25 Planning Commission Staff Report November 14, 2017 Exhibits 1. EXISTING ZONING DESIGNATION MAP 2. PROJECT SITE PLAN PACKAGE 3. PARKING MANAGEMENT PLAN 4. MITIGATED NEGATIVE DECLARATION 5. CONDITONS OF APPROVAL The decision of the Planning Commission is final unless appealed to the City Council within 10 working days after the permit has been approved, conditionally approved or denied. Any aggrieved person may file an appeal of the decision with the City Clerk, in writing. The Planning Division shall then set a hearing date before the City Council to review the matter at the next available City Council meeting date. If you have any questions concerning the information presented above, please contact John Yonai at 310.603.0220 ext. 268 or jyonai@lynwood.ca.us. Prepared by: Reviewed by: _______________________________ ____________________________ Ebony J. McGee Andersen John Yonai Interim Principal Planner Interim Director