AUTHORIZING A PROFESSIONAL ENGINEERING
SERVICES CONTRACT WITH CME ASSOCIATES,
FEE ESTIMATE - FEMA FMA FEASIBILITY STUDY
RE: NOES CREEK FLOOD MITIGATION
WHEREAS, the Borough of Carteret is in need of specialized engineering services in
connection with the FEMA Flood Mitigation Assistance Grant Noes Creek Flood
Mitigation Feasibility Study; and
WHEREAS, CME Associates, 1460 Route 9 South, Howell, New Jersey 07731,
possesses the requisite experience and expertise to provide said services; and
WHEREAS, CME Associates has submitted a proposal to provide said services at a total
cost not to exceed $100,000.00; and
WHEREAS, the Mayor and the Council have reviewed said proposal; and
WHEREAS, the Chief Financial Officer has certified that funds are or will be available
for said purpose. Acct. #
NOW, THEREFORE, BE IT RESOLVED by the Mayor and the Council of the
Borough of Carteret, County of Middlesex, State of New Jersey, as follows:
I. The proposal from CME Associates for engineering services related to the
FEMA Flood Mitigation Assistance Grant Noes Creek Flood Mitigation
Feasibility Study at a cost not to exceed $100,000.00 is hereby approved.
2. This action is approved as an award of a professional services contract
pursuant to N.J.S.A 40A:11- 5(1)(a) in accordance with the Borough's Fair
and Open Process as authorized by law.
3. A copy of this Resolution be forwarded to the Borough's Purchasing
Department, the Borough Director of Engineering and CME Associates.
Adopted this 25" day of August, 2022
and certified as a true copy of the
original on August 26, 2022.
CARMELA POGORZ,ELSKI, RMC
Municipal Clerk
RECORD OF COUNCIL VOTE
COUNCILMAN
XIS
NO
NY
A.B.
- COUNCILMAN
YES
NO
NV
A.B.
BELLIATO
X
JOHAL
X
DTAZ
X
DIMASCIO
X
NAPLES
X
X- Indicate Vote AB- Absent NV -Not Voting XOR- Indicates Vote to Overale Veto
Adopted at a meedng of the Municipal Council
August 25, 2021
gt
!i
Municipal Cler;k.� /'��l
BO&OUGH OF CARTERET Daniel Reiman, Mover
MUNICIPAL CLERK
Date: August 25, 2022
To:
Patrick DoWnsio
Treasurer
Borough of Carteret
RBOUBST FORCTsRTIFICATION OF AVAILABLE FUNDS
For: AUTHORIZING A PROFESSIONAL GLVGINCERING URVICIS CONTRACT WITH CMR
ASSOCIATES FRE > STIMATE — FEMA FMA FEASIBILITY STUDY RE; NOCS CHEW FLOOD
MITIGATION
Resolution It: #2Z-177
Name of Aeeounl; CMB ASSOCIATES•
AMOUNT TO BE ENCUMBERED: $100,000 00
CA MBLA PO d OR E1, Kl
Municipal Ciork
CERTIFICATION OF AVAILABILITY OF FUNDS
I, Treasurer of the Borough of Curterot, do hereby eorHfy, that thane are sufficient fiords available fit the current
budget to enable the Municipal Council to authorize the entering Into a Contract between the Borough of Comm
and;
The funds available for this contract are In the Budget, III the account of;
In the amount at'. ed"o d7
By this certification, I have hereby encumbered the above named account for the amount of the contract ponding
Council action. g
Patrick DeBlasio
Memorial Municipal Building
Teit732�541-3800
Treasurer
* ISI Cooke Avenue m Carteret, New Jersey 07008
Ilaxt 732.5414925 ! clerlt IceQc teret,net
,omwearterot:net
AFFIDAVIT OF PUBLICATION
The following is a true copy of an Ordinance or Resolution of
the Borough of Carteret that has appeared in the Home News
Tribune, a newspaper which is printed in Freehold, New
Jersey and published in Neptune, in said County and State and
of general circulation in said county. One 1 time(s), once in
each issue as follows:
Aueust 30, 2022
Notary P6 4c of New Jersey
W ^ JENNIFER K, OTERO
_ Notary Public • State of New Jersey
Commisslon # 50.18.8983
h M Comm. Expires Mar, 31 2027
Sworn and subscribed before
me this day of 7Lo` �`�
i
Carmela Pogorzelski,. M
Municipal Clerk
Hand Delivered
Borough of Carteret
61 Cooke Avenue
Carteret, NJ 07008
Attn: Honorable Mayor Daniel J. Reiman
JOHN H. ALLGAIR, PE, PP, LS (100 &2001)
DAVID J. SAMUEL, PE, PP, CME
JOHN J. STEFANI, PE, LS, PP, CME
JAY B. CORNELL, PE, PP, CME
MICHAEL J. McCLELLAND, PE, PP, CME
GREGORY R. VALESL PE, PP, CME
WAR' °_
TIMOTHY W. GILLEN, PE, PP, CME
BRUCE M. KOCH, PE, PP, CME
LOUIS J. PLOSKONKA, PE, CME
ASSOCIATES
TREVOR J. TAYLOR. PE, PP, CME
DEHRAM TURAN, PE. LSRP
LAURA J. NEUMANN, PE, PP
DOUGLAS ROHMEYER. PR, CFM, CME
ROBERT J. RUSSO, PE, PP, CME
August 15, 2022
Re: Fee Estimate for Professional Engineering Services for:
FEMA Flood Mitigation Assistance Grant (EMN- 2020 -FM -001 -0020)
Noes Creek Flood Mitigation Feasibility Study
Borough of Carteret, Middlesex County, New Jersey
Proposal No. 2022 -210
Dear Mayor Reiman:
We are pleased to have the opportunity to present our fee estimate for professional engineering
services for the above - referenced project. In 2020, CME Associates submitted a Flood Mitigation
Assistance (FMA) grant application on behalf of the Borough for a planning study to determine
appropriate measures to mitigate flooding associated with the inundation of Noes Creek from the
Arthur Kill in the central low -lying areas of the Borough. In July 2022, the Borough executed a
grant agreement with NJOEM for a $100,000 grant to fund this feasibility study. The terms of the
grant Include a 75% federal / 25% local cost sharing agreement. Enclosed is a copy of the award
letter and executed sub -grant agreement.
The approved scope of work outlined In the application included assessing a holistic flood
management solution to the 1,200+ structures Impacted in Zone A and Zone X due to coastal
flooding emanating from Noes Creek. A system of preliminary engineering measures working In
concert (flood barrier, pump station, and flood gate) are part of the proposed scope of work.
Specifically, the project scoping phase will develop multiple mitigation solutions and assess all
aspects of a potential mitigation project, focusing on three main areas: (A) engineering feasibility,
(B) environmental feasibility, and (C) economic feasibility. Following these assessments, (D)
community Input will be sought through public presentations, public meetings, and comment
sessions on the proposed mitigation actions. All these factors will be summarized into a final
project scoping report (E) which will be used for a future funding opportunity.
This fee estimate outlines the scope and costs of services necessary for CME Associates to
prepare a feasibility study consistent with the approved scope of work within the March 22, 2025
period of performance required by the funding source.
59C er1ero0PropoS8;SV2A0-16.2022210 • FEMA FMA Noes Crook Flood Co Irol.dooa
CONSULTING AND MUNICIPAL ENGINEERS
1460 ROUTE 0 SOUTH • HOWELL, NEW JERSEY 07731 • (732) 402.7400 • FAX: (732) 400.0766
ASSOCIATES
Mayor Daniel J. Reiman
Borough of Carteret
Re: Estimate of Fees for Professional Engineering Services
FEMA FMA Feasibility Study — Noes Creek Flood Mitigation
With this in mind, we offer the following scope of services:
Feasibility Study Preparation
August Ili, 2022
Proposal No. 2022 -210
Page 2
Our office will work in support of the grant to prepare a thorough feasibility study to fulfill the scope
of work requirements presented in the grant application, as detailed below. Work would also be
inclusive of work necessary to administer the grant, including quarterly NJOEM reporting,
reimbursement processing, and grant closeout.
A. Engineering Feasibility
This task will Include collecting data, including topographic, hydraulic and hydrologic
information, and historical storm event data to determine an appropriate level of
protection (wall and flood gate elevations) and limits of mitigation measures. We will
review and recommend types of construction and preliminary designs for flood barriers,
gates, and stormwater pumping solutions.
Estimated Fee ........................................ ............................... .....................$40,000.00
B. Environmental Assessment
This task will include reviewing the impacts of the proposed mitigation actions on the
local environment, including, but not limited to: wildlife, threatened and endangered
species, riparian and wetland impacts, stream flow impacts, nolse pollution, planning,
and aesthetics. This task would also include a review of permitting requirements for
various scenarios from the NJDEP and USACE.
Estimated Fee
C. Economic Feasibility Assessment
................ .....................$20,000.00
Our office will prepare a preliminary construction cost estimate based on historical
construction costs; maintenance costs; and final design costs, and a benefit -cost
analysis for use in a subsequent application for federal funding to ensure project cost -
effectiveness. Work in this phase would also include the identification of possible outside
funding sources, including those available on the County, State, and Federal level, which
may be available to supplement funding sources for the eventual implementation of the
mitigation activity.
EstimatedFee ........................................ ............................... .....................$20,000.00
S.WwAoro[V'r sals22A0.16. 2022310 - FEMA FMA Noes Creak Flood CmVol.Om
ASSOCIATES
Mayor Daniel J. Reiman August 15, 2022
Borough of Carteret Proposal No. 2022 -210
Re: Estimate of Fees for Professional Engineering Services Page 3
FEMA FMA Feasibility Study — Noes Creek Flood Mitigation
D. Community Outreach
Our office will publicize and conduct at least one (1) community outreach hearing to
present the preliminary results of the feasibility studies. These meetings will seek to gain
Input from residents, local officials, community members and other stakeholders on
concerns and ways to improve the plan as well as answer any questions. The results of
these meetings and input gained will be factored into the final draft of the project scoping
documents
EstimatedFee ........................................ ............................... .....................$10,000.00
E, Final Project Scopinc Report
This phase will include the preparation of a final report of the project scoping phases
(engineering, environmental, and economic studies) into a cohesive report. This will
Include any input from the community and revisions to the preliminary scoping phases
conducted. The intent of this document is to be used for a future grant application to fund
the infrastructure Improvements associated with the mitigation activity and to allow for a
seamless transition from the project planning stage to the development of construction
documents. This report will specifically be used for a community floodplain mitigation
project application.
EstimatedFee ........................................ ............................... .....................$10,000.00
Total Estimated Fee (Not To Exceed) .. ............................... ....................$100,000.00
Exceptions:
Design phase, permit phase, bid phase, and construction phase services.
Environmental and/or professional engineering services, including, but not limited to the
preparation of an environmental impact statement.
The above - quoted fees will be in effect for a period of twelve (12) months from the date of this
proposal; however, the fees on the hourly rate schedule are subject to change by January 1
of each year.
$.%C&two11Pmposnls122 -0816.2022- 2t0 -FF.MA FMA Nos Cree %Flood CMlfd.doox
ASSOCIATES
Mayor Daniel J. Reiman August 15, 2022
Borough of Carteret Proposal No. 2022 -210
Re: Estimate of Fees for Professional Engineering Services Page 4
FEMA FMA Feasibility Study -- Noes Creek Flood Mitigation
Should you accept our fee estimate, kindly provide a purchase order or professional services
resolution authorizing same.
In the meantime, should you have any questions concerning this matter, please do not hesitate
to contact this office.
Very truly yours,
C ssociates
Trevor Taylor, PE, PP, CME
Princlpal
TT:MZ
cc: John DuPont, PE — Director of Engineering
$XworeMroposels1220 .16.2022 -210- FE6M FMA Noos C1ed Flood Cw1(d.d=