HomeMy Public PortalAboutr 22-265A00oluflon of e Poxoug
#22-265 Date of Adoption December 29, 2022
AUTHORIZING A PROFESSIONAL ENGINEERING
SERVICES CONTRACT WITH CME ASSOCIATES,
PIER EXTENSION DAMAGE ASSESSMENT AND EMERGENCY REPAIRS
WHEREAS, the Borough of Carteret is in need of specialized engineering services in
connection with the pier extension damage assessment and emergency repairs; and
WHEREAS, CME Associates, 1460 Route 9 South, Howell, New Jersey 07731,
possesses the requisite experience and expertise to provide said services; and
WHEREAS, CME Associates has submitted a proposal to provide said services at a total
cost not to exceed $35,000.00; and
WHEREAS, the Mayor and the Council have reviewed said proposal; and
WHEREAS, the Chief Fin roll llcergln cyRed that funds are or will be available
for said purpose. Acct. # 5 L GGll7lll
NOW, THEREFORE, BE IT RESOLVED by the Mayor and the Council of the
Borough of Carteret, County of Middlesex, State of New Jersey, as follows:
1. The proposal from CME Associates for engineering services related to the .
pier extension damage assessment and emergency repairs, at a cost not to
exceed $35,000.00 is hereby approved.
2. This action is approved as an award of a professional services contract
pursuant to N.J.S.A 40A:11-5(1)(a) in accordance with the Borough's Fair
and Open Process as authorized by law.
3. A copy of this Resolution be forwarded to the Borough's Purchasing
Department, the Borough Director of Engineering. and CME Associates.
Adopted this 29m day of December, 2022
and certified as a true copy of the
original on December 30, 2022.
CARMELA POGORZELSKI, RMC
Municipal Clerk
RECORD OF COUNCIL VOTE
COUNCILMAN
YES
NO
NV
A.B.
i COUNCILMAN
YES
NO
NV
A.B.
BELLINO.
X
JOML
X
DIAZ
X
KRUM
X
DIMASCIO
X
X
X-Indicate Vote AB -Absent NV -Not Voting XOR -Indicates Vote to Overrul9 Veto
Adopted at a meeting of the Municipal Council
December 29 2 2
z,
rt
municipal iueri�+ `_.,
AFFIDAVIT OF PUBLICATION
The following is a true copy of an Ordinance or Resolution of
the Borough of Carteret that has appeared in the Home News
Tribune, a newspaper which is printed in Freehold, New
Jersey and published in Neptune, in said County and State and
of general circulation in said county. One 1 time(s), once in
each issue as follows:
January 5, 2023
Carnhela Pogc�rzelRMCU
Municipal Clerk
Notary Wblic of New Jersey
ENNfFER N. OTERO
QM
Not ayPoblM•SlaleofNew,lersey
COmmi5s10n q 50.18.8983
Comm. Ex Tres Mar, 31 2027
Sworn and subscribed before
me this �Z day of Jail 43
BOROUGH OF CA.RTFRET _ padeli..
MUNICIPAL CLERK
Date; December 22,2022
To; PalriokDeBiaslo
'f reasurer
Borough of Carteret
REQUEST FOR CERTIFICATION OF AVAILABLE FUNDS
Fort AUTHORIZING A PRO ESSIONAI. ENGINEf RING SERVICES CONTRACT WITH C YM
ASSOCIATES. PICR BX'rENSION DAMAGE ASSWSMENT AND I;MIIRGENCY RED
Resolution Ht 922.263
Namo of Aceoaut: CME ASSOCIATES
AMOUNT TO BE ENCUMBERED: $35.000,00
Municipal Clerk
CERTIFICATION OF AVAILABILITY OF FUNDS
1, Treasurer of the Borough of Carteret, do hereby certify cunt there fire suffieleut8mds available In the current
budget to enable tine Munioipnl Council to authorize the entering into a Contract bohveen the Borough of Carteret
and;
The fiords available for this contract are In the Budget, in the account of
s ef-
Inthomnountof
By tills cortitiontion, I have boreby encumbered the above named account for the amount of the contract pendi»g
Council action. n
Patrick DOBIRSIO
Treasurer
Data, ii- I ?-f ( xr-
MetnorlallvuWc1pa11luI1dbag o 610ooke.AWAW • Carteret, New jeraep07008
`felt 732-541-3800 o Pax-, 732-541.8925 o flerkofficencg"teret•net
mWarreret net
JOHN H.ALLGAIR, PE, PP, LS (1903-2001)
DAVIDJ. SAMUEL, PE, PP, CME
JOHN J. STEFANI, PE, LS, PP CME
JAY B. CORNELL, PE, PP, CME
MICHAEL J. McCLELLAND, PE, PP, CME
GREGORY R. VALES[, PE, PP, CME
TIMOTHYE PE, PP, CME
'��
BRUCE M. KOCH, PE, PP, CME
M. KOCH,
LOUIS J. PLOSKONKA, PE, CME
ASSOCIATES
TREVOR J. TAYLOR, PE, PP, CME
BEHRAM TURAN, PE, LSRP
LAURA J. NEUMANN, PE, PP
DOUGLAS ROHMEYER, PE, CFM, CME
November 30, 2022
ROBERT J. RUSSO, PE, PP, CME
Hand Delivered
Borough of Carteret
61 Cooke Avenue
Carteret, NJ 07008
Attn: Honorable Mayor Daniel J. Reiman — Mayor
Re; Proposal for Professional Engineering Services
Pier Extension Damage Assessment and Emergency Repairs
Borough of Carteret, Middlesex County, New Jersey
Proposal No.: 2022-302
Dear Mayor:
We are pleased to present our estimate of fees for professional services for the above -
referenced project.
In early November 2022, the steel pier extension at Waterfront Park was struck by a barge
resulting in severe damage to a 75-foot section of the structure. We understand the incident is
currently under investigation. The pier has since been closed to protect the public. Our office
has made a preliminary assessment from the water and structure and identified, at minimum,
the following damage:
• Significant deflection of at least three (3) steel H-piles and batter piles;
• Buckled wavescreen sheeting (approximately 11 pairs of sheeting) and walers;
• Extensive superstructure damage, including structural steel channels, handrails, and bar
grating over a 75-foot length of the pier; and,
• Damage to electrical handrail lighting conductors, conduit, and power supply units.
To date, our office has met with and begun to solicit emergency repair quotes from three (3)
marine heavy construction contractors to immediately mobilize and commence with repairs. The
cost estimate for the repairs is approximately $1,500,000.
With this being said, we anticipate that the following tasks will be required:
A) Structural Investigation and Underwater Inspection
Work in this phase will include a hands-on detailed underwater inspection of the 61 steel H-
piles and bents located along the marina side of the pier extension. Inspections will identify
the type, size, and location of any damage resulting from the collision. An inspection report
will be prepared to document the descriptions of the damage along with photographs and
sketches. All underwater inspection work will be conducted by a licensed Professional
S:\Carmre0Pmposa1sV022-302 Steel Pier Extenslon Damage 11-30-22.doc
CONSULTING AND MUNICIPAL ENGINEERS
1400 ROUTE 9 SOUTH . HOWELL, NEW JERSEY 07731 . (732) 462-7400 . FAX: (732) 409-0766
ASSOCIATES
Borough of Carteret, Middlesex County, New Jersey November 30, 2022
Re: Proposal for Professional Engineering Services Proposal No. 2022-302
Pier Extension Damage Assessment and Emergency Repairs Page 2
Engineer in accordance with National Bridge Inspection Standards (NBIS). The crew will
consist of a three man dive team operating from a skiff alongside the pier.
B) Bid Phase Services for Emergency Repair Quotes and Underwater Evaluation
Work in this phase will provide the following services to solicit emergency underwater
assessment and repair quotes to qualified underwater inspection firms and marine heavy
construction contractors, respectively:
1. Provide quotation documents to prospective contractors as needed;
2. Answer prospective contractor requests for information;
3. Provide addenda for clarification of project specifications; and,
4. Analyze quotes and recommend contract award.
C) Construction Phase Services — Generally, we prefer to quote services for construction
phase upon the completion of the Bid Phase as the ultimate cost for our services will
depend upon a number of factors including the final design, the contractor to whom the
contract is awarded and the desired level of construction observation required. The
following services will be provided under this phase:
1. Contract preparation including review of bonds, insurance certificates, and project
manning reports;
2. Attend preconstruction meeting;
3. Provide assistance with interpretation of the contract documents;
4. Review shop drawings for site -related items;
5. Provide construction observation services and prepare contractor punch lists; and,
6. Review and approve monthly progress pay estimates
This phase will include notification of agencies having jurisdiction of the intended
emergency repair work schedule. As the structure is being reconstructed in accordance
with the originally approved design, no new permitting approvals are anticipated to be
required.
We would recommend that the fee outlined below be budgeted for this purpose. Should
the final design and other contract factors preclude CME from being able to properly
administer the project within this budget, we will inform you immediately.
S \Cartere6ProposalsU022-302 Steel Pier Extension Damage 11-30-22.doe
ASSOCIATES
Borough of Carteret, Middlesex County, New Jersey November 30, 2022
Re: Proposal for Professional Engineering Services Proposal No. 2022-302
Pier Extension Damage Assessment and Emergency Repairs Page 3
We will provide the necessary engineering services as described above based upon the cost
breakdown as noted below:
A. Design Phase Services ............................................
.... $24,000.00
B. Bid Phase Services ..................................................... ....... ................. ..... $3,500.00
C. Construction Phase Services.................................................................. $7,500.00
Total Fee for Services............................................................................ $35,000.00
Exceptions
• Any work not specified as listed in the above phases, including permitting, shall be
considered additional services and will be invoiced at the time said work is authorized by
the Borough.
• Application fees are considered extra and will be requested at time of submission.
The above fee estimate is based on information provided to us by the Borough. Should the
scope of the project change requiring additional professional fees, we will detail same in writing
and seek authorization prior to proceeding.
Should you accept this proposal, kindly prepare a professional services Resolution as
authorization for us to proceed.
Thank you again for the opportunity to offer our professional services, and should you have any
questions or require additional information, please do not hesitate to contact this office.
Very truly yours,
CME Associates
Mat hew R. Zwin , PE, CME, CFM
For the Firm
TT\MZ
cc: John DuPont, PE, PP, CME — Director of Engineering
S:\Carteret\Proposals=-302 Steel Pier Extension Damage 11-30-22.doo