Loading...
HomeMy Public PortalAbout2014 MFT Street Imp Program_BidTabVILLAGE OF PLAINFIELD 2014 MFT STREET IMPROVEMENT PROGRAM - BID TAB BID DATE: May 13, 2014 CONSTRUCTION ESTIMATE OF COST TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL ITEM NO.ITEMS UNIT QUANTITY PRICE COST PRICE COST PRICE COST PRICE COST PRICE COST PRICE COST PRICE COST 1 MIXTURE FOR JOINTS, CRACKS, AND FLANGEWAYS TON 12 350.00 $4,200.00 $$50.00 $600.00 $400.00 $4,800.00 $100.00 $1,200.00 $300.00 $3,600.00 $400.00 $4,800.00 $50.00 $600.00 2 HOT-MIX ASPHALT SURFACE REMOVAL-BUTT JOINT SQ YD 3,700 10.00 $37,000.00 $$0.01 $37.00 $0.01 $37.00 $0.01 $37.00 $5.00 $18,500.00 $0.01 $37.00 $0.01 $37.00 3 HOT-MIX ASPHALT SURFACE REMOVAL, 2"SQ YD 45,393 3.00 $136,179.00 $$1.35 $61,280.55 $1.00 $45,393.00 $2.00 $90,786.00 $1.80 $81,707.40 $2.40 $108,943.20 $2.00 $90,786.00 4 BITUMINOUS MATERIALS (PRIME COAT)TON 19 30.00 $570.00 $$0.01 $0.19 $0.01 $0.19 $0.01 $0.19 $1.00 $19.00 $1.00 $19.00 $0.01 $0.19 5 HOT-MIX ASPHALT SURFACE COURSE, MIX "D", N50 TON 5,613 75.00 $420,975.00 $$60.50 $339,586.50 $65.00 $364,845.00 $62.00 $348,006.00 $66.00 $370,458.00 $66.00 $370,458.00 $72.00 $404,136.00 6 LEVELING BINDER (MACHINE METHOD), N50 TON 811 95.00 $77,045.00 $$59.40 $48,173.40 $69.00 $55,959.00 $62.00 $50,282.00 $68.00 $55,148.00 $73.00 $59,203.00 $72.00 $58,392.00 7 AGGREGATE WEDGE SHOULDERS, TYPE B TON 16 100.00 $1,600.00 $$35.00 $560.00 $140.00 $2,240.00 $50.00 $800.00 $80.00 $1,280.00 $70.00 $1,120.00 $100.00 $1,600.00 8 CLASS D PATCHES, TYPE II, 6"SQ YD 400 90.00 $36,000.00 $$31.00 $12,400.00 $50.00 $20,000.00 $55.00 $22,000.00 $60.00 $24,000.00 $46.00 $18,400.00 $20.00 $8,000.00 9 CLASS D PATCHES, TYPE III, 6"SQ YD 400 80.00 $32,000.00 $$31.00 $12,400.00 $50.00 $20,000.00 $50.00 $20,000.00 $50.00 $20,000.00 $44.00 $17,600.00 $20.00 $8,000.00 10 CLASS D PATCHES, TYPE IV, 6"SQ YD 400 70.00 $28,000.00 $$31.00 $12,400.00 $50.00 $20,000.00 $41.00 $16,400.00 $40.00 $16,000.00 $41.00 $16,400.00 $20.00 $8,000.00 11 SIDEWALK REMOVAL SQ FT 2,124 3.50 $7,434.00 $$1.25 $2,655.00 $2.00 $4,248.00 $2.00 $4,248.00 $1.30 $2,761.20 $1.30 $2,761.20 $3.45 $7,327.80 12 PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH (SPECIAL).SQ FT 2,927 6.50 $19,025.50 $$5.75 $16,830.25 $6.00 $17,562.00 $8.00 $23,416.00 $4.30 $12,586.10 $4.25 $12,439.75 $6.00 $17,562.00 13 DETECTABLE WARNINGS SQ FT 260 25.00 $6,500.00 $$24.50 $6,370.00 $20.00 $5,200.00 $19.00 $4,940.00 $16.00 $4,160.00 $16.00 $4,160.00 $23.00 $5,980.00 14 COMBINATION CONCRETE CURB AND GUTTER REMOVAL AND REPLACEMENT FOOT 433 40.00 $17,320.00 $$30.00 $12,990.00 $40.00 $17,320.00 $39.00 $16,887.00 $28.00 $12,124.00 $27.00 $11,691.00 $30.00 $12,990.00 15 COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.18,SPECIAL FOOT 1,260 35.00 $44,100.00 $$26.00 $32,760.00 $26.00 $32,760.00 $41.00 $51,660.00 $32.00 $40,320.00 $31.00 $39,060.00 $23.00 $28,980.00 16 PROTECTIVE COAT SQ YD 715 2.00 $1,430.00 $$1.50 $1,072.50 $3.00 $2,145.00 $0.01 $7.15 $0.50 $357.50 $0.50 $357.50 $0.50 $357.50 17 HOT-MIX ASPHALT DRIVEWAY SURFACE REMOVAL AND REPLACEMENT SQ YD 100 90.00 $9,000.00 $$63.00 $6,300.00 $60.00 $6,000.00 $45.00 $4,500.00 $80.00 $8,000.00 $50.00 $5,000.00 $60.00 $6,000.00 18 DRAINAGE AND UTILITY STRUCTURES TO BE ADJUSTED EACH 5 500.00 $2,500.00 $$350.00 $1,750.00 $625.00 $3,125.00 $350.00 $1,750.00 $270.00 $1,350.00 $350.00 $1,750.00 $450.00 $2,250.00 19 SANITARY MANHOLES TO BE ADJUSTED EACH 1 750.00 $750.00 $$800.00 $800.00 $850.00 $850.00 $700.00 $700.00 $270.00 $270.00 $450.00 $450.00 $600.00 $600.00 20 VALVE BOXES TO BE ADJUSTED EACH 1 750.00 $750.00 $$150.00 $150.00 $450.00 $450.00 $200.00 $200.00 $240.00 $240.00 $200.00 $200.00 $250.00 $250.00 21 THERMOPLASTIC PAVEMENT MARKING - LETTERS AND SYMBOLS SQ FT 790 3.75 $2,962.50 $$4.14 $3,270.60 $3.25 $2,567.50 $4.00 $3,160.00 $4.00 $3,160.00 $4.00 $3,160.00 $4.00 $3,160.00 22 THERMOPLASTIC PAVEMENT MARKING - LINE, 4"FOOT 36,100 0.75 $27,075.00 $$0.64 $23,104.00 $0.55 $19,855.00 $0.55 $19,855.00 $0.55 $19,855.00 $0.55 $19,855.00 $0.55 $19,855.00 23 THERMOPLASTIC PAVEMENT MARKING - LINE, 6"FOOT 4,242 1.50 $6,363.00 $$0.98 $4,157.16 $0.99 $4,199.58 $0.75 $3,181.50 $0.75 $3,181.50 $0.75 $3,181.50 $0.75 $3,181.50 24 THERMOPLASTIC PAVEMENT MARKING - LINE, 12"FOOT 2,165 2.25 $4,871.25 $$1.96 $4,243.40 $1.90 $4,113.50 $1.50 $3,247.50 $1.50 $3,247.50 $1.50 $3,247.50 $1.50 $3,247.50 25 THERMOPLASTIC PAVEMENT MARKING - LINE, 24"FOOT 339 3.75 $1,271.25 $$4.42 $1,498.38 $3.25 $1,101.75 $4.00 $1,356.00 $4.00 $1,356.00 $4.00 $1,356.00 $4.00 $1,356.00 26 DETECTOR LOOP REPLACEMENT FOOT 300 10.00 $3,000.00 $$22.00 $6,600.00 $30.00 $9,000.00 $19.00 $5,700.00 $20.00 $6,000.00 $19.00 $5,700.00 $19.00 $5,700.00 27 PARKWAY RESTORATION SQ YD 610 20.00 $12,200.00 $$15.00 $9,150.00 $16.00 $9,760.00 $15.00 $9,150.00 $15.00 $9,150.00 $18.00 $10,980.00 $25.00 $15,250.00 28 TEMPORARY INFORMATION SIGNING SQ FT 208 20.00 $4,160.00 $$15.00 $3,120.00 $12.00 $2,496.00 $15.00 $3,120.00 $13.00 $2,704.00 $15.00 $3,120.00 $15.00 $3,120.00 29 FLEXIBLE DELINEATORS, SPECIAL FOOT 150 35.00 $5,250.00 $$68.00 $10,200.00 $62.00 $9,300.00 $47.00 $7,050.00 $62.00 $9,300.00 $47.00 $7,050.00 $47.00 $7,050.00 30 TRAFFIC CONTROL AND PROTECTION, STANDARD 701501 LSUM 1 3,000.00 $3,000.00 $$3,750.00 $3,750.00 $5,000.00 $5,000.00 $10,770.00 $10,770.00 $2,000.00 $2,000.00 $16,500.00 $16,500.00 $31,200.00 $31,200.00 31 TRAFFIC CONTROL AND PROTECTION, STANDARD 701502 LSUM 1 3,000.00 $3,000.00 $$1.00 $1.00 $750.00 $750.00 $10.00 $10.00 $750.00 $750.00 $10.00 $10.00 $10.00 $10.00 32 TRAFFIC CONTROL AND PROTECTION, STANDARD 701701 LSUM 1 10,000.00 $10,000.00 $$1.00 $1.00 $1,000.00 $1,000.00 $10.00 $10.00 $1,500.00 $1,500.00 $10.00 $10.00 $10.00 $10.00 33 TRAFFIC CONTROL AND PROTECTION, STANDARD 701801 LSUM 1 5,000.00 $5,000.00 $$1.00 $1.00 $1,500.00 $1,500.00 $10.00 $10.00 $2,000.00 $2,000.00 $10.00 $10.00 $10.00 $10.00 Engineer's Estimate of Cost 970,531.50 $Bidder's Proposal as read $638,211.93 $693,577.52 $724,439.34 $737,085.20 $749,029.65 $754,998.49 Bidder's Proposal as corrected $638,211.93 $693,577.52 $724,439.34 $737,085.20 $749,029.65 $754,998.49 Engineer's Estimate K-Five Construction Corporation P. T. Ferro Construciton, Co.Gallagher Asphalt Corporation James D. Fiala Paving Co., Inc.D Construciton, Inc.Austin Tyler Construction, Inc.I:\Chicago\PFLDV\140056-2014 Misc Traffic\TR 107_2014 MFT Street Program\40-Design\Work\Assist Bidding\FinalQuantitiesforBidTab.xlsxFinalQuantitiesforBidTab.xlsx