HomeMy Public PortalAbout2014 Street Imp Program Option1_BidTabVILLAGE OF PLAINFIELD 2014 STREET PROGRAM - BID TAB - OPTION 1 BID DATE: May 13, 2014 NO.ITEMS UNIT 1 EARTH EXCAVATION CU YD 78 $30.00 2,340.00 $$35.00 $2,730.00 $50.00 $3,900.00 $40.00 $3,120.00 $71.00 $5,538.00 2 REMOVAL AND DISPOSAL OF UNSUITABLE MATERIAL CU YD 116 $30.00 3,480.00 $$35.00 $4,060.00 $0.01 $1.16 $40.00 $4,640.00 $61.00 $7,076.00 3 AGGREGATE SUBGRADE IMPROVEMENT CU YD 23 $40.00 920.00 $$48.00 $1,104.00 $115.00 $2,645.00 $35.00 $805.00 $70.00 $1,610.00 4 PARKWAY RESTORATION SQ YD 781 $10.00 7,810.00 $$27.50 $21,477.50 $15.00 $11,715.00 $16.00 $12,496.00 $14.00 $10,934.00 5 GRADING AND SHAPING SHOULDERS UNIT 234 $15.00 3,510.00 $$22.00 $5,148.00 $30.00 $7,020.00 $50.00 $11,700.00 $60.00 $14,040.00 6 AGGREGATE WEDGE SHOULDER, TYPE B TON 546 $12.00 6,552.00 $$22.00 $12,012.00 $33.00 $18,018.00 $25.00 $13,650.00 $32.00 $17,472.00 7 INLET FILTERS EACH 28 $300.00 8,400.00 $$150.00 $4,200.00 $100.00 $2,800.00 $100.00 $2,800.00 $185.00 $5,180.00 8 AGGREGATE BASE COURSE, TYPE B TON 80 $15.00 1,200.00 $$19.70 $1,576.00 $35.00 $2,800.00 $12.00 $960.00 $28.00 $2,240.00 9 AGGREGATE BASE COURSE, TYPE B 4"SQ YD 0 $0.00 -$$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 10 AGGREGATE BASE COURSE REMOVAL AND REPLACEMENT WITH AGGREGATE TYPE B, 12"SQ YD 1228 $20.00 24,560.00 $$14.75 $18,113.00 $18.00 $22,104.00 $25.00 $30,700.00 $28.00 $34,384.00 11 LEVELING BINDER (MACHINE METHOD), N50 TON 148 $75.00 11,100.00 $$63.50 $9,398.00 $66.00 $9,768.00 $65.00 $9,620.00 $80.00 $11,840.00 12 HOT-MIX ASPHALT BINDER COURSE, IL19.0, N50 TON 1679 $70.00 117,530.00 $$61.60 $103,426.40 $57.00 $95,703.00 $60.00 $100,740.00 $66.00 $110,814.00 13 HOT-MIX ASPHALT SURFACE COURSE, MIX "D", N50 TON 3234 $75.00 242,550.00 $$61.60 $199,214.40 $66.00 $213,444.00 $65.00 $210,210.00 $72.00 $232,848.00 14 PREPARATION OF BASE (SPECIAL)SQ YD 12247 $2.50 30,617.50 $$0.80 $9,797.60 $1.50 $18,370.50 $1.00 $12,247.00 $1.00 $12,247.00 15 BITUMINOUS MATERIALS (PRIME COAT)POUND 39548.875 $2.00 79,097.75 $$0.01 $395.49 $0.01 $395.49 $0.01 $395.49 $0.60 $23,729.33 16 HOT-MIX ASPHALT SURFACE REMOVAL, 2"SQ YD 12400 $2.50 31,000.00 $$1.70 $21,080.00 $2.25 $27,900.00 $1.75 $21,700.00 $1.80 $22,320.00 17 HOT-MIX ASPHALT SURFACE REMOVAL, 2 1/4"SQ YD 2580 $2.75 7,095.00 $$2.05 $5,289.00 $2.30 $5,934.00 $2.25 $5,805.00 $2.50 $6,450.00 18 HOT-MIX ASPHALT SURFACE REMOVAL, 2 3/4"SQ YD 3422 $3.00 10,266.00 $$2.60 $8,897.20 $2.50 $8,555.00 $2.50 $8,555.00 $3.50 $11,977.00 19 HOT-MIX ASPHALT SURFACE REMOVAL (FULL DEPTH)SQ YD 12247 $3.25 39,802.75 $$2.30 $28,168.10 $3.00 $36,741.00 $4.00 $48,988.00 $3.00 $36,741.00 20 HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT SQ YD 409 $12.00 4,908.00 $$6.10 $2,494.90 $0.01 $4.09 $10.00 $4,090.00 $18.00 $7,362.00 21 HOT-MIX ASPHALT DRIVEWAY SURFACE REMOVAL AND REPLACEMENT SQ YD 1319 $15.00 19,785.00 $$19.75 $26,050.25 $39.00 $51,441.00 $35.00 $46,165.00 $50.00 $65,950.00 22 PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 6"SQ YD 44 $60.00 2,640.00 $$42.00 $1,848.00 $60.00 $2,640.00 $60.00 $2,640.00 $40.00 $1,760.00 23 PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 8"SQ YD 30 $80.00 2,400.00 $$55.50 $1,665.00 $70.00 $2,100.00 $70.00 $2,100.00 $46.00 $1,380.00 24 PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH (SPECIAL)SQ FT 3945 $5.00 19,725.00 $$4.00 $15,780.00 $7.00 $27,615.00 $5.00 $19,725.00 $5.00 $19,725.00 25 DETECTABLE WARNINGS SQ FT 434 $25.00 10,850.00 $$25.00 $10,850.00 $19.00 $8,246.00 $20.00 $8,680.00 $16.80 $7,291.20 26 CLASS D PATCHES, 3 INCH SQ YD 548 $25.00 13,700.00 $$19.60 $10,740.80 $25.00 $13,700.00 $25.00 $13,700.00 $27.00 $14,796.00 27 CLASS D PATCHES, 5 INCH SQ YD 218 $35.00 7,630.00 $$30.00 $6,540.00 $38.00 $8,284.00 $40.00 $8,720.00 $40.00 $8,720.00 28 CLASS D PATCHES, 8 INCH SQ YD 258 $45.00 11,610.00 $$54.00 $13,932.00 $50.00 $12,900.00 $60.00 $15,480.00 $68.00 $17,544.00 29 CLASS D PATCHES, 10 INCH SQ YD 818 $50.00 40,900.00 $$60.00 $49,080.00 $60.00 $49,080.00 $75.00 $61,350.00 $80.00 $65,440.00 30 COMBINATION CONCRETE CURB AND GUTTER REMOVAL AND REPLACEMENT FOOT 1091 $25.00 27,275.00 $$41.00 $44,731.00 $37.00 $40,367.00 $36.00 $39,276.00 $27.00 $29,457.00 31 DRIVEWAY PAVEMENT REMOVAL SQ YD 158 $10.00 1,580.00 $$11.00 $1,738.00 $9.00 $1,422.00 $10.00 $1,580.00 $12.00 $1,896.00 32 BRICK DRIVEWAY PAVEMENT REMOVAL AND REPLACEMENT SQ YD 43 $50.00 2,150.00 $$220.00 $9,460.00 $170.00 $7,310.00 $115.00 $4,945.00 $100.00 $4,300.00 33 HOT-MIX ASPHALT DRIVEWAY PAVEMENT, 6"SQ YD 84 $50.00 4,200.00 $$26.00 $2,184.00 $35.00 $2,940.00 $54.00 $4,536.00 $70.00 $5,880.00 34 SIDEWALK REMOVAL SQ FT 3970 $1.00 3,970.00 $$1.25 $4,962.50 $2.00 $7,940.00 $1.50 $5,955.00 $1.60 $6,352.00 35 TRENCH BACKFILL CU YD 26 $35.00 910.00 $$35.00 $910.00 $32.00 $832.00 $40.00 $1,040.00 $40.00 $1,040.00 36 STORM SEWERS, RUBBER GASKET, CLASS A, TYPE 1 12"FOOT 80 $45.00 3,600.00 $$24.00 $1,920.00 $45.00 $3,600.00 $50.00 $4,000.00 $60.00 $4,800.00 37 CATCH BASINS, TYPE C, TYPE 1 FRAME, OPEN LID EACH 1 $2,000.00 2,000.00 $$975.00 $975.00 $1,200.00 $1,200.00 $1,100.00 $1,100.00 $1,000.00 $1,000.00 38 INLETS, TYPE A, TYPE 1 FRAME, OPEN LID EACH 1 $1,200.00 1,200.00 $$960.00 $960.00 $1,000.00 $1,000.00 $1,100.00 $1,100.00 $900.00 $900.00 39 PRECAST REINFORCED CONCRETE FLARED END SECTIONS 12"EACH 1 $900.00 900.00 $$435.00 $435.00 $700.00 $700.00 $600.00 $600.00 $550.00 $550.00 40 FRAMES, TYPE 1 EACH 5 $400.00 2,000.00 $$350.00 $1,750.00 $310.00 $1,550.00 $300.00 $1,500.00 $450.00 $2,250.00 41 FRAMES, TYPE 11 EACH 9 $400.00 3,600.00 $$350.00 $3,150.00 $400.00 $3,600.00 $400.00 $3,600.00 $500.00 $4,500.00 42 CULVERTS TO BE CLEANED FOOT 150 $25.00 3,750.00 $$6.50 $975.00 $15.00 $2,250.00 $30.00 $4,500.00 $10.00 $1,500.00 43 SANITARY MANHOLES TO BE ADJUSTED EACH 15 $600.00 9,000.00 $$800.00 $12,000.00 $700.00 $10,500.00 $750.00 $11,250.00 $1,250.00 $18,750.00 44 DRAINAGE & UTILITY STRUCTURES TO BE ADJUSTED EACH 34 $400.00 13,600.00 $$350.00 $11,900.00 $350.00 $11,900.00 $650.00 $22,100.00 $875.00 $29,750.00 45 VALVE BOXES TO BE ADJUSTED EACH 2 $350.00 700.00 $$150.00 $300.00 $200.00 $400.00 $475.00 $950.00 $350.00 $700.00 46 TRAFFIC CONTROL AND PROTECTION L SUM 1 $32,847.89 32,847.89 $$7,000.00 $7,000.00 $16,950.00 $16,950.00 $14,000.00 $14,000.00 $9,000.00 $9,000.00 47 TEMPORARY INFORMATION SIGNING SQ FT 252 $10.00 2,520.00 $$24.00 $6,048.00 $15.00 $3,780.00 $15.00 $3,780.00 $15.00 $3,780.00 48 SHORT TERM PAVEMENT MARKING FOOT 4165 $0.25 1,041.25 $$0.83 $3,456.95 $0.01 $41.65 $1.00 $4,165.00 $1.20 $4,998.00 49 WORK ZONE PAVEMENT MARKING REMOVAL SQ FT 690 $0.50 345.00 $$1.32 $910.80 $1.00 $690.00 $1.00 $690.00 $1.00 $690.00 50 THERMOPLASTIC PAVEMENT MARKING - LETTERS AND SYMBOLS SQ FT 235 $10.00 2,350.00 $$4.42 $1,038.70 $3.40 $799.00 $3.40 $799.00 $4.00 $940.00 51 THERMOPLASTIC PAVEMENT MARKING - LINE 4"FOOT 5336 $0.75 4,002.00 $$0.65 $3,468.40 $0.65 $3,468.40 $0.60 $3,201.60 $0.59 $3,148.24 52 THERMOPLASTIC PAVEMENT MARKING - LINE 6"FOOT 848 $2.00 1,696.00 $$0.98 $831.04 $1.50 $1,272.00 $1.35 $1,144.80 $0.89 $754.72 53 THERMOPLASTIC PAVEMENT MARKING - LINE 12"FOOT 990 $6.00 5,940.00 $$1.95 $1,930.50 $1.95 $1,930.50 $1.80 $1,782.00 $1.77 $1,752.30 54 THERMOPLASTIC PAVEMENT MARKING - LINE 24"FOOT 322 $8.00 2,576.00 $$4.42 $1,423.24 $3.50 $1,127.00 $3.40 $1,094.80 $4.00 $1,288.00 55 RAILROAD PROTECTIVE LIABILITY INSURANCE L SUM 1 $5,000.00 5,000.00 $$5,522.14 $5,522.14 $7,500.00 $7,500.00 $3,000.00 $3,000.00 $4,000.00 $4,000.00 56 TEMPORARY ACCESS (PRIVATE ENTRANCE)EACH 163 $200.00 32,600.00 $$50.00 $8,150.00 $0.01 $1.63 $0.01 $1.63 $95.00 $15,485.00 57 TEMPORARY ACCESS (ROAD)EACH 29 $400.00 11,600.00 $$75.00 $2,175.00 $0.01 $0.29 $0.01 $0.29 $135.00 $3,915.00 58 PRECONSTRUCTION VIDEO RECORDING L SUM 1 $1,368.66 1,368.66 $$1,600.00 $1,600.00 $500.00 $500.00 $2,000.00 $2,000.00 $500.00 $500.00 59 CONTINGENCY ALLOWANCE DOLLAR 30000 $1.00 30,000.00 $$1.00 $30,000.00 $1.00 $30,000.00 $1.00 $30,000.00 $1.00 $30,000.00 Engineer's Estimate of Cost $ 976,300.80 Bidder's Proposal as read $766,972.91 $829,395.71 $855,472.61 $971,284.79 Bidder's Proposal as corrected $766,972.91 $829,395.71 $855,472.61 $971,284.79 Engineer's Estimate QTY OPTION 1 D Construction, Inc.UNIT PRICE OPTION 1 P. T. Ferro Construction Co.Austin Tyler Construction, Inc.Gallagher Asphalt Corporation UNIT PRICE OPTION 1 UNIT PRICE OTPION 1 TOTAL PRICE OPTION 1 UNIT PRICE OPTION 1 TOTAL PRICE OPTION 1 TOTAL PRICE OPTION 1 TOTAL PRICE OTPION 1 UNIT PRICE OPTION 1 TOTAL PRICE OPTION 1 \\corp.baxwood.com\Projects\Chicago\PFLDV\140056-2014 Misc Traffic\TR 105_2014 Street Program\40-Design\Assist Bidding\Non-MFT BidTab Option 1.xlsxNon-MFT BidTab Option 1.xlsx