HomeMy Public PortalAbout2014 Street Imp Program Option2_BidTabVILLAGE OF PLAINFIELD 2014 STREET PROGRAM - BID TAB - OPTION 2 BID DATE: May 13, 2014 NO.ITEMS UNIT 1 EARTH EXCAVATION CU YD 82 $30.00 2,460.00 $$35.00 $2,870.00 $50.00 $4,100.00 $40.00 $3,280.00 $70.00 $5,740.00 2 REMOVAL AND DISPOSAL OF UNSUITABLE MATERIAL CU YD 123 $30.00 3,690.00 $$35.00 $4,305.00 $0.01 $1.23 $40.00 $4,920.00 $60.00 $7,380.00 3 AGGREGATE SUBGRADE IMPROVEMENT CU YD 26 $40.00 1,040.00 $$48.00 $1,248.00 $115.00 $2,990.00 $35.00 $910.00 $70.00 $1,820.00 4 PARKWAY RESTORATION SQ YD 817 $10.00 8,170.00 $$27.50 $22,467.50 $15.00 $12,255.00 $16.00 $13,072.00 $14.00 $11,438.00 5 GRADING AND SHAPING SHOULDERS UNIT 256 $15.00 3,840.00 $$22.00 $5,632.00 $30.00 $7,680.00 $50.00 $12,800.00 $60.00 $15,360.00 6 AGGREGATE WEDGE SHOULDER, TYPE B TON 600 $12.00 7,200.00 $$22.00 $13,200.00 $33.00 $19,800.00 $25.00 $15,000.00 $32.00 $19,200.00 7 INLET FILTERS EACH 29 $300.00 8,700.00 $$150.00 $4,350.00 $100.00 $2,900.00 $100.00 $2,900.00 $185.00 $5,365.00 8 AGGREGATE BASE COURSE, TYPE B TON 80 $15.00 1,200.00 $$19.70 $1,576.00 $35.00 $2,800.00 $12.00 $960.00 $28.00 $2,240.00 9 AGGREGATE BASE COURSE, TYPE B 4"SQ YD 756 $0.00 -$$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 10 AGGREGATE BASE COURSE REMOVAL AND REPLACEMENT WITH AGGREGATE TYPE B, 12"SQ YD 1367 $20.00 27,340.00 $$14.75 $20,163.25 $18.00 $24,606.00 $25.00 $34,175.00 $28.00 $38,276.00 11 LEVELING BINDER (MACHINE METHOD), N50 TON 148 $75.00 11,100.00 $$63.50 $9,398.00 $66.00 $9,768.00 $65.00 $9,620.00 $80.00 $11,840.00 12 HOT-MIX ASPHALT BINDER COURSE, IL19.0, N50 TON 1679 $70.00 117,530.00 $$61.60 $103,426.40 $57.00 $95,703.00 $60.00 $100,740.00 $66.00 $110,814.00 13 HOT-MIX ASPHALT SURFACE COURSE, MIX "D", N50 TON 3394 $75.00 254,550.00 $$61.60 $209,070.40 $66.00 $224,004.00 $65.00 $220,610.00 $72.00 $244,368.00 14 PREPARATION OF BASE (SPECIAL)SQ YD 13635 $2.50 34,087.50 $$0.80 $10,908.00 $1.50 $20,452.50 $1.00 $13,635.00 $1.00 $13,635.00 15 BITUMINOUS MATERIALS (PRIME COAT)POUND 42985 $2.00 85,970.00 $$0.01 $429.85 $0.01 $429.85 $0.01 $429.85 $0.60 $25,791.00 16 HOT-MIX ASPHALT SURFACE REMOVAL, 2"SQ YD 12400 $2.50 31,000.00 $$1.70 $21,080.00 $2.25 $27,900.00 $1.75 $21,700.00 $1.80 $22,320.00 17 HOT-MIX ASPHALT SURFACE REMOVAL, 2 1/4"SQ YD 2580 $2.75 7,095.00 $$2.05 $5,289.00 $2.30 $5,934.00 $2.25 $5,805.00 $2.50 $6,450.00 18 HOT-MIX ASPHALT SURFACE REMOVAL, 2 3/4"SQ YD 3422 $3.00 10,266.00 $$2.60 $8,897.20 $2.50 $8,555.00 $2.50 $8,555.00 $3.50 $11,977.00 19 HOT-MIX ASPHALT SURFACE REMOVAL (FULL DEPTH)SQ YD 13635 $3.25 44,313.75 $$2.30 $31,360.50 $3.00 $40,905.00 $4.00 $54,540.00 $3.00 $40,905.00 20 HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT SQ YD 447 $12.00 5,364.00 $$6.10 $2,726.70 $0.01 $4.47 $10.00 $4,470.00 $18.00 $8,046.00 21 HOT-MIX ASPHALT DRIVEWAY SURFACE REMOVAL AND REPLACEMENT SQ YD 1319 $15.00 19,785.00 $$19.75 $26,050.25 $39.00 $51,441.00 $35.00 $46,165.00 $50.00 $65,950.00 22 PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 6"SQ YD 44 $60.00 2,640.00 $$42.00 $1,848.00 $60.00 $2,640.00 $60.00 $2,640.00 $40.00 $1,760.00 23 PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 8"SQ YD 256 $80.00 20,480.00 $$55.50 $14,208.00 $70.00 $17,920.00 $70.00 $17,920.00 $44.00 $11,264.00 24 PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH (SPECIAL)SQ FT 4655 $5.00 23,275.00 $$4.00 $18,620.00 $7.00 $32,585.00 $5.00 $23,275.00 $5.00 $23,275.00 25 DETECTABLE WARNINGS SQ FT 554 $25.00 13,850.00 $$25.00 $13,850.00 $19.00 $10,526.00 $20.00 $11,080.00 $16.80 $9,307.20 26 CLASS D PATCHES, 3 INCH SQ YD 548 $25.00 13,700.00 $$19.60 $10,740.80 $25.00 $13,700.00 $25.00 $13,700.00 $27.00 $14,796.00 27 CLASS D PATCHES, 5 INCH SQ YD 218 $35.00 7,630.00 $$30.00 $6,540.00 $38.00 $8,284.00 $40.00 $8,720.00 $40.00 $8,720.00 28 CLASS D PATCHES, 8 INCH SQ YD 258 $45.00 11,610.00 $$54.00 $13,932.00 $50.00 $12,900.00 $60.00 $15,480.00 $68.00 $17,544.00 29 CLASS D PATCHES, 10 INCH SQ YD 818 $50.00 40,900.00 $$60.00 $49,080.00 $60.00 $49,080.00 $75.00 $61,350.00 $80.00 $65,440.00 30 COMBINATION CONCRETE CURB AND GUTTER REMOVAL AND REPLACEMENT FOOT 1115 $25.00 27,875.00 $$41.00 $45,715.00 $37.00 $41,255.00 $36.00 $40,140.00 $27.00 $30,105.00 31 DRIVEWAY PAVEMENT REMOVAL SQ YD 384 $10.00 3,840.00 $$11.00 $4,224.00 $9.00 $3,456.00 $10.00 $3,840.00 $10.00 $3,840.00 32 BRICK DRIVEWAY PAVEMENT REMOVAL AND REPLACEMENT SQ YD 43 $50.00 2,150.00 $$220.00 $9,460.00 $170.00 $7,310.00 $115.00 $4,945.00 $100.00 $4,300.00 33 HOT-MIX ASPHALT DRIVEWAY PAVEMENT, 6"SQ YD 84 $50.00 4,200.00 $$26.00 $2,184.00 $35.00 $2,940.00 $54.00 $4,536.00 $70.00 $5,880.00 34 SIDEWALK REMOVAL SQ FT 4614 $1.00 4,614.00 $$1.25 $5,767.50 $2.00 $9,228.00 $1.50 $6,921.00 $1.60 $7,382.40 35 TRENCH BACKFILL CU YD 26 $35.00 910.00 $$35.00 $910.00 $32.00 $832.00 $40.00 $1,040.00 $40.00 $1,040.00 36 STORM SEWERS, RUBBER GASKET, CLASS A, TYPE 1 12"FOOT 80 $45.00 3,600.00 $$24.00 $1,920.00 $45.00 $3,600.00 $50.00 $4,000.00 $60.00 $4,800.00 37 CATCH BASINS, TYPE C, TYPE 1 FRAME, OPEN LID EACH 1 $2,000.00 2,000.00 $$975.00 $975.00 $1,200.00 $1,200.00 $1,100.00 $1,100.00 $1,000.00 $1,000.00 38 INLETS, TYPE A, TYPE 1 FRAME, OPEN LID EACH 1 $1,200.00 1,200.00 $$960.00 $960.00 $1,000.00 $1,000.00 $1,100.00 $1,100.00 $900.00 $900.00 39 PRECAST REINFORCED CONCRETE FLARED END SECTIONS 12"EACH 1 $900.00 900.00 $$435.00 $435.00 $700.00 $700.00 $600.00 $600.00 $550.00 $550.00 40 FRAMES, TYPE 1 EACH 5 $400.00 2,000.00 $$350.00 $1,750.00 $310.00 $1,550.00 $300.00 $1,500.00 $450.00 $2,250.00 41 FRAMES, TYPE 11 EACH 9 $400.00 3,600.00 $$350.00 $3,150.00 $400.00 $3,600.00 $400.00 $3,600.00 $500.00 $4,500.00 42 CULVERTS TO BE CLEANED FOOT 150 $25.00 3,750.00 $$6.50 $975.00 $15.00 $2,250.00 $30.00 $4,500.00 $10.00 $1,500.00 43 SANITARY MANHOLES TO BE ADJUSTED EACH 18 $600.00 10,800.00 $$800.00 $14,400.00 $700.00 $12,600.00 $750.00 $13,500.00 $1,250.00 $22,500.00 44 DRAINAGE & UTILITY STRUCTURES TO BE ADJUSTED EACH 37 $400.00 14,800.00 $$350.00 $12,950.00 $350.00 $12,950.00 $650.00 $24,050.00 $875.00 $32,375.00 45 VALVE BOXES TO BE ADJUSTED EACH 2 $350.00 700.00 $$150.00 $300.00 $200.00 $400.00 $475.00 $950.00 $350.00 $700.00 46 TRAFFIC CONTROL AND PROTECTION L SUM 1 $32,847.89 32,847.89 $$7,000.00 $7,000.00 $16,950.00 $16,950.00 $18,000.00 $18,000.00 $10,000.00 $10,000.00 47 TEMPORARY INFORMATION SIGNING SQ FT 302 $10.00 3,020.00 $$24.00 $7,248.00 $15.00 $4,530.00 $15.00 $4,530.00 $15.00 $4,530.00 48 SHORT TERM PAVEMENT MARKING FOOT 4165 $0.25 1,041.25 $$0.83 $3,456.95 $0.01 $41.65 $1.00 $4,165.00 $1.20 $4,998.00 49 WORK ZONE PAVEMENT MARKING REMOVAL SQ FT 690 $0.50 345.00 $$1.32 $910.80 $1.00 $690.00 $1.00 $690.00 $1.00 $690.00 50 THERMOPLASTIC PAVEMENT MARKING - LETTERS AND SYMBOLS SQ FT 235 $10.00 2,350.00 $$4.42 $1,038.70 $3.40 $799.00 $3.40 $799.00 $4.00 $940.00 51 THERMOPLASTIC PAVEMENT MARKING - LINE 4"FOOT 5336 $0.75 4,002.00 $$0.65 $3,468.40 $0.65 $3,468.40 $0.60 $3,201.60 $0.59 $3,148.24 52 THERMOPLASTIC PAVEMENT MARKING - LINE 6"FOOT 848 $2.00 1,696.00 $$0.98 $831.04 $1.50 $1,272.00 $1.35 $1,144.80 $0.89 $754.72 53 THERMOPLASTIC PAVEMENT MARKING - LINE 12"FOOT 990 $6.00 5,940.00 $$1.95 $1,930.50 $1.95 $1,930.50 $1.80 $1,782.00 $1.77 $1,752.30 54 THERMOPLASTIC PAVEMENT MARKING - LINE 24"FOOT 322 $8.00 2,576.00 $$4.42 $1,423.24 $3.50 $1,127.00 $3.40 $1,094.80 $4.00 $1,288.00 55 RAILROAD PROTECTIVE LIABILITY INSURANCE L SUM 1 $5,000.00 5,000.00 $$5,522.14 $5,522.14 $7,500.00 $7,500.00 $3,000.00 $3,000.00 $4,000.00 $4,000.00 56 TEMPORARY ACCESS (PRIVATE ENTRANCE)EACH 183 $200.00 36,600.00 $$50.00 $9,150.00 $0.01 $1.83 $0.01 $1.83 $90.00 $16,470.00 57 TEMPORARY ACCESS (ROAD)EACH 35 $400.00 14,000.00 $$75.00 $2,625.00 $0.01 $0.35 $0.01 $0.35 $130.00 $4,550.00 58 PRECONSTRUCTION VIDEO RECORDING L SUM 1 $1,368.66 1,368.66 $$1,600.00 $1,600.00 $500.00 $500.00 $2,000.00 $2,000.00 $500.00 $500.00 59 CONTINGENCY ALLOWANCE DOLLAR 30000 $1.00 30,000.00 $$1.00 $30,000.00 $1.00 $30,000.00 $1.00 $30,000.00 $1.00 $30,000.00 Engineer's Estimate of Cost $ 1,046,512.05 Bidder's Proposal as read $815,547.12 $883,545.78 $915,183.23 $1,028,264.86 Bidder's Proposal as corrected $815,547.12 $883,545.78 $915,183.23 $1,028,264.86 UNIT PRICE OPTION 2 TOTAL PRICE OPTION 2 UNIT PRICE OPTION 2 TOTAL PRICE OPTION 2 UNIT PRICE OPTION 2 TOTAL PRICE OPTION 2 Engineer's Estimate D Construction, Inc.P. T. Ferro Construction Co.Austin Tyler Construction, Inc.Gallagher Asphalt Corporation QTY OPTION 2 UNIT PRICE OPTION 2 TOTAL PRICE OPTION 2 UNIT PRICE OPTION 2 TOTAL PRICE OPTION 2 I:\Chicago\PFLDV\140056-2014 Misc Traffic\TR 105_2014 Street Program\40-Design\Assist Bidding\Non-MFT BidTab Option 1.xlsxNon-MFT BidTab Option 1.xlsx