HomeMy Public PortalAboutr 23-039Pooluflon of the �Rorogh of our#ere#, N, 0c
No. #23-39 Date of Adontio February 2, 2023
RESOLUTION AUTHORIZING EMERGENCY REPAIRS
FROM AGATE CONSTRUCTION COMPANY, INC.
FOR MARINA FIRE DAMAGE AND PIER EXTENSION
COLLISION EMERGENCY REPAIRS
WHEREAS, N.J.S.A. 40A:11-6 provides that a purchase, contract or agreement may be
made, negotiated or awarded without public advertising for bids and bidding therefore,
notwithstanding that the cost of contract price will exceed the amount set in the
prevailing bidding threshold, when an emergency affecting the public health, safety or
welfare requires the immediate delivery of performance of services, provided: A written
requisition for the performance of such work or labor, or the f imislung of materials,
supplies or services is filed with the contracting agent or his deputy in charge describing
the nature of the emergency, the time of its occurrence and the need for invoking this
section, certified by the officer or director in charge of the department wherein the
emergency occurred, or such other officer or employee as may be authorized to act in the
place of said officer or director, and the contracting agent or his deputy in charge, being
satisfied that the emergency exists, is hereby authorized to award a contract for said work
or labor, materials, supplies or services; and
WHEREAS, an emergency situation meeting the criteria set forth above resulting from
MARINA FIRE DAMAGE AND PIER EXTENSION COLLISION EMERGENCY
REPAIRS; and
WHEREAS, an emergency purchase/repair was made by Agate Construction Co., Inc.,
1030 Route 83, Clermont, NJ, 08210 in the amount not to exceed of $1,446,000.00 for
said Emergency Repairs with regard to Marina Fire Damage and Pier Extension Collison
Emergency Repairs.
NOW THEREFORE BE IT RESOLVED that the Mayor and Council of the Borough
of Carteret, does hereby authorize the payment of $1,446,000.00 to Agate Construction
Co., Inc., for the emergency repairs as described herein in accordance with N.J.S.A.
40A:11-6.
Adopted this 2"d day of February, 2023
and certified as a true copy of the
original on February 3, 2023.
CARMELA POGORZELSKI, RMC
Municipal Clerk
RECORD OF COUNCIL VOTE
COUNCILMAN
YES
NO
NV
A.B.
COUNCILMAN
YRSI
NO
I NV
A.B.
BELLINO
X
JOHAL
X
DIAZ
X
KRUM
X
DIMASCIO
X
NAPLES
X
-
X-Indicate Vote AD -Absent NV -Not Voting XOR- Indicates Vote to Overrate Veto
Adopted at a meeting of the Municipal Council
February 2 2023
1 y C
�uulc.i,�a.i.� "terry � p
BOROUGH OF CARTERET Daniell -Reiman,,( omy
MUNICIPAL CLERK
Date: January 1,1, 2023
To: PatrickDoBlasio
Treasure'
Borough of Carteret
isol•mmx• a_ c l!�
Fort, RE99LUTION AUTRORIZING EAMR_CYMY REPAIRS FROM AVATE CONSTRUCTION
COMPANY INC PM MARINA FIRE DAMAGE AND PJAR OTENSION COLLISION BMBROFNCY
RUPAIRS
Resolution tI: 023-
NomoofAceount: AQATECONSTRUCTIONCOMPANY INC,n'
AMOUNT TO BR ENCUMBERED: Amount not to oxcccd $L446.000.0t1 P
Municipal Clerk
CERTIFICATION OF AVAILABILITY OF FUNDS
1, Troasurer of the Borough of Carteret, do hereby certIfy that there are sufficient lands available hr the current
budget to enable the Municipal Council to authorize the entering Into a Contract between the Borough of Carteret
and;
The fiords available for this contract are in the Budget, in tine account of
In the amounto£ to lmg6mlo
By this certification, I have hereby encumbered the above named account for the amoun
t
of the contract bending
Council action,
Patrick De •
Treasurer
Dale: I -o _
.Memorlul,Mun3.citialBUIlding 0 61C001ce.A.uenue 0 Carteret', New Jerseyo7008
Tel: 732 591-3800 ® Faxt 732.541.8925 0 clerko6lceocart mtnet
ruurwrartnrnt•.nah
JOHN H.ALLGAIR, PE, PP, LS (1983-2001)
DAVID J. SAMUEL. PE, PP, CME
JOHN J. STEFANI, PE, I.S. PP, CME
.JAY B. CORNELL, PE, PP, CME
MICHAEL J. McCLELLAND, PE, PP, CME
_,'.> r OREGORY R. VALESI, PE, PP, CME
BRUCE M. KOCH. PE, PP, CME
VA
LOUIS J. PLOSKONKA, PE, CME
TREVOR J. TAYLOR, PE, PP, CME
ASSOCIATES
BEHRAM TURAN, PE, LSRF
LAURA J. NEUMANN, PE, PF
DOUGLAS ROHMEYER, PE, CFM, CME
January 30,202.3
ROBERT J. RUSSO, PE, PP, CME
JOHN J. HESS, PE, PP, CME
KEITH CHIARAVALLO, PE, CME
Via Electronic Mail (mayoraPcarteret.net)
Mayor and Borough Council
Borough of Carteret
61 Cooke Avenue
Carteret, NJ 07008
f . i -- F : llam E1imr,
Re: Waterfront Emergency Repair Quote Summary
Marina Fire Damage and Pier Extension Collision Emergency Repairs
Borough of Carteret, Middlesex County, NJ
CME File No.: HCA00501.17
Dear Mayor and Borough Council:
Our office has responded to and inspected damages related to the proceeding Marina vessel fire
and Pier Extension collision events that occurred at the Carteret Waterfront on October 24 and
31, 2022, respectively. Based on these inspections, our office has prepared detailed scopes of
work and solicited quotes from qualified contractors for emergency repairs to restore the affected
structures to their original conditions. Each of these events and the scope of associated repair
recommendations are detailed herein:
Event #1 — Dock A & B Fire Damage
On October24, 2022, a fire involving multiple vessels originating at the east end of Dock B caused
significant damage on Dock B as well as collateral damage on Dock A. We understand the
Incident is currently under investigation. The "T" end of Dock B has since been closed to protect
the public and the vessels involved have been recovered and removed from the marina. The
effected portion of the electrical system on Dock B was isolated by an electrician on the day of
the incident and power restored to unaffected slips.
CME has surveyed the site and identified the following damages related to the fire:
0 Dock A:
o Fire damage to one (1) electrical pedestal and one (1) dock box.
Dock B:
Fire damage to the concrete dock surface, polymer corner slabs, fendering, dock
boxes, and internal floatation of three (3) floating concrete modules;
SaCadere161CA00501.17- Pitt EAensian Repa]ACoaespondence123 01-30-Combined Emergency Rip RepodAm
CONSULTING AND MUNICIPAL ENGINEERS
NJ CERTIFICATE OF AUTHORIZATION NO. 24GA2835900
14%ROUTE 9 SOUTH w HOWELL, NEW JERSEY 07731 • (732) 462-7400 • FAX: (732) 499-0756
ASSOCIATES
Mayor and Borough Council January30, 2023
Re: Waterfront Emergency Repair Quote Summary Our File No. HCA00501.17
Marina Fire Damage and Pier Extension Collision Emergency Repairs Page 2
o Fire damage to the treated timber waler system, totaling approximately 104 linear
feet; and,
o Fire damage to PVC electrical chases, two (2) junction boxes, electrical
conductors, and three (3) power pedestals.
Due to the damage sustained to the internal foam floatation of the dock units, we recommend the
complete replacement of the three (3) above -mentioned floats on Dock B. Additionally, flame and
heat from the fire completely melted electrical conductors and components within the Dock B
modules and will require full replacement of the cables within the limits of the damaged float
modules. Furthermore, removal and replacement of all above -mentioned electrical pedestals,
dock boxes, and accessories on Docks A and B are recommended.
Bellingham Marine, Inc., the manufacturer of the floating dock modules, has advised the lead time
for dock production is approximately 20 to 24 weeks.
Event #2 — Pier Extension Barae Collision
On October 31, 2022, the steel pier extension at Waterfront Park was struck by a barge resulting
in severe damage to approximately 100 feet of the 700-foot long structure in two (2) specific
locations further described below. We understand the incident is currently under investigation.
The pier has since been closed to protect the public.
CME engaged an underwater structural engineer to conduct an inspection of the entire pier length.
The findings of this inspection are enclosed for Council's review. The barge's main point of impact
and area of most significant damage was concentrated in the area of Pile 41 with a secondary
impact at Pile 11. No damage was identified at the adjacent timber fishing pier. '
Based on field inspections, the damages are summarized below:
• Significant buckling, rotation, and, bending of three (3) HP14x73 steel plumb piles and
three (3) batter piles at Piles 40, 41, and 42;
• Buckled wavescreen waters, sheeting, and pile cap totaling ±48 feet at Piles 39 through
43;
• Buckled wavescreen sheeting totaling ±4 feet at Pile 11;
• Extensive superstructure damage, including structural steel channels, brackets, handrails,
and bar grating totaling ±96 feet at Piles 36 through 44; and,
• Damage to electrical handrail lighting conductors, conduit, and power supply units.
SACerterokMA00501.17-Fier Extension RepelACorrespondenee123-01-30-Combined Emergency Rip ReportAm
ASSOCIATES
Mayor and Borough Council January 30, 2023
Re: Waterfront Emergency Repair Quote Summary Our File No. HCA00501.17
Marina Fire Damage and Pier Extension Collision Emergency Repairs Page 3
We recommend that all damaged H-piles, sheeting, and superstructure components be removed
and replaced to original specifications. Steel suppliers have advised the lead time for steel sheet
piling and H-pile delivery is approximately 4 to 5 weeks, and superstructure structural steel is
approximately 14 to 17 weeks.
Summary of Repair Costs
Due to the level of damage sustained and the critical nature of the pier and wavescreen to protect
the inner harbor facilities of the marina, our office recommends that repairs be carried out an
emergency basis to restore the pier to its existing condition. Furthermore, we recommend the
immediate in -kind replacement of the fire -damaged floating docks and electrical infrastructure
resulting from the vessel fires as damage to the floatation material within the docks may result in
differential levels of buoyancy and unanticipated stresses within the adjacent floating dock
modules and structural connections. All components will be replaced in kind according to the
original specifications of the marina, pier extension, and wavescreen.
To effect these repairs, quotes have been solicited from three (3) marine construction contractors
and are summarized below. Original copies of the quotes are enclosed for your review and further
use. Due to the related location and nature of the work, quotes have been reviewed in aggregate
for the benefit of the Borough to consolidate mobilization costs where feasible.
--- ---
IContractor _ _
1. 1 Agate Construction Co., Inc.
2._LBird Construction
---
� Fire Damage �Pier_Collisi—on
$217,000.00 $1,229,000.00
$36.5,700.0.0__I $1,149,760.00
_— Comb—ine--
d Quote
$1_,446,000.00 _
$1,515,460.0__0___
3. 1 Atlantic Subsea, Inc.
�_ I $1,590,270.00
_
Based on this information, we recommend awarding the lowest responsible quote for floating dock
and pier extension repairs to Agate Construction Co., Inc., of Clermont, NJ in the amount of
$1,446,000.00. By copy of this letter, we request that the Borough Attorney prepare the necessary
Resolution of Award and forward any required documentation to the Borough's insurance adjuster
for reimbursement.
Upon authorization to complete the pier extension repairs, our office will issue a notice to the US
Army Corps of Engineers New York District advising that the work is anticipated to be conducted
within the January let to June 301' mudline disturbance moratorium related to essential fish habitat.
Work will be limited to the removal and replacement of three (3) pile bents and is anticipated to
be completed within five (5) working days.
No additional regulatory notice is anticipated for work related to floating dock repairs, as work will
not include any mudline disturbance.
S:\Ca,Ieret\HCA00W1.17-Pier Extension Repa1T\Correspondsnce@3M-30-Combined Emergency Pop Rossma.do"
ASSOOATES
Mayor and Borough Council January 30, 2023
Re: Waterfront Emergency Repair Quote Summary Our File No. HCA00501.17
Marina Fire Damage and Pier Extension Collision Emergency Repairs Page 4
We trust this is the information you require at this time. However, should you have any questions
or require additional information, please do not hesitate to contact this office.
Very truly yours,
CME Associates
PE, CME, CFM
For the Firm
T'RMZ
Enclosures to all (via e-mail)
cc: Patrick DeBiasio — CFO
John DuPont, PE, CME — Borough Engineer
Robert Bergen, Esq. — Borough Attorney
SACarteretUICA00501A7- Pier Extension Rep9kACerrospondenoet2"1.30-Combined Emergency Pop Repod.do
CARTERET MUNICIPAL MARINA - FIRE DAMAGE QUOTES
AGATE
CONSTRUCTION CO., INC.
ENGINEERS CONSTRUCTORS
Sent Via Email: I con)
December 23r1, 2022
CME Associates
1460 Rt. 9 South
Howell, NJ 07731
Attention: Matthew Zwingraf, PE, CME, CFM
Re: Carteret Waterfront Park
Marina Fire Damage
200 Middlesex Ave, Carteret, N1 07008
Dear Mr. Zwingraf:
Main Office:
1030 Route 83
Clermont, NJ 08210
TEL (609) 624-9090
FAX (609)624-0957
Letter No P576-001
Agate Construction Co., Inc. is pleased to provide you with this proposal for the work you have requested pricing for on the above
referenced project in Carteret, NJ. Our pricing sheet is attached. The anticipated duration of this work is 2 to 3 weeks.
Agate's proposal is based on the following inclusions, exceptions, and scope as outlined below:
1. Proposal is based on the information provided by CME Associates, specifically the following documents:
a. Email dated 12/9/22 with links and attachments
2. All pricing is based on one (1) mobilizations to the project site.
3. Pricing includes eight (8) %" dia x 9-1/4" SS studs with coupler inserts in the 8x20 unifloat. This was not specifically called
out in the scope document but is required.
4. Pricing is based on the assumption that a Carteret owned bulkhead can be used to launch the new and remove the old
floats.
5. Agate requires free and clear access to the work site at all times.
6. The pricing in this proposal is based on continuous, uninterrupted access to the work from the time Agate mobilizes to the
project site until completion of Agate's features of work.
7. Agate is responsible for the layout of all of its work.
8. Agate shall provide sufficient supervision to properly manage all phases of the work.
9. Our proposal specifically excludes the following:
a. Liquidated or Consequential Damages
b. Removals other than mentioned above
c. Utility Relocations of any kind, including cutting/capping of any utilities
d. Sump Pits and Dewatering
e. Handling, treatment and disposal of contaminated soil or groundwater
f. Hazardous material handling protocols of any kind
g. Sediment and erosion control measures
h. Vibration & settlement monitoring
i. Surveys of existing properties or structures
j. Backfilling and grading
k. Restorations of any kind
I. Removal of obstructions
m. Delays due to obstructions
n. Permits and fees.
An Equal Opportunity Employer
o. Premium time pay
p. Pedestrian/traffic control
q. Installation of plumbing
10. The concrete unifloats currently have a lead time of 20 - 24 weeks.
11. This proposal and pricing expires thirty (30) days from the date listed above. After that date, pricing is subject to change.
Insurance: Agate's insurance coverages are included as follows:
Workers Compensation
$1,000,000
Automobile Liability
$2,000,000
General Liability Each Occurrence
$2,000,000
General Liability Aggregate
$4,000,000
Umbrella Each Occurrence/Aggregate
$10,000,000
If you have any questions concerning the items listed above or the attached pricing, Agate will be pleased to review with you. We
look forward to having the opportunity to work with your organization on this project and appreciate the opportunity to quote this
work.
Please feel free to contact me if you need any additional Information at (609) 374-2698 or via email at cm_ oran_(c� l_atecons_truction _ne.t-.
Sincerely,
Chip Moran
Project Manager/Estimator
Agate Construction Company, Inc.
Attachments: Bid Totals
An Equal Opportunity Employer
O O O O
O O O O
F 0 0 0 0
ai V Nti7
N O O O O
u o 0 0 0
'G o000
P. o000
o 0 0 0
•�I aaaa
0
v
_i
w
c7
A
CIO
x
w
a A U
�dA
M H
Pw
zu �
��www
A
0
N
N V
w
mg
BIRD CONSTRUCTION
MARINE CONSTRUCTION
BULKHEADING ♦ PILE DRIVING ♦ DOCK BUILDERS ♦ DREDGING
106 HARBOR INN ROAD, BAYVILLE, NJ 08721
732-269-1333 FAX:732-269-4747
December 6, 2022
CME Associates
1460 Rt. 9 South
Howell, NJ 07731
Attn.: Mr. Matthew Zwingraf
III 'zw IV, t it jir)cmeus i Lcom
Ref.: Carteret Marina
Borough of Carteret, Middlesex County, NJ
Subj.: Proposal to Repair Fire Damage to Dock B & A
Dear Mr. Zwingraf,
Bird Construction (Bird) is pleased to submit its pricing to repair the fire damage to Dock B & A at the
referenced project site for the Lump Sum Amount of $365,700.00. The lump sum amount includes the
following:
• Mobilization / demobilization
• Removal & disposal of 3 Floating Unifloats & Associated electrical & plumbing
• Furnish and install 3 new floating Unifloats as follows:
0 1 Each 8' x 20' Concrete Unifloat, 1 Each 8' x 18' Concrete Unifloat, 1 Each 8' x 14'
Concrete Unifloat
o Fabricated, heated (CCA) wood waler system - all walers
to be Southern Yellow Pine, No. 1. Includes 104 linear feet of double 4" x 10" walers
with a 2" x 10" cover board.
o Vinyl tendering — includes 360 feet of vinyl tendering, dark gray in color.
o Corner bumpers - 4 each.
o PVC chaseways and junction boxes — includes 4" x 16" PVC chaseway and 2 each
17" x 30" junction boxes.
o Galvanized steel thru-rods - includes 43 each 113" x '/a" galvanized thru-rods with
galvanized hardware. All miscellaneous hardware such as bolts, nails etc ... will also be
stainless steel.
o Galvanized steel weldments — includes 2 each 4' x 6' HDG triangle flames. Also
includes 2 each T-Head/L-Head Clips.
o Slip -resistant polymer filler slabs - including 4 each 4' x 6' triangle filler slabs to
provide a continuous deck surface.
o Design criteria is in kind replacement. Signed, sealed drawings or calculations are
excluded.
• Furnish & Install New Electrical at Dock B & A
o Filing electrical permit
o Electrical disconnects for removal
o Furnish and install the following
• (4) Power pedestals rated at 50 Amps
0 (3) Dock storage boxes
BIRD CONSTRUCTION
MARINE CONSTRUCTION
BULKHEADING ♦ PILE DRIVING ♦ DOCK BUILDERS ♦ DREDGING
105 HARBOR INN ROAD, BAYVILLE, NJ 08721
732-269-1333 FAX:732-269-4747
o Type "w" cable 4-# 1 Copper (Allowance of approx. 200' LF)
o Testing
o Final clean up and inspection
The above pricing is based on the following:
1. Replacing pieces in kind.
2. Bird Construction has based its proposal on its interpretation of the information provided and will
revise its pricing as necessary upon receipt of any future information, including additions,
clarifications and/or modifications.
3. Furnishing all labor, equipment, tools, consumable materials, permanent materials and incidentals
required to complete the work unless otherwise noted.
4. Bird employees are members of Local 726, the International Union of Journeymen & Allied
Trades which is included in the above pricing.
5. We have NOT included New Jersey sales tax on materials in the above pricing.
6. Bird requires unfettered access to the work and has not included any cost to account for
interruptions due to other work being performed at the site.
7. Payment and Performance Bonds are not included. If bonds are required, we can furnish them at
an additional cost.
8. Downtime as a result of interruptions caused by others will be evaluated on a case -by -case basis
and if necessary, additional work will be billed on a time and material basis and agreed to before
work resumes.
9. We have included one mobilization and one de -mobilization.
10. When the existing Unifloats are removed, should there be any additional materials and/or utility
work required, this will be billed as additional work.
11. When mobilized to the site, the barge and push tug will restrict access to the marina during the
dock repair,
12. Price is valid for 30 Days. There will be a 20 week Lead Time for delivery of materials.
Should you have any questions and/or comments, do not hesitate to contact us; if you wish to meet
regarding our proposal, we are available at your convenience.
Sincerely,
PM XWUwa
Jim Hannon
JH/nlh
CARTERET MUNICIPAL MARINA - PIER EXTENSION
BIRD CONSTRUCTION
MARINE CONSTRUCTION
BULKHEADING ♦ PILE DRIVING ♦ DOCK BUILDERS ♦ DREDGING
106 HARBOR INN ROAD, BAYVILLE, NJ 08721
732-269-1333 FAX:732-269-4747
January 16, 2023
CME Associates
1460 Rt. 9 South
Howell, NJ 07731
Attn.: Mr. Matthew Zwingraf
mz,w_in rz a>,croeuseI.Co m
Ref: Carteret Marina
Borough of Carteret, Middlesex County, NJ
Subj.: Proposal to Repair Existing Wave Screen Damage Rev. 2
Dear Mr. Zwingraf,
Bird Construction (Bird) is pleased to submit its revised pricing to repair the damage to the existing wave
screen at the referenced project site for the Lump Sum Amount of $1,149,760.00. The lump sum amount
includes the following:
• Mobilization / Demobilization.
• Removal & Disposal of 96 LF of Superstructure and Associated Electrical.
• Furnish and Install 96 LF of New Superstructure and Associated Electrical.
• Remove and Replace with New, 6 each HP14x73 Steel H Piles; 3 Plumb and 3 Batter W/ Required
Connections and Coal Tar Epoxy Coated.
• Remove and Replace with New, 2 Walers at 48 LF Each Including Required Connections and Coal
Tar Epoxy Coated.
• Remove and Replace with New, 12 Pair PZC18x20' with WI Ox39x36' Stingers Attached Between
Bents 39 and 43, Each Including Required Connections and Coal Tar Epoxy Coated.
• Remove and Replace 50 LF of Cap Between Bents 39 and 43.
• Remove and Replace with New, 1 Pair PZC18x20' with W l Ox39x36' Stingers Attached at Bent 11,
Including Required Connections and Coal Tar Epoxy Coated.
• Purchase 2 Additional Pair of Sheets with Stingers as a Contingency if Needed.
As an Alternate to the above, Bird will ASAP mobilize to the site, remove and dispose of the superstructure,
perform a survey of the existing area and demobilize from the site for a Lump Sum Amount of $155,000.00.
Should this option be exercised, Bird will provide a credit of $36,000.00 to the base contract for the removal
of the existing superstructure.
The above pricing is based on the following:
1. Reconstruction will in accordance with Envar Services, Inc. Wave Screen Drawings as received
from CME Associates on November 15, 2022.
2. Bird Construction has based its proposal on its interpretation of the information provided and will
revise its pricing as necessary upon receipt of any future information, including additions,
clarifications and/or modifications or after demolition is complete and addition damage is
revealed.
BIRD CONSTRUCTION
MARINE CONSTRUCTION
BULKHEADING ♦ PILE DRIVING ♦ DOCK BUILDERS ♦ DREDGING
105 HARBOR INN ROAD, BAYVILLE, NJ 08721
732-269-1333 FAX:732-269-4747
3. Furnishing all labor, equipment, tools, consumable materials, permanent materials and incidentals
required to complete the work unless otherwise noted.
4. Bird employees are members of Local 726, the International Union of Journeymen & Allied
Trades which is included in the above pricing.
5. We have NOT included New Jersey sales tax on materials in the above pricing.
6. Bird requires unfettered access to the work and has not included any cost to account for
interruptions due to other work being performed at the site.
7. Payment and Performance Bonds are not included. If bonds are required, we can furnish them at
an additional cost.
8. Downtime as a result of interruptions caused by others will be evaluated on a case -by -case basis
and if necessary, additional work will be billed on a time and material basis and agreed to before
work resumes.
9. We have included one mobilization and one de -mobilization.
10. When the existing structures are removed, should there be any additional materials and/or utility
work required, this will be billed as additional work.
11. When mobilized to the site, the barge and push tug will restrict access to the marina during the
dock repair.
12. Price is valid for 30 Days. There will be a 16-week Lead Time for delivery of materials.
13. If the HP14 x 73 steel beams cannot be extracted the existing beams will be cut off at the mud line
and new beams installed
Should you have any questions and/or comments, do not hesitate to contact us; if you wish to meet
regarding our proposal, we are available at your convenience.
Sincerely,
PM Ncuu m
Jim Hannon
JH/nlh
AGATE Main Office:
1030 Route 83
CONSTRUCTION CO., INC. Clermont, NJ 08210
ENGINEERS • CONSTRUCTORS TEL (609) 624-9090
FAX (609) 624-0957
Sent Via Email: mzwini_com
January 1111, 2023
CME Associates Letter No P572-002
1460 Rt. 9 South
Howell, NJ 07731
Attention: Matthew Zwingraf, PE, CME, CFM
Re: Carteret Waterfront Park
Pier Extension Damage
200 Middlesex Ave, Carteret, NJ 07008
Dear Mr. Zwingraf:
Agate Construction Co., Inc. is pleased to provide you with this proposal for the revised scope you have requested pricing for on the
above referenced project in Carteret, NJ. Our pricing sheet is attached. The anticipated duration of this work is 2.5 months.
Scope Clarification:
1. Remove/replace 96 LF of pier superstructure from Bent 36 to Bent 44. Pricing includes lights Inside of railing sections, and
replacing six (6) cantilever angle supports and pile caps on bents 36-39, 43 and 44.
2. Remove/replace three (3) plumb and three (3) batter HP14x73 piles at Bents 40, 41 and 42.
3. Remove/replace 15 pair of steel sheet piles, 48 LF wale and 50 LF SSP cap from Bent 36 to 37.
Agate's proposal is based on the following inclusions, exceptions, and scope as outlined below:
1. Proposal is based on the information provided by CME Associates, specifically the following documents:
a. Email dated 11/4/22 and attachments
b. Emails dated 11/8/22 and attachments
c. Email dated 11/9/22 and attachments
d. Email dated 1/6/23 and attachments
2. All pricing is based on one (1) mobilizations to the project site.
3. Agate requires free and clear access to the work site at all times.
4. The pricing in this proposal is based on continuous, uninterrupted access to the work from the time Agate mobilizes to the
project site until completion of Agate's features of work.
5. Agate is responsible for the layout of all of its work.
6. Agate shall provide sufficient supervision to properly manage all phases of the work.
7. This proposal includes four (4) days of an electrical crew for the repair of existing conduit. Should more than 4 days be needed
to repair the existing electrical system, an additional cost of $3,250/day will apply.
8. Our proposal specifically excludes the following:
a. Liquidated or Consequential Damages
b. Removals other than mentioned above
c. Utility Relocations of any kind, including cutting/capping of any utilities
d. Sump Pits and Dewatering
e. Handling, treatment and disposal of contaminated soil or groundwater
f. Hazardous material handling protocols of any kind
g. Sediment and erosion control measures
An EqualOpporrnnify Employer
h. Vibration & settlement monitoring
I. Surveys of existing properties or structures
j. Backfiiling and grading
k. Restorations of any kind
I. Removal of obstructions
M. Delays due to obstructions
n. Permits and fees.
o. Premium time pay
p. Pedestrian/traffic control
9. Steel sheet piling and HP14x73 piles have a lead time of 4-5 weeks.
10. Superstructure structural steel has a lead time of 14-17 weeks.
11. This proposal and pricing expires ten (10) days from the date listed above. After that date, pricing Is subject to change.
Insurance: Agate's insurance coverages are included as follows:
Workers Compensation
$1,000,000
Automobile Liability
$2,000,000
General Liability Each Occurrence
$2,000,000
General Liability Aggregate
$4,000,000
Umbrella Each Occurrence/Aggregate
$10,000,000
If you have any questions concerning the Items listed above or the attached pricing, Agate will be pleased to review with you. We
look forward to having the opportunity to work with your organization on this project and appreciate the opportunity to quote this
work.
Please feel free to contact me if you need any additional information at (609) 374-2698 orvia email at cmora�naEateconstructian.ne[.
Sincerely,
C
Chip Moran
Project Manager/Estimator
Agate Construction Company, Inc.
Attachments: Bid Totals
An Equal Oppa7nnity Employer
4
a
T
0 ATLANTIC SUBSEA, INC
January 9, 2023
Matthew Zwingraf
CME Associates
1460 Rt. 9 South,
Howell, NJ 07731
Re: Carteret Pier Extension Damaee Repairs
PROPOSAL
PO Box 714
Bridgeport, NJ 08014-0714
Tel: (856) 241-3544. Fax: (856) 241-3545
www.atiantiGsubsea.com
Attached please find our proposal for the above referenced project. Our prices are based on
information and reference plan supplied by CME Associates.
Our scope of work includes
1. Mobilize to site within next 30 days
2. Remove and replace damaged 96' section of superstructure
3. Remove and replace 15 pairs of sheet pile, 48LF walers and 501,17 pile cap
4. Remove and replace 3 H pile bents
5. Survey surrounding existing pile structures to confirm alignment and potentially
identify additional piles requiring replacement
Our pricing is as follows -
Item #
Description
Cost
1.
Mobilization
$198,000.00
2.
Demolish existing damaged superstructure walkway
and grating
$148,000.00
3.
Survey Existing piles
$14,270.00
4.
Demolish damaged sheets and 3 pile bents
$140,000.00
5.
Install 96' of new superstructure, 3 pile bents and
new Sheet pile & wale sections as detailed
$1,090,000.00
Total
$1,590,270.00
Our bid exceptions for our work scope are as follows:
1. Bonds, Permits
2. PDA
3. Price is based on uninterrupted work
4. Any delays or shutdowns beyond our control
5. Subsurface obstructions to pile driving activity
6. Bid is based on single mobilization. Any subsequent mobilizations will be charged
extra.
"Providing In -Depth Solutions"
ATLANTIC SUBSEA, INC
Matthew Zwingraf
Carteret Pier Extension Damage Repairs
Page 2
Please review the above and the attached proposal and do give us a call if you need further
clarifications.
Y urs truly,