Loading...
HomeMy Public PortalAbout9982 BOGUE ST_Building_1/29/2020_B20-39223 demo and backfill poolTEMPLE CITY PERMIT NO. B20-39223 City of Temple City 19701 Las Tunas Drive i Temple City, California 91780 i (626)285-2171 I www.templecity.us Address: 9982 Bogue Street, Temple City, California 91780 Parcel: 8588-015-030 Permit No: B20-39223 Type: Building Subtype: OTOther Description: COMPLETE DEMO AND BACKFILL OF 238.5SF POOL Special Conditions: Issue Date: 01-29-2020 Expire Date: 01-28-2021 Extension: Extension: Permit expires on date shown if: l) work does not commence, or 2) work Is suspended or abandoned, or 3) applicant fails to obtain code required inspection. - Contacts Owner Li Qun Chen $6000.00 9982 Bogue Street, Temple Cily, California 91780 ( Applicant Torres Demolition Contractor 5134 Landis Avenue, Baldwin Park, California 91706 (626)960-1308 806495 Contractor Torres Demolition Contractor 5134 Landis Avenue, Baldwin Park, California 91706 (626) 960-1308 806495 r Building Details $0.00 Sewer Const Fee $0.00 Bldg Dept Framing Rated Walls Slab/Under Floor Shear Panels Structure 1: 2: 3: 4: T -Bar Construction Type: Insulation/Weather Ceilings Underfloor Occupancy Group: Lot Drainage Insulation Interior New/Added Area: 0 0 0 0 Detectors Remodel/Tl Area: 0 0 0 0 2nd Floor New Dwelling Units: 0 0 0 0 Stories: 0 0 0 0 r Fees Total Valuation $6000.00 Plan Check Fees $176.56 Permit Fees $207.72 Approval Date Inspector Approval Date Inspector Strong Motion Fee $0.00 SB 1473 Fee $1.00 Parks Dev Fee $0.00 Sewer Const Fee $0.00 �Building Inspections Approval Date Inspector Approval Date Inspector Approval Date Inspector Location/Setbacks 1 Roof Sheathing Rated oils Engineer Fire Dept Framing Floor/Ceiling �� V�L Foundation Forms � Bldg Dept Framing Rated Walls Slab/Under Floor Shear Panels Rated Shahs Raised Floor Sprinkler Hangars T -Bar Framing Insulation/Weather Ceilings Underfloor Strip Lot Drainage Insulation Interior Smoke 1st Floor Lath/Drywall Detectors Sheathing Exterior Lath Fire Dept 2nd Floor Approval Sheathing FINAL