Loading...
HomeMy Public PortalAbout9523 BLACKLEY ST_Electrical_2/10/2021_E21-40503 electrical panelCity of Temple City 1 9701 Las Tunas Drive I Temple City, California 91780 1 (626)285-2171 I www,templecity.us Address: 9523 Blackley Street Unit B, Temple City, Parcel: 8590-005-011 California 91780 Permit No: E21-40503 Type: Electrical Subtype: Subtype: Residential Description: ELECTRIC AL FO RA NEW DETACHED Special ACCESSORY DWELLING UNIT WITH A 100 Conditions: AMP SERVICE PANEL Issue Date: 02-10-2021 Expire Date: 02-10-2022 Extension: Extension: Permit expires on date shown if: 1) work does not commence, or 2) work is suspended or abandoned, or 3) applicant fails to obtain code required inspection. �- Contacts Owner Selina 9523 Blackley Street, Temple City, California ( Zhang 91780 Contractor RRSW Construction 765 Francesca Drive, Walnut, California (626) 201-2506 10453d9 Inc. 91789 Architect Kamen Elite Design 8748 E. Valley Boulevard Suite K, Rosemead, (626) 288-2654 Lai Development Inc. California 91770 Engineer Jim C. I.F.C. Engineering, Inc. 1822 E Route 66 Suite 328, Glendora, (818) 814-8268 Wong California 91740 Electrical Details New Multifamily 0 New Single- 869 New Swimming 0 Spa, Hot Tub, 0 Carnival Ride: 0 Family/Duplex Pool Alteration Electric Carnival Ride: 0 Carnival Lighting 0 Temporary 0 Temporary 0 Branch 0 Mechanical System Power Pole Power System Circuit: Outlets Branch Circuit: 0 Receptacle, 0 Light Fixture 0 Light Fixture: 0 Light Fixture: 0 Lights Switch, Lighting Pole Mount Theatrical Outlets Residential 0 Non -Residential 0 Power 0 Power 0 Power 0 Appliance:3 HP Appliance:3 HP or Apparatus: 3- Apparatus: 10- Apparatus: or less less 10HP 50 HP 50-100 HP Power Apparatus: 0 Busway 0 Sign 0 Service: Under 1 Service: 400- 0 Over 100 HP 400 Amps. 1000 Amps Service: Over 0 Miscellaneous 0 1000 Amps Fees Total Plan Check Fees $0.00 Permit Fees $263.52 Electrical Inspections Approval Date ,,,,, Inspector Approval Date Inspector Approval Date Inspector Temp Pole "'` Conduit Utility Underground �' Wiring � Release 16 Ufer Ground Water FINAL ^! Ground