HomeMy Public PortalAboutr 23-078Atoatuttion of the 190roug4 of (fa rtezet, N� �1
#23-78 March 23 2023
Date of Adoptio �
AUTHORIZING A PROFESSIONAL SERVICES CONTRACT WITH
MOTT MACDONALD FOR GENERAL ENGINEERING SERVICES
WHEREAS, the Borough of Carteret is in need of professional General Engineering
Services for various projects in the Borough; and
WHEREAS, the Borough's Consulting Engineers, Mott MacDonald, possess the
requisite skill and expertise to provide said services; and
WHERIKAS, Mott MacDonald has submitted a proposal to provide said engineering
services at a total cost not to exceed $75,000.00; and
WHEREAS, the Mayor and Council have reviewed said proposal; and
WHERE, ApS, the Chief Financial
cial ffic �r 11 s�TfifN that nds a��e� qr NvAbe available
for said purpose. Acet. # 8 S 4 0, 4
- - , 5.05
NOW, THEREFORE, BE IT RESOLVED by the Mayor and Council of the Borough
of Carteret, County of Middlesex, State of New Jersey, as follows:
1. That the proposal from Mott MacDonald for professional General
Engineering Services for various projects at a total cost not to exceed
$75,000.00, billable in accordance with Mott MacDonald's existing
contract with the Borough, is hereby approved.
2. That this action is approved as an award of a professional services
contract pursuant to N.J.S.A. 40A:11-5(l)(a) in accordance with the
Borough's Fair and Open Process as authorized by law.
3. A copy of this Resolution be forwarded to the Borough's Purchasing
Department and Mott MacDonald.
Adopted this 23`d day of March, 2023
and certified as a true copy of the
original on March 24, 2023.
CARMELA POGORZELSKI, RMC
Municipal Clerk
RECORD OF COUNCIL VOTE
COUNCILMAN
YBS
NO
I NV
I A.B.
COUNCILMAN I
YES
I NO
I NV
A.B.
$LLLI1\0
X
JOHAL
X
DIAZ
X
KRUM
.X
DIMASCIO
X
NAPLFS
X
X-Indicate Vote AB -Absent NV -Not Voting XOR -Indicates Vote to Overrule Veto
Adopted at a meeting of the Municipal Councils
March. 23, 2023 `
Municipal Cl kw, ,/
AFFIDAVIT OF PUBLICATION
The following is a true copy of an Ordinance or Resolution of
the Borough of Carteret that has appeared in the Home News
Tribune, a newspaper which is printed in Freehold, New
Jersey and published in Neptune, in said County and State and
of general circulation in said county. One 1 time(s), once in
each issue as follows:
March 31, 2023
Carinela Pogoirii
Municipal Clerk
i� (Y) . kkk'b 0
Notary ublic of New Jersey
Sworn and subscribed before
me this a>I '�A day of H Vfi 1 I
-` MARGARET M. RUSSO
NOt�q�
oeuc NOTARY PUBLIC Of NEW JERSEY
wFw �cxs�+ MYCOMMISSION EXPIRES 4/4/202S
BOROUGH OF
MUNICIPAL CLERK
To: Patrick DeBlaslo
Treasurer
Borough of Carteret
RHOU13ST FORCERTIFICATION OF AVAILABLE FUNDS
DanieiJ:
Ditto: March 8, 2023
For: AUTHORIZING A PROKfflONAL SERVICES CONTRACT WI1 I0 MOTT MACDONALD C+OR
GENERAL ENGINEERING SERVICES,
Resolution #; 023-78
Name of Account: MOTT MACDONALD
AMOUNT TO BE ENCUMBERED; Amount not to exceed $ S7 .000.
Municipal Clerk
CERTIFICATION OF AVAILABILITY OF FUNDS
I, Treasurer of the Borough of Carteret, do hereby certify that there are Buff Bleat funds available In the current
budget to enable the Municipal Council to authorize the entering Into it Coth:rct betwoon the Borough of Carteret
and;
The fbads available for this oontraot ore in the Bgget, in the account of
_._... — 3-�,tt- • p-► S 2a�`I. �r���l. ��� :� os-5t �+�1-2s�. ��dzs.•a•T
Ill tile antountof n06
By this certification, I have hereby encumbered the above named account for the amount of the contract pending
Council action, P,�
Patrick DeBlaslo
Treasurer
Date:__
Memorial Municipal Building * 61Cooke.Avenue ® Carteret,Newjersey07008
'AI:732-541-3800 ® Pax, 732-541.8925 & derkofficeamrartetetmet
ruunuaatFnrnf.nrt
MOTT - -M
'
MACDONALD
Mr. John Dupont, PE, CME, PP
Director of Municipal Engineering
Borough of Carteret
Memorial Municipal Building
61 Cooke Avenue
Carteret, NJ 07008
3 Paragon Way
Freehold NJ 07728
United States of America
T +1 (732) 780 6565
F +1 (732) 577 0551
mottmac.com
Borough of Carteret
Annual General Engineering Services Proposal - 2023
February 20, 2023
Dear Mr. Dupont,
Mott MacDonald is pleased to provide the Borough of Carteret our Annual General
Engineering Services proposal for 2023. During 2022 and prior years, Mott
MacDonald has provided consulting engineering services and other technical
advisory support to the Borough related to its municipal sewer system and other
infrastructure. We are excited to have the opportunity to continue providing these
services to the Borough in 2023 and greatly appreciate the long-standing
relationship we have developed with the community over the past 20+ years.
Based upon our understanding of the Borough's needs, goals and objectives
related to their municipally owned, operated and maintained infrastructure, we have
developed a summary of the tasks and services we have completed over the past
year and the tasks and services we anticipate will be required in the year ahead as
outlined below:
General Task / Project Progression and Completion
1. Sanitary Sewer System Support and Master Planning
a. With respect to the Borough's Pump Stations, Mott MacDonald completed
operational support and maintenance activities associated with nearly all of
the pump station facilities. Specifically, Mott MacDonald had extensive
coordination for the continued rehabilitation work performed at the Roosevelt
Ave PS and to move the construction contract to closeout. Mott MacDonald
also coordinated with the Borough and Contractors for various replacements
at the Hayward Ave PS and Dorothy St PS and for wet well cleanings at the
three previously mentioned pump stations along with the Sabo St PS and
Harrison PS.
b. Assisted the Borough with preparation and implementation of a Master Pump
Station improvements list. Every Borough owned pump station has an
equipment and infrastructure issues list for consideration for equipment parts
MOTT M
MACDONALD and infrastructure replacement. As the Borough is aware various
improvements have been initially identified and we have assisted in
developing an action plan to implement the most critical items at various
stations throughout the Borough.
2. Sanitary Sewer Cleaning and CCTV Investigation
Provided Design and Bidding services, and reviewed CCTV information
regarding the cleaning and CCTV inspection of approximately 17,000 LF
of 8-inch, 10-inch, 12-inch, and 15-inch sewer mains. The work also
included multiple wet well cleanings of grease build up at various pump
stations and the tanks at the park bathroom along the Riverfront. Review
of the CCTV information is on -going with the potential of rehabilitation
and sewer main replacements based on initial findings.
3. Smoke Testing
In preparation for a smoke testing project contract, the entire Borough's
sewer system was analyzed to determine potential smoke testing areas.
Based on the configuration of the overall system, the Borough was
divided into four (4) sewer influent flow sections leading into the
Roosevelt Avenue PS. These sections were developed in anticipation for
further testing.
4. Carteret Abattoir
- Provided communication with the Abattoir's attorney regarding invoicing
from the Borough. An environmental report was provided by the abattoir
and submitted to the Borough outlining the wastewater and on -site blood
collection process revealing an isolated system of blood collection. This
report was reviewed by Mott MacDonald along with a follow up
walkthrough with the Director of Engineering on -site with the Carteret
Abattoir managementlownership.
5. Attended meetings and conference calls related to the Borough's day-to-day
sewer operations, maintenance, and troubleshooting. Performed on -site
inspection and observation as requested and as necessary.
6. Prepared quarterly reports to the Borough for MCUA related to compliance with
the Borough's action plan outlined in the Borough's approved Inflow/Infiltration
(1/1) Reduction Report. Items such as the Borough's efforts with smoke testing
and the cleaning and CCTV contracts have been added to the reports.
7. Supported 1/1 investigation for Kinder Morgan industrial campus and continued
design coordination of a new meter chamber and control valve connecting the
Kinder Morgan facility into Carteret's sewer system.
Upcoming Specific Tasks and Project Development
Mott MacDonald has been asked by the Borough to continue providing consultation
and guidance related to the following General tasks:
1. Sanitary Sewer Cleaning Design Bidding & Construction Management Services
Mott MacDonald will provide design services, bidding services and construction
management services for the upcoming 2023 Sanitary Sewer Cleaning & CCTV
Page 2 of 6
MOTT M
MACDONALD
Page 3 of 6
project which will be designed and will go out to bid and into the construction
phase over the next few months as the existing project closes out. We will
coordinate with Borough engineering and operations to determine priority areas
to be cleaned and CCTV'd and will develop plans for the Contractor to perform
the work. Coordination with the Contractor will also be necessary throughout the
construction phase of the project as new locations are identified for cleaning and
inspection. The Borough has stated a 3-year contract with a contractor is
desired for this work.
2. Various Minor Pump Station Improvements - It is our understanding that the
Borough would like to continue evaluations of and improvements to their existing
generators, outgoing alarms, equipment, and safety concerns at each of their
smaller capacity pump stations. Mott MacDonald will continue to visit pump
stations, as necessary, to identify and possibly expand on the existing list of
deficiencies created over the prior year. With initial identification and checklists
developed for each pump station, Mott MacDonald will assist in developing a
2023 action plan to implement the most critical items at various stations
throughout the Borough. Mott MacDonald will coordinate internally for design
purposes, as necessary, and coordinate with Contractors to perform any repairs.
3. 1/1 Reduction Plan Report Updates and Quarterly Submissions — Mott
MacDonald will continue to provide quarterly updates to the Borough for MCUA
submission on the approved 1/1 Reduction Report. We will continue to discuss
proactive solutions to continue mitigation of deficiencies to reduce 1/1 based
upon the items identified in the original 1/1 reduction report. Specifically, based
on metering at the Roosevelt Pump Station, we have suggested completion of
flow metering in various areas of the Roosevelt Pump Station service area to
narrow the source of large and rapid inflow to the facility during storm events.
4. Sanitary Sewer Repairs and Replacements — Mott MacDonald will expand upon
the 2022 Sewer Cleaning & CCTV project, by discussing and preparing with the
Borough areas of concern for sewer infrastructure improvements by means of
sewer main rehabilitation and replacement. This process will include plans and
specifications for bidding of the work should the Borough choose to proceed.
5. Roosevelt Avenue Force Main Air Release Valves Replacement — Mott
MacDonald will discuss and coordinate the development of initial concepts for
the replacement of the previously inspected Roosevelt Avenue Force Main air
release valves which were identified for replacement under the Force Main
Evaluation Study. The air release valve replacement project work will need to be
performed under a separate contract to include the development of plans and
specifications for bidding purposes and construction management oversight.
6. Kinder Morgan Coordination — It is Mott MacDonald's understanding the
Borough will require Kinder Morgan to fund the design and installation of the
proposed meter/valve chamber. At the Borough's direction, Mott MacDonald will
continue assisting the Borough in coordinating with Kinder Morgan and providing
them guidance on the installation of a permanent meter/valve for the Borough's
use.
7. Carteret Abattoir Investigation — Mott MacDonald will continue coordination with
the Borough Treasurer regarding the investigation performed at the Abattoir and
MMOTT M
MACDONALD
Page 4 of 5
will continue assisting the Borough as necessary. Coordination with the Carteret
Abattoir's lawyer will also be continued.
8. Day -to -Day Borough Requests and Meetings — Mott MacDonald representatives
will continue to be available to participate in in -person and virtual meetings/calls,
to perform site visits, investigations, and inspections for any infrastructure or
utility matter on an as -needed basis.
General Engineering Budget
Mott MacDonald respectfully requests a budget for the General Engineering
Services explained above in the amount of $75,000.00 to enable us to continue
providing general engineering services to the Borough related to their municipal
sewer system and other infrastructure. As we have done previously, Mott
MacDonald will advise the Borough when we reach 80% of the approved budget
allotment and at 90% we will request a budget amendment, if necessary.
Mott MacDonald will not conduct any additional work without prior authorization by
the Borough. Invoices for the work described will be submitted to the Borough
monthly based on actual hours worked and expenses at the time the invoice is
prepared. Below is a table to summarize the expected project costs based on this
budget amendment:
Task
Description
Engineering Fees
1
2023 Sanitary Sewer Cleaning Design, Bidding
$12,500
& Construction Management Services
2
Various Minor Pump Station Improvements
$10,000
3
1/1 Reduction Plan Report Updates and
$5,000
Quarterly Submissions
4
Sanitary Sewer Repairs and Replacements
$12.500
5
Initial Concepts of the RAPS Force Main Air
$10,000
Release Valves Replacement
6
Kinder Morgan Coordination
$5,000
7
Carteret Abattoir Investigation
$5,000
8
Day -to -Day Borough Support Services
$15,000
Requests and Meetings
2023 General Engineering Services Budget
$76,000
M MOTT ' "M
'
MACDONALD
Page 6 of 5
We appreciate this opportunity to continue serving the Borough of Carteret. If you
have any questions, please do not hesitate to contact us.
Very truly yours,
Mott MacDonald
Peter Giammona, PE
Senior Project Engineer
T 732.333.3270
[LeeGgLammona(_ ottmac corn
cc: Peter E. Kocsik, PE, Mott MacDonald
Angelo Bufaino, PE
Senior Vice President
T 732.333.3272
angelq_bufa no a)pL rnac,00m