HomeMy Public PortalAbout5828 BURTON AVE_Building_2/3/2020_B20-39228 trellisTEMPLE CITY PERMIT NO. B20-39228
Permit expires on date shown if: 1) work does not commence, or 2) work Is suspended or abandoned, or 3) applicant fails to obtain code
required inspection.
Contacts______
VOwner-Builder
Owner Yuan)!/Shang Yin Tian
Applicant
Architect Alan Gao
v Building Details
Structure l:
City of Temple City 1 9701 Las Tunas Drive I Temple City,
California 917801
(626)285-2171 1 www.templecity.us
Address:
5828 North Burton Avenue, San Gabriel, California
Parcel:
5387-006-025
Remodel/TI Area:
91775
New Dwelling Units;
0
Permit No:
B20-39228
Type:
Building Subtype: RAResidential
Addition
Description:
NEW TRELLIS PATIO ATTACHED TO REAR OF THE
Special
HOUSE
Conditions:
Issue Date:
02-03-2020
Expire Date:
02-02-2021 Extension: Extension:
Permit expires on date shown if: 1) work does not commence, or 2) work Is suspended or abandoned, or 3) applicant fails to obtain code
required inspection.
Contacts______
VOwner-Builder
Owner Yuan)!/Shang Yin Tian
Applicant
Architect Alan Gao
v Building Details
Structure l:
Trellis 2;
Construction Type:
V -B
Occupancy Group:
U Utility, miscellaneous
New/Added Area;
285
Remodel/TI Area:
0
New Dwelling Units;
0
Stories:
0
Fees Total
9443 Longden Avenue, Temple City, California 91780
17791 Neff Ranch Road, Yorba Linda, California 92886
3: 4:
0
0
0
0
0
0
0
0
0
0
0
0
(
(626) 899-6108
Valuation $13,765.50 Plan Check Fees $335.68 Permit Fees 8394.92
Strong Motlon Fee $0.00 581473 Fee $1.00 Parks Dev Fee $0.00 Sewer Const Fee $0.00
Building Inspections
Approval Date Inspector Approval Date Inspector Approval Date Inspector
Location/Setbacks Roof Sheathing Rated
Soils Engineer Fire Dept Framing Floor/Ceiling
3l Foundation Forms W--s`i-� Bldg Dept Framing Rated Walls
/ Slab/Under Floor Shear Panels Rated Shafts
Raised Floor Sprinkler Hangars T -Bar
Ceilings
Framing Insulation/Weather
Underfloor Strip Lot Drainage
Insulation Interior Smoke
1st Floor Lath/Drywall Detectors
Sheathing Exterior Lath Fire Dept ��
2nd Floor Approval
Sheathing FINAL