HomeMy Public PortalAboutr 02:10202-102 Dale ~t ^d,>plil~n Itarch ?, 2(I)2
APPROVING CHANGH ORDHR #4
SUSPECT AREAS SEWER SEPARATION AND IMPROVEMENTS CONTRACT
WHEREAS, on July 19, 2001, the Governing Body of the Borough of CaAeret passed
Resolution No. 01-241 awarding a contract to Star of the Sea Concrete Corp. in the
amount of $399,950.00 for the CaAeret Suspect Areas Sewer Separation and
Improvements Contract; and
WHEREAS, the Borough's Consulting Engineer for the project, T ~ ~ Associates, has
advised the Governing Body that a modification to said contract is required as a result of
conditions which were unforeseen at the time of the award of said contract, and has
fuAher advised the Governing Body that said modification is reasonable and reflective of
the actual work performed and quantities utilized in the pedormance of said contract;
and
WHEREAS, due to the above referenced unforeseen field conditions, T A ~ Associates
has recommended that the contract with Star of the Sea Concrete Corp. be modified in
accordance with Change Order ~4, (see aEached leEer and Change Order); and
WHEREAS, the Governing Body has reviewed Change Order ~4 which results in a net
/increase of $16,874.47 to the contract.
NOW, THEREFORE, BE [T RESOLVED by the Nayor and Borough Council of the
Borough of CaAeret, Coun~ of Hiddlesex, State of New Jersey as follows:
(1) Contract Change Order ~4, a~ached hereto and made a par hereof,
resulting in a net/increase of $16,874.47 in the contract price; and the
payment of the revised contract price for the Suspect Area Sewer Separation and
Improvement Contract, including Change Order ~4 and all previous change
orders, in the total amount of $472,750.~0 [s hereby approved.
(2) That the appropriate Borough o~cials are hereby authorized and dAre,ed to
execute Change Order ~4.
Adopted this 7th day of Narch, 2002
And ce~ified as a true copy of the
Original on March 8, 2002.
~THLEEN ~. BARNEY, Hunicipal Clerk
COUNCILMAN Y~ NO NV A.B. COUNCILMAN ~'~S NO NV A.B.
P4RISI X SA~RO X
~ X ~A~ X
RIOS X ~q~KI X
X - Indicatc Vote AB - Absent NV - No{ Voting XOR - lndicu{cs Vo{c lo Ovcrrulc
Adopted at a meeting of ~hc Municipal Council ~ _7_~2
(732) 671 6400 * fax (732) ~}71 7365 * WWVv tandrn~ssociates c¢}m
CART~00$90 February 22, 2002
Mayor and Borough Council
c/o Kath)een Barney, Clerk
Borough of Carteret
20 Cooke Avenue
Carteret, NJ 07008
Re: Suspect Areas Sewer Separation and Improvements
Star of the Sea Concrete Corp.
Change Order No. 4
Dear Mayor and Council,
Enclosed are six (6) copies of Change Order No. 4 for the Suspect Area Sewer Separation and Improvement
contract being performed by Star of the Sea Concrete Corporation. Change Order No. 4 includes two
supple~nentary itmns. Supplementary Item S-3, in the amount of o,- 1.47, is for lost time incurred by the
Contractor due to encountering unanticipated contain;~ fuel tanks on the property at the
intersection of Washington and Whittier Street~ '~ in the amount of $4,000.00, is for a
trenchless point repair of the 8" sewer ' c~,- roposed in lieu of excavating and
repairing the sewer as shown on the plan /r7 r ! ~ ~ tly paved. The change order also
includes an increase to several contract itc f//V ~ ¢ 't a reduction to15 contract items
as it is anticipated portions of these items x ~/~ nge order includes an extension
of the time period allotted for the sewer woi 1, 2002 due to additional sewer
work added to the contract, access problems . problems for several homes on
Tyler Avenoe. Note that the overall contract .,~ oeing extended. Overall, this Change
Order results in a net increase in the contract · . the majority of this increase is due to additional
footage of lateral pipe, additional temporary p .,cnt repair associated with the laterals and the additional
sewer on Columbus Street, and due to the extra work at Washington and Whittier which could not have been
anticipated. We recommend the Borough approve Change Order No. 4.
If you have any questions or require additional information, please call.
Very truly yours,
T&M ASSOCIATES
DONALD J. NORBUT, P.E., C.M.E.
BOROUGH OF CARTERET ENGINEER
~ ,
JOI4N, J/qvlcKEL~ZEY, P.E~.
SUPERVISING ENGINEER
DJN:JJM:RRS:scb
Attachments
cc: Patrick DeBlasio, Acting Administrator
Gloria Goodrich, Purchasing Agent
Robert Bergen, Borough Attorney
H:\Can\00590\Correspondence\Mayor-JIM-Change Order 4 doc
ENGINEERS * PLANNERS * LANDSCAPE ARCHITECTS * ENVIRONMENTAL SCIENTISTS * SURVEYORS
CIVIL * ELECTRICAL * ENVIRONMENTAL * MECHANICAL * MUNICIPAL * SITE * STRUCTURAL * TRAFFIC * TRANSPORTATION
REGIONAL OFFICE IN TOMS RIVER
.TIILE~N Mo .B.~'TNEY,
545,.4989
Date: MARCH.7, 2002
TO: Patrick DeBlasio,
Treasurer
Borough of Carteret
REQUEST FOR CERTIFICATION OF AVAILABLE FUNDS:
For: APPROVING CHANGE ORDER #4 SUSPECT AREAS SEWER SEPARATION
AND IMPROVEMENTS CONTRACT.
Name of Account: RESOLUTION
AMOUNT TO BE ENCUMBERED: not to exceed $16,874.~7 at an
hourly rate ~aCcording to rate schedules.
KATHLEEN M. BARNEY,
Municipal Clerk
CERTIFICATION OF. AVAILABILITY OF FUNDS
I, Treasurer of the Borough of Carteret, do hereby certify that
there are sufficient funds available in the current budget to
enable the Municipal Council to authorize the entering into a
Contract between the Borough of Carteret'and:
The funds available'for this contract are in the Budget, in the
account of:
in the amount of:
By this cer~ification, I have hereby encumbered the above named
account for the amount of the contract pending Council action.
Patri~DeBlasio,
Treasurer
DARE: 'J/~ {" ~
T&M ASSOCIATES SHEET NO. I OF 2
CONSULTING & MUNICIPAL ENGINEERS PROJECT NO. CART-00S90
ELEVEN TINDALL ROAD
MIDDLETOWN, NEW JERSEY 07748
CIIANGE ORDER NO. 4
DATE: [February 14, 2002 ]
PROJECT: ]SUSPECT 3~REA SEWER SEPARATION & IMPROVEMENT I
OWNER: IBOROUG, OF CARTERET l
CONTRACTOR: ISTAR OF THE SEA CONCRETE CORP. ]
DESCRIPTION OF CHANGE:
Contract period of 120 days for compleflon of sewer related work is extended from Jan 1, 2002 to Mar 31, 2002
due to additional sewer work added to the contract, access problems at 200 E. Cherry and elevation problems
for several homes on Tyler St.
REDUCTIONS:
Items la, ld, 2a, 6b, 6c, 7,8h, 9c, 9e, 10a, 12c, 12f, 12g, 13b, and 17 have been reduced to reflect actual field quantities.
EXTRA:
Items 5, 6a, 6e, 8d, 9a, 9b, 10b, 12a have been increased to reflect actual field quantities.
SUPPLEMENTARY:
Item S-3 is for additional compensation requested by the contractor for lost time due to encountering
contaminated soils and of an underground storage tank at the intersection of Washington and Whittier Streets.
Item S-4 is for installation of a trenchless point repair on Salem Ave in lieu of excavating and repairing the sewer as
shown on the plans.
SEE ATTACHED DETAIL ADDITIONAL REDUCTION
DONALD J. NORBUT, P.E., C.M.E. THIS C.O. 3L~LXXXXXXXXX $24,212.00
ACCEPTED: /~ _ _ B. TOTAL EXTRAS
THIS C.O. $33,325.00 XXXXXXXXXX3
SUPPLEMENTARY
Tills C.O. $7,761.47 %VOCv~.X.XXXXX
OWNER'S APPROVALS:
TOTALS THIS C.O. $41,086.47 $24,212.00
NET CHANGE THIS
CHANGE ORDER $16,874.47
PREVIOUS CHANGE
ORDERS $80,250.63 $24,325.00
NOTE: All work to be done TOTAL CHANGE
according to Contract ORDERS TO DATE $121,337.10 $48,537.00
Specifications. NET CHANGE IN
CONTRACT $72,S00.10
ORIGINAL CONTRACT BID PRICE [ $399,950.00 ]
CHANGE ORDERS TO DATE [ $72,800.10]
REVISED CONTRACT pRICE [ $472,750.10 ]
CHANGE ORDER NO. 4 SHEET NO. 2 OF 2
PROJECT NO. CARTq}0590
PROJECT: ISUSPECT AREA SEWER SEPARATION & IMPROVEMENT [
OV~rNER: I BOROUGH OF CARTERET I
CONTRACTOR: [STAR OF THE SEA CONCRETE CORP. ]
UNIT
ITEM
NO. DESCRIPTION QUANTITY PRICE AMOUNT
la 8" Diameter PVC Pipe 5.00 LF $35.00 $175.00
ld 8" Diameter Ductile Iron Pipe 42.00 LF $40.00 $1,680.00
2a Timber Sheeting 0.20 BM $400.00 $80.00
R 6b 60" Diameter Doghouse Manhole 1.00 UN $3,800.00 $3,800.00
E 6c Reconstruction of Bench and Channel of Existing Manhole 1.00 UN $1,100.00 $1,100.00
D 7 Concrete for Pipelines 12.00 CY $200.00 $2,400.00
U 8h ~0"x4" or 6" Diameter Saddle Connection 1.00 UN $1,000.00 $1,000.00
C 9c 4" Diameter Ductile Iron Service Laterals 50.00 LF $45.00 $2,250.00
T 9e Seal Storm Sewer at Abandoned Service Laterals 5.00 UN $325.00 $1,625.00
I 10a 4" Diameter Risers with Cleanouts 50.00 LF $10.00 $500.00
O 12c Temporary Pavement Restoration County Roads 64.00 SY $68.00 $4,352.00
N 12f Reset Manhole Inlet and Casting 5.00 UN $125.00 $625.00
12g Reset Valve Boxes 5.00 UN $75.00 $375.00
13b Furnish and Plant New Shrub to Replace Existing 5.00 SY $100.00 $500.00
17 yaHie and Pedestrian Safety - Off Duty Police Offieers 75.0 HR 50.00 $3,750.00
A. TOTAE REDUCTIONS [ $24,212.00 ]
$0.00 !
5 Test Pits 145.50 CY $20.00 $2,910.00
6a 48" Diameter Manholes 1.00 UN $2,380.00 $2,380.00
6e Construct Internal Drop Connection within Existing Manhole 2 UN $800.00 $1,600.00
E 8d 10"X4" or 6" Diameter Saddle Connections 5.00 UN $275.00 $1,375.00
X 9a 4" Diameter PVC Service Laterals 99.00 LF $33.00 $3,267.00
T 9b 6" Diameter PVC Service Laterals 283.00 LF $35.00 $9,905.00
R 10b 6" Diameter Risers with Cleanouts 22.00 LF $14.00 $308.00
A 12a Temporary Pavement Replacement in Municipal Roads 579.00 LF $20.00 $11,580.00
B. TOTAL EXTRA I $33,325.00 ]
S3 Washington and Whittier Lost Time $0.00
1 LS $3,761.47 $3,761.47
uS S4 Salem Ave Trenchless Point Repalr ILS $4,000.00 $4,000.00
$0.00
p $0.00
$0.00
LP $0.00
$0.00
$0.00
$0.00
$0.00
i $0.00
$0.00
$0.00
$0.00
$0.00
$0.00
C. TOTAL SUPPLEMENTARY [ $7,761.47 ]
T&M ASSOCIATES StlEET NO. 1 OF 2
CONSULTING & MUNICIPAL ENGINEERS PROJECT NO. CART-00590
ELEVEN TINDALL ROAD
MIDDLETOWN, NEW JERSEY 07748
CHANGE ORDER NO. 4
DATE: [February 14, 2002 ]
PROJECT: ISUSPECT AREA SEWER SEPARATION & IMPROVEMENT I
OWNER: [BOROUGH OF CARTERET [
CONTRACTOR: ['~F THE SEA CONCRETE CORP. ]
DESCRIPTION OF CHANGE:
Contract period of 120 days for completion of sewer related work is extended from Jan 1, 2002 to Mar 31, 2002
due to additional sewer work added to tile contract, access problems at 200 E. Cherry and elevation problems
for several homes on Tyler St.
REDUCTIONS:
Items la, ld, 2a, 6b, 6c, 7,8h, De, 9e, 10a, 12c, 12f, 12g, 13b, and 17 have been reduced to reflect actual field quantities.
EXTRA:
Items 5, 6a, 6e, 8d, Da, Db, 10b, 12a have been increased to reflect actual field quantities.
;UPPLEMENTARY:
Item S-3 is for additional compensation requested by the contractor for lost time due to encountering
contaminaled soils and of an underground storage tank at the intersection of Washington and Whittier Streets.
Item S~I is for installation ora trenchless point repair on Salem Ave in lieu of excavafing and repairing the sewer as
shown on the plans.
SEE ATTACHED DETAIL ADDITIONAL REDUCTION
APPROV RECOMM DED:
DONALD J. NORBUT, P.E., C.M.E. THIS C.O. XXXXXXXXXXX $24,212.00
~ACCEPTED: B. TOTAL EXTRAS
~"'"'~~RpCONTRAC. C. THISsuPPLEMENTARyTOTALC.O. $33,325.00 XXXXXXXXXX~
THIS C.O. $7,761.47
OWNER'S APPROVALS:
TOTALS THIS C.O. $41,086.47 $24,212.00
NET CHANGE THIS
CHANGE ORDER $16,874.47
PREVIOUS CHANGE
ORDERS $80,250.63 $24,325.00
NOTE: All work to be done TOTAL CHAaNGE
according to Contract ORDERS TO DATE $121,337.10 $48,537.00
Specifications. NET CHANGE IN
CONTRACT $72,800.10
ORIGINAL CONTRACT BID PRICE [_ $399,950.00
CIIANGE ORDERS TO DATE [ $72,800.10
REVlSEDCONTRACr p ucE I $4,2,7so.10]
SHEET NO. 2 OF 2
CHANGE ORDER NO. 4
PROJECT NO. CART-00590
PROJECT: ISUSPECT AREA SEWER SEPARATION & IMPROVEMENT
OWNER: I BOROUGH OF CARTERET
CONTRACTOR: ISTAR OF TIlE SEA CONCRETE CORP.
UNIT
ITEM
NO. DESCRIPTION QUANTITY pRICE AMOUNT
1 a 8" Diameter PVC Pipe 5.00 LF $35.00 $175.00
ld 8" Diameter Ductile Iron Pipe 42.00 LF $40.00 $1,680.00
2a Timber Sheeting 0.20 BM $400.00 $80.00
R 6b 60" Diameter Doghouse Manhole 1.00 UN $3,800.00 $3,800.00
E 6c Reconstruction of Bench and Channel of Existing Manhole 1.00 UN $1,100.00 $1,100.00
D 7 Uoncrete for Pipelines 12.00 CY $200.00 ~ $2,400.00
U~ 8h }0"x4" or 6" Diameter Saddle Connection 1.00 UN $1,000.00 $1~000.00
C 9c 4- Diameter Ductile Iron Service Laterals 50.00 LF $45.00 $2,250.00
T 9e Seal Storm Sewer at Abandoned Service Laterals 5.00 UN $325.00 $1,625.00
I 10a 4" Diameter Risers with Cleanouts 50.00 LF $10.00 $500.00
O 12e Temporary Pavement Restoration County Roads 64.00 SY $68.00 $4,352.00
N 12f Reset Manhole lnlet and Casting 5.00 UN $125.00 $625.00
12g Reset Valve Boxes 5.00 UN $75.00 $375.00
13b Furnish and Plant New Shrub to Replace Existing 5.00 SY $100.00 $500.00
17 Traffic and Pedesirian Safety - Off Duty Pollce Officers 75.0 HR 50.00 $3,750.00
A. TOTAl, REDUCTIONS
$0.00
5 Test Pits 145.50 CY $20.00 $2,910.00
6a 48" Diameter Manholes L00 UN $2,380.00 $2,380.00
6e Construct Internal Drop Connection within Existing Manhole 2 UN $800.00 $1,600.00
8d 10-X4" or 6" Diameter Saddle Connections 5.00 UN $275.00 $1,375.00
9a 4" Diameter PVC Service Laterals 99.00 LF $33.00 $3,267.00
9b 6" Diameter PVC Service Laterals 283.00 LF $35.00 $9,905.00
10b 6" Diameter Risers with Cleanouts 22.00 LF $14.00 $308.00
12a Temporary Pavement Replacement in Municipal Roads 579.00 LF $20.00 $11,580.00
TOTAL E×TRA
$0.00
S3 Washington and Whittier Lost Time ILS $3,761.47 $3,761.47
S4 Salem Ave Trenchless Point Repair ILS $4,000.00 $4,000.00
$0.00
$0.00
S0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
C. TOTAL SUPPLEMENTARY [ $7,761
T&M ASSOCIATES SHEET NO. I OF 2
CONSULTING & MUNICIPAL ENGINEERS PROJECT NO. CARTd10590
ELEVEN TINDALL ROAD
MIDDLETOWN, NEW JERSEY 07748
CHANGE ORDER NO. 4
DATE: [February 14, Z00Z ]
PROJECT: [SUSPECT AREA SEWER SEPARATION & IMPROVEMENT
OWNER: IBOROUGI1 OF CARTERET I
CONTRACTOR: I STAHOF THE SEA CONCRETE CORP.
DESCRIPTION OF CHANGE:
Contract period of 120 days for completion of sewer related work is extended from Jan 1, 2002 to Mar 31, 2002
due to additional sewer work added to the contract~ access problems at 200 E. Cherry and elevation problems
for several homes on Tyler St.
REDUCTIONS:
Items I a, I d, 2a, 6b, 6c, 7,8h, 9c, 9e, 10a, 12e, 12f, 12g, 13b, and 17 have been reduced to reflect actual field quantities.
EXTRA:
Items 5, 6a, 6e~ Sd, 9a, 9b, 10b, 12a have been increased to reflect actual field quantities.
SUPPLEMENTARY:
Item S-3 is for additional compensation requested by the contractor for lost time due to encountering
contaminated soils and of an underground storage tank at the intersection of Washington and Whittier Streets.
Item S-4 is for installation of a trenchless point repair on Salem Ave in lieu of excavating and repairing the sewer as
shown on the plans.
APPROVA RECOMME ED: SEE ATTACHED DETAIL ADDITIONAL REDUCTION
/~ ~ ~L~'~ A. TOTAL REDUCTIONS
DONALD J. NORBUT, P.E., C.M.E. THIS C.O. XX.XXXXXXXXX $24,212.00
THIS C.O. $33,325.00 KXXXXXXXXX~N
NET CItANGE T~IS
C~ANGE O~ER $16,874.47
O~E~ $80,250.63 $24,325~00
NOTE: All work to be done TOTAL C~ANGE
a~ording to Contract O~E~ TO DATE $121,337.10 $48,537.00
ORIGIN~ CONTACT BID PRICE [ *399,950.00
REVISED CONT~ PmCE [ $472,750.10
SHEET NO. 2 OF 2
CHANGE ORDER NO. 4 PROJECT NO. CART-00590
PROJECT: ISUSPECT AREA SEWER SEPARATION & IMPROVEMENT I
OWNER: IBOROUC, H OF CARTE T I
CONTRACTOR: ISTAR OF THE SEA CONCRETE CORP. 1
UNIT
ITEM
NO. DESCRIPTION QUANTITY PRICE AMOUNT
la 8" Diameter PVC Pipe 5.00 LF $35.00 $175.00
ld I" Diameter Ductile iron Pipe 42.00 LF $40.00 $1,680.00
2a Timber Sheeting 0.20 BM $400.00 $80.00
R 6b 60" Diameter Doghouse Manhole 1.00 UN $3,800.00 $3,800.00
E 6c Reconstruction of Bench and Channel o f Existing Manhole 1.00 UN $1,100.00 $1,100.00
D 7 Eoncrete for Pipelines 12.00 CY $200.00 $2,400.00
U 8h t0"x4" or 6" Diameter Saddle Connection 1.00 UN $1,000.00 $1,000.00
C 9c "Diameter Ductile Iron Service Laterals 50.00 LF $45.00 $2,250.00
T 9e Seal Storm Sewer at Abandoned Service Laterals 5.00 UN $325.00 $1,625.00
I 10a 4" Diameter Risers with Cleanouts 50.00 LF $10.00 $500.00
O 12c Temporary Pavement Restoration County Roads 64.00 SY $68.00 $4,352.00
N 12f Reset Manhole Inlet and Casting 5.00 UN $125.00 $625.00
12g Reset Valve Boxes 5.00 UN $75.00 $375.00
13b Furnish and Plant New Shrub to Replace Existing 5.00 SY $100.00 $500.00
17 Traffic and Pedestrian Safety - Off Duty Police Officers 75.0 HR 50.00 $3,750.00
A. TOTAL. REDUCTIONS I $24,212.00 ]
$0.00
5 Fest Pits 145.50 CY $20.00 $2,910.00
6a 48" Diameter Manholes 1.00 UN $2,380.00 $2,380.00
' 6e Construct Internal Drop Connection within Existing Manhole 2 UN $800.00 $1,600.00
8d 10,,X4" or 6" Diameter Saddle Connections 5.00 UN $275.00 $1,375.00
i 9a 4" Diameter PVC Service Laterals 99.00 LF $33.00 $3,267.00
9b 6" Diameter PVC Service Laterals 283.00 LE $35.00 $9,905.00
10b 6" Diameter Risers with Cleanouts 22.00 LF $14.00 $308.00
12a Temporary Pavement Replacement in Municipal Roads 579.00 LF $20.00 $11,580.00
B. TOTAL EXTRA I $33,325.00 I
$0.00
S3 Yashington and Whittier Lost Time ILS $3,761.47 $3,761.47
S4 ]alem Ave Trenehless Point Repair ILS $4,000.00 $4,000.00
SU $0.00
$0.00
P $0.00
$0.00
$0.00
i $0.00
$0.00
$0.00
i $0.00
$0.00
$0.00
$0.00
$0.00
I $o.oo
C. TOTAL SUPPLEMENTARY [ $7,761.47 ]
T&M ASSOCIATES SHEET NO. I OF 2
CONSULTING & MUNICIPAL ENGINEERS PROJECT NO. CART-O0590
ELEVEN TINDALL ROAD
MIDDLETOWN, NEW JERSEY 07748
CIIANGE ORDER NO. 4
DATE: [February 14, 2002 ]
PROJECT: ISUSPECT AREA SEWER SEPARATION & IMPROVEMENT I
O~VNER: I BOROUGH OF CARTERET I
CONTRACTOR: [STAR OF THE SEA CONCRETE CORP. ]
DESCRIPTION OF CHANGE:
Contract period of 120 days for completion of sewer related work is extended from Jan 1, 2002 to Mar 31, 2002
due to additional sewer work added to the contract, access problems at 200 E. Cherry and elevation problems
for several homes on Tyler St.
REDUCTIONS:
Items la, Id, 2a, 6b, 6c, 7,8h, 9c, 9e, 10a, 12¢, 12f, 12g, 13b, and 17 have been reduced to reflect actual field quantities.
EXTRA:
Items 5, 6a, 6e, 8d, 9a, 9b, 10b, 12a have been increased to reflect actual field quantities.
~UPPLEMENTARY:
Item S-3 is for additional compensation requested by the contractor for lost time due to encountering
contaminated soils and of an underground storage tank at the intersection of Washlngton and Whittier Streets.
Item S-4 is for installation ora trenchless point repair on Salem Ave in lieu of excavating and repairing the sewer as
shown on the plans.
SEE ATTACHED DETAIL ADDITIONAL REDUCTION
APPROVA RECOMME DED:
DONALD J. NORBUT, P.E., C.M.E. THiS C.O. XXXXXXXXXXX $24,212.00
ACCEP~ ~ D. TOTAL EXTRAS
THIS C.O. $7,761.47
OWNER'S APPROVALS:
TOTALS THIS C.O. $41,086.47 $24,212.00
NET CHANGE THIS
CHANGE ORDER $16,874.47
PREVIOUS CHANGE
ORDERS $80,250.63 $24,325.00
NOTE: All work to be done TOTAL CHANGE
according to Contract ORDERS TO DATE $121,337.10 $48,537.00
Specifications. NET CHANGE IN
CONTRACT $72,800.10
ORIGINAL CONTRACT BID PRICE [ $399,950.00
CIlANGE ORDERS TO DATE [ $72,800.10J
REVISED CONTRACT PRICE I $472,750.101
SHEET NO. 2 OF 2
CtlANGE ORDER NO. 4 PROJECT NO. CARTq}0590
PROJECT: ]SUSPECT AREA SEWER SEPARATION & IMPROVEMENT I
OWNER: [BOROUGH OF CARTERET [
CONTRACTOR: [STAR OF THE SEA CONCRETE CORP, [
UNIT
ITEM
NO. DESCRIPTION QUANTITY PRICE AMOUNT
la 8" Diameter PVC Pipe $.00 LF $35.00 $175.00
ld 8" Diameter Ductile Iron Pipe 42.00 LF $40.00 $1,680.00
2a Timber Sheeting 0.20 BM $400.00 $80.00
R 6b 60" Diameter Doghouse Manhole 1.00 UN $3,800.00 $3,800.00
E 6e Reeonstruction of Beneh and Channel of Existing Manhole 1.00 UN $1,100.00 $1,100.00
D 7 Uoncrete for Pipelines 12.00 CY $200.00 $2,400.00
U 8h 10"x4" or 6" Diameter Saddle Connection 1.00 UN $1,000.00 $1,000.00
C 9c 4" Diameter Ductile Iron Service Laterals 50.00 LF $45.00 $2,250.00
T 9e .eal Storm Sewer at Abandoned Service Laterals 5.00 UN $325.00 $1,625.00
I 10a 4" Diameter Risers with Cleanouts 50.00 LF $10.00 $$00.00
O 12c Temporary Pavement Restoration County Roads 64.00 SY $68.00 $4,352.00
N 12f Reset Manhole lnlet and Casting 5.00 UN $125.00 $625.00
12g Reset Valve Boxes 5.00 UN $75.00 $375.00
13b Curnish and Plant New Shrub to Replace Existing $.00 SY $100.00 $500.00
17 Traffic and Pedestrian Safety - Off Duty Police Officers 75.0 1IR 50.00 $3,750.00
A. TOTAl. REDUCTIONS I $24,212.00 I
$0.00
5 Test Pits 145.50 CY $20.00 ~ $2,910.00
6a 48" Diameter Manholes 1.00 UN $2,380.00 $2,380.00
6e Construct Internal Drop Connectlon within Existing Manhole 2 UN $800.00 $1,600.00
0d 10"X4" or 6" Diameter Saddle Connections 5.00 UN $275.00 $1,375.00
9a 4" Diameter PVC Service Laterals 99.00 LF $33.00 $3,267.00
9b 6" Diameter PVC Service Laterals 283.00 LF $35.00 $9,905.00
10b 6" Diameter Risers with Cleanouts 22.00 LF $14.00 $308.00
12a Temporary Pavement Replacement in Municipal Roads 579.00 LF $20.00 $11,580.00
B. TOTAL EXTRA I $33,325.00 ]
$0.00
S3 Washington and Whittier Lost Time I LS $3,761.47 $3,761.47
S4 Salem Ave Trenchless Point Repalr ILS $4,000.00 $4,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$8.OO
$0.00
$0.00
C. TOTAL SUPPLEMENTARY [ $7,761.47
T&M ASSOCIATES SHEET NO. 1 OF 2
CONSULTLNG & MUNICIPAL ENGINEERS PROJECT NO. CART-00590
ELEVEN TINDALL ROAD
MIDDLETOWN, NEW JERSEY 07748
CHANGE ORDER NO. 4
DATE: IFebruary 14, 2002 I
PROJECT: ISVSPECT AREA SEWER SEPARATION & IMPROVEMENT I
OWNER: ]BOROUGH OF CARTERET I
CONTRACTOR: ISTAR OF THE SEA CONCRETE CORP. I
DESCRIPTION OF CHANGE:
Contract period of 120 days for completion of sewer related work is extended from Jan 1, 2002 to Mar 31, 2002
due to additional sewer work added to the contract, access problems at 200 E. Cherry and elevation problems
for several homes on Tyler St.
REDUCTIONS:
Dems la, ld, 2a, 6b, 6c, 7,8h, 9c, 9e, 10a, 12c, 12f, 12g, 13b, and 17 have been reduced to reflect actual field quantities.
EXTRA:
Items 5, 6a, 6e, Sd, 9a, 9b, 10b, 12a have been increased to reflect actual field quantities.
SUPPLEMENTARY:
Item S-3 is for additional compensation requested by the contractor for lost time due to encountering
contaminated soils and of an underground storage tank at the intersection of Washington and Whittier Streets.
Item S-~ is for installation ufa trenchless point repair on Salem Ave in lieu of excavating and repairing the sewer as
shown on the plans.
SEE A~I~FACHED DETAIL ADDITIONAL ~REDUCTION
~Pr~V ~RE{£OMMf~ EE:/~_/. n~ 4~/,~~'-~ A. TOTAL REDUCTIONS
DONALD J. NORBUT, P.E., C.M.E. THIS C.O. XXXXXXX3L~ $24,212.00
ACCEPTED: ~ B. TOTAL EXTRAS
C~- ~. THIS C.O. $33,325.00 ~v~XXXXXXXX
CO O . C. TOTAL
ST~P. SUPPLEMENTARY
THIS C.O. $7,761.47 LXXX~v, XXXXX
OWNER'S APPROVALS:
TOTALS THIS C.O. $41,086.47 $24,212.00
NET CHANGE THIS
CHANGE ORDER $16,874.47
PREVIOUS CHANGE
ORDERS $80,250.63 $24,325.00
NOTE: All work to be done TOTAL CHANGE
according to Contract ORDERS TO DATE $121,337.10 $48,537.00
Specifications. NET CHANGE IN
CONTRACT $72,800.10
ORIGINAL CONTRACT BID PRICE [ $399,950.00J
CHANGE ORDERS TO DATE [ $72,800.10~
REVISED CONTRACT pRICE ~_ $472,750.10
CHANGE ORDER NO. 4 SHEET NO. 2 OF 2
PROJECT NO. CART-00590
PROJECT: ISUSPECT AREA SEWER SEPARATION & IMPROVEMENT ]
OWNER: IBOROUGH OF CARTERET I
CONTRACTOR: [STAR OF TIlE SEA CONCRETE CORP. I
ITEM UNIT
NO. DESCRIPTION QUANTITY PRICE AMOUNT
la 8" Diameter PVC Pipe 5.00 LF $35.00 $175.00
ld 8" Diameter Ductile Iron Pipe 42.00 LF $40.00 $1,680.00
2a Timber Sheeting 0.20 BM $400.00 $80.00
R 6b 60" Diameter Doghouse Manhole 1.00 UN $3,800.00 $3,800.00
E 6c Reconstruction of Bench and Channel of Existing Manhole 1.00 UN $1,100.00 $1,100.00
D 7 Concrete for Pipelines 12.00 CY $200.00 $2,400.00
U 8h 30"x4" or 6" Diameter Saddle Connection 1.00 UN $1,000.00 $1,000.00
C 9e "Diameter Duct0e Iron Service Laterals 50.00 LF $45.00 $2,250.00
T 9e ~,eal Storm Sewer at Abandoned Service Laterals 5.00 UN $325.00 $1,625.00
I 10a l" Diameter Risers with Cleanouts 50.00 LF $10.00 $500.00
O 12c l~emporary Pavement Restoration Courtly Roads 64.00 SY $68.00 $4,352.00
N 12f Reset Manhole Inlet and Canting 5.00 UN $125.00 $625.00
128 Reset Valve Boxes 5.00 UN $75.00 $375.00
13b ~urnish and Plant New Shrub to Replace Existing 5.00 SY $100.00 $500.00
17 Tra file and Pedestrian Safety - Off Duty Police Officers 75.0 tlR 50.00 $3,750.00
A. TOTAL REDUCTIONS [ $24,212.00 I
$0.00
5 Test Pits 145.50 CY $20.00 $2,910.00
6a 48" Diameter Manholes t.00 UN $2,380.00 $2,380.00
6e Construct Internal Drop Connection withln Existing Manhole 2 UN $800.00 $1,600.00
8d 10-X4- or 6" Diameter Saddle Connections 5.00 UN $275.00 $1,375.00
9a 4" Diameter PVC Service Laterals 99.00 LF $33.00 $3,267.00
9b 6" Diameter PVC Service Laterals 283.00 LF $35.00 $9,905.00
10b V' Diameter Risers with Cleanouts 22.00 LF $14.00 $308.00
12a Fe~nporary Pavement Rvplacement in Municipal Roads 579.00 LF $20.00 $11,580.00
TOTAL E×TRA I $33,325.00 I
$0.00
S3 Washlngton and Whittier Lost Time 1 LS $3,761.47 $3,761.47
S4 Salem Ave Trenchless Point Repair ILS $4,000.00 $4,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
C. TOTAL SUPPLEMENTARY [ $7,761.47
T&M ASSOCIATES SHEET NO. I OF 2
CONSULTING & MUNICIPAL ENGINEERS PROJECT NO. CART-00590
ELEVEN TINDALL ROAD
MIDDLETOWN, NEW JERSEY 07748
CHANGE ORDER NO. 4
DATE: IFebruary 14, 2002 I
PROJECT: ISUSPECT AREA SEWER SEPARATION & IMPROVEMENT I
OWNER: IBOROUGH OF CARTERET I
CONTRACTOR: S~-AR OF THE SEA CONCRETE CORP. ]
DESCRIPTION OF CHANGE:
Contract period of 120 days for completion of sewer related work is extended from Jan 1, 2002 to Mar 31, 2002
due to additional sewer work added to the contract, access problems at 200 E. Cherry and elevation problems
for several homes on Tyler St.
REDUCTIONS:
Items la, Id, 2a, 6b, 6c, 7,8h, 9c, 9e, 10a, 12c, 12f, 12g, 13b, and 17 have been reduced to reflect actual field quantities.
Items 5, 6a, 6e, 8d, 9a, 9b, 10b, 12a have been increased to reflect actual field quantities.
SUPPLEMENTARY:
Item S-3 is for additional eompensafion requested by the contractor for lost time due to encountering
contaminated soils and of an underground storage tank at the intersection of Washington and Whittier Streets.
Item S-4 is for installation of a trenchless point repair on Salem Ave in lieu of excavating and repairing the sewer as
shown on the plans.
APPROVA RECOMME D: SEE ATTACHED DETAIL ADDITIONAL REDUCTION
DONALD J. NORBUT, P.E., C.M.E. THIS C.O. CXJLXXX)LXXXX $24,212.00
AC~ ~'~ B. TOTAL EXTRAS
THIS C.O. $33,325.00 XXXXXXXXXX
C C. TOTAL
STAR OF TItE SEA CONCRETE CORP. SUPPLEMENTARY
THIS C.O. $7,761.47 ~XXXXXXXXX
OWNER'S APPROVALS:
TOTALS THIS C.O. $41,086.47 $24,212.00
NET CHANGE THIS
CHANGE ORDER $16,874.47
PREVIOUS CHANGE
ORDERS $80,250.63 $24,325.00
NOTE: All work to be done TOTAL CHANGE
according to Contract ORDERS TO DATE $121,337.10 $48,537.00
Specifications. NET CHANGE IN
CONTRACT $72,800.10
ORIGINAL CONTRACT BID PRICE L- $399,950.00 ]
CHANGE ORDERS TO DATE l_ $72,800.10]
REVISED CONTRACT PRICE [ $472,750.101
CHANGE ORDER NO. 4 SHEET NO. 2 OF 2
PROJECT NO. CART-00590
PROJECT: ISUSPECT AREA SEWER SEPARATION & IMPROVEMENT I
OWNEU: [BOUOUGH OW CARTERET I
CONTRACTOR: [STAg OF THE SEA CONCRETE COUP.
ITEM UNIT
NO. I)ESCRIPTION QUANTITY PRICE AMOUNT
la g" Diameter PVC Pipe 5.00 LF $35.00 $175.00
ld [}" Diameter Ductile Iron Pipe 42.00 LF $40.00 $1,680.00
2a Yimber Sheeting 0.20 BM $400.00 $80.00
R 6b §0" Diameter Doghouse Manhole 1.00 UN $3,800.00 $3,800.00
E 6c Reconstruction of Bench and Channel of Existing Manhole 1.00 UN $1,100.00 $1,100.00
D 7 Concrete for Pipelines 12.00 CY $200.00 $2,400.00
U 8h 30,,x4" or 6" Diameter Saddle Connection 1.00 UN $1,000.00 $1,000.00
C 9c 4" Diameter Ductile Iron Service Laterals 50.00 LF $45.00 $2,250.00
T 9e Seal Storm Sewer at Abandoned Service Laterals 5.00 UN $325.00 $1,625.00
10a 4" Diameter Risers with Cleanouts 50.00 LF $10.00 $500.00
O 12c Temporary Pavement Restoration CounW Roads 64.00 SY $68.00 $4,352.00
N 12f Reset Manhole Inlet and Casting 5.00 UN $125.00 $625.00
12g Reset Valve Boxes 5.00 UN $75.00 $375.00
13b Furnish and Plant New Shrub to Replace Existing 5.00 SY $100.00 $500.00
17 Traffic and Pedestrian Safety - Off Duty Police Officers 75.0 HR 50.00 $3,750.00
A. TOTAL REDUCTIONS [ $24,212.00 ]
$0.00
5 Test Pits 145.50 CY $20.00 $2,910.00
6a 48" Diameter Manholes 1.00 lIN $2,380.00 $2,380.00
6e Construct Internal Drop Connection within Existing Manhole 2 UN $800.00 $1,600.00
E 8d 10"X4" or 6" Diameter Saddle Connections 5.00 UN $275.00 $1,375.00
X 9a 4" Diameter PVC Service Laterals 99.00 LF $33.00 $3,267.00
T 9b 6" Diameter PVC Service Laterals 283.00 LF $35.00 $9,905.00
R 10b 6" Diameter Risers with Cleanouts 22.00 LF $14.00 $308.00
A 12a Temporary Pavement Replacement in Municipal Roads 579.00 LF $20.00 $11,580.00
B. TOTAL EXTRA [ $33,325,00
$0.00
~34 :;1~ ~: ~; :~C h~i stt~eori ~LtO;te pT~ e 1 LS $3,761.47 $3,761.47
1 LS $4,000.00 $4,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
C. TOTAL SUPPLEMENTARY k $7,761.47