Loading...
HomeMy Public PortalAbout9956 DAINES DR_Building_3/1/2022_B22-42084 roof mounted PVm 4.8 KWTEMPLE CITY PERMIT NO. 622-42084 ~= Combo Rooftop Solar Details System Qty 1 Area 180 Stories Fees Total _ Valuation $6800.00 Plan Check Fees $300.00 Permit Fees $165.00 Strong Motion Fee $0.00 SB1473Fee $1.00 Parks Dev Fee $0.00 Sewer Const Fee $0.00 q Building Inspections Approval Date Inspector Approval Date Inspector Approval Date Inspector Location/Setbacks Roof Sheathing Rated Soils Engineer Fire Dept Framing Floor/Ceiling Foundation Forms Bldg Dept Framing Rated Wails Slab/Under Floor Shear Panels Rated Shafts - Raised Floor Sprinkler Hangars T -Bar Framing Insulation/Weather Ceilings Underfloor Strip Lot Drainage Insulation Interior Smoke 1st Floor Lath/Drywall Detectors Sheathing Exterior LathFire Dept 2nd Floor (nLd��\J/ Approval Sheathing \ � S"I Z iQ72---��/ FINAL 51 L 2oZZ City of Temple City 1 9701 Las Tunas Drive I Tem pie City, California 917801 (626)285-21711 www.tempiecity.us Address: 9956 Dalnes Drive, Temple City, California 91780 Parcel: 8588-018-023 Permit No: B22-42084 Type: Building Subtype: CBCombo Building Description; INSTALL ROOF MOUNTED PV, 4.8 KW, (12) Special MODULES Conditions: Issue Date: 03-01-2022 Fxplre Date: 03-01-2023 Extension: Extension: Permit expires on date shown if.,]) work does not commence, or 2) work is suspended or abandoned, or 3) applicant falls to obtain code required inspection. Contacts . .Owner Chi Wah Wong 9956 Daines Drive, Temple City, California 91780 ( Applicant Anna Black . Tesla Energy Operations 3022 Kenwood Street, Burbank, California 91505 (559) 805-1621 Contractor Tesla Energy Operations Inc. 901 Page Avenue, Fremont, California 94538 (650) 436-9690 888104 ~= Combo Rooftop Solar Details System Qty 1 Area 180 Stories Fees Total _ Valuation $6800.00 Plan Check Fees $300.00 Permit Fees $165.00 Strong Motion Fee $0.00 SB1473Fee $1.00 Parks Dev Fee $0.00 Sewer Const Fee $0.00 q Building Inspections Approval Date Inspector Approval Date Inspector Approval Date Inspector Location/Setbacks Roof Sheathing Rated Soils Engineer Fire Dept Framing Floor/Ceiling Foundation Forms Bldg Dept Framing Rated Wails Slab/Under Floor Shear Panels Rated Shafts - Raised Floor Sprinkler Hangars T -Bar Framing Insulation/Weather Ceilings Underfloor Strip Lot Drainage Insulation Interior Smoke 1st Floor Lath/Drywall Detectors Sheathing Exterior LathFire Dept 2nd Floor (nLd��\J/ Approval Sheathing \ � S"I Z iQ72---��/ FINAL 51 L 2oZZ