AUTHORIZING A PROFESSIONAL ENGINEERING SERVICES CONTRACT
WITH CME ASSOCIATES FOR CARTERET STREETSCAPE
OBELISK FOUNDATIONS
WHEREAS, the Borough of Carteret is in need of professional Engineering Services for
Carteret Streetscape Obelisk Foundations; and
WHEREAS, the Borough's' Consulting Engineers, CME Associates, possess the
requisite skill and expertise to provide said services; and
WHEREAS, CME Associates has submitted a proposal to provide said engineering
services at a total cost not to exceed $9,600.00; and
WHEREAS, the Mayor and Council have reviewed said proposal; and
WHEREAS, the Chief Financial Officer has certified that funds are or will be available
for said purpose. Account #
NOW, THEREFORE, BE IT RESOLVED by the Mayor and Council of the Borough
of Carteret, County of Middlesex, State of New Jersey, as follows:
1. That the proposal fiom CME Associates for Professional Engineering
Services with regard to the Carteret Streetscape Obelisk Foundations at a
total cost not to exceed $9,000.00, billable in accordance with CME's
existing contract with the Borough, is hereby approved.
2. That this action is approved as an award of a professional services contract
pursuant to N.J.S.A. 40A:11-5(1)(a) in accordance with the Borough's
Fair and Open Process'as authorized by law.
3. A copy of this Resolution be forwarded to the Borough's Purchasing
Department and CME Associates,
Adopted this 27's day of April, 2023
and certified as a true copy of the .
original on April 28, 2023.
CARMELA POGORZELSKI, RMC
Municipal Clerk
RECORD OF COUNCIL VOTE
COUNCILMAN
YES
NO
NV
A.B.
COUNCILMAN
YES
NO
NV
A.B.
BMINO
X
JOHAL
DIAZ
X
KfUM
X
DIMASCIO
NAPLES
X
X-Indicate Vota AB -Absent NV -Not Voting XOR -Indicates Vote to Overrule Veto
Adopted at a meeting of the Municipal Council
1� April 27, 20
Municipal Cterk' !
A
AFFIDAVIT OF PUBLICATION
The following is a true copy of an Ordinance or Resolution of
the Borough of Carteret that has appeared in the Home News
Tribune, a newspaper which is printed in Freehold, New
Jersey and published in Neptune, in said County and State and
of general circulation in said county. One 1 time(s), once in
each issue as follows:
May 2, 2023
L
lM
Notary P is of New Jersey
IQNot ry Pubik • State oNo Jersey
Commission # 50.18.8983
Comm, Ez Iras Mar, 31 2027
Sworn and subscribed before
me this 24d day of ` 0
Municipal Clerk
'BOROUGH OF CARTERET
NOTICE OF CONTRACT AWARD
Hugh of Carteret has awarded a contract without torsp "d-
Iing as a Professional Service pursuant to N.J.S.A. 40A:11
rhls contract end the resolution authorizingg It are. available.
i=lnspa 'on IF the OHlce of the Munldpal Clerk:'` This'ac-
pproved as an award of Professional Services Contract pur
N.J.S.A. 40A;11-5i"I., In accordance with the Borough's
]pen Process as authorized by law..
to: CME Associates
Professional Englneering Services,
Re: Obelisk Foundations.
n 023-120
to exceed $9,000.00 billable In accordance with the exist -
Mt.
Cl
0gerkorzehki, RMC
JOHN H. ALLGAIR, PE, PP, LS (1983-2001)
DAVID J. SAMUEL, PE, PP, CME
T r ry
JOHN J. STEFANI, PE, LS, PP, CME
"
JAY B. CORNELL, PE, PP, CME
MICHAEL J. MGCLELLAND, PE, PP, CME
GREGORY R. VALESI, PE, PP, CME
ASSOCIATES
April 18, 2023
Revised April 27, 2023
Via Electronic Mail (mayorCG)carteret.net)
Borough of Carteret
61 Cooke Avenue
Carteret, NJ 07008
Attn: Honorable Mayor Daniel J. Reiman
Re., Proposal for Professional Engineering Services
Carteret Streetscape Obelisk Foundations
Borough of Carteret, Middlesex County, New Jersey
Proposal No.. 2023-069
BRUCE M. KOCH, PE, PP, CME
LOUIS J. PLOSKONKA, PE, CME
TREVOR J. TAYLOR, PE, PP, CME
BEHRAM TURAN, PE, LSRF
LAURA J. NEUMANN, PE, PF
DOUGLAS ROHMEYER, PE, CFM, CME
ROBERTJ. RUSSO, PE, PP, CME
JOHN J. HESS, PE, PP, CME
KEITH CHIARAVALLO, PE, CME
Dear Mayor:
We are pleased to present our estimate of fees for professional services for the above -referenced
project.
We understand the Borough has engaged the County Vocational School District's welding
program to design and fabricate steel obelisk sculptures which are proposed to be installed at
the intersection of Washington Avenue and High Street. Accordingly, we are proposing to
provide construction drawings and contract documents and manage the construction of the
foundations as required to support the proposed art installations,
With this being said, we anticipate the following scope of engineering services:
Structural Design Phase and Construction Documents
This work will consist of the preparation of a construction plan and details for a concrete
foundation to support the proposed structure. The services have been divided into tasks as
detailed below:
1. Perform site visits and collect existing site information and assess conditions;
2. Review of previously conducted geotechnical reports for the existing mixed -use
redevelopments as part of the design process;
3. Preparation of the structural design, including:
a. Structural design of foundation elements, based on "The 2021 International
Building Code, New Jersey Edition and ASCE 7-16, Minimum Design Loads and
Other Criteria for Buildings and other Structures."
S:1 ;sderWftposals%2&04-17-2023-069 -Carteret SVeetsupe Obelisk Foundation Deslan.da
CONSULTING AND MUNICIPAL ENGINEERS
NJ CERTIFICATE OF AUTHORIZATION NO. 24GA2835900
1460 ROUTE 9 SOUTH . HOWELL, NEW JERSEY 07731 . (732) 462-7400 . FAX: (732) 409-0756
ASSOCLATES
Hon. Mayor Daniel J. Reiman April 17, 2023
Borough of Carteret, Middlesex County, New Jersey Proposal No. 2023-069
Re: Professional Engineering Services Page 2
Carteret Streetscape Obelisk Foundations
b. Working drawings of the new foundation system signed and sealed by a licensed
New Jersey Professional Engineer.
Construction Phase Services — Generally, we prefer to quote services for construction phase
upon the completion of the Bid Phase as the ultimate cost for our services will depend upon a
number of factors including the final design, the contractor to whom the contract is awarded and
the desired level of construction observation required. The following services will be provided
under this phase:
1. Contract preparation Including review of bonds, insurance certificates, and project
manning reports;
2. Attend preconstruction meeting;
3. Provide assistance with interpretation of the contract documents;
4. Review shop drawings;
5. Provide construction observation services and prepare contractor punch lists; and,
6. Review and approve progress pay estimates and final payment to the Contractor.
We will provide the necessary engineering services as described above based upon the cost
breakdown as noted below:
A. Structural Design Phase Services .....................
$4,800.00
B. Construction Documents........................................................................ $1,700.00
C. Construction Phase Services................................................................. $2 500.00
TotalFee for Services.............................................................................. $9,000.00
Exceptions
• Any work not specified as listed in the above phases shall be considered additional
services and will be invoiced at the time said work is authorized by the Borough.
• Structural design of the sculpture to be designed and provided by Middlesex County
Vocational School
• Geotechnical Services
SACartereAPmposals123-04-17 - 2023-009 -Carteret Streetwape Obelisk Foundation Deslgn.dooz
ASSOCIATES
Hon. Mayor Daniel J. Reiman April 17, 2023
Borough of Carteret, Middlesex County, New Jersey Proposal No. 2023-069
Re: Professional Engineering Services Page 3
Carteret Streetscape Obelisk Foundations
The above fee estimate is based on information provided to us by the Borough. Should the
scope of the project change requiring additional professional fees, we will detail same in writing
and seek authorization prior to proceeding.
Should you accept this proposal, kindly prepare a professional services Resolution as
authorization for us to proceed.
Thank you again for the opportunity to offer our professional services, and should you have any
questions or require additional information, please do not hesitate to contact this office.
Very truly yours,
CME Associates
PE, CME, CFM
For the
TT\MZ\TC