METROPOLITAN ST. LOUIS SEWER DISTRICT
PURCHASING DIVISION
REQUEST FOR QUOTE – 9337
Roof Replacement for Harlem North P-144
ADDENDUM 1
Bids MUST be received in the
PURCHASING DIVISION
Metropolitan St. Louis Sewer District
2350 Market Street
St. Louis, MO 63103-2555
No Later Than: 10:00AM., May 2nd, 2018
Lisa Treat
Assistant Buyer
Direct Phone: 314.768.6269
Fax: 314.768.6369
E-mail: ltreat@stlmsd.com
FAILURE TO ACKNOWLEDGE ADDENDUM WILL RENDER YOUR BID
NON-RESPONSIVE. PLEASE ACKNOWLEDGE ADDENDA ON THE BID
FORM THAT WAS IN THE INITIAL BID PACKAGE OR BY SIGNING
BELOW.
I have read and acknowledge this addendum: ___________________________
Company Representative
Publish Date: April 12, 2018
METROPOLITAN ST. LOUIS SEWER DISTRICT
PURCHASING DIVISION
REQUEST FOR QUOTE 9337
Addendum 1 Page 1
ADDENDUM 1
April 12, 2018
1. Acknowledge of Addendum. Bidders will indicate on their bid that they
have received this Addendum, and have taken it into account in preparing
their bid. Bidders can sign the cover page and include it with their
submission as confirmation of acknowledgement.
2. If a Bidder has already submitted a bid the BIDDER still needs to
acknowledge this Addendum.
3. ALL “REQUIRED SUBMITTAL FORMS” must be submitted with your
bid or your bid WILL BE found NON-RESPONSIVE.
4. ALL ADDENDA must be acknowledge with your bid or your bid WILL
BE found NON-RESPONSIVE.
5. A Pre-Bid meeting was held on 04/11/18 at 9:00am. The Minutes from
that meeting, the sign-in sheet and Questions/Answers from that meeting
are attached to this Addendum.
Note: These minutes are intended to be as brief as possible. They do not attempt to record all of the conversations
that took place. However, they are intended to convey all of the actions taken and instructions issued to the
participants.
I. GENERAL
1. Introductions:
A. Completed.
2. Bidding and Project Schedule: All information reviewed by Lisa Treat with MSD.
A. Bid Due Date: May 2, 2018 before 10:00am CST
i. Bid Form must be fully completed.
ii. Review and follow requirements outlined in the front-end documents for additional
information.
B. Prevailing Wages: Refer to MSD front-end documents for additional information.
C. Anticipated Award: Anticipated immediate. Susceptible to change based upon bids and
weather.
D. Bidders must meet qualification criteria set forth in front-end documents and Project
Manual. Bidders that do not meet these criteria will be disqualified.
E. Construction Schedule: Immediate.
F. Liquidated Damages: Do not apply to this project.
G. WBE/MBE: Required for projects over $50,000. MSD promotes the use of qualified and
registered WBE and MBE firms. Review recommendations and requirements defined in
the MSD front-end documents and include intent on MSD Form A with your Bid. If you
do not meet the minimum requirements, as stated in the “MBE Utilization and
Workforce Program” at the end of the Terms & Conditions they will be found NON-
Responsive, automatically.
H. Payment Procedures: Refer to section 7.4 of front-end documents for additional
information.
3. Scope of Work:
A. The owner is FM Global insured. Provide the specified FMG 1A-60 Assembly as tested
and approved by FM Global.
4. General: Two (2) roof areas totaling approximately 1,071 sqft. See roof drawing RP-1.
A. Basis of design for this project to follow FM Global RoofNav number: 91053-0-0 by
Sika Sarnafil Inc. or pre-approved equal.
B. Provide required project submittals. Do not commence work without approved submittals
and FM Approval.
C. Submit FM Global’s Application for Acceptance of Roofing System, contractor form
X2688, attached to Section 01330, or FM approved RoofNav contractor application
procedure packet. Proof of FM Global application and FM Global approval is required as
part of the submittal process before work may commence.
D. Distribute construction related loads to prevent damage to the structure. The roofer is to
inspect the construction related areas before work to ensure the roof can accommodate the
construction related loads and activities. Provide adequate precautions to secure the area
Pre-Bid Meeting Minutes
Project: Harlem North Pump Station Roof
Replacement
Date: April 11, 2018 at 9:00 AM CST
Attendance: Refer to attached sign-in sheet
Pre-bid Meeting Minutes
Harlem North Pump Stations Roof Replacement
April 11, 2018
Page 2 of 3
before work commences.
E. Coordinate work with the owner’s operation to ensure the building remains watertight and
in operation during construction.
F. All flashing heights must meet or exceed 8-inch minimum requirement, unless otherwise
noted.
G. Provide overnight tie-ins at the end of each and every work day regardless of weather
predictions.
H. Provide all work to meet or exceed the minimum published recommendations and
requirements of the manufacturer’s 20-year NDL/workmanship system warranty.
5. Execution: Roofs 1 and 2
A. Upon approval, remove and dispose of the existing roof system, associated components
and metalwork.
B. Inspect the deck for damage. Photograph and quantify damage for review by Owner and
Consultant. Repairs to be completed under additional approval beyond this contract.
C. Clean and prepare the concrete decking to accept the new roof assembly. Refer to
manufacturer printed recommendations.
D. Adhere new polyisocyanurate insulation (4-ft by 4-ft boards) in ribbons of low-rise foam
adhesive. Stagger laps and layers. Insulation thickness to be and taper as indicated below:
i. 1/4:12 tapered polyisocyanurate insulation with 2-inch minimum starting thickness
fully adhered to prepared concrete deck. Stagger and offset the adhered 4 ft. x 4 ft.
insulation boards per FM Global guidelines. Insulation package shall meet or exceed a
minimum R-20 average. Secure the insulation boards in “full-coverage” bead
application of low-rise foam adhesive.
E. Provide and install new ¼” gypsum coverboard, DensDeck Prime or approve equal, over
the newly installed insulation. Secure the coverboard in “full-coverage” bead application
of low-rise foam adhesive.
F. Ensure all curbs meet or exceed an 8-inch minimum flashing height. Remove, modify,
and install new wood blocking as required to accommodate new roof height. All wood
blocking is to be installed/modified in accordance with FM 1-49 requirements.
G. Fabricate and install new tapered edge panel sumps at all thru-wall scupper locations.
Sump size to be a minimum of 2-ftx2-ft.
H. Provide and install fully adhered 60-mil PVC membrane to the new substrate. Membrane
to be within +/- 1mil of specified thickness.
I. Provide and install new flashings as required. Flashing membrane to be 60-mil +/-1mil.
J. Install new 24ga reglet mount counterflashing along the perimeter of Roof 1. This will
require installation of new reglet directly below the perimeter coping stone.
K. Install new roof-to-wall expansion joint detail including new 24 surface mount
counterflashing along the north perimeter of Roof 2.
L. Remove and expose of existing gutters and downspouts. Provide and install new gutters
and downspouts matching existing size, location, profile and color. Install new wood
blocking as required. Install to comply with FM Global 1-49 and ANSI SPRI ES-1.
Extend membrane over gutter flange. Install new termination bar detail set in water cut-
off. Fasten new termination bar at 6” O.C. Install new tooled sealant.
M. Provide and install new Perma-Tite 200 perimeter metal system along the east and west
perimeters of Roof 2. Include fascia extender if required to cover existing reveal line.
Clip-on metal fascia color to be selected from standard color chart by the Owner.
N. Remove existing sealant at all stone coping joints. Install new backer rod and new
dynamic sealant at all stone coping joints. New sealant to match color of existing coping
stones.
Pre-bid Meeting Minutes
Harlem North Pump Stations Roof Replacement
April 11, 2018
Page 3 of 3
O. Upon completion provide warranty:
i. 2-year contractor warranty covering workmanship and materials.
ii. 20-year NDL full system warranty covering labor and materials.
iii. Provide 72-mph wind speed warranty upgrade.
6. Questions-Additional Site Visits:
A. All correspondence will be completed via email. Send emails to Lisa Treat at MSD.
Contact information is provided within Project Manual.
7. Job Site:
A. Performed site visit and reviewed roof, access, staging, and existing conditions.
B. Further discussion regarding staging locations will be reviewed at the pre-construction
meeting.
8. Bid Questions-Clarifications:
A. Jeremy McCoy to verify contractor parking and access outside the gate surrounding the
pump station.
B. Refer to Addendum #1 for revised Detail C.
Meeting Minutes submitted by,
Scott Herman, RRO
RoofTech Consulting, Inc.
MSD-HARLEM SOUTH AND HARLEM DRAINAGE PUMP STATIONS ROOF
REPLACEMENT PROJECT
ADDENDUM #1
April 12, 2018
This addendum relates to the following Specification Sections:
Parapet Detail– Harlem North Pump Station-Detail C
The Owner requires your bid to accommodate the following changes to the above listed sections
of the specification on the project:
1. Detail C has been revised to illustrate existing copper counterflashings and copper receiver
installed between the wall and stone coping cap set in mortar. To prevent severe damage to
the existing copper receiver during the demolition of the counterflashings Detail C has been
changed to allow for the existing counterflashings to be cut at the top of the metal break to
allow for termination of new membrane. New copper counterflashings to be pinned into
existing counterflashings in lieu of complete removal and install of new reglet
counterflashing detail.
End of Addendum #1
EXISTING COPPER RECEIVER AND COUNTERFLASHING
NEW TERMINATION BAR DETAIL
ANCHORED 6" O.C.
NEW COPPER COUNTERFLASHINGS TO BE
PINNED INTO EXISTING COPPER RECEIVER
NEW PERIMETER ATTACHMENT AS
REQUIRED BY MANUFACTURER
FOR TYPICAL ROOF
CONSTRUCTION
PROFILE SEE DETAIL
NOTES:
1. REPLACE BUTT END SEALANT ON THE FRONT, BACK, AND TOP OF THE COPING STONE.
2. CUT EXISTING COUNTERFLASHINGS ABOVE BREAK IN METAL. CONTRACTOR TO ALLOW FOR
ENOUGH ROOM TO ACCOMODATE FOR NEW PINNED COUNTERFLASHINGS.
B
EXISTING LIMESTONE CAP -CUT
OUT ALL SEALANT JOINTS -
INSTALL NEW BACKER ROD AND
NEW DYNAMIC SEALANT
NEW TOOLED DYNAMIC
SEALANT AT A DEPTH
OF1/2WMAX.
NEW CLOSED CELL BACKER ROD
SECTION B-B
RoofTech
CONSULTING, INC.
ROOF PLANNING AND MANAGEMENT
3122 SUTTON 6OULF\ARD. ST. LOUIS. MO63143
P1-401,0: 314/754, 7440 FAX: 314/833. 3424
PROJECT NAME.
HARLEM NORTH PUMP STATION
DRAWN BY:
MER
DATE.
3/6/2017
PROJECT MOR._
S. HERMAN
SCALE
N.T.S.
TITLE
PARAPET
WORK OR ER No-'.
DETAIL LABEL.
C
Meeting Sign -In Sheet
Project:
Harlem North Pump Station Pre -Bid Meeting
PRINT NAME
i1 �em�� �2rthan
'2 cgiVb 12 It`;z.e
5.
!7.
!8.
9.
t 10.
11.
!12.
13.
114.
115.
'16.
117.
18
ORGANIZATION
Root* c C Svi4\f • it�l:
L. (Ltd 1'`- _ g-00
T: 0 a.r ►
P/4,07 5lfcc- fry Tit-
/O SP
TITLE
i= ,,
t" 1
Date:
Time:
Wednesday, April 11, 2018
9:00AM CST
PHONE EMAIL
)L1. 61) t'7g9 SI,foctuN ro614ecl-N &du )3 . Corn.
i B ;L Lt I`" e.,,,,ci.t f vt
t_r a -d� t. .. 14_
3
frpd-
'P60-grs,}t,geressoti,rtite. �o3 81111 __67.), ee.o1 s4[ose,coni
-{-
CJM
Templates by Ve le 42.com
0 2009 Vertex42 LLC