AUTHORIZING A PROFESSIONAL PRECONSTRUCTION
SERVICES CONTRACT WITH TORCON, INC.
WHEREAS, the Borough of Carteret is in need of professional preconstruclion services
for the Borough of Carteret Ferry Terminal; and
WHEREAS, Torcon, Inc., possess the requisite skill and expertise to provide said
services; and
WHEREAS, Torcon, Inc. has submitted a proposal to provide said preconshvetion
services at a total cost not to exceed $75,000.00; and
WHEREAS, the Mayor and Council have reviewed said proposal; and
WHEREAS, the Chief Financial Officer has certified that funds are or will be available
for said purpose. Account #
NOW, THEREFORE, BE IT RESOLVED by the Mayor and Council of the Borough
of Carteret, County of Middlesex, State of New Jersey, as follows:
1. That the proposal from Torcon, Inc. for professional preconstruction
services with regard to the Borough of Carteret Ferry Terminal at a total
cost not to exceed $75,000.00, billable in accordance Torcon's existing
contract with the Borough, is hereby approved.
2. That this action is approved as an award of a professional services contract
pursuant to N.J.S.A. 40A:11-5(1)(a) in accordance with the Borough's
Fair and Open Process as authorized by law.
3. A copy of this Resolution be forwarded to the Borough's Purchasing
Department and Torcon, Inc.
Adopted this 27'b day of July, 2023
and certified as a true copy of the
original on July 28, 2023,
CARMELA POGORZELSKI, RMC
Municipal Clerk
RECORD OF COUNCIL VOTE
COUNCILMAN
YES
NO
NV
A.E.
COUNCILMAN
YES
NO
NV
A.B.
BELLINO
X
JOIiAL
DIAZ
X
KRUM
DIMASCIO
X
NAPLES
X
X- Indicate Vote AU - Absent NV - Not Voting XOR- Indicates Vote to Overrule Vto
Adopted at a meeting of the Municipal Council
July 27, 2023
fU P LK t
$OR-OUGH OF
MUNICIPAL CLERK
To: Patrick DeBlasio,
'ncusurer
Borough of Cortaro
IWOU13ST 1_OR CER'I'1F1CA'I'ION OP AVAILABLE FUNDS
Donlei A
Date: Jt1Iy 27, 2023
Resoluflon #; 23-187
Nate of Aecouult TORCON_ , INC.,
AMOUNT TO BE ENCUMBERED: Amaurt not to exceed $75,000 00
CARM LA POGO BL I
Municipal Clerk
CERTIFICATION OFAVAILABILITY OF FUNDS
1, Treasurer of the Borough ol'Carieret, do hereby certify That there are sufficient fbnds available iu file current
budget to enable (he Municipal Council to authorize file enlering late a Contract betiveon the Borough of Carteret
and;
IDQCt�1
The funds available for tills contract are fir the Budget, in the account Of.
In (he amounto '5,(>W
By Ibis certification, I have hereby encumbered the above named account fo amour f the c n °
Council action,
Aato:.—IN—
Patrick DoWnlo
Treasurer .
Memorlat M iAcIput Building 0 61 Coolm Avenue 0 Carteret, New jersey OV008
Tel: 732-541-3800 i ;kax:732-541-8925 tip cleltc ce c xteref neq
wwvucarteret.net
AFFIDAVIT OF PUBLICATION
The following is a true copy of an Ordinance or Resolution of
the Borough of Carteret that has appeared in the Home News
Tribune, a newspaper which is printed in Freehold, New
Jersey and published in Neptune, in said County and State and
of general circulation in said county. One 1 time(s), once in
each issue as follows:
August 4, 2023
Municipal Clerk
Q%D
Notary is of New Jersey
: : Notes Ic - StatNNIFER e of Now Jersey
Commisslon # 50.18.8983
M Comm, Ex Tres Mar. 31 2027
Sworn and subscribed before
me this 4 H- day of 0
Mayor Daniel 1. Reiman
BOROUGH of CARTERET
61 Cooke Avenue
1®
Carteret, NJ 07008
June 28, 2023
Torcon
TOTWn, inc.
Re: Proposal for Preconstruction Services
328 Newman Springs Road
Carteret Ferry Terminal
Red Bank N) 07701
Dear Mayor Reiman:
TEL 732.704.9800
FAX 732.104.9813
Torcon is pleasedto presentits proposal to provide Preconstruction phase Construction
www.tomon.com
Management Services to the Borough of Carteret for its planned Ferry Terminal. Our
submittal reflects our recent conversations about the project. The following is an
overview of the scope of work Torcon will provide to support the Borough.
KEY STAFF
Vice President Steve Kessler will take the lead in all Torcon services. He will be joined by
Vice President George Kourides who will oversee estimating and cost control for the
project.
MEETINGS
Torcon's proposal assumes we will participate in meetings every 2 weeks. These project
meetings will include Carteret representatives, the architect and other consultants.
Meeting Purpose and Goals
• Collaborate on project status
• Review design development
• Review schedule
ESTIMATING
Torcon proposes to provide three estimates at various stages of design during the Ferry
Terminal's preconstTuction phase --
Concept Design
The CD estimate is completed during early programming and is important to confirm
conformance with the Borough's budget. Information typically required includes:
• Description of Foundation System
• Description of Structural System
• Basic Floor Plans
• Description of Exterior Closure Systems/ Typical Elevation
• Architectural Narrative of proposed materials andfinishes
• HVAC Narrative
• Fire Protection code determination
• Electrical Narrative
• Describe Building Equipment
Construction Managers & General Contractors
Mayor Daniell. Reiman
BOROUGH OF CARTERET
June 28, 2023
Page 2
Schematic Design
The SD estimate is typically completed at approximately the 20% to 30% design
completion mark and is based on the following documents and information:
• General site plan
• Floor layouts
• Exterior Elevations
Torcon Through Building Sections
• Statistical Area Summary
• Outline Specifications for Major Systems and Materials
• Preliminary Soil Boring Reports
Design Development
The DD estimate is performed when design reaches the 50%to 75% completion stage,
which typically provides:
• Completed Site Plan
• Fully Developed Floor Plans
• Interior and Exterior Elevations
• Reflected Ceiling Plans
• Building Sections
• Structural Foundation and Frame Scoped and Sized
• Final Solis Report
• MEP Equipment Schedule
• Basic MEP Layouts
• MEP One Line Diagrams
• MEP Riser Diagrams
• Preliminary Specifications for all Sections
VALUE ENGINEERING
After each estimate Torcon will collaborate with the project team to recommend
potential value engineering options for the project. VE seeks to identify and integrate
design alternatives that maintain the functionality of the facility while providing cost
savings.
SCHEDULE DEVELOPMENT
Torcon's team will develop a Level 1 schedule for the project that incorporates an
overview of preconstruction and construction elements. The CPM schedule will be
developed by scheduling professionals using Primavera, the construction industry's
leading project controls software.
CONSTRUCTABILITY REVIEW
Torcon will evaluate design documents and recommend modifications that will
enhance the facility in terms of build quality, construction safety, building
maintenance, function and efficient operations.
Mayor Daniel J. Reiman
BOROUGH OFCARTERET
June 27, 2023
Page 3
PROPOSED COST
Total Cost of Preconstruction Services
Discount
Proposed Cost
Estimated Expenses
$90,344
($15,344)
$75,000
$500 (to be billed at Cost)
T ®r C o n BILLING RATES
Listed below are Torcon's hourly billing rates for requested work beyond our currently
proposed preconstruction scope:
Vice President / Project Executive
Vice President / Estimate Manager
Lead Estimator
MEP Estimators
Document Control
Sr. Project Controls Manager
Steve Kessler
$258
George Koundes
$225
DyanaSantiago
$75
Staff
$150
Staff
$45
Chris McMillan
$165
Assumptions
• Torcon's proposal assumes preconstruction activities will be completed in 2023.
Exclusions
Our proposal does not include any subcontractor or equipment purchasing, nor
monitoring of any activities at the project site (Gectech work, etc.)
We appreciate your consideration and look forward to collaborating with the Borough
on such an exciting development. Please feel free to contact me if you have any
questions or if you require additional information. Thank you.
Sincerely,
TORCON, INC.
4oph ATorcivia
o resident
'® Borough of Carteret— New Ferry Terminal
Carteret, New Jersey
T O r" C o n June 27, 2023
ESTIMATED GENERAL. CONDITIONS SUMMARY
Preconstruction Personnel - WS $ 90,844 100.0%
Construction Personnel - 0.0%
Consumabies & Temporary Requirements - 0.0%
Total Estimated General Conditions $ 90,844 100.0%
Description Duration
-----------------
Ca_lY
endar Da s
Start Date End Date � ' Days Weeks IUlorikhs '
Preconstruction July _1,, 2023 , (_ pecember 31, 2023 __ 183 26 6.0
Total Construction
Pagel of 3
T Borough of Carteret —Now Ferry Terminal
Carteret, New Jersey
T D r C o n June 27, 2023
PRECQNSTRUCTION PERSONNEL
Preconstruction - Duration
26
Wks
6
Months
Description -(Function)
Duration
Unit Price
Amount
Management
00110_001 001
Project Executive
112
Mhrs
257.81
28,875
Systems Support
00310001002
Design Review Team
20
Mhrs
198.32
3,966
Engineering
00470_001_001
Project Controls Engineer
40
Mhrs
105.00
6,600
Estimating & Value Engineering
0063o_001 col
Estimate Manager
120
Mrs
220.53
26,463
00030_OW 002
Lead Estimator
194
Mhre
72.98
14,168
00650_001_001
Mechanical Estimator
24
Mhrs
146.76
3,622
00650_001 002
Electrical Estimator
24
Mhrs
148.74
3,570
00075_001001
Document Control & Admin
12
We
43.63
524
Accounting
00730_001 001
Project Accountant
24
Mhrs
111.06
2,665
Subtotal 570
We
$
90,344
Expenses
01570_005 001
Drawing Reproduction
Lump Sum
500
Subtotal
$
5o0
01300_001_0ol
Payroll Burden 05.0°%
In Rates 0.0%
-
In Rates
01330001001
Escalation o.o%
In Rates 0.0%
90,344
-
Total Preconstruction Personnel
$
90,844
Total Preconstruction Personnel • Breakdown
Management Costs
28,876
Estimating & Value
Engineering Services
48,237
Related Services Costs
13,232
Expenses
500
Total
$
90,844