HomeMy Public PortalAboutFY 2016 Final Budget SupplementMetropolitan St. Louis Sewer District
2015-2016 Budget Supplement
BUILD
SYSTEM
IMPROVEMENTS
GET THE
RAIN OUT
REPAIR
AND
MAINTAIN
Get excess rain out of the
system during heavy
storms with the help of
rainscaping and
stormwater disconnections
An ambitious program of
repair and maintenance
on existing system
infrastructure to improve
operations
Design and construction
of new system
improvements like tunnels
and storage tanks to
improve system capacity
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
BUDGET SUPPLEMENT FOR FISCAL YEAR 2016
PREFACE
This annual Budget Supplement provides information about the Metropolitan St. Louis Sewer District's
intended Capital Improvement and Replacement Program during Fiscal Year 2016 (July 1, 2015 to June 30, 2016).
This document is divided into the following sections:
• Program Summary (includes a glossary of terms used in the Budget Supplement) • Wastewater Engineering Projects • Wastewater Construction Projects • Wastewater Continued Projects • Wastewater Contingency Projects • Wastewater Program • Stormwater Engineering Projects • Stormwater Construction Projects • Stormwater Continued Projects • Stormwater Contingency Projects • Stormwater Program • Appendix
The Wastewater Construction Projects and Stormwater Construction Projects sections list projects that have
scheduled construction starts during Fiscal Year 2016. The Wastewater Engineering Projects and Stormwater
Engineering Projects sections list projects that have scheduled engineering starts during Fiscal Year 2016 (which
includes design, planning, and data collection/system investigation services). Due to the magnitude and complexity
of these projects and the requirements for permitting and easement acquisition, their construction is scheduled in
future years. The Contingency Projects sections detail projects that are currently scheduled for Fiscal Year 2017, but
may be expedited and constructed during Fiscal Year 2016, if revenue becomes available and project schedules
allow. The Wastewater and Stormwater Program sections summarize the program by fund.
For each new project identified for funding in Fiscal Year 2016, this document provides information
regarding the approximate project scope and estimated cost. For projects continued from previous fiscal years, only
the estimated construction cost and reason for continuance are provided. Specific information regarding Continued
Projects was included in previous Budget Supplement documents in the fiscal years in which the projects were
initially identified. Lastly, a listing of all Fiscal Year 2016 projects sorted by municipality is provided in the
Appendix.
On the Cover: MSD Project Clear is the Metropolitan St. Louis Sewer District’s initiative to improve water quality and
alleviate many wastewater concerns in the St. Louis region. MSD Project Clear will invest billions of dollars over a
generation in planning, designing, and building community rainscaping and new system improvements. This initiative
includes an ambitious program of maintenance and repair, and the disconnection of some residential downspouts in parts of
St. Louis County’s separate sewer area from the wastewater sewer line. This work is part of an agreement between MSD
and the United States Environmental Protection Agency. Illustrations highlight vital components of the program.
")
")
")
")
")
")
")
")
")
")
")")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")")
")
")
")
")
")
")
")
")
")
")
")
")
")
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(!(!(
!(!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(MSD Bounda
ry
St. Louis County Boundary§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦ 44
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦ 55
§¨¦170
§¨¦255
195
191
248
239
253
247
241
192
185
250
242
246
245
255 249
244
189
190
205
201
182
183
197
200
188
187
199
254
240
252251
198
243
204
203
193
196
202
186
206
184
4
8
6
5
9
2
3
7
1
23
68
30
64
72
76
14
58
15
52
49
25 26
53
54
55
56
79
94
75
95
66
73
59
83
85
28
24
60
65
97
46
50
86
10
29
98
13
32
69
47
74
88
48
93
62
63
67 87
2282
17
96
61
99
90
84
91
89
81
57
27
18
31
92
80
171
115
178
237
108
160
173
229
218 235152
220
154
125
107
148
109
162
174
228
153
103
157
208181
101
230
126
116
179 142
102
149
163
147
151
144
166
104
106
100
137
177
213
141
168
233
225
169
136
211
155
212
138
238
223
231
210
226
216
119
156
146
118
232
113
224
143
135
139
236
217
215
158175
234
209
222
127
159
112
145
227
167
51
180
172
129
221
207214
120
161
150
140
165
105
176
134
114
128
Map produced by MSD GIS Mapping, May 2015
The Metropolitan St. Louis Sewer DistrictCapital Improvement and Replacement ProgramFiscal Year 2016
Legend
FISCAL YEAR 2016
!(Wastewater
!(Stormwater
FISCAL YEAR 2017
")Wastewater
")Stormwater
Combined Sewer Area
MSD DISTRICT WIDE PROJECTS
22 April 2015
Page 1 of 10
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY16
PAGE NUMBER PROJECT NAME
1 82ND STREET TO I-170 SANITARY RELIEF (UR-08, UR-09)
2 AFFTON I/I REDUCTION (HANOVER, HILDESHEIM-WEBER RD, SEIBERT, AND
HAMBURG)
3 APPLE ORCHARD - SINGERSON - BAYLESS PLACE I/I REDUCTION (LEMAY
FERRY RD AND BAYLESS AVE)
4 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2017)
CONTRACT A
5 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2017)
CONTRACT B
6 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2017)
CONTRACT C
7 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2017)
CONTRACT F
8 BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
9 BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
10 CAULKS CREEK FORCEMAIN REHABILITATION
11 CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS (2014)
12 CCTV INSPECTION OF SEWERS (2014)
13 COLDWATER CREEK WWTF FINAL CLARIFIERS REPLACEMENT
14 COLDWATER SANITARY RELIEF SECTION B, C & D WET WEATHER STORAGE
FACILITY TANK C
15 COLDWATER SOUTHWEST SUBWATERSHED I/I REDUCTION (ST. CHARLES
ROCK RD AND ASHBY RD)
16 COMPREHENSIVE AMMONIA AND NUTRIENT REMOVAL MASTER PLAN
17 CONCORD I/I REDUCTION (TESSON FERRY RD AND E CONCORD RD)
18 CONSTRUCTION MANAGEMENT SERVICES - LOWER AND MIDDLE RDP
TUNNEL FACILITIES
19 CONSTRUCTION MANAGEMENT SERVICES - LOWER MERAMEC AND DEER
CREEK TUNNELS
22 April 2015
Page 2 of 10
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY16
PAGE NUMBER PROJECT NAME
20 CONSTRUCTION MANAGEMENT SERVICES - TANK/TREATMENT/PUMP
STATION FACILITIES
21 CRITICAL INFRASTRUCTURE ASSESSMENT
22 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD)
PHASE I
23 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD)
PHASE III
24 DC-09 WEST I/I REDUCTION (S LINDBERGH BLVD AND LADUE RD)
25 DEER CREEK PUBLIC I/I REDUCTION (2017) CONTRACT A
26 DEER CREEK PUBLIC I/I REDUCTION (2017) CONTRACT B
27 DEER CREEK SANITARY SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
28 DEER CREEK SANITARY SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
29 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP)
30 DEGIVERVILLE COMBINED SEWER RELOCATION
31 FAWN VALLEY, PIONEER PARK, WESTCHESTER I/I REDUCTION (MANCHESTER
RD W OF N GEYER RD)
32 FF-18 VILLA DORADO - LACKLAND - PAGE SANITARY RELIEF (ADIE RD TO
VILLA DORADO DR)
33 GENERAL SERVICES AGREEMENT - CONSTRUCTION MANAGEMENT (2016)
34 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2015) CONTRACT A
35 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2015) CONTRACT B
36 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (FY2015) CONTRACT C
37 GENERAL SERVICES AGREEMENT - PLANNING (FY2014)
38 GENERAL SERVICES AGREEMENT - FACILITY & SEWER DESIGN (2016)
39 GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT B
40 GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT C
41 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2016) CONTRACT A
42 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2016) CONTRACT B
22 April 2015
Page 3 of 10
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY16
PAGE NUMBER PROJECT NAME
43 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2016) CONTRACT C
44 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2016) CONTRACT D
45 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2016) CONTRACT E
46 GRAVOIS TRUNK SANITARY STORAGE FACILITY (PARDEE LN AND PARDEE
RD)
47 HAMBURG AVE TO AL CLAIRE DR TO WEBMORE DR CSO L-181 (I-032)
ELIMINATION
48 HELTA, SAPPINGTON, AND GREGORY COURT I/I REDUCTION (SAPPINGTON RD
AND I-270)
49 HUNTLEIGH MANOR, OLD WARSON, TIMBERWYCK I/I REDUCTION (S
LINDBERGH BLVD SOUTH OF LITZSINGER RD)
50 KAPPEL (PARTIAL) I/I REDUCTION (EXUMA DR AND GLEN OWEN DR)
51 KIRKWOOD I/I REDUCTION (BIG BEND BLVD AND S KIRKWOOD RD)
52 KIRKWOOD MIDDLE SCHOOL, SIMMONS, WILSON, W SARAH I/I REDUCTION
(MANCHESTER RD AND KIRKWOOD RD)
53 LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT A
54 LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT B
55 LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT C
56 LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT D
57 LEMAY PUMP STATIONS 1 AND 2 IMPROVEMENTS
58 LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT)
59 LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT)
60 LEMAY WWTP SECONDARY IMPROVEMENTS
61 LMRDP CSO STORAGE TUNNEL (BROADWAY TO RDP TUBES)
62 LMRDP CSO STORAGE TUNNEL NORTH CONSOLIDATION SEWERS
63 LMRDP CSO STORAGE TUNNEL SOUTH CONSOLIDATION SEWERS
64 LMRDP TUNNEL DEWATERING PUMP STATION
65 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
22 April 2015
Page 4 of 10
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY16
PAGE NUMBER PROJECT NAME
66 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
67 LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
68 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF
ROCKS DR TO CHURCH DR)
69 NATURAL BRIDGE RD - DARBY TO CHEVROLET COMBINED SEWER RELIEF
70 PRIVATE INFLOW/INFILTRATION PUBLIC ENGAGEMENT PROGRAM 2013
71 RADAR RAINFALL DATA (FY2014)
72 RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC
SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT)
73 RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC
SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT)
74 RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL
75 REAVSDALE I/I REDUCTION (MACKENZIE RD AND REAVIS BARRACKS RD)
76 SPRINGDALE I/I REDUCTION (ROLLING DR AND SMITHFIELD PL)
77 STREAM FLOW GAUGE OPERATION AND MAINTENANCE (USGS)
78 STREAM FLOW WATER QUALITY SAMPLING (FY 2014)
79 UNION CREEK I/I REDUCTION (I-55 BETWEEN S LINDBERGH BLVD AND
BUCKLEY RD)
80 UNIVERSITY CITY SANITARY STORAGE FACILITY (HAFNER CT)
81 VALCOUR AND BURLINGTON RR SANITARY RELIEF AND I/I REDUCTION
(VALCOUR RD AND WATSON RD)
82 WEBSTER GROVES TRUNK E SANITARY REHABILITATION AND I/I REDUCTION
PHASE III
83 82ND STREET TO I-170 SANITARY RELIEF (UR-08, UR-09)
84 ALPINE DRIVE SEPARATE SEWER I/I REMOVAL
85 ALPINE DRIVE SEPARATE SEWER I/I REMOVAL
86 BALLAS ROAD SUBTRUNK SOUTH I/I REDUCTION
87 BAUMGARTNER & BLACK FOREST SANITARY REPLACEMENT PHASE II
22 April 2015
Page 5 of 10
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY16
PAGE NUMBER PROJECT NAME
88 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2016)
CONTRACT A
89 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2016)
CONTRACT D
90 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2016)
CONTRACT E
91 BISSELL HILLS SANITARY RELIEF/CALUMET I/I REDUCTION (BP-317)
92 BISSELL POINT I/I REDUCTION (BP-619) (VALLEY DR)
93 BLACK CREEK SANITARY SEWER AND I/I REDUCTION
94 BRINWOOD I/I REDUCTION
95 BRINWOOD I/I REDUCTION
96 CAULKS CREEK FORCEMAIN (RIVER VALLEY RD TO L-52)
97 CAULKS CREEK TRUNK SEWER (SKME-011) PHASE I
98 CHANDELLAY DR. SANITARY SEWER REPLACEMENT
99 CLAVERACH PARK I/I REDUCTION AND SEWER SEPARATION
100 CLAVERACH PARK I/I REDUCTION AND SEWER SEPARATION
101 COLDWATER CREEK WATERSHED I/I REMOVAL - SHARON STUDY AREA (N
LINDBERGH BLVD AND LINDSAY LN)
102 COLDWATER SANITARY RELIEF SECTION B, C & D WET WEATHER STORAGE
FACILITY TANK C
103 CSO VOLUME REDUCTION GREEN INFRASTRUCTURE
104 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD)
PHASE I
105 DC-06 DEER CREEK SANITARY RELIEF PHASE III AND I/I REDUCTION
106 DC-06 DEER CREEK SANITARY RELIEF PHASE III AND I/I REDUCTION
107 DEER CREEK PUBLIC I/I REDUCTION (2016)
108 DIXIE I/I REDUCTION
109 DUCHESNE AND GOTT I/I REDUCTION
110 EASEMENT ACQUISITION FOR COMBINED / SANITARY PROJECTS (FY 2016)
22 April 2015
Page 6 of 10
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY16
PAGE NUMBER PROJECT NAME
111 EMERGENCY REPAIR FUNDS (WASTEWATER)
112 FF-15 MCKELVEY/R.R. TO ADIE SANITARY RELIEF PHASE III
113 FLORISSANT I/I REDUCTION
114 FLORISSANT PUBLIC I/I REDUCTION
115 FLORLAND SANITARY RELIEF PHASE I - I/I REDUCTION
116 FLORLAND SANITARY RELIEF PHASE I - I/I REDUCTION
117 FLOW METERING MANHOLE IMPROVEMENTS (2016)
118 FOREST BROOK SANITARY RELIEF (SKME-003 AND SKME-016) PUBLIC
REHABILITATION AND I/I REDUCTION
119 FOREST BROOK SANITARY RELIEF (SKME-003 AND SKME-016)
REHABILITATION AND I/I REDUCTION
120 FORESTATE AND TEXAS SANITARY RELIEF (SKME-513)
121 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT
A
122 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT B
123 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT C
124 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT
D
125 GRAND GLAIZE TRUNK SANITARY RELIEF AND I/I REDUCTION (SKME-417)
126 GRAVOIS TRUNK SANITARY STORAGE FACILITY (PARDEE LN AND PARDEE
RD)
127 HARLEM - BADEN RELIEF PHASE IV (HEBERT) (IMPROVEMENTS FROM BASIN
TO HAMILTON TRUNK)
128 HOLLY DRIVE SEWER SEPARATION
129 HOLLY DRIVE SEWER SEPARATION
130 INFRASTRUCTURE REPAIRS (REHABILITATION) (FY2016) CONTRACT A
131 INFRASTRUCTURE REPAIRS (REHABILITATION) (FY2016) CONTRACT B
132 INFRASTRUCTURE REPAIRS (SANITARY/COMBINED - FY2016)
133 INFRASTRUCTURE REPAIRS (SANITARY/COMBINED - FY2016)
22 April 2015
Page 7 of 10
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY16
PAGE NUMBER PROJECT NAME
134 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS)
135 LACKLAND I/I REDUCTION
136 LEMAY PUBLIC I/I REDUCTION (2016)
137 LEMAY PUMP STATIONS 1 AND 2 IMPROVEMENTS
138 LEMAY WWTF CHANNEL AERATION BLOWERS
139 LOWER MERAMEC RIVER WWTF SCREEN CHANNEL IMPROVEMENTS
140 LUCAS & HUNT AND I-70 SANITARY SEWER
141 LYNKIRK STUDY AREA I/I REDUCTION
142 MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF
ROCKS DR TO CHURCH DR)
143 MARIETTA DR STORM SEPARATION AND I/I REDUCTION (BP-292)
144 MARIETTA DR STORM SEPARATION AND I/I REDUCTION (BP-292)
145 MARTIGNEY I/I REDUCTION
146 MCNULTY - PALLARDY I/I REDUCTION
147 MCNULTY - PALLARDY I/I REDUCTION
148 MEADOWRIDGE AND EASTWOOD STORM AND SANITARY RELIEF
149 MEADOWRIDGE AND EASTWOOD STORM AND SANITARY RELIEF
150 MIDLAND SANITARY RELIEF - PUBLIC AND PRIVATE I/I REDUCTION
151 MIDLAND SANITARY RELIEF - PUBLIC AND PRIVATE I/I REDUCTION
152 MISSOURI RIVER BONFILS SANITARY SEWER REHABILITATION PHASE II
153 MISSOURI RIVER SERVICE AREA I/I REDUCTION - CREVE COEUR CREEK EAST
154 MISSOURI RIVER WWTF BERM AND WATER FEED UPGRADE
155 MISSOURI RIVER WWTF SECONDARY TREATMENT ELECTRICAL /
MECHANICAL MODIFICATIONS
156 MISSOURI RIVER WWTP SECONDARY TREATMENT EXPANSION (MITIGATION
CREDIT)
157 NEWCASTLE I/I REDUCTION
158 NORTH BADEN CREEK I/I REDUCTION (BP-532) (WINCHESTER DR)
22 April 2015
Page 8 of 10
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY16
PAGE NUMBER PROJECT NAME
159 PADDOCK CREEK I/I REDUCTION (PRIVATE)
160 PICKWICK - BERNADINE - BIMINI SANITARY RELIEF
161 POWELL AVE AND ANNALEE SEWER SEPARATION
162 PROVIDENCE SANITARY RELIEF (SKME-640)
163 PROVIDENCE SANITARY RELIEF (SKME-640)
164 PUMP STATION REPLACEMENT PROJECTS (PHASE I)
165 ROSEMARY, PHILO, & KATHLEEN SEWER SEPARATION
166 ROSEMARY, PHILO, & KATHLEEN SEWER SEPARATION
167 SELVIDGE AREA I/I REDUCTION
168 SHERWYN SANITARY RELIEF (SKME-651) AND I/I REDUCTION
169 SUB-TRUNK #2 LATERAL SANITARY RELIEF
170 SUPPLEMENTAL ENVIRONMENTAL PROJECTS (SEP) PROGRAM
171 UNIVERSITY CITY I/I REDUCTION - WEST
172 UNIVERSITY CITY I/I REDUCTION - WEST
173 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (WC-01)
174 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (WC-02 AND WC-03)
175 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (BEL-NOR)
176 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (HANLEY HILLS)
177 UNIVERSITY CITY SANITARY STORAGE FACILITY (HAFNER CT)
178 UPPER COLDWATER SECTION D I/I REDUCTION
179 UPPER COLDWATER SECTION D I/I REDUCTION
180 VINITA DRIVE SANITARY RELIEF
181 WEBSTER GROVES TRUNK E SANITARY REHABILITATION AND I/I REDUCTION
PHASE IV
207 BIG BEND TO PAPIN STORM SEWER PHASE I
208 COTTAGE #206 STORM IMPROVEMENTS
209 DEER CREEK OMCI STORMWATER DESIGN (CONTRACT A)
22 April 2015
Page 9 of 10
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY16
PAGE NUMBER PROJECT NAME
210 HUDSON RD. #1401 - #1405 BANK STABILIZATION (MCDW-120)
211 ROSEWOOD LANE & WOODARD DR. STORM SEWER
212 UNIVERSITY CITY BRANCH OF RIVER DES PERES - CORPS OF ENGINEERS
STUDY
213 ANCHOR DR. AND DANA AVE. STORM SEWER
214 AUSTIN PLACE AND LOCKWOOD AVE. STORM SEWER
215 CALVERT AVE. #3342 STORM SEWER
216 CONWAY & CHAPEL OAKS STORM IMPROVEMENTS (FRONTENAC 7-5)
217 DEER CREEK WATERSHED INITIATIVE
218 DESMET INDUSTRIAL CT. LOT 8 BANK STABILIZATION
219 EMERGENCY REPAIR FUNDS (STORMWATER)
220 GLEN ABBEY DR. STORM IMPROVEMENTS (FRONTENAC 7-3)
221 GLEN RD #35 BANK STABILIZATION
222 GRANT #609 BANK STABILIZATION
223 HERBERT AVE. 4200-4400 BLOCK STREAMBANK STABILIZATION
224 HERMITAGE HILLS BANK STABILIZATION (FRONTENAC 3-1)
225 LAVINIA DR. #10709 STORM SEWER
226 LIGGETT TO BIG BEND CHANNEL REPAIRS
227 MADISON #708 STORM SEWER
228 MANDA LANE #8901 STORM SEWER
229 MARYHILL DRIVE STORM SEWER
230 MC ADOO CT #4325 STORM SEWER
231 OAK VALLEY EAST STORM SEWER (FRONTENAC 1-2)
232 RAINRIDGE CT. #4125 BANK STABILIZATION & BUYOUTS (GCMB-370)
233 ROANOKE AND LOEKES STORM SEWER
234 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT - COLDWATER
CREEK OMCI
22 April 2015
Page 10 of 10
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY16
PAGE NUMBER PROJECT NAME
235 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT - FOUNTAIN
CREEK OMCI
236 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT - MALINE CREEK
OMCI
237 STORMWATER INFRASTRUCTURE REPAIR / REPLACEMENT - UNIVERSITY
CITY OMCI
238 WEST OAK DRIVE STORM IMPROVEMENTS
1 May 2015
Page 1 of 2
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX CONTINGENCY PROJECTS - FY17
PAGE NUMBER PROJECT NAME
182 BRIDGEVALE I/I REDUCTION (BRIDGEVALE AVE AND LAKEVIEW AVE)
183 CHAPEL HILL I/I REDUCTION (MATTIS RD AND VENARDE DR)
184 CREVE COEUR CREEK PUBLIC I/I REDUCTION SOUTH
185 DAMMERT AND BROADWAY SANITARY RELIEF (SKME-551)
186 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP)
187 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP)
188 FF-16 SCHUETZ - MEADOWSIDE TO PAGE SANITARY RELIEF
189 GASLIGHT SQUARE SEWER IMPROVEMENTS
190 LEMAY PUMP STATIONS 1 AND 2 IMPROVEMENTS
191 LEMAY WWTF CONCRETE PRESERVATION
192 MACKENZIE I/I REDUCTION
193 NEW ENGLAND TOWN QUARRY PUMP STATION (P-307) (SKME-544)
IMPROVEMENTS
194 PRIVATE INFLOW AND INFILTRATION REDUCTION PROGRAM
195 PROSPECT HILL LANDFILL VERTICAL EXPANSION
196 ROLENS AND TELEGRAPH SANITARY STORAGE
197 SAPPINGTON CREEK I/I REDUCTION (GRAVOIS RD AND SAPPINGTON RD)
198 SENECA PRIVATE I/I REDUCTION
199 SENECA PRIVATE I/I REDUCTION
200 STERLING PLACE SEPARATE SEWER I/I REMOVAL
201 TRAMPE (PARTIAL) I/I REDUCTION (CASTILON AVE AND TRAMPE AVE)
202 UNIVERSITY CITY I/I REDUCTION - EAST (WC-01, WC-02, & WC-03)
203 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (UR-08 AND UR-09)
204 UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (UR-10)
205 UNIVERSITY CITY SANITARY STORAGE FACILITY (HAFNER CT)
206 UPPER MALINE TRUNK SANITARY RELIEF PHASE IV SECTION A
239 BUSIEK AVE. #8044 STORM SEWER
1 May 2015
Page 2 of 2
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX CONTINGENCY PROJECTS - FY17
PAGE NUMBER PROJECT NAME
240 EVERMAN-TENNYSON STORM SEWER
241 FOX RUN DRIVE #1360 STORM SEWER
242 FROSTWOOD PARK STREAMBANK STABILIZATION
243 LAKE VALLEY DR STORM SEWER REPLACEMENT
244 LEE AVE. #337 STORM SEWER
245 MALLARD LANE & PHEASANT DRIVE STORM SEWER
246 PARK AVENUE STORM IMPROVEMENTS
247 PICARDY LANE SUBDIVISION BANK STABILIZATION
248 RALEIGH DRIVE #8829 STORM SEWER
249 REDLAND DR. - TAHQUITZ DR. STORM SEWER
250 ROGERS LANE #975 STORM SEWER
251 ST. EDMUND #10728 - 10732 STORM SEWER
252 STANSBERRY AVE #9262 STORM SEWER
253 TEALWOOD DRIVE AND BEAVER DRIVE BANK STABILIZATION
254 WHITEHAVEN AND RALEIGH STORM SEWER
255 WINTERGREEN 3503 AND 3507 STORM SEWER
22 April 2015
Page 1 of 1
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY - FY16
TYPE OF PROJECT NUMBER OF
PROJECTS
PROJECT COST
Wastewater Engineering 82 $69,341,000
Wastewater Construction 99 $195,334,000
Stormwater Engineering 6 $1,450,000
Stormwater Construction 26 $5,580,500
TOTAL:213 $271,705,500
Wastewater Continued 10 $24,650,000
Stormwater Continued 5 $1,688,000
TOTAL:15 $26,338,000
GRAND TOTAL:228 $298,043,500
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
1 of 8
The identification and prioritization of projects to be included in the Capital Improvement
and Replacement Program is a multi-step process, requiring monitoring and updating to ensure
that the highest priority problems within the District are addressed in a timely manner, given
funding limitations. These stages include: project identification, conceptual solution,
preliminary study, final design, and construction.
At each step in the process, the project scope is reevaluated to verify that it continues to
meet regulatory requirements and customers’ needs. The project cost is updated based on
available information, and the project’s priority is assessed with the goal that the highest priority
projects are funded first.
Project cost estimates used in the budget preparation process and shown in the Budget
Supplement are usually based on the preliminary study stage of the process. At this stage there is
typically a minimal amount of detailed information available regarding geotechnical conditions,
utility relocation requirements, easement requirements, and other site-specific issues that have
the potential to significantly affect the project’s construction cost. Preliminary study cost
estimates are intended to be within thirty percent of the design engineer’s final estimates.
Individual projects may vary to a greater degree than the average, due to unanticipated site-
specific conditions that impact the project cost.
New projects are identified on an ongoing basis to ensure that the District is in
compliance with the regulatory requirements of the United States Environmental Protection
Agency and Missouri Department of Natural Resources, to address customer stormwater or
wastewater problems, remedy deficiencies identified through planning studies and hydraulic
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
2 of 8
analysis of the system, and implement required collection system and wastewater treatment plant
maintenance and upgrades.
Upon the initial identification of regulatory issues, localized problems, or system
deficiencies, a conceptual solution is developed, which includes a project scope, cost estimate,
and priority ranking of the project relative to similar projects. This solution and associated cost
estimate are general, based on a single site visit and a “table-top” analysis of the problem. The
project may then be incorporated into the Capital Improvement and Replacement Program in a
specific fiscal year, based on the availability of funds and priority of the project.
Before the year in which funding of the project is anticipated, a preliminary study is
performed. In this study, scope is reevaluated in greater detail to ensure that the conceptual
solution is still viable, given current conditions, regulatory requirements, and updated project
cost estimate and priority ranking. In performing this preliminary study, the District may make
multiple site visits to inspect the problem area and estimate alignment of the sewer or channel to
be constructed. Preliminary survey information may be obtained and a more detailed hydraulic
analysis performed than was done at the conceptual solution level. Preliminary studies are
typically performed by the Engineering Department. However, the District may use engineering
consultants to perform preliminary studies during periods of heavy workload, or for large,
complex projects such as new treatment plants, upgrades to existing treatment plants, tunnel
projects, or major sewer upgrades.
Upon completion of a preliminary study, the project’s priority ranking is reevaluated
relative to other, similar projects. A project may be rescheduled to a later fiscal year within the
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
3 of 8
Capital Improvement and Replacement Program, should its priority ranking be reduced due to
increased project cost estimate or modification of its scope.
The final design of a project is performed by either the District’s Engineering Department
staff or via engineering consultant services. As part of the final design process, topographic and
geotechnical information is collected, utility conflicts are identified, construction plans and
specifications are prepared, and easement and temporary construction license plats are drafted.
In FY 2016, 55 engineering budget items have been or will be procured using the
Watershed Consultant approach, retaining firms for multi-year efforts on a related suite of
projects, in order to increase efficiency, expedite the program and meet Consent Decree
requirements and schedule. Following is a listing of the Watershed Consultant related
engineering projects and associated professional service firms:
Project
Number Project Name Page
Number Budget
Watershed Program Consultant - 11151 - Construction Management Services -
Tank/Treatment/Pump Station Facilities. Consultant: Kennedy Associates /
Architects, Inc.
11151
CONSTRUCTION MANAGEMENT SERVICES - TANK/TREATMENT/PUMP STATION
FACILITIES 20 4,900,000
Watershed Program Consultant - 11152 - Construction Management Services - Lower
and Middle RDP Tunnel Facilities. Consultant: Shannon & Wilson, Inc.
11152
CONSTRUCTION MANAGEMENT SERVICES - LOWER AND MIDDLE RDP TUNNEL
FACILITIES 18 1,400,000
Watershed Program Consultant - 11826 - Construction Management Services - Lower
Meramec and Deer Creek Tunnels. Consultant: Black & Veatch Corporation
11826
CONSTRUCTION MANAGEMENT SERVICES - LOWER MERAMEC AND DEER CREEK
TUNNELS 19 2,600,000
Watershed Program Design Consultant - 11109 - Lower & Middle RDP CSO Controls
System Improvements. Consultant: Jacobs Engineering Group, Inc.
12619 HAMBURG AVE TO AL CLAIRE DR TO WEBMORE DR CSO L-181 (I-032) ELIMINATION 47 245,000
11820 LMRDP CSO STORAGE TUNNEL (BROADWAY TO RDP TUBES) 61 8,075,000
11959 LMRDP CSO STORAGE TUNNEL NORTH CONSOLIDATION SEWERS 62 81,000
11958 LMRDP CSO STORAGE TUNNEL SOUTH CONSOLIDATION SEWERS 63 223,000
11816 LMRDP TUNNEL DEWATERING PUMP STATION 64 2,050,000
11109
LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT) 65 270,000
11109
LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT) 66 527,000
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
4 of 8
11656
MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF ROCKS
DR TO CHURCH DR) 68 211,000
Watershed Program Design Consultant - 11110 - Deer Creek Sanitary System
Improvements. Consultant: Parsons Water & Infrastructure, Inc.
10021 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD) PHASE I 22 300,000
11110 DEER CREEK SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 27 150,000
11110 DEER CREEK SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 28 600,000
11731 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) 29 500,000
Watershed Program Design Consultant - 11144 - Bissell - Coldwater - Missouri -
Meramec Sanitary System Improvements. Consultant: AMEC Environment &
Infrastructure, Inc.
12023
BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2017)
CONTRACT A 4 80,000
12024
BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2017)
CONTRACT B 5 140,000
12025
BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2017)
CONTRACT C 6 60,000
12617
BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2017)
CONTRACT F 7 60,000
11144
BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT) 8 3,200,000
11144
BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT) 9 800,000
11726
COLDWATER SANITARY RELIEF SECTION B, C & D WET WEATHER STORAGE
FACILITY TANK C 14 1,200,000
12125
COLDWATER SOUTHWEST SUBWATERSHED I/I REDUCTION (ST. CHARLES ROCK
RD AND ASHBY RD) 15 3,100,000
12128 CONCORD I/I REDUCTION (TESSON FERRY RD AND E CONCORD RD) 17 280,000
10018
FF-18 VILLA DORADO - LACKLAND - PAGE SANITARY RELIEF (ADIE RD TO VILLA
DORADO DR) 32 600,000
12304
HELTA, SAPPINGTON, AND GREGORY COURT I/I REDUCTION (SAPPINGTON RD
AND I-270) 48 560,000
12314 KAPPEL (PARTIAL) I/I REDUCTION (EXUMA DR AND GLEN OWEN DR) 50 475,000
12209 SPRINGDALE I/I REDUCTION (ROLLING DR AND SMITHFIELD PL) 76 130,000
Watershed Program Design Consultant - 11145 - Lemay Sanitary System
Improvements. Consultant: Burns & McDonnell Engineering Co. Inc.
11993 82ND STREET TO I-170 SANITARY RELIEF (UR-08, UR-09) 1 855,000
12075
AFFTON I/I REDUCTION (HANOVER, HILDESHEIM-WEBER RD, SEIBERT, AND
HAMBURG) 2 565,000
12078
APPLE ORCHARD - SINGERSON - BAYLESS PLACE I/I REDUCTION (LEMAY FERRY
RD AND BAYLESS AVE) 3 610,000
11997 DC-09 WEST I/I REDUCTION (S LINDBERGH BLVD AND LADUE RD) 24 320,000
12036 DEER CREEK PUBLIC I/I REDUCTION (2017) CONTRACT A 25 170,000
12037 DEER CREEK PUBLIC I/I REDUCTION (2017) CONTRACT B 26 150,000
11996
FAWN VALLEY, PIONEER PARK, WESTCHESTER I/I REDUCTION (MANCHESTER RD
W OF N GEYER RD) 31 530,000
12569 GRAVOIS TRUNK SANITARY STORAGE FACILITY (PARDEE LN AND PARDEE RD) 46 1,500,000
11994
HUNTLEIGH MANOR, OLD WARSON, TIMBERWYCK I/I REDUCTION (S LINDBERGH
BLVD SOUTH OF LITZSINGER RD) 49 300,000
12317 KIRKWOOD I/I REDUCTION (BIG BEND BLVD AND S KIRKWOOD RD) 51 780,000
11995
KIRKWOOD MIDDLE SCHOOL, SIMMONS, WILSON, W SARAH I/I REDUCTION
(MANCHESTER RD AND KIRKWOOD RD) 52 560,000
12048 LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT A 53 100,000
12049 LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT B 54 90,000
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
5 of 8
12050 LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT C 55 90,000
12038 LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT D 56 130,000
11145 LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 58 4,750,000
11145 LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 59 760,000
12420 REAVSDALE I/I REDUCTION (MACKENZIE RD AND REAVIS BARRACKS RD) 75 485,000
12240
UNION CREEK I/I REDUCTION (I-55 BETWEEN S LINDBERGH BLVD AND BUCKLEY
RD) 79 565,000
11992 UNIVERSITY CITY SANITARY STORAGE FACILITY (HAFNER CT) 80 3,100,000
12253
VALCOUR AND BURLINGTON RR SANITARY RELIEF AND I/I REDUCTION (VALCOUR
RD AND WATSON RD) 81 994,000
11677
WEBSTER GROVES TRUNK E SANITARY REHABILITATION AND I/I REDUCTION
PHASE III 82 270,000
Watershed Program Design Consultant - 11153 - RDP Tributaries (Deer Creek)
Controls System Improvements. Consultant: HDR Engineering, Inc.
12472 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD) PHASE III 23 1,500,000
11746
LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO FENTON
WWTF TUNNEL 67 3,500,000
11153
RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT) 72 400,000
11153
RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT) 73 500,000
12441 RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL 74 600,000
For projects of significant scope and impact, coordination with property owners who will
benefit or who will be affected by the construction of the project is achieved at neighborhood
meetings hosted by the District. For smaller projects, property owners are individually contacted
during the design of the project.
Many projects require that new easements be acquired to enable the project to be
constructed. The time required to acquire these easements is lengthy and may result in delays in
the planned construction schedule. When necessary, the District may condemn for easements in
order to ensure that a project is constructed. Any required condemnation proceedings are
performed in full compliance with state and federal law. Some projects may additionally require
specific permitting from other government agencies, such as the Missouri Department of Natural
Resources, prior to bidding.
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
6 of 8
A project is advertised for public bidding a minimum of 30 days, followed by a formal
bid opening. Bids are evaluated to determine the lowest responsive, responsible bidder.
Appropriation and contract ordinances are submitted to the Board of Trustees for their approval.
Upon ordinance passage, contracts are executed and notices to proceed are issued.
In addition to wastewater and stormwater projects, the District may construct sanitary
sewer sub-district projects at the request of property owners currently served by private systems
or individual septic tank systems. These sub-districts are financed by the benefiting property
owners, using special benefit assessments. The affected property owners initiate the projects by
submitting a petition to the District, which provides design and construction management
assistance. Because of the uncertainty of the viability and/or schedule of sub-district projects,
they are not always listed in the Budget Supplement.
Wastewater projects are funded via revenue from the wastewater user charge paid by
ratepayers. The user charge also supports the sale of revenue bonds to fund the wastewater
program. Generally, Fund 6660, the Sanitary Replacement Fund, is used to pay for capital
wastewater work, while Fund 1101, the General Fund, is used to pay for non-capital wastewater
related work. The allocation of a given project’s costs between these two funds is an accounting
function necessary to facilitate capitalization of District assets. Wastewater projects may also be
funded by various Operation, Maintenance, Construction and Improvement (OMCI) funds,
Construction Funds, Special Funds, or the Improvement Fund.
Stormwater projects may be funded via the General Fund, Construction Funds, Special
Funds, the Improvement Fund, or from various Operation, Maintenance, Construction, and
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
7 of 8
Improvement (OMCI) funds. These OMCI funds are established in certain areas of the District,
are supported by property tax collection, and must be spent only within their specific areas of tax
collection.
The sections included in this Budget Supplement document are:
• Program Summary – summary of budget, and number and type of projects. Includes
general description of the capital program and budgeting process, and a glossary of terms.
• Wastewater Engineering Projects – summary and details on wastewater engineering
consulting services and other professional services necessary to implement the
wastewater program.
• Wastewater Construction Projects – summary and details on wastewater construction
projects and other expenses such as property rights acquisition necessary to implement
the wastewater program.
• Wastewater Continued Projects – summary of wastewater projects continued from
previous fiscal years, due to difficulties in easement acquisition, permitting process or
coordination with other agencies, design revisions or status, or other special issues.
• Wastewater Contingency Projects – summary and details on wastewater projects
currently budgeted in the next fiscal year, but having the chance to be expedited into the
current fiscal year, if scheduling or budget allow.
• Wastewater Program – annual alphabetical listing of wastewater projects by fund,
including the type of service (task) budgeted.
• Stormwater Engineering Projects - summary and details on stormwater engineering
consulting services and other professional services necessary to implement the
stormwater program.
• Stormwater Construction Projects - summary and details on stormwater construction
projects and other expenses such as property rights acquisition necessary to implement
the stormwater program.
• Stormwater Continued Projects - summary of stormwater projects continued from
previous fiscal years, due to difficulties in easement acquisition, permitting process or
coordination with other agencies, design revisions or status, or other special issues.
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
8 of 8
• Stormwater Contingency Projects - summary and details on stormwater projects currently
budgeted in the next fiscal year, but having the chance to be expedited into the current
fiscal year, if scheduling or budget allow.
• Stormwater Program - annual alphabetical listing of stormwater projects by fund,
including the type of service (task) budgeted.
• Appendix – list of projects by municipality.
Please note that the detail sheets for each project in this document include approximate
locations and quantities of work to be performed. These maps and quantities are estimates only,
and final location and extent of work may vary depending on final design and/or field conditions
during construction.
GLOSSARY
BIORETENTION A concave landscape feature which stores, filters, and infiltrates
stormwater runoff.
BIOSTABILIZATION A method of repairing eroding streams by utilizing the structural
properties of live plants to rebuild eroded streambanks and incised
channels.
BIOSWALE A sloped open drainage channel with landscape elements designed to
store, filter, and infiltrate stormwater runoff.
CD
The Federal Consent Decree, entered on April 27, 2012 and all
appendices and all modifications or amendments thereto, between MSD,
United States of America, and the Missouri Coalition for the
Environment Foundation designed to eliminate or reduce overflows from
the Combined and Separate Sewer Systems in order to improve water
quality and protect human health and the environment.
CIPP Cured in Place Pipe, a construction method to rehabilitate a sewer pipe by
lining it with a new pipe. This work does not require excavating the pipe
and replacing it in total.
CIRP Capital Improvement and Replacement Program, the ongoing system
improvement efforts by MSD.
CMOM Capacity, Management, Operations, and Maintenance program.
COE United States Army Corps of Engineers.
COMBINED SEWER The portion of MSD's sewer system designed to convey municipal
sewage (i.e. domestic, commercial and industrial wastewaters) and
stormwater runoff through a single-pipe system to a wastewater treatment
facility and/or to a CSO outfall.
CONSENT DECREE See “CD”.
CSO Combined Sewer Overflow, any discharge from the combined sewer
system at a point prior to the headworks of a wastewater treatment
facility.
GI Green Infrastructure, environmentally friendly and sustainable
stormwater management practices that reduce runoff by using infiltration,
such as bioretention and bioswales.
I/I Inflow and Infiltration; inflow refers to direct connections of rainwater
sources to the sanitary sewer system; infiltration refers to groundwater
sources of flows into sewer pipes. Inflow sources can include roof
downspouts, yard and area drains, foundation drains, manhole covers,
cross connections from storm sewers, or inlets. Infiltration sources can
include defective building laterals, sewer pipes, pipe joints, connections,
or manhole walls.
INFILTRATION Infiltration refers to groundwater sources of flows into sewer pipes.
Infiltration sources can include defective building laterals, sewer pipes,
pipe joints, connections, or manhole walls.
INFLOW Inflow refers to direct connections of rainwater sources to the sanitary
sewer system. Inflow sources can include roof downspouts, yard and area
drains, foundation drains, manhole covers, cross connections from storm
sewers, or inlets.
GLOSSARY
LATERAL A sewer connecting a building with the publicly owned sanitary sewer
main.
LMRDP Lower and Middle River Des Peres, generally the river from University
City south to the Mississippi River.
LTCP Long Term Control Plan, a long duration plan to manage/improve the
combined sewer system and abate combined sewer overflows, through
the identification of a capital improvement plan tailored to receiving
stream water quality and the community's financial capability.
MAIN A smaller public sewer collecting flows from buildings via lateral
connections.
MGD Million Gallons per Day, a measure of flow over time. 1 MGD is
equivalent to 700 gallons per minute of flow.
MSD Metropolitan St. Louis Sewer District, district formed in 1954 via vote of
the people, with responsibility for wastewater and stormwater services in
St. Louis City and most of St. Louis County.
OMCI Operation Maintenance Construction Improvement district, funds
generated by tax payments in certain districts can be used for capital
improvements in those districts. Funds can be used for capital projects or
maintenance.
OUTFALL The point of discharge to the environment from a constructed SSO or
CSO.
PRIVATE I/I
REDUCTION
Reduction of inflow and infiltration sources on private property, from
private sources, such as downspout and driveway drain connections to the
sanitary sewer system (inflow) or deteriorated service laterals or broken
connections (infiltration).
PUBLIC I/I
REDUCTION
Reduction of public inflow and infiltration sources such as cracked and
broken sewer pipes or deteriorated manholes.
RAINSCAPING Any combination of plantings, water features, catch basins, permeable
pavement and other activities that manage stormwater as close as possible
to where it falls, rather than moving it someplace else.
RDP River Des Peres, a river in the central and south portions of the
metropolitan area, which was enlarged in the early 1900s to provide
conveyance to the Mississippi River of stormwater runoff in order to
reduce surface flooding.
RFP Request for Proposals.
RFQ Request for Qualifications.
SANITARY SEWER
SYSTEM
The portion of the sewer system designed to convey only sewage, and not
stormwater, from residences, commercial buildings, industrial plants and
institutions for treatment at a wastewater treatment facility.
SKME Sverdrup Kwame Metcalf Eddy - a planning team that identified system
needs in the early 2000’s.
GLOSSARY
SSO Sanitary Sewer Overflow, any overflow, spill, diversion, or release of
wastewater from or caused by MSD's sanitary sewer system. This CD
term shall include: (i) discharges to surface waters of the State or United
States from MSD's sanitary sewer system and (ii) any release of
wastewater from MSD's sanitary sewer system to public or private
property that does not reach waters of the State or United States.
SSO MP Sanitary Sewer Overflow Control Master Plan, a capital improvement
plan which describes the results of system evaluations and the specific
measures that will result in the elimination of all constructed SSOs
Outfalls, all known SSOs, and Building Backups, and/or that are
necessary to ensure that there is adequate capacity in the Sanitary Sewer
System to collect, convey, and treat anticipated peak wet weather flows
under current and projected future conditions as defined in Paragraphs
21(e) and (g) of the CD.
SUBTRUNK A sewer that serves a smaller or sub-watershed area, which brings flow to
a trunk sewer.
TRUNK SEWER A major sewer which serves a large area. A trunk sewer typically is
centrally located within a watershed to which subtrunks and other sewers
are tributary.
USGS United States Geological Survey.
WWTF Wastewater Treatment Facility, any facility, method or process which
removes, reduces or renders less obnoxious pollutants or water
contaminants released from any source.
WWTP Wastewater Treatment Plant, a municipal facility that removes, reduces
or renders less obnoxious pollutants or water contaminants from
wastewater before releasing it to the environment.
22 April 2015
Page 1 of 5
WASTEWATER ENGINEERING PROJECTS - FY16
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11993 82ND STREET TO I-170 SANITARY RELIEF (UR-
08, UR-09)
$855,000 1
12075 AFFTON I/I REDUCTION (HANOVER,
HILDESHEIM-WEBER RD, SEIBERT, AND
HAMBURG)
$565,000 2
12078 APPLE ORCHARD - SINGERSON - BAYLESS
PLACE I/I REDUCTION (LEMAY FERRY RD AND
BAYLESS AVE)
$610,000 3
12023 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2017)
CONTRACT A
$80,000 4
12024 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2017)
CONTRACT B
$140,000 5
12025 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2017)
CONTRACT C
$60,000 6
12617 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2017)
CONTRACT F
$60,000 7
11144 BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
$3,200,000 8
11144 BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
$800,000 9
11789 CAULKS CREEK FORCEMAIN REHABILITATION $500,000 10
11811 CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2014)
$2,000,000 11
11810 CCTV INSPECTION OF SEWERS (2014)$1,000,000 12
12504 COLDWATER CREEK WWTF FINAL CLARIFIERS
REPLACEMENT
$900,000 13
11726 COLDWATER SANITARY RELIEF SECTION B, C
& D WET WEATHER STORAGE FACILITY TANK
C
$1,200,000 14
12125 COLDWATER SOUTHWEST SUBWATERSHED I/I
REDUCTION (ST. CHARLES ROCK RD AND
ASHBY RD)
$3,100,000 15
12070 COMPREHENSIVE AMMONIA AND NUTRIENT
REMOVAL MASTER PLAN
$1,500,000 16
12128 CONCORD I/I REDUCTION (TESSON FERRY RD
AND E CONCORD RD)
$280,000 17
22 April 2015
Page 2 of 5
WASTEWATER ENGINEERING PROJECTS - FY16
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11152 CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL FACILITIES
$1,400,000 18
11826 CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
$2,600,000 19
11151 CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION FACILITIES
$4,900,000 20
11125 CRITICAL INFRASTRUCTURE ASSESSMENT $1,200,000 21
10021 DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD) PHASE I
$300,000 22
12472 DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD) PHASE
III
$1,500,000 23
11997 DC-09 WEST I/I REDUCTION (S LINDBERGH
BLVD AND LADUE RD)
$320,000 24
12036 DEER CREEK PUBLIC I/I REDUCTION (2017)
CONTRACT A
$170,000 25
12037 DEER CREEK PUBLIC I/I REDUCTION (2017)
CONTRACT B
$150,000 26
11110 DEER CREEK SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
$150,000 27
11110 DEER CREEK SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
$600,000 28
11731 DEER CREEK SANITARY TUNNEL (CLAYTON
RD TO RDP)
$500,000 29
11136 DEGIVERVILLE COMBINED SEWER
RELOCATION
$650,000 30
11996 FAWN VALLEY, PIONEER PARK,
WESTCHESTER I/I REDUCTION (MANCHESTER
RD W OF N GEYER RD)
$530,000 31
10018 FF-18 VILLA DORADO - LACKLAND - PAGE
SANITARY RELIEF (ADIE RD TO VILLA
DORADO DR)
$600,000 32
11752 GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2016)
$250,000 33
11753 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2015) CONTRACT A
$50,000 34
22 April 2015
Page 3 of 5
WASTEWATER ENGINEERING PROJECTS - FY16
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11754 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2015) CONTRACT B
$50,000 35
12064 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2015) CONTRACT C
$50,000 36
11755 GENERAL SERVICES AGREEMENT - PLANNING
(FY2014)
$400,000 37
11760 GENERAL SERVICES AGREEMENT - FACILITY
& SEWER DESIGN (2016)
$300,000 38
11780 GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT B
$90,000 39
11781 GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT C
$90,000 40
11764 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT A
$50,000 41
12394 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT B
$50,000 42
12395 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT C
$50,000 43
12405 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT D
$50,000 44
12406 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT E
$50,000 45
12569 GRAVOIS TRUNK SANITARY STORAGE
FACILITY (PARDEE LN AND PARDEE RD)
$1,500,000 46
12619 HAMBURG AVE TO AL CLAIRE DR TO
WEBMORE DR CSO L-181 (I-032) ELIMINATION
$245,000 47
12304 HELTA, SAPPINGTON, AND GREGORY COURT
I/I REDUCTION (SAPPINGTON RD AND I-270)
$560,000 48
11994 HUNTLEIGH MANOR, OLD WARSON,
TIMBERWYCK I/I REDUCTION (S LINDBERGH
BLVD SOUTH OF LITZSINGER RD)
$300,000 49
12314 KAPPEL (PARTIAL) I/I REDUCTION (EXUMA DR
AND GLEN OWEN DR)
$475,000 50
12317 KIRKWOOD I/I REDUCTION (BIG BEND BLVD
AND S KIRKWOOD RD)
$780,000 51
22 April 2015
Page 4 of 5
WASTEWATER ENGINEERING PROJECTS - FY16
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11995 KIRKWOOD MIDDLE SCHOOL, SIMMONS,
WILSON, W SARAH I/I REDUCTION
(MANCHESTER RD AND KIRKWOOD RD)
$560,000 52
12048 LEMAY PUBLIC I/I REDUCTION (2017)
CONTRACT A
$100,000 53
12049 LEMAY PUBLIC I/I REDUCTION (2017)
CONTRACT B
$90,000 54
12050 LEMAY PUBLIC I/I REDUCTION (2017)
CONTRACT C
$90,000 55
12038 LEMAY PUBLIC I/I REDUCTION (2017)
CONTRACT D
$130,000 56
12488 LEMAY PUMP STATIONS 1 AND 2
IMPROVEMENTS
$470,000 57
11145 LEMAY SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
$4,750,000 58
11145 LEMAY SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
$760,000 59
11649 LEMAY WWTP SECONDARY IMPROVEMENTS $510,000 60
11820 LMRDP CSO STORAGE TUNNEL (BROADWAY
TO RDP TUBES)
$8,075,000 61
11959 LMRDP CSO STORAGE TUNNEL NORTH
CONSOLIDATION SEWERS
$81,000 62
11958 LMRDP CSO STORAGE TUNNEL SOUTH
CONSOLIDATION SEWERS
$223,000 63
11816 LMRDP TUNNEL DEWATERING PUMP STATION $2,050,000 64
11109 LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
$270,000 65
11109 LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
$527,000 66
11746 LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO FENTON
WWTF TUNNEL
$3,500,000 67
11656 MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR TO
CHURCH DR)
$211,000 68
22 April 2015
Page 5 of 5
WASTEWATER ENGINEERING PROJECTS - FY16
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12536 NATURAL BRIDGE RD - DARBY TO
CHEVROLET COMBINED SEWER RELIEF
$200,000 69
11699 PRIVATE INFLOW/INFILTRATION PUBLIC
ENGAGEMENT PROGRAM 2013
$565,000 70
11702 RADAR RAINFALL DATA (FY2014)$130,000 71
11153 RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
$400,000 72
11153 RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
$500,000 73
12441 RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL $600,000 74
12420 REAVSDALE I/I REDUCTION (MACKENZIE RD
AND REAVIS BARRACKS RD)
$485,000 75
12209 SPRINGDALE I/I REDUCTION (ROLLING DR
AND SMITHFIELD PL)
$130,000 76
10766 STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
$570,000 77
11916 STREAM FLOW WATER QUALITY SAMPLING
(FY 2014)
$625,000 78
12240 UNION CREEK I/I REDUCTION (I-55 BETWEEN S
LINDBERGH BLVD AND BUCKLEY RD)
$565,000 79
11992 UNIVERSITY CITY SANITARY STORAGE
FACILITY (HAFNER CT)
$3,100,000 80
12253 VALCOUR AND BURLINGTON RR SANITARY
RELIEF AND I/I REDUCTION (VALCOUR RD
AND WATSON RD)
$994,000 81
11677 WEBSTER GROVES TRUNK E SANITARY
REHABILITATION AND I/I REDUCTION PHASE
III
$270,000 82
TOTAL:$69,341,000
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
82ND STREET TO I-170 SANITARY RELIEF (UR-08,UR-09)
Design Services
6660 - SanitaryReplacement Fund
UNDERSIZED SEWER. ELIMINATION OF CONSTRUCTED SSO BP-421REQUIRED. PREDECESSOR PROJECT FOR FUTURE SSO REMOVALS.
CONSTRUCT 5,800 FEET OF 15-INCH TO 30-INCH DIAMETER SEWER.ELIMINATE CONSTRUCTED SSO OUTFALL BP-421, AND FACILITATEFUTURE ELIMINATION OF MULTIPLE UPSTREAM CONSTRUCTED SSOOUTFALLS (BP-416, BP-417, BP-433, AND BP-476).
§¨¦170
§¨¦170 82ND81STMCKNIGHTOLD BONHOMME GROBYHILLTOPPR
I
CEWOODSONBALSON
B
R
A
D
D
O
C
K
ELMORE
APPLETON
GRANTRICHARD
S
H
E
R
I
D
A
N
GAYORCHARD
MILAN
TULANE
C
O
O
L
I
D
G
E
ALICE
SPOON
CANTON
A
L
A
N
S
O
N
LE PEREBERICKFULLERTONPENNELL
PRIVATEHAFNERBELL ARCHERKEMPLANDSEVILLE
CRIXDALE
VILLA LAUGHLINIROQUOIS
B
LACKBERRYMULBERRYCOLLINGWOODBON HILLS
WATSONIA ARROWHEADLOCUST
ALDANBLANCHA
BON P RICEV A R DA M A N
VILLA CAPRICHICKASAW
MAYFLOWER
ROWLANDBRISCOECOMSTOCK
ORCHARD
PRICEELMORE
RICHARD
COOLIDGE
OLIVE BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11993
Wastewater
11
$855,000
University City
Lemay/RDP
University City Branch
Capital
1Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
AFFTON I/I REDUCTION (HANOVER,HILDESHEIM-WEBER RD, SEIBERT, ANDHAMBURG)
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
§¨¦55UNIONWEBER
SEI
B
E
R
T
DANAGERMANIA
KAMMERERMORGAN FORDMOHEGAN
RIVER
DESPERES
PR
I
V
A
T
E
FAN
N
I
E
HEIDELBERGMATHILDA
BAY
L
E
S
SFORMANFABER
LANGLEY
KAYACORN OLDENBURGPILOT P
R
I
M
M
HI
L
D
A
VINE
HA
M
B
U
R
G
HA
N
N
O
V
E
R
AVENUE HUNIONPA C I F I C
WALDO
LODE
HEE
G
E STOLLEHAMPTONPHILOHEA
L
Y
PAPOOSEFATIMA
CO
L
V
I
NGENESTA STE
I
N
S
ALLEY
BIGCHIEFJULIAHILDESHEIM DAVIS
KO
E
L
N
SAN
T
E
NHARLANTIE
M
A
N
N
CA
R
O
N
D
E
L
E
T
WEBER TRAILKR
A
M
E
R
GR
A
S
S
O PARKWOODADKINSCARLSBADRAYTIFFANYT
E
S
S
O
N
BLACKHAWK WANDAPEARKATHLEENPINTOHU
M
M
E
L
S
H
E
I
MWOLZ
WILMA
SU
N
S
H
I
N
E
MAJE S TYMACKINAWARONIASTEFFENDONRONLA
S
A
T
A
AUTUMN
GA
R
D
E
N
P
A
R
K
TO
M
O
R
E
HERSHEY
GARLYNJONMARFORMAN WANDAHE
E
G
E
PRIVATE
PILOTSEIBERT
HE
E
G
E
FATIM
A
HA
N
N
O
V
E
R
LODE
TIEMANNGRAVOIS RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12075
Wastewater
11
$565,000
Unincorporated
Lemay/RDP
Mackenzie Creek
Capital
2Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
APPLE ORCHARD - SINGERSON - BAYLESS PLACEI/I REDUCTION (LEMAY FERRY RD AND BAYLESSAVE)
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE I/I ENTERING THE SYSTEM AND STRUCTURAL ISSUESCAUSING BUILDING BACKUPS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
§¨¦55
UNIONKO
E
L
N
DA
V
I
S
REAVISB
A
R
R
A
CKSWACHTELBA
Y
L
E
S
S
ZEISSWIL
L
H
ALEGREGGGRANTCCCMINNESOTAPARDELLAWEBE
R
I O NEVIRGINIATELFORD
FAN
N
I
E
ARLEEKAMMERER MILITARYGENTRYFAIN PRIV ATEJOPLINGERMANIARADIOMA
R
C
E
A
U
UNIONPACIFICG R E E N PARK
MOHEGAN
PAU
L
E
LINNORI
E
N
T
RIP
A
RADIOMKIT
LUNAGRANDGARKLUCIALARK WATERFORMANKA
Y
OUTER
RAINBOWHOFFME IS TE R
REILLYVA
SEL
SP
R
I
N
GTIBER
L E M ONA
WEMBLEYMO
U
N
T
O
L
I
V
E
ETTA
PRI
M
M
PERRINAVENUEHSPOKANEBOUNDARYCA
T
A
L
A
N
CAMINOIDAHOHO
R
N
MARCHIJEFFERSONIANLANZENITH GOETZ
LORETTA
SOUTHSHIRE REGINABUCKLEYDANAPILOTCYE
WEI
S
S
MEADOWPHILOHEA
L
Y
MANN
FAT
I
M
A
CO
L
V
I
N
BLUE RIDGEEIF
F
E
L
BANISTERGR
A
S
S
O
ARVIN
CISCOCLE
V
E
S
PA
R
K
C
R
E
S
T TIFFANYWE
S
T
A
I
RBREUER KASKEWINSTONRUNYONREESNA
V
A
J
O
PO
E
P
P
I
N
G
BOXDANAREILLYBUCKLEYWEBER
PR IVA T E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12078
Wastewater
11
$610,000
Unincorporated
Lemay/RDP
Gravois Creek
Capital
3Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2017) CONTRACT A
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 43,000 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12128 AND 12304.
§¨¦270
§¨¦55
§¨¦270
MA
T
T
I
S
KENNERL Y
T
H
E
I
S
SSAPPINGTONALSWELLMUSIC
K
SCH U E SSLERMENTZHILL BAPTIST CHURCHR O BYNVONTALGEDENNY
LEEBUR
LITTIE
AMBSROXANNABAUERGEYER SUNSETGE
R
A
L
D
KE
M
P
F MUELLERGREGORY
RUSTYDIERSTESSHIREELIA
N
T
O
NGRAVOIS
TO
WNECENTRE TESCORDGATESBURYPRIVATEHADLEYHILLEMILMEPPEN
GEMINI
DO
R
S
I
E
LANGTREEVAR G A S
FLORITWILIGHTMAYOTEALBYFARADAY
MAPLELINCORDEIMESAKURA
JAMIEJOSSEJAN
CHERYLMUSICMEA T H
CONCORDCRESTWICKPICKWICKROOSEVELT
LARKINCONCORD V ILLA G E
TEALRIDGE
S T A R H ILLW ORTHIN G T O N FIVEOAKSBIRD HAVENROANNA ARCTICSTOLZ
TAMMY
K
A
Y SONATASUNHILL
TIOGA
J
O
A
N
SOL
A
R
BASLERALLPINE
JU
E
N
G
E
L
DU BOURGROBERT WO
O
D
COSMOS
ADAMSLAVINIAOLD TESSONPRIVATEGRAVOIS RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12023
Wastewater
11
$80,000
Various
Meramec
Mattese Creek
Capital
4Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2017) CONTRACT B
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 56,000 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12314 AND 12137.
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦70
§¨¦270
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12024
Wastewater
11
$140,000
Various
Various
Various
Capital
5Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2017) CONTRACT C
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 54,000 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12125, 11704, AND12209.
§¨¦70
§¨¦270
§¨¦170
§¨¦270
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12025
Wastewater
11
$60,000
Various
Various
Various
Capital
6Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2017) CONTRACT F
Design Services
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE PUBLIC SEWERS USING THE CURED IN PLACE PIPEMETHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 12125.
§¨¦70§¨¦70
ASHBYADIEWOODSONFEEFEELINKWRIGHTBALTIMORELONGHIGHDIXIE NORTH
AVERY
DIXSIMSJANEPOECYPRESSGUTHRIE
LITZ
BROWNREXEMINENCEBOBB
METROLINK
OLDSTCHARLES
MERT GERALDINEARGYLEKREMFALCONCOLESGORDON
HOODBURNSST FRANCISBANKS
THORPE TENNYSONS
C
HAEF
E
R RAYMONDP R IVATEMARGOANN
CHAUCERBRUNOST X A V IE RPASTEURAIRWAYMILTONFARVIEW
HAROLD
WURDACK
MORRO
W
TUDORSANJOSEST LEOWISMERBENSON
HUNTER
IVAN
HERBERTPEAR TREE
VANCLEVE
BATAAN
CLAR ENDON
STKATHERINE
MARVINTIPTONQUIETBENEDETTA
CALVERTISOLDAW IL W O OD
S
T
P
HILIP
SPR
I
N
G
TREADWAY
WINNAIRFLIGHTINVER
N
E
S
SNORA MURIEL
FLORE
N
C
E
LINDADE
S
A
X
O
N
H
A
L
L
SHE
L
L
E
Y
ANN MAR
EDMUND
ANGELOKIN
G
B
E
E
G R A NDCIRCLE
EDMIL JOELCINNAMON
BRYANTFAIRWAYJUNE
LYNROSGRABE N
WISMERADIE
POESIMSST
C
H
A
R
L
E
S
R
O
C
K
R
D
NATURALBRIDGE RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12617
Wastewater
11
$60,000
Various
Coldwater
Coldwater Creek
Capital
7Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECSANITARY SYSTEM IMPROVEMENTS (WATERSHEDCONSULTANT)
Professional Services
6660 - SanitaryReplacement Fund
SYSTEM DEFICIENCIES REQUIRING CORRECTION.
PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING,ANALYSIS AND DESIGN SERVICES THROUGHOUT THE BISSELL,COLDWATER, MISSOURI AND MERAMEC WATERSHEDS, TO MEETCONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11144
Wastewater
16
$3,200,000
Various
Various
Various
Asset Management
8Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECSANITARY SYSTEM IMPROVEMENTS (WATERSHEDCONSULTANT)
Professional Services
1101 - General Fund
SYSTEM DEFICIENCIES REQUIRING CORRECTION.
PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING,ANALYSIS AND DESIGN SERVICES THROUGHOUT THE BISSELL,COLDWATER, MISSOURI AND MERAMEC WATERSHEDS, TO MEETCONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11144
Wastewater
16
$800,000
Various
Various
Various
Asset Management
9Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CAULKS CREEK FORCEMAIN REHABILITATION
Design Services
6660 - SanitaryReplacement Fund
FORCEMAIN CONVERSION TO REDUNDANT FORCEMAIN REQUIRESLINING DUE TO AGE AND CONDITION.
LINE 35,000 FEET OF 20-INCH TO 24-INCH FORCEMAIN FROM PUMPSTATION A TO THE 36-INCH FORCEMAIN AT THE MISSOURI AMERICANWATER PLANT.
§¨¦64§¨¦64
THF
EDISON C E N T R A L MIDLAND
WILDHORSECR E E K PRIVATENORTH OUTER FORTY
CHESTERFIELDWILS
O
N
SWINGLEYRIDGE
OLDCHESTER
FIE
L
D
TODD E V A NBUR
K
H
ARDT
WO
O
D
C
LIF
FE
PLACE MAPLERISED E JOU R N E T
BEN
T
O
N
TAYLOR
C H E S T E R F IELDFARMSCHESTERFIELDMANOR ALR
I
C
K
WESTMEADE
GILE
A
D
CHESTERFIELD B L U F F S
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11789
Wastewater
11
$500,000
Chesterfield
Missouri
Caulks Creek
Capital
10Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CCTV INSPECTION AND PHYSICAL INSPECTION OFSEWERS (2014)
Vendor Services
1101 - General Fund
FIELD INVESTIGATION OF PRIMARILY LARGE DIAMETER SEWERS ISNEEDED TO IDENTIFY PROBLEMS AND QUANTIFY NEEDED CLEANINGAND REPAIRS/IMPROVEMENTS.
PERFORM CLEANING, CCTV, PHYSICAL INSPECTION, AND DEBRISVOLUME ESTIMATION OF SELECTED SEWERS. SERVICES MAY BERENEWED THROUGH FY2016 BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11811
Wastewater
16
$2,000,000
Various
Various
Various
Asset Management
11Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CCTV INSPECTION OF SEWERS (2014)
Vendor Services
1101 - General Fund
FIELD INVESTIGATION OF SEWERS TO ENSURE CONSENT DECREECOMPLIANCE AND TO IDENTIFY PROBLEMS AND QUANTIFY NEEDEDREPAIRS/IMPROVEMENTS.
PERFORM AS NEEDED CCTV INSPECTION AND CLEANING OF SEWERS.SERVICES MAY BE RENEWED THROUGH FY2016 BASED ONPERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11810
Wastewater
16
$1,000,000
Various
Various
Various
Asset Management
12Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
COLDWATER CREEK WWTF FINAL CLARIFIERSREPLACEMENT
Design Services
6660 - SanitaryReplacement Fund
EXISTING FOUR SQUARE FINAL CLARIFIERS ARE 50 YEARS OLD, ANDPAST THEIR USEFUL LIFE.
DEMOLISH EXISTING FOUR SQUARE CLARIFIERS AND CONSTRUCT NEWFOURTH CIRCULAR CLARIFIER. ENLARGE FEED CHANNEL AND PIPINGTO THE EXISTING THREE CIRCULAR CLARIFIERS.PRIVATERICHM
ONDFORESTROBBINSGROVE §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12504
Wastewater
11
$900,000
Unincorporated
Coldwater
Coldwater Creek
Capital
13Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
COLDWATER SANITARY RELIEF SECTION B, C & DWET WEATHER STORAGE FACILITY TANK C
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
EXCESSIVE INFILTRATION CAUSING OVERCHARGED SANITARYSEWERS.
CONSTRUCT AN 8 MILLION GALLON, 180 FOOT DIAMETER SANITARYWET WEATHER STORAGE TANK.
§¨¦270§¨¦270
DUNN
FO
R
D
PERSHALL
POLSONTA
Y
L
O
R
NORFOLK
SOU
T
H
E
R
N
NORFOLKSOUTHERN§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11726
Wastewater
11
$1,200,000
Hazelwood
Coldwater
Coldwater Creek
Capital
14Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
COLDWATER SOUTHWEST SUBWATERSHED I/IREDUCTION (ST. CHARLES ROCK RD AND ASHBYRD)
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12025.
§¨¦70§¨¦70
ASHBYADIEWOODSONFEEFEELINKWRIGHTBALTIMORELONGHIGHDIXIE NORTH
AVERY
DIXSIMSJANEPOECYPRESSGUTHRIE
LITZ
BROWNREXEMINENCEBOBB
METROLINK
OLDSTCHARLES
MERT GERALDINEARGYLEKREMFALCONCOLESGORDON
HOODBURNSST FRANCISBANKS
THORPE TENNYSONS
C
HAEF
E
R RAYMONDP R IVATEMARGOANN
CHAUCERBRUNOST X A V IE RPASTEURAIRWAYMILTONFARVIEW
HAROLD
WURDACK
MORRO
W
TUDORSANJOSEST LEOWISMERBENSON
HUNTER
IVAN
HERBERTPEAR TREE
VANCLEVE
BATAAN
CLAR ENDON
STKATHERINE
MARVINTIPTONQUIETBENEDETTA
CALVERTISOLDAW IL W O OD
S
T
P
HILIP
SPR
I
N
G
TREADWAY
WINNAIRFLIGHTINVER
N
E
S
SNORA MURIEL
FLORE
N
C
E
LINDADE
S
A
X
O
N
H
A
L
L
SHE
L
L
E
Y
ANN MAR
EDMUND
ANGELOKIN
G
B
E
E
G R A NDCIRCLE
EDMIL JOELCINNAMON
BRYANTFAIRWAYJUNE
LYNROSGRABE N
WISMERADIE
POESIMSST
C
H
A
R
L
E
S
R
O
C
K
R
D
NATURALBRIDGE RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12125
Wastewater
11
$3,100,000
Various
Coldwater
Coldwater Creek
Capital
15Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
COMPREHENSIVE AMMONIA AND NUTRIENTREMOVAL MASTER PLAN
Professional Services
1101 - General Fund
NEW REGULATIONS BEING PROMULGATED REGARDING AMMONIA ANDNUTRIENT EFFLUENT LIMITATIONS.
PREPARE A COMPREHENSIVE MASTER PLAN TO INFORM AND GUIDETHE DISTRICT'S AMMONIA AND NUTRIENT REMOVAL STRATEGY ATWASTEWATER TREATMENT FACILITIES OVER THE NEXT 15 YEARS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12070
Wastewater
16
$1,500,000
Various
Various
Various
Non-recurring
16Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CONCORD I/I REDUCTION (TESSON FERRY RD ANDE CONCORD RD)
Design Services
6660 - SanitaryReplacement Fund
INSUFFICIENT SYSTEM CAPACITY FOR WET WEATHER FLOWS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12023.
§¨¦270
§¨¦270
TH
E
I
S
S
MA
T
T
I
S
GE
R
A
L
D MUELLERVON TALGETESCORDGATESBURYTHEISS
C
O
R
DDIERSDO
R
S
I
ETWILIGHTBAPTISTCHURCHLAVINIAGREGORYLINCORDCONCORD
SCH
OOL
SAKURA
JAMIEJOSSEJAN
CHERYLCONCORDLARKINCONCORD V IL L A G ER EVEREWI
N
K
E
L
W ORTHINGTO N
F IV EOAKSBIMINI
BEHRSUNNYVIEWMARLEYCAROLYNNE ACTONARTH U R
SL
E
V
I
N
CHAR WICKME
A
D
O
W
F
I
E
L
D
LEONARDKRAMPERS
T
G
EMM
E
EDGECLIFFE
BRIDLEW O O D
VALL
E
Y
CREST
FAWNWOODD O RCLINWISTERIAJU
E
N
G
E
L
NEELYWOODWORTHCOUWELSROUNDHILL
CONG ER
PRIVATE
CONCORDOA K S
OLDTESSONHUE
G
E
L
SUANISAPPLE GROVEMERITOCONC OR DTESSONFERRYRDS LINDBER
G
H
B
L
V
D
SLINDBERGHBLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12128
Wastewater
11
$280,000
St. Louis County
Meramec
Mattese Creek
Capital
17Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CONSTRUCTION MANAGEMENT SERVICES -LOWER AND MIDDLE RDP TUNNEL FACILITIES
Professional Services
6660 - SanitaryReplacement Fund
SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIATUNNEL CONSTRUCTION.
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICESFOR TUNNEL CONSTRUCTION PROJECTS IN THE LOWER AND MIDDLERDP AREAS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦55
UNIONBAT
E
S
MACKENZIEDEL
O
R
GERMANIA
TAF
T
MORGAN FORDMINNESOTAVIRGINIAPENNSYLVANIADA
V
I
S
RHODES
RIVER
DES
PER
ESHAMPTON
WACHTELIDAHOBAY
L
E
S
S
MILENT
Z
ZEISSH
A
LE
SEIBERT ALASKALOUISIANAWAL
S
H
MO
T
T
DOV
E
R
PARDELLABLO
W
I O NEWEBE
R
FINKMAN
HOL
L
Y
H
I
L
L
S
WIL
M
I
N
G
T
O
N
REAVISBARRAC
K
S ROS
A
FAN
N
I
EELTONKAMMERER SHARPIRO
N
ARLEE MILITARYCHRISTYBUR
G
E
N
FIELDGENTRYMATHILDAPRIVATERADIOMA
R
C
E
A
U TENNESSEEBO
W
E
N
UNIONPACIFICHAV
E
N
QUINCY
MOHEGAN
STAELY 37THOSCEOLA
CLIFTONAL
M
A
JOPLINITAS
K
A
KAY
SCH
I
L
L
E
R
RO
B
E
R
T
RIP
A
HEIDELBERG
RADIOMKIT EUGENEGRANDEILE
R
GRESHAM
LUCIAWATERVASELFORMAN
BELLERIVEGENESTA
ACORNALABAMAHOFFME I S T E R REILLYJ
A
MIESON
UPTON
MO
U
N
T
O
L
I
V
EWIL
LMORE
ETTA
CIRCLEVIEW
ALTHEAPRI
M
M
AVENUE HSPOKANECA
T
A
L
A
N
JEFFLEIGHHO
R
NPILOT
ZENITHPECANEL
W
O
O
D
S A V I O
HA
N
N
O
V
E
R
REGINARAYHE
E
G
E
SOUTHERN
CEC
I
L
JOELBLUE RIDGEEIF
F
E
L
DEERWOOD
T
E
S
S
O
N
RAMP I55PAVIA HELMRUNYONBIRCHVIRGINIAP RIVATEALASKARIPA
IRO
N
GRANDGRANDWEBER
LEMAYFERRYRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11152
Wastewater
16
$1,400,000
Various
Lemay/RDP
Various
Asset Management
18Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CONSTRUCTION MANAGEMENT SERVICES -LOWER MERAMEC AND DEER CREEK TUNNELS
Professional Services
6660 - SanitaryReplacement Fund
SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIATUNNEL CONSTRUCTION.
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICESFOR PROJECTS ASSOCIATED WITH THE LOWER MERAMEC TUNNELSYSTEM AND UPPER RDP TUNNEL SYSTEM.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11826
Wastewater
16
$2,600,000
Various
Various
Various
Asset Management
19Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CONSTRUCTION MANAGEMENT SERVICES -TANK/TREATMENT/PUMP STATION FACILITIES
Professional Services
6660 - SanitaryReplacement Fund
SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIATHE CONSTRUCTION OF STORAGE TANKS, PUMP STATIONS AND/OROTHER FACILITIES.
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICESFOR TANK, TREATMENT, AND PUMP STATION PROJECTS THROUGHOUTTHE DISTRICT.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11151
Wastewater
16
$4,900,000
Various
Various
Various
Asset Management
20Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CRITICAL INFRASTRUCTURE ASSESSMENT
Vendor Services
1101 - General Fund
INVESTIGATION NEEDED TO DETERMINE SEWER CONDITIONS ANDSYSTEM DEFECTS TO PROVIDE THE BASIS FOR PREVENTATIVEMAINTENANCE AND REHABILITATION ACTIVITIES.
PERFORM SERVICES SUCH AS PROJECT INSPECTION, RECONNAISSANCE,INSPECTION PRIORITIZATION, PROJECT SET-UP, FIELD VERIFICATION,MAP UPDATES, WORK ORDER MANAGEMENT, AND POST INSPECTIONREVIEW. SERVICES MAY BE RENEWED THROUGH FY2017 BASED ONPERFORMANCE.
THIS PROJECT WILL PROVIDE SUPPORT FOR THE OPERATIONSDEPARTMENT, DESIGN AND PLANNING ACTIVITIES, AND UPDATES TOASSET INFORMATION PROGRAMS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11125
Wastewater
16
$1,200,000
Various
Various
Various
Asset Management
21Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DC-02 & DC-03 SANITARY RELIEF (BRENTWOODBLVD TO CONWAY RD) PHASE I
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY TRUNK SEWER.
CONSTRUCT 5,000 FEET OF 6-INCH TO 78-INCH SANITARY SEWER TOALLEVIATE SURCHARGING. ELIMINATE CONSTRUCTED SSO OUTFALLBP-545, AND FACILITATE FUTURE REMOVAL OF BP-170, BP-198, BP-348,BP-349, BP-155, AND BP-591.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 17. TOTAL BUDGET IS $11,000,000.GLENBELLBRENTWOODELMMADGE
MARYTHORNTON
RUSSE
L
L
MARSHALL
WAYMIRE
FLORENCE
CORNELLUNIONPACIFICPENDLETONPRIVATEBRAZEAU
ATALANTA RUTHLITHIA
MERRITT
MANDERLYPOWELL
CRAWFOR
D
HILLDALECOLLIERR
O
CKF
ORDJOSEPH
MASON
HOLLANDLAWNDELL
ALMENTOR
ALLISONREASNOR
MAGDALEN
WILLIS BOMPARTKIRKHAMBREMERTONC
R
E
V
E
C
O
E
U
R
KEYSTONE
BREMERTONWILLIS
GLENATALANTA
PRIVATE
GLENMARYCOLLIERBOMPARTMANCHESTER RD §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10021
Wastewater
11
$300,000
Brentwood
Lemay/RDP
Deer Creek
Capital
22Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DC-02 & DC-03 SANITARY RELIEF (BRENTWOODBLVD TO CONWAY RD) PHASE III
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY TRUNK SEWER.
CONSTRUCT 5,400 FEET OF 78-INCH SANITARY SEWER TO ALLEVIATESURCHARGING AND ELIMINATE CONSTRUCTED SSOS.
§¨¦64
§¨¦170
§¨¦64
§¨¦170
CLAYTONLADUE
LAYPINE
M E T R O L IN K
ELMPRICEOLD WARSON MCKNIGHTNEWPORTWOODLAWNLEE
CLARK
MARSHALL
UNIONPACIFICTR ENTBRENTWOODMARYLAND
WARSONODAYDAVISWENNE
K
E
R
WHITE
BELLBISMARKBARNES EULALIE
SOUTHFORTY
LITZSINGER
GLEN
EUCLID
S
WAN
LITHIA
WILSON DANIELP ACIFICSQUIRESCELLALOUISHANLEYHIGHSCHOOLANDREWMCCUTCHEONROANOVER
H
IL
LSWOODDEACONGOR
E
B
U
C
KWRENWOOD
ST CLAIRMARYHUNTERMCKINLEYST A N DREWSDALE
MAPLE
YEATMAND E N N Y
ROCK HILLCECELIAC L E R M O N TRENDEREREA G E R
ROSE
GODWIN
WILD DEE R
Y ORKCONWAYWESTWOODDESPERESDRO
M
A
R
ASPRINGWOOD
ARTHUR P IC ARDYFOLGERDONOHO
P R IV ATE
JOANNAHIGHDOWN ANNALEEVICTORIAWARWICK
WILD ROSEDWYER
PORTERBERRY
BENNETTBERRYWARSONDWYERME
T
R
OL
I
N
K
MARYLITZSINGERS LINDBERGH BLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12472
Wastewater
11
$1,500,000
Various
Lemay/RDP
Deer Creek
Capital
23Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DC-09 WEST I/I REDUCTION (S LINDBERGH BLVDAND LADUE RD)
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW AND INFILTRATION CAUSING SEWERSURCHARGING AND BUILDING BACKUPS.
REMOVE PUBLIC AND PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REMOVAL INCLUDED IN PROJECT 12036.
§¨¦64§¨¦64
LADUE WARSONSPOEDEGRAESERCLAYTONMOSLEY BARNESVOUGANORT H F O R T Y
T E A L W O OD
BE AVE R
S T ACY
LOG CABINC L ER M O N T STONEYSIDEOAKPARKOLDBONHOMME
RONDELAY
P R IVATECONWAYALD E N
B
R
OOKTRAIL HEATHER HILLMAGNOLIASPRINGWOOD
ARTHUR
P IC A R D Y
FO
R
D
Y
CEM O R WOODTUREEN
HIGHDOWNTUCKERLADUEESTATESWHITEBRIDGE
ANZEIGER
LISA
MAYFAIRA L L E G ROLYLEWOOD
SHERWYNTRILANE
LAWRENCE
M A R Y HILL
CLERBROOK APPLE TREEQ U A IL W A Y S
RANDELAYOAK GAT
E
CAPITOL
CHERRI
C O U N T R YV IE W
NOTRE DAMED O G W O O D
L Y N N B R O O KSUNDOWN
PRIVATE
PRIVATE PRIVATEPRIVATE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11997
Wastewater
11
$320,000
Ladue
Lemay/RDP
Deer Creek
Capital
24Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK PUBLIC I/I REDUCTION (2017)CONTRACT A
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE PUBLIC SEWERS USING THE CURED IN PLACE PIPEMETHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT1 11996 AND 11997.
§¨¦64
§¨¦270
§¨¦44
§¨¦170
§¨¦270
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12036
Wastewater
11
$170,000
Various
Lemay/RDP
Deer Creek
Capital
25Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK PUBLIC I/I REDUCTION (2017)CONTRACT B
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE PUBLIC SEWERS USING THE CURED IN PLACE PIPEMETHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11994 AND 11995.
§¨¦64
§¨¦270
§¨¦44
§¨¦170
§¨¦270
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12037
Wastewater
11
$150,000
Various
Lemay/RDP
Deer Creek
Capital
26Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK SANITARY SYSTEM IMPROVEMENTS(WATERSHED CONSULTANT)
Professional Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS.
PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING,ANALYSIS, AND DESIGN SERVICES IN THE DEER CREEK WATERSHED, TOMEET CONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦64
§¨¦270
§¨¦44
§¨¦170
§¨¦270
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11110
Wastewater
16
$150,000
Various
Lemay/RDP
Deer Creek
Asset Management
27Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK SANITARY SYSTEM IMPROVEMENTS(WATERSHED CONSULTANT)
Professional Services
1101 - General Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS.
PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING,ANALYSIS, AND DESIGN SERVICES IN THE DEER CREEK WATERSHED, TOMEET CONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦64
§¨¦270
§¨¦44
§¨¦170
§¨¦270
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11110
Wastewater
16
$600,000
Various
Lemay/RDP
Deer Creek
Asset Management
28Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK SANITARY TUNNEL (CLAYTON RD TORDP)
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW AND INFILTRATION CAUSING SURCHARGING INEXISTING SEWERS AND ACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 20,000 FEET OF 19 FOOT DIAMETER SEWER, PUMP STATION,AND DIVERSION STRUCTURES.
§¨¦64
§¨¦44
§¨¦170
§¨¦64
DALEMETROL
IN
K
ELMMCKNIGHTLAYPINE
UNIONPACIFICWYDOWN
FORSYTH
PERNOD
FYLER
FOLK
LOCKWOOD LANSDOWNE
NEWPORT
MARSHALL
LEE YALECLARK
LITZSINGER
ARSENALLACLEDESTATIONSOUTHWESTBRENTWOODHANLEY
G
O
R
E
W E LLSPRICE
ODAYDAVIS
LINDENWOOD
ETHEL
BANCROFT
BRADLEY
FORES T P A R K
WHITE
ODELL
BELLBREDELLBISMARK
SCANLANBOLANDSUTTONEULALIEGLEN
ARUNDEL
EUCLID FRANCISS
WAN
WEST PARK
PAR K
OAKLAND
LITHIA
WABASHDANIELP ACIFIC
SUMMITZEPHYR
OLD WARSONCELLA FORESTLOUISMARQUETTE
W I L L I A MS
ALAMO
LAGOON
MARDELMCCUTCHEONROANOAKLOUWENFLORA
WRENWOOD
MARYASBURYBRUNO
GLADES
JEROME
MANHATTANPRATHERIOLAWISE
YEATMANCECELIAEA G E R
ROSE
C E C ILOXFO RDGODWIN
Y ORKPARKDALE
LYLEDESPERESARLINGT
O
NLANGTON TAMMVILLA
CROMWELL
LAFAYETTEKRAFTINDIAN
FAUQUIER
DOLAN
JAMIESONMERRITT
PORTERCEDAR
BERRY TAMMUNIO N P A CIFICMARYETHEL
WHITEPARK
BANCROFT
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11731
Wastewater
11
$500,000
Various
Lemay/RDP
Deer Creek
Capital
29Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEGIVERVILLE COMBINED SEWER RELOCATION
Design Services
6660 - SanitaryReplacement Fund
EXISTING SEWER HAS HISTORY OF HEAVY SILTRATION CAUSINGBLOCKAGES AND OVERCHARGED MAINS, LEADING TO BUILDINGBACKUPS.
RELOCATE 3,800 FEET OF COMBINED SEWER IN METROLINK ROW WITH12-INCH TO 42-INCH COMBINED SEWER.
DELMAR
LINDELL
METRO LINK
CLEMENS
FOREST PARK
METROLINK
ENRIGHT
CLARAPERSHING LAURELROSEDALEDEBALIVIEREDE
G
I
V
E
R
V
I
L
L
E
WATERMAN
KINGSBURY
NI
N
A HAMILTONCATES
GOODFELLOWWESTMINSTER
MCPHERSON
WASHINGTON
DES PERESPRIVATEWATERMAN
M
E
T
R
O
L
I
N
K PRIVATENI
N
A
PERSHING
ENRIGHT
DESPER
E
S
METROLINK CLARAWESTMINSTER
FORESTPARK
MCPHERSON
DES PERES§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11136
Wastewater
11
$650,000
St. Louis City
Lemay/RDP
Blackstone- Clarendon
Capital
30Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FAWN VALLEY, PIONEER PARK, WESTCHESTER I/IREDUCTION (MANCHESTER RD W OF N GEYERRD)
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW AND INFILTRATION CAUSING SEWERSURCHARGING, BUILDING BACKUPS, AND CONSTRUCTED SSOACTIVATION.
CONSTRUCT PUBLIC SEWER REHABILITATION OF 8,000 FEET OF 8-INCHTO 12-INCH SANITARY SEWER AND 90 MANHOLES, AND REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS.GEYERBALLASBOPPRUTHWOODGATESIMMONSOAK VALLEY
TWINPINENANALINDEMANJEWELTALLIELINWOODCLAYCHESTER CLEVELANDDOUGHE R T Y F E R RY
TWI N FAWNS
LINDGATE MEIERKIRKSHIRE
GRUPPKEND
ONMISSOURIDUNM ORR
LILLIAN
CREEKHAVEN
SUN NY FOLGERL
O
CKETTBLASELINDEMANN PAMELA
KINSTERNSERAMA
VINETTALAVENDELHARWOODBAMBURY
TIMBER
FE D E RAL
CHRISTINEWILSON
ROCHDALEMANHATTAN
B A Y BE R RYBROOKCREEK
SCOTTSDALE
MOZARTBORCHERDING
WHIT ECLIFFMISTLETOE
BRIAR RIDGE
LYNKIRK
TIMBERWYCK
HAVERSHAMFAW NRIDGE
PLAZATRAIL C R E S T
A
PP LEWOODPINEGATEDELCHESTERDAWNINGBANSBACHWEDGETON
MONTOUR
MIDDLEVIEW
DES PERESDOMINION
JASMINLIN MANOR
BELVA
IRENE
ST CROIXBALLAS
JEWEL
SUNNY BOPPSIMMONSLYN K IR K
MANCHES
T
E
R
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11996
Wastewater
11
$530,000
Des Peres
Lemay/RDP
Deer Creek
Capital
31Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FF-18 VILLA DORADO - LACKLAND - PAGESANITARY RELIEF (ADIE RD TO VILLA DORADODR)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 5,230 FEET OF 30-INCH SANITARY RELIEF SEWER WEST OFSCHUETZ ROAD FROM ADIE ROAD SOUTH TO VILLA DORADO DRIVE.ELIMINATE CONSTRUCTED SSO OUTFALL BP-087.
PAGE
ADIE
SCHUETZLACKLAN
D BALLCRAIGB O R MANFEE FEEWELDONGRISSOMV I L L A D O R A D OCHAFFEE TIVOLICONCOURSEWESTLINEINDUSTRIAL
GR
A
E
L
E
R
PRIVATE
W
E
S
T
P
ORTPLAZAWESTPORTCENTERARC
PAGESERVICE
ALTOMCONGRESSIONALCENTERLINEINDUSTRIALNORFOLK SOUTHERNVERNALAKESIDE C R O S S IN G
WOODLANDC R E S T A VERDE MONTAUKADMINISTRATIONCRAIG PARKTAWNY ASH
PAGEPRIVAT EPRIVATEPRIVATE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10018
Wastewater
11
$600,000
Maryland Heights
Missouri
Fee Fee Creek
Capital
32Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT -CONSTRUCTION MANAGEMENT (2016)
General Services -Construction Inspection
6660 - SanitaryReplacement Fund
CONSTRUCTION MANAGEMENT NEEDS TO SUPPORT CAPITAL PROJECTSTHROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OF INTERNALSTAFF.
RETAIN CONSTRUCTION MANAGEMENT CONSULTANT FOR AS NEEDEDSERVICES. SERVICES MAY BE RENEWED THROUGH FY2017 BASED ONPERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11752
Wastewater
14
$250,000
Various
Various
Various
Asset Management
33Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT -GEOTECHNICAL (FY2015) CONTRACT A
General Services -Geotechnical
6660 - SanitaryReplacement Fund
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OFINTERNAL STAFF.
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICESMAY BE RENEWED THROUGH FY2016 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11753
Wastewater
11
$50,000
Various
Various
Various
Asset Management
34Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT -GEOTECHNICAL (FY2015) CONTRACT B
General Services -Geotechnical
6660 - SanitaryReplacement Fund
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OFINTERNAL STAFF.
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICESMAY BE RENEWED THROUGH FY2016 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11754
Wastewater
11
$50,000
Various
Various
Various
Asset Management
35Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT -GEOTECHNICAL (FY2015) CONTRACT C
General Services -Geotechnical
6660 - SanitaryReplacement Fund
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OFINTERNAL STAFF.
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICESMAY BE RENEWED THROUGH FY2016 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12064
Wastewater
11
$50,000
Various
Various
Various
Asset Management
36Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - PLANNING(FY2014)
General Services-Planning
6660 - SanitaryReplacement Fund
WITH THE ELIMINATION OF THE WATERSHED PLANNING CONSULTANT,PLANNING NEEDS TO SUPPORT THE CAPITAL PROGRAM EXCEED THECAPACITY OF INTERNAL STAFF.
RETAIN FIRM FOR AS NEEDED PLANNING SERVICES. SERVICES MAY BERENEWED THROUGH FY2016 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11755
Wastewater
11
$400,000
Various
Various
Various
Asset Management
37Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - FACILITY &SEWER DESIGN (2016)
General Services -Design CIRP Funds
6660 - SanitaryReplacement Fund
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF.
RETAIN DESIGN FIRM FOR AS NEEDED FACILITY & SEWER DESIGNSERVICES. SERVICES MAY BE RENEWED THROUGH FY2017 BASED ONPERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11760
Wastewater
11
$300,000
Various
Various
Various
Asset Management
38Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SEWERDESIGN (FY2013) CONTRACT B
General Services -Design CIRP Funds
6660 - SanitaryReplacement Fund
SEWER DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUTTHE DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF.
RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICES MAYBE RENEWED THROUGH FY2017 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11780
Wastewater
11
$90,000
Various
Various
Various
Asset Management
39Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SEWERDESIGN (FY2013) CONTRACT C
General Services -Design CIRP Funds
6660 - SanitaryReplacement Fund
SEWER DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUTTHE DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF.
RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICES MAYBE RENEWED THROUGH FY2017 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11781
Wastewater
11
$90,000
Various
Various
Various
Asset Management
40Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2016) CONTRACT A
General Services -Survey
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2017 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11764
Wastewater
11
$50,000
Various
Various
Various
Asset Management
41Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2016) CONTRACT B
GSA - (Survey) CIRPFunds
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2017 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12394
Wastewater
11
$50,000
Various
Various
Various
Asset Management
42Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2016) CONTRACT C
GSA - (Survey) CIRPFunds
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2017 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12395
Wastewater
11
$50,000
Various
Various
Various
Asset Management
43Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2016) CONTRACT D
GSA - (Survey) CIRPFunds
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2017 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12405
Wastewater
11
$50,000
Various
Various
Various
Asset Management
44Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2016) CONTRACT E
GSA - (Survey) CIRPFunds
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2017 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12406
Wastewater
11
$50,000
Various
Various
Various
Asset Management
45Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GRAVOIS TRUNK SANITARY STORAGE FACILITY(PARDEE LN AND PARDEE RD)
Pre-Design Services
6660 - SanitaryReplacement Fund
WET WEATHER I/I CAUSING SYSTEM SURCHARGING ANDCONSTRUCTED SSO ACTIVATION.
CONSTRUCT SANITARY STORAGE FACILITY TO STORE WET WEATHERSANITARY FLOW, TO MITIGATE SURCHARGING AND ELIMINATE TWOCONSTRUCTED SSOS.
PA
R
D
E
E
GRA
N
T
ARBANBR
O
O
K
V
I
E
W
W H IT ECLIFFPARKPRIVATELODGE POLELURLINESILVERCRESTSIGNATURE PRIVATEPRIVATEWATSON RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12569
Wastewater
11
$1,500,000
Crestwood
Lemay/RDP
Gravois Creek
Capital
46Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HAMBURG AVE TO AL CLAIRE DR TO WEBMOREDR CSO L-181 (I-032) ELIMINATION
Design Services
6660 - SanitaryReplacement Fund
ELIMINATION OF CSO L-181 REQUIRED.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS AT 139PROPERTIES, REHABILITATE 6,500 FEET OF SANITARY AND STORMSEWERS, AND REMOVE CSO L-181.
§¨¦55
GERMANIA
MORGAN FORDWE
B
E
R
SEI
B
E
R
T
UNIONPR
I
V
A
T
E
KAMMERERHEI
D
E
L
B
E
R
G
RIVER DESPERES
TIE
M
A
N
N
OL
D
E
N
B
U
R
G
HA
M
B
U
R
G
WANDAHEALY
HA
N
N
O
V
E
R
DAVI
S
GR
A
S
S
O PARKWOODCA
R
O
N
D
E
L
E
TADKINSCARLSBADTE
S
S
O
N
LEONA
KR
A
M
E
R
HEE
G
E
PEARSTE
I
N
S
PO
E
P
I
N
G
P A RKRIDG E
D
E
B
R
A
P
R
I
M
M
SCH
I
R
M
E
R
JUL IA HENZEWILMARDIANTHANAL
C
L
A
R
E
CLEARPOINTCOMS
T
OCK
GA
R
D
E
N
P
A
R
K JEANENEKETMOREWEBMOREHERNANWEIMARHILDESHEIMHA
M
B
U
R
G
HAN
N
O
V
E
R
TES
S
O
N
G
R
A
S
S
O
PRIV
A
T
E
HEIDELBE
RG
HANNOVER
PRIV
A
T
E
TESSON
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12619
Wastewater
11
$245,000
Unincorporated
Lemay/RDP
Mackenzie Creek
Capital
47Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HELTA, SAPPINGTON, AND GREGORY COURT I/IREDUCTION (SAPPINGTON RD AND I-270)
Design Services
6660 - SanitaryReplacement Fund
INSUFFICIENT SYSTEM CAPACITY FOR WET WEATHER FLOWS.
CONSTRUCT 7,900 FEET OF 8-INCH SANITARY SEWER AND REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12023.
§¨¦270
KENNERLY
MA
T
T
I
SALSWELLSAPPINGTONSCHUESSLER
HILLT
O
P
MENTZHILLLE
E
B
U
R
LITTIE
ROXANNASUNSETBAPTIST CHURCHGE
R
A
L
DGEYER TH
E
I
S
S
GREGORY
DIERSGRAVOISA
N
T
O
N TESCORDPRIVATEH ADLEY HILL
CONCORDSCHO
OL
LANGTREEWEBER
H
I
LLDANDRIDGEELNORETWILIGHTHELTA
VARGAS
MAPLELINCORDEIMEREYNOSA
SAKURA
JOSSEFAWNHAVEN
CONCORDC
H
A
P
ELHILL
W ORTH IN G T O NBIRD HAVENROANNA CAROLYNNE
DAVANA
ARTHU RDOVERHILL
VALD A M E R E
TIOGA
J
O
A
N
CHA R WICKMUGAN
ME
A
D
O
W
F
I
E
L
D KRAMPERALLPINE BRIDLE W O O D
GLENCROFTEDDINGH A M REBECCACHARD I N
CEDARQUAIL RUN
OLD TESSONTAMARA
P
R
I
V
A
T
E PRIVATEPRIVATEGRAVOISRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12304
Wastewater
11
$560,000
Unincorporated
Meramec
Mattese Creek
Capital
48Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HUNTLEIGH MANOR, OLD WARSON,TIMBERWYCK I/I REDUCTION (S LINDBERGHBLVD SOUTH OF LITZSINGER RD)
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW AND INFILTRATION CAUSING SEWERSURCHARGING, BUILDING BACKUPS, AND CONSTRUCTED SSOACTIVATION.
CONSTRUCT PUBLIC SEWER REHABILITATION OF 10,500 FEET OF 8-INCHTO 21-INCH SANITARY SEWER, 100 MANHOLES, AND REMOVE PRIVATEI/I SOURCES FROM SANITARY SEWERS.
§¨¦64
§¨¦64
GEYERCLAYTON
KIRKHAMWOODLAWNOLDWARSON
LEE
T R ENTRUTHWOODWARSONODAYBROWNELL
BISMARK
TAYLORWILSON
LITZSINGER
WOODGATENORTH F O R T Y
DANIELBENNETTS
QUIRES
OAK VALLEY
DICKSONBACON
SOUTHFORTY
ANDREWROANOVE
RHILLS
GILBERTDEACONEVANSSIMMONSBRIDLEHARRISONO A KNANAMEDINAMCKINLEYTALLIENORTH
PORTLAND
LINWOODFIRETHORN D E N N Y
KORTWRIGHTEASTKIRKSHIRE
BERNICEC H IP PE R
CLAYFOLGERHICKORYWINDI N GR ID G E
LOGCAB IN
IOLAJOANNA OVERBROOKTREGARON
HIGHHAMP T ONMANITOU
SERA
M
A
TWIN SPRINGS
JULIAN
VICTORIA
WARWICK
P R IV ATE
SWAN
HUNTLEIGH LINDWORTHFOX RIDGE LEAGRAMLOCKETTHICKOR Y WARSONOAKCLAYLITZSINGERSLINDBERGHBLVD §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11994
Wastewater
11
$300,000
Ladue
Lemay/RDP
Deer Creek
Capital
49Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
KAPPEL (PARTIAL) I/I REDUCTION (EXUMA DRAND GLEN OWEN DR)
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12024.VICKIEWINKLERLORNAEXUMAGLENOWEN VENTURADENNISKAPPEL
ANDROSMEDFORDSCOTTDALE NEMNICHPRIVATE JACOBITULLAMOORGREEN VALLEYABACOK ILREADUNNIDEERINAGUAMILLBURNBARBADOS L O N G FORDBALBOAMAYFAIRBON OAKIMPERIALNEVILLEG LENBRAELAKEMOORCLAIRMONT HERMAN
LA N E C O U R TKNOLLCREST CROWNPOINTSAMANAVINCENNESCHAMBERSHILLMANAGUACLOVERDALENORLAKESNEWHALL
DELLWOOD
NEMNICHB A L B O A
V
I
C
K
I
E GREENVALLEYKAPPEL
VENTURAKAPPEL
G REENVALLEYWINKLERBALBOA§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12314
Wastewater
11
$475,000
Unincorporated
Bissell
Maline Creek
Capital
50Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
KIRKWOOD I/I REDUCTION (BIG BEND BLVD AND SKIRKWOOD RD)
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE I/I CAUSING BUILDING BACKUPS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
§¨¦44
§¨¦44GEYERADAMSCLAY TAYLORHARRISONCOUCHUNIONPACIFI C
CRAIGANN
ROSE HILL
WOODBINE
JEFFERSON
NIRK
RAYBURN
ESSEX
MADISON
FORESTHOLMESLARK
BALLASWOODLAWNWAY
DICKSONBURLINGTO
N
N
O
R
T
H
E
R
N
S
A
N
T
A
F
E
L EM P
WILTONLEEVAN BURENBODLEY
CRESTORCHARDFILLMOREGILLIRIS
CLARKMO NROE
MONICASCOTTFRIEDA SAMO
AALTUSHILL
APEX
CENTRAL
RECO
TAHITILONGVIE
W
LEFFINGW E L L
JEWEL
ORLEANSARGONNE
ELLIOTTROSEGOETHE
MILWAUKEESMITHFLORALEA
M ARSHALLATTUCKS
LINDE
M
A
N
PRIVAT EMARYHURSTPARKCOULTERKNIERIMBRENTALICEGRANDVIEW
LODGEEVANSANDREWS B
ALI
M CL A I N
CLINTON
OAKWAY
MIDWAY PARKWOODSMARCO OAKSHIREPEARLFOREST GLEN
SPEARS
C
A
M
E
R
A SAPPINGTONERBERIDLEWILD MINTURNFUHRMANN
DUBOISCHESTER
WASHINGTON
KINYONBRYANMADISON
BODLEY
C
L
A
Y
ARGONNE
ESSEX
MONROE
CLINTON FILLMOREHOLMESPRIVATE
S KIRKWOOD RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12317
Wastewater
11
$780,000
Kirkwood
Lemay/RDP
Gravois Creek
Capital
51Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
KIRKWOOD MIDDLE SCHOOL, SIMMONS, WILSON,W SARAH I/I REDUCTION (MANCHESTER RD ANDKIRKWOOD RD)
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW AND INFILTRATION CAUSING SEWERSURCHARGING, BUILDING BACKUPS, AND CONSTRUCTED SSOACTIVATION.
CONSTRUCT PUBLIC SEWER REHABILITATION OF 16,000 FEET OF 8-INCHTO 12-INCH SANITARY SEWER AND 140 MANHOLES, AND REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS.GEYERWOODLAWNDICKSONRUTHEVANSWOODTAYLORCLAYPEEKE
SIMMONSHARRISONESSEX
WILSON QUANWOODGATESQUIRES
SARAH
O A K V ALLEY
PAR
DOUGHER T Y F E R R Y DEACONNANAM E D I N A
LINWOOD
MAPLE
MARK
JEWEL
TWIN FAWNS
MEIERKIRKSHIRE
CURRANBERNICEGRAYFL A ND E R S
BOGEYMISSOURIFOLGERFIRETHORNCLUBHICKORYPAMELA
P R IVA T E
SERAMA
JULIANVINETTAHARWOODLINDGATE
OLD WARSON
KEN
DONBAMBURY
TIMBER
HIGHHAMPT O N
HUNTLEIGH
CLAYCHESTER
PEARLSCOTTSDALE
MOZARTWH ITECLIFFBEAUFORD
HIGHMEADO
W
MISTLETOE
BRIAR RIDGEPINE HILLGASLITE
MERMOD KENMOREALFRED
DUNLORA
EARLGARDEN
J
I
L
L
DOMINION
GIRARDJASMIN
PAR
ESSEXHARWOODJEWELJEWELSIMMONSCLAY FLANDE R SPRIVATE
HARRISONCLAYHICKOR Y
M A N C H E S T E R R DS LINDBERGH BLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11995
Wastewater
11
$560,000
Kirkwood
Lemay/RDP
Deer Creek
Capital
52Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT A
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE PUBLIC SEWERS USING THE CURED IN PLACE PIPEMETHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12075 AND 12078.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12048
Wastewater
11
$100,000
Various
Lemay/RDP
Various
Capital
53Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT B
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE PUBLIC SEWERS USING THE CURED IN PLACE PIPEMETHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12317.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12049
Wastewater
11
$90,000
Various
Lemay/RDP
Various
Capital
54Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT C
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE PUBLIC SEWERS USING THE CURED IN PLACE PIPEMETHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12420 AND 12253.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12050
Wastewater
11
$90,000
Various
Lemay/RDP
Various
Capital
55Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT D
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE PUBLIC SEWERS USING THE CURED IN PLACE PIPEMETHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12240.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12038
Wastewater
11
$130,000
Various
Lemay/RDP
Various
Capital
56Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY PUMP STATIONS 1 AND 2 IMPROVEMENTS
Design Services
6660 - SanitaryReplacement Fund
AGING AND FAILING SYSTEMS IN NEED OF REPLACEMENT ANDUPGRADE TO ENSURE CONSENT DECREE COMPLIANCE.
CONSTRUCT MECHANICAL GATE REPLACEMENT, UPGRADEELECTRICAL SYSTEMS AND SWITCH GEAR, AND UPGRADE PUMPS.
FY16 CONSTRUCTION BUDGET IS FOR EQUIPMENT PROCUREMENT,WITH THE BALANCE OF CONSTRUCTION WORK FUNDED IN FY17.
MA
R
C
E
A
U
HU
R
C
K
DA
V
I
SVIRGINIA
CA
T
A
L
A
NMINNESOTANEL
L
I
E
ES
P
E
N
S
C
H
I
E
DIDAHOAD
E
L
I
A
PENNSYLVANIAFAN
N
I
E WEBERMICHIGANLUX
E
M
B
U
R
G MICHIGANMICHIGANLEMAY FERRY RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12488
Wastewater
11
$470,000
St. Louis City
Lemay/RDP
River Des Peres
Capital
57Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY SANITARY SYSTEM IMPROVEMENTS(WATERSHED CONSULTANT)
Professional Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS.
PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING,ANALYSIS, AND DESIGN SERVICES IN THE LEMAY WATERSHED, TOMEET CONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦270
§¨¦70§¨¦170
§¨¦255
§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦255
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11145
Wastewater
16
$4,750,000
Various
Lemay/RDP
Various
Asset Management
58Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY SANITARY SYSTEM IMPROVEMENTS(WATERSHED CONSULTANT)
Professional Services
1101 - General Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS.
PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING,ANALYSIS, AND DESIGN SERVICES IN THE LEMAY WATERSHED, TOMEET CONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦270
§¨¦70§¨¦170
§¨¦255
§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦255
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11145
Wastewater
16
$760,000
Various
Lemay/RDP
Various
Asset Management
59Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY WWTP SECONDARY IMPROVEMENTS
Miscellaneous Services
6660 - SanitaryReplacement Fund
INCREASE OF SECONDARY TREATMENT DESIGN CAPACITY TO 210 MGDIS REQUIRED BY CONSENT DECREE.
PERFORM STRESS TESTING OF SECONDARY IMPROVEMENTS TOCONFIRM EXPANSION OF TREATMENT CAPACITY.UNION PACIFICPRIVA TEH
O
F
F
M
E
I
S
T
E
R
WEI
S
S
VELMA
ETTA
PERRINHOLDEN
HOR
N
RUBYPRI
V
A
T
E
UNION PACIFICUNION PACIFICP
R
I
V
A
T
E
P
R
I
V
A
T
E
VELMA§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11649
Wastewater
11
$510,000
Unincorporated
Lemay/RDP
Lemay Creek
Capital
60Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LMRDP CSO STORAGE TUNNEL (BROADWAY TORDP TUBES)
Design Services
6660 - SanitaryReplacement Fund
MITIGATION OF CSO FLOWS INTO THE RIVER DES PERES IS REQUIREDBY CONSENT DECREE, NECESSITATING CONSTRUCTION OF A DEEPSTORAGE TUNNEL SYSTEM.
CONSTRUCT A 30 FOOT FINISHED DIAMETER, 9 MILE LONG, 200 - 250FOOT DEEP STORAGE TUNNEL WHICH FOLLOWS APPROXIMATELY THERIVER DES PERES ALIGNMENT, INCLUDING SEVERAL CONNECTINGTUNNELS, ACCESS SHAFTS AND INTAKE STRUCTURES, IN THE LEMAYWATERSHED.
§¨¦44
§¨¦55
§¨¦55
GRAVOIS R
D
M A NCHE S T E R R D
W A TSONRDCHIPPEWA BLVD
TESSONFERRYRDLEMAYFERRYRDCHIPPEWA BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11820
Wastewater
11
$8,075,000
St. Louis City
Lemay/RDP
River Des Peres
Capital
61Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LMRDP CSO STORAGE TUNNEL NORTHCONSOLIDATION SEWERS
Design Services
6660 - SanitaryReplacement Fund
MITIGATION OF CSO FLOWS INTO THE RIVER DES PERES IS REQUIREDBY CONSENT DECREE.
CONSTRUCT CONSOLIDATION SEWERS TO DELIVER FLOWS TO THENORTHERN PORTION OF THE DEEP STORAGE TUNNEL SYSTEM.
§¨¦44
DALE
FYLER
ARSENAL
UNION PACIFIC
PERNOD
HAMPTONMET
R
OL
I
N
K
MARDELHANLEY SUBLETTEWEIL
BRANNONWATSONDELOR
ITASKAWALSH MORGAN FORDMACKLINDLANSDOWNE BENTCOLUMBIA
RHODES
WEST PARK
LACLEDESTATIONBAT
E
S
SHAW
NOTTINGHAM
FOLK
ELLENWOOD
BECK
ROSA
NEOSHO
WINONAREGAL
MIL
ENT
Z
WISE
CHRISTYYALEOAK HILLSOUTH W E S TMcCAUSLANDMCCAUSLANDODELL
SCANLAN TAMMTHOLOZAN TOWER GROVESWAN
MCREE
ARCO
MURDOCH
RIV
E
RDESPERE
SFINKMAN
BANCROFT
RAYTAF
T
PARKER ALFREDTUXEDO
BRADLEY
MIAMI
HUNTBREDELL
MACKENZIESUTTONCLIFTONMAGNOLIAVANDEVENTER
POTOMAC
WANDASMILEY
SCH
I
L
L
E
R
ZEPHYR
MARSHALL
GRESHAM
MARQUETTE
JUNIATA
OLEATHA
ULENAW I L L I A MS GARNER
FLORA
S U T HERLAND
HICKS
WIL
LMORE
BRUNO
GLADES
JEROME
LILLYNAGELMANHATTANIVANHOEHANCOCK
WEST SOUTH
SPRING59THPRIVATE SPROULEHEREFORDBINGHAMESTHERREBERLYLE
WALLACE
VILLA
ANNA
HAZELLENOX
WESTEASTCUTTERSIGE
L
JONES
WINNEBAGO HALFKINSEYWABASHECOFF
LEONAPORTERBISCHOFF
TAFTLENOXBECK
RAYITA S KA
TAMMUNIONPACI
F
I
C
BRUNO
WISE
WATS O NRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11959
Wastewater
11
$81,000
St. Louis City
Lemay/RDP
River Des Peres
Capital
62Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LMRDP CSO STORAGE TUNNEL SOUTHCONSOLIDATION SEWERS
Design Services
6660 - SanitaryReplacement Fund
MITIGATION OF CSO FLOWS INTO THE RIVER DES PERES IS REQUIREDBY CONSENT DECREE.
CONSTRUCT CONSOLIDATION SEWERS TO DELIVER FLOWS TO THESOUTHERN PORTION OF THE DEEP STORAGE TUNNEL SYSTEM.
§¨¦55
§¨¦55 UNIONBAT
E
S
MORGAN FORDGERMANIA
WALSH
DA
V
I
S
RHODES
HAMPTONRIVER
D
ES
PERES
U NIO N P A C IFIC
ROSA
BA
Y
L
E
S
S
MIL
E
N
T
ZGOE
T
H
E
H
ALEJANUARYSE
I
B
E
R
T
VIRGINIAMINNESOTADEWEYCHRISTYBLO
W
IDAHOWEBER
HOLLYHILLSMACKENZIEDELOR
ZEISSRAYFAN
N
I
EELTONKAMMERER SHARPMACKLINDIRO
N
FIELDMATHILDARADIOMA
R
C
E
A
U
BO
W
E
N
CARONDELETCLIFTONHAV
E
N
Q
U
I
N
C
Y
MOHEGAN
WIL
M
I
N
G
T
O
NWANDA
LANGLEY
AL
M
A
PARDELLAPR
I
V
A
T
E
KA
Y
SCH
I
L
L
E
R
STAELY GUSTINERO
B
E
R
T
RADIOMKIT EUGENEGRANDHO
R
N ULENALUCIADOVER
WATEREIC H E L B E RGER
VASELFORMANPAULEGENESTAACORN ALABAMALOUIS
REILLYJ
A
MIESON
SP
R
I
N
GTIBER
L E M ONA
UPTON
SUNSHINEWI
L
L
MORE
CIRCLEVIEW
PRI
M
MADKINS
IONECA
T
A
L
A
N
FRENCHLEONA
PILOTKIN
G
S
HA
M
B
U
R
G
ELGINS A V IO
AVENUEHDANANEIERALASKAHE
E
G
E
KAY
S
E
RSTOLLEWE STPHILOTYROLEAN
HEA
L
Y
CO
L
V
I
NJOEL STE
I
N
SRUTH
WEBER TRAILTES
S
O
N
ARVIN
CISCOKINSEY
TIFFANYALEXANDERBREUERMENOLADUKE
HELMFRIE
D
A
NEL
L
I
E
ORI
E
N
T RADOMWANDABL
O
WLEONA
DANARAYDEL
O
R
RAYVA
SEL WANDAROSAWEBER RAYREILLYWAL
S
H
GRANDGRAVOIS RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11958
Wastewater
11
$223,000
St. Louis City
Lemay/RDP
River Des Peres
Capital
63Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LMRDP TUNNEL DEWATERING PUMP STATION
Design Services
6660 - SanitaryReplacement Fund
MITIGATION OF CSO FLOWS INTO THE RIVER DES PERES IS REQUIREDBY CONSENT DECREE, NECESSITATING CONSTRUCTION OF A DEEPSTORAGE TUNNEL SYSTEM.
CONSTRUCT PUMP STATION TO PUMP STORED COMBINED SEWAGEFROM THE TUNNEL STORAGE SYSTEM TO THE LEMAY TREATMENTPLANT.
HOR
N
P
R
I
V
A
T
E
UNION PACIFICWEI
S
S
KAYSER
CA
T
A
L
A
N
WA
L
L
E
R
P
R
I
V
A
T
E
WAL
L
E
R
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11816
Wastewater
11
$2,050,000
Unincorporated
Lemay/RDP
River Des Peres
Capital
64Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER & MIDDLE RDP CSO CONTROLS SYSTEMIMPROVEMENTS (WATERSHED CONSULTANT)
Professional Services
6660 - SanitaryReplacement Fund
MITIGATION OF CSO FLOWS INTO THE RIVER DES PERES IS REQUIREDBY CONSENT DECREE, NECESSITATING CONSTRUCTION OF A DEEPSTORAGE TUNNEL SYSTEM.
DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATIONSEWERS, AND DEWATERING PUMP STATIONS. THIS PROJECT ALSOINCLUDES MANAGEMENT SERVICES, FIELD INVESTIGATIONS ANDPRELIMINARY STUDIES.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦70
§¨¦44
§¨¦55
§¨¦64
§¨¦170
§¨¦255
§¨¦170
§¨¦255
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11109
Wastewater
16
$270,000
Various
Lemay/RDP
Various
Asset Management
65Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER & MIDDLE RDP CSO CONTROLS SYSTEMIMPROVEMENTS (WATERSHED CONSULTANT)
Professional Services
1101 - General Fund
MITIGATION OF CSO FLOWS INTO THE RIVER DES PERES IS REQUIREDBY CONSENT DECREE, NECESSITATING CONSTRUCTION OF A DEEPSTORAGE TUNNEL SYSTEM.
DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATIONSEWERS, AND DEWATERING PUMP STATIONS. THIS PROJECT ALSOINCLUDES MANAGEMENT SERVICES, FIELD INVESTIGATIONS ANDPRELIMINARY STUDIES.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦70
§¨¦44
§¨¦55
§¨¦64
§¨¦170
§¨¦255
§¨¦170
§¨¦255
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11109
Wastewater
16
$527,000
Various
Lemay/RDP
Various
Asset Management
66Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC RIVER SYSTEMIMPROVEMENTS - BAUMGARTNER TO FENTONWWTF TUNNEL
Pre-Design Services
6660 - SanitaryReplacement Fund
THE FENTON WWTF IS AN INTERIM FACILITY AND IT'S ELIMINATON ISPART OF THE EAST WEST GATEWAY SECTION 208 REGIONAL WATERQUALITY MANAGEMENT PLAN.
CONSTRUCT DEEP TUNNEL TO CONVEY WASTEWATER FROM THEFENTON WWTF TO THE BAUMGARTNER TUNNEL, FOR TREATMENT ATTHE LOWER MERAMEC WWTF.
THIS PROJECT ALSO ELIMINATES MERAMEC BOTTOMS PUMP STATION489 AND FORECEMAIN, PER THE CAPACITY ASSURANCE EVALUATIONREPORT.
§¨¦55
§¨¦270
§¨¦55 KERTHMA
T
T
I
S
GRAVOIS
WELLSKELLERMERAMEC BO T T O M AMBSKENNE
R
L
Y
T
H
EI
SSEA
S
T
CONCORD
AL
L
E
N ALSWELLSC H U E S SLERMENTZHILL
R IN G ERB A UERB U T L E R HIL L
GREENTONPO I N T E
CARIBEEHAWKINSGE
R
A
L
D
KE
M
P
F
HAGEMANNOLSENGREGORY
DIERSPRIVATE
MAIN
RI VERCURVE VALMEYERTESCORDMAN G OWAT
SO
N
GATESBURY
DANTONAIREGRIFFINA C O RN LANGTREEVALLEYSIDEFUCHSFIJIBAHNFYRENU
L
S
E
N
OP
P
S
FERN BEACHED LOUCLAYRIDGESTARLITATLNTIC LARKINLITTLEROCKTIOGA
COYL
E
TOWNE SO UTHBAUER
PRIVATEPR
I
VATEPRIVATE AMBS
HAWKINSPRIVATE
T E S S ONFERRYRDLEMAYFERRYRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11746
Wastewater
11
$3,500,000
Various
Meramec
Meramec Tributary Areas
Capital
67Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MALINE CREEK CSO BP 051 & 052 LOCAL STORAGEFACILITY (CHAIN OF ROCKS DR TO CHURCH DR)
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
CONTROL OF COMBINED SEWER OVERFLOWS IS REQUIRED BY THECONSENT DECREE.
CONSTRUCT A 28-FOOT DIAMETER UNDERGROUND COMBINED SEWERSTORAGE FACILITY 3,000 FEET IN LENGTH, A 12.5 MGD PUMP STATION,AND ASSOCIATED COLLECTOR SEWERS.
FIRST YEAR OF A PROJECTED FIVE YEAR CONSTRUCTION PROJECT.TOTAL CONSTRUCTION BUDGET IS $85,000,000.HALLELIAS
FONTAINE
MELVINNEWBYHARLAN
MARIAS
JORDANWALDORFLEBON
ORAN
GUSTAVDONNELL
LOWELLNASSAU
CHAIN OF ROCKS
JENNINGSSTATION
RAFORD
G
A
S
T
JACKSON
TROY FILIBERTDUENKE RIV ER RUNRIVER TRAIL
P O R T L A N D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11656
Wastewater
11
$211,000
St. Louis City
Bissell
Maline Creek
Capital
68Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
NATURAL BRIDGE RD - DARBY TO CHEVROLETCOMBINED SEWER RELIEF
Design Services
6660 - SanitaryReplacement Fund
OVERCHARGED COMBINED SEWER MAINS RESULTING IN BUILDINGAND OVERLAND FLOODING.
REPLACE 1,100 FEET OF 36-INCH TO 42-INCH COMBINED SEWER WITH54-INCH COMBINED SEWER, AND REPLACE 10 SINGLE INLETS WITHDOUBLE INLETS.
F
E
R
RIS GOODFELLOWHAMILTONDARBYM
C
A
R
T
H
URKIENLEND
R
E
S
S
ELL
BRENNAN
CHEVROLETG
R
I
M
S
H
A
WDARDENNE
NAYL
O
R
LEXINGTON
HAMILTONNAT
U
R
A
L
B
R
I
D
G
E
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12536
Wastewater
11
$200,000
St. Louis City
Bissell
Harlem
Capital
69Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
PRIVATE INFLOW/INFILTRATION PUBLICENGAGEMENT PROGRAM 2013
Professional Services
1101 - General Fund
PRIVATE SOURCES OF STORMWATER ENTER THE SANITARY SEWERSYSTEM CAUSING OVERFLOWS AND BUILDING BACKUPS.
PUBLIC ENGAGEMENT PROGRAM FOR OUTREACH REGARDINGREMOVAL OF PRIVATE STORMWATER SOURCES, THE CONSENT DECREE,& OTHER WET WEATHER RELATED COMMUNICATIONS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11699
Wastewater
16
$565,000
Various
Various
Various
Asset Management
70Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RADAR RAINFALL DATA (FY2014)
Vendor Services
1101 - General Fund
ESTIMATED PIPE FLOWS FROM INFLOW AND INFILTRATION DUE TORAIN EVENTS ARE NEEDED TO PROPERLY CALIBRATE HYDRAULICSYSTEM MODELS.
INTEGRATE EXISTING RAIN GAUGE NETWORK WITH RADAR IMAGING,FOR USE IN CONJUNCTION WITH FLOW METERING,INFLOW/INFILTRATION STUDIES, AND HYDRAULIC MODELCALIBRATIONS. SERVICES MAY BE RENEWED THROUGH FY2016 BASEDON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11702
Wastewater
16
$130,000
Various
Various
Various
Asset Management
71Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RDP TRIBUTARIES & UPPER RDP CSO CONTROLS& LOWER MERAMEC SYSTEM IMPROVEMENTS(WATERSHED CONSULTANT)
Professional Services
6660 - SanitaryReplacement Fund
MAJOR WASTEWATER SYSTEM CONTROLS ARE REQUIRED TO OBTAINCONSENT DECREE COMPLIANCE.
PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING,ANALYSIS, AND DESIGN SERVICES FOR MAJOR WASTEWATER SYSTEMCONTROLS, TO MEET CONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. PROJECTMAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦270
§¨¦70§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦64 §¨¦270
§¨¦55
§¨¦170
§¨¦255
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11153
Wastewater
16
$400,000
Various
Various
Various
Asset Management
72Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RDP TRIBUTARIES & UPPER RDP CSO CONTROLS& LOWER MERAMEC SYSTEM IMPROVEMENTS(WATERSHED CONSULTANT)
Professional Services
1101 - General Fund
MAJOR WASTEWATER SYSTEM CONTROLS ARE REQUIRED TO OBTAINCONSENT DECREE COMPLIANCE.
PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING,ANALYSIS, AND DESIGN SERVICES FOR MAJOR WASTEWATER SYSTEMCONTROLS, TO MEET CONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. PROJECTMAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦270
§¨¦70§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦64 §¨¦270
§¨¦55
§¨¦170
§¨¦255
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11153
Wastewater
16
$500,000
Various
Various
Various
Asset Management
73Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL
Pre-Design Services
6660 - SanitaryReplacement Fund
COMBINED SEWER OVERFLOWS IN THE DEER, BLACK, HAMPTON, ANDCLAYTONIA WATERSHEDS REQUIRE MAJOR SYSTEM CONTROLS TOOBTAIN CONSENT DECREE COMPLIANCE.
CONSTRUCT 12,000 FEET OF 20-FOOT DIAMETER TUNNEL, DEWATERINGPUMP STATION, AND CONSOLIDATION PIPING, TO PROVIDE A STORAGEVOLUME OF 28 MILLION GALLONS.
§¨¦64
§¨¦44
§¨¦170
§¨¦64 §¨¦170
M A N C H ESTER R DS LINDBERGH BLVDWATSONRDCHIPPE W A B LVD
N KIRKWOOD RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12441
Wastewater
11
$600,000
Various
Lemay/RDP
Deer Creek
Capital
74Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
REAVSDALE I/I REDUCTION (MACKENZIE RD ANDREAVIS BARRACKS RD)
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE I/I CAUSING BUILDING BACKUPS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
§¨¦55HALEMACKENZIEIONE UNIONRADIORADIOM
REAVIS TIBERL EMONA
REAVISBARR
A
C
KS
SOUTHVIEW
NEMO
ZEN ITHBRENDABURLINGTONNORTHERNSANTAFEERIEPORTFORMAN
RIP
A
MOHEGAN
DANAE
V
A
NDALE
AVILATALBOT
JEFFLEIGHUPLAND
KOERBER
SHAPFIELDPANCHO MONTBROOKDORISANN
EIF
F
E
L
ANCHOR
L
Y
DEL
L
ARVIN
PRIVATEPAPOOSEVILLARIDGECISCOARROW HOWERTONSEQUOIA
MADAFORDBLACKHAWK
CAYUGA
CASAROSA
B L A C K P O O L
BONTONBREUERATW
OOD
VASEL
HUNTINGDONJUDITH
DA M S O NJACHURST
BERWICK
SONTAG
ALPINE
AFFTON WARRIORASTERWILMA
MARYVALECHAMBLINNIGER
SHUFFLEVIAVENETO
EUCALYPTUS ZANECHESTERTONPAULINE
WAGER
APLEYLABETTELENARD
AMONA
HALLOCK
CITADEL
BUNK ERHILLFLAGLERALPINE
PR IVA T E
ARVIN
ZENITHDANADANA§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12420
Wastewater
11
$485,000
Unincorporated
Lemay/RDP
Gravois Creek
Capital
75Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SPRINGDALE I/I REDUCTION (ROLLING DR ANDSMITHFIELD PL)
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12025.
§¨¦70
§¨¦170
§¨¦170
HANLEYM
ETRO
LINK
WESTSHIRLEYRAMONASPRINGDA LEEVANS
GEIGER
LADALINKMALINEENGLEREDGARCONNORSARGENT
LACKLANDMARCELLA
TR
U
M
B
E
L
L
BO
S
T
O
N
JANE
ST HENRYA LVA
GARVIN
ELAI
N
E
SPUR
MAYBELLEBOLBECHERCRANBERRY
TORII
J E N N YWEL D O N
CARSON
T
O
R
CHLAMP
RANCHS E V E R IN
APPLEBERRYL
OG
ANBERRY
PAR K
MEDORA KATHERINE
RAMONALAKE
MEDORAMETROLINK
RAMONA
NATURAL
B
RI
D
GE
RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12209
Wastewater
11
$130,000
Bel-Ridge
Bissell
Maline Creek
Capital
76Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STREAM FLOW GAUGE OPERATION ANDMAINTENANCE (USGS)
Vendor Services
1101 - General Fund
DATA IS REQUIRED TO DETERMINE URBAN RAINFALL/RUNOFFRESPONSE OF WATERSHEDS AND IS UTILIZED FOR WATER QUANTITYAND QUALITY EVALUATION OF STREAMS.
CONTINUE THE STREAM GAUGE DATA COLLECTION PROGRAM INCONJUNCTION WITH WASTEWATER AND STORMWATER PLANNING ANDDESIGN EFFORTS, AND TO SUPPORT REPORTING WHICH IS REQUIREDPURSUANT TO THE CONSENT DECREE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10766
Unallocated
16
$570,000
St. Louis City and County
Various
Various
Asset Management
77Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STREAM FLOW WATER QUALITY SAMPLING (FY2014)
Vendor Services
1101 - General Fund
STREAM SAMPLING IS REQUIRED TO DOCUMENT WATER QUALITYCHANGES PER IMPLEMENTATION OF THE CSO LTCP, SSO ELIMINATION,& STORMWATER MANAGEMENT PROGRAMS.
PERFORM SAMPLING AND ANALYSIS OF STREAM WATER QUALITYWITHIN THE MSD SERVICE AREA. SERVICES MAY BE RENEWEDTHROUGH FY2016 BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11916
Unallocated
16
$625,000
Various
Various
Various
Asset Management
78Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UNION CREEK I/I REDUCTION (I-55 BETWEEN SLINDBERGH BLVD AND BUCKLEY RD)
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE I/I CAUSING BUILDING BACKUPS AND OVERCHARGEDSANITARY SEWERS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
§¨¦55
§¨¦270 UNIONWIL
L
GRE
E
N
P
A
R
K
CORDESVONTALGEBURLINGTONNORTHERNS A NTAFEMUELLERKOHRSPO
P
L
A
RRUSTYANTIGOLINVALLEFLORIALIXCAMINOLANPATSYTIMMDILLON PECANYUMA
FORESTDA L E
JAC
I
N
T
O
BUCKLEYLARKINDACE
JA
C
K
I
E
HAWKSTONE
VIA M IR A L ESTADRUSO
MCCORRY
CON CO R D VIC
T
O
R
Y
ANI
T
A SPOKANEARCTICACTONCHEVRONBERVIEWMANOR BANISTEREVE
R
G
R
E
E
N
COACHELLA
MA
L
U
S
AD W O RTHBISTATEINDUSTRIALCRESCENTDOHACKANDORACA
L
E
FGREENPARKINDUSTRI
A
L
B
ARTH
PINOAKG
UEHRING DOLPHSOUTHTOWNEME
H
L
V
I
E
W
RIT
Z
OP
A
L BIRCHLOIS
SAX
O
N
GAPS
C
H
COUWELS
RODAPA
PINE HILL GENEPRI
V
A
T
EJUNIPER
EL
C
H
A
R
SUNRISEYUMABUCKLEYVIC
T
O
R
Y
VIC
T
O
R
YLEMAY FERRY RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12240
Wastewater
11
$565,000
Unincorporated
Lemay/RDP
Gravois Creek
Capital
79Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UNIVERSITY CITY SANITARY STORAGE FACILITY(HAFNER CT)
Design Services
6660 - SanitaryReplacement Fund
SANITARY STORAGE IS NECESSARY IN THE UNIVERSITY CITYWATERSHED FOR FLOW ALLOCATION TO THE LEMAY TREATMENTFACILITY DURING WET WEATHER EVENTS.
CONSTRUCT A 6.5 MILLION GALLON UNDERGROUND STORAGEFACILITY.82NDCANTON
81STGRANTFAIRVIEWBRADDOCK
WESTOVERHAFNERGLENSIDEVAUGHANMENDELLBLANCHA GROBYLAUGHRENARCHER
ELMORE
RICHARD LAUGHLINORCHARD
V A RDAM A N
COOLIDGE
PRESIDIO
BRIAR
MALIBOU
BRADDOCK
MENDELLOLIVE BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11992
Wastewater
11
$3,100,000
University City
Lemay/RDP
University City Branch
Capital
80Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
VALCOUR AND BURLINGTON RR SANITARYRELIEF AND I/I REDUCTION (VALCOUR RD ANDWATSON RD)
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE I/I CAUSING BUILDING BACKUPS AND OVERCHARGEDSANITARY SEWERS.
CONSTRUCT 1,800 FEET OF 12-INCH SANITARY SEWER AND REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS.
WEBER VALCOURHEEGE
NEW HAMPSHIRELACLEDE STATIONCHESHIRE
DELMA
ARDALECRAIGHILL VITA
STAFFORD
HOSMER CHIVVISLANGLEY
LACONIA
LAWNSIDEGENERALSHERMAN
FE
R
N
B
ROOK
CREEKVIEWMARLTO NGRA
M
OND
MARVALEWEBSHIREPALMETTOV A L BROOKLARRY DELBURLINGTON
NORTHERN
SANTA
FE
HORS TBLUEWATER RABETHDARLOW
ROCKSPRING
WATERFORD
ROCKHAVENHAMPSTEADMIDDLEVALLEYRICHFORD COLLEENPIL
G
RIM
SECURITYGRANDVISTACREST INDUSTRIALHI
G
H
L
A
NDHOUSE
PRIVATE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12253
Wastewater
11
$994,000
Unincorporated
Lemay/RDP
Mackenzie Creek
Capital
81Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WEBSTER GROVES TRUNK E SANITARYREHABILITATION AND I/I REDUCTION PHASE III
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS DUE TO OVERCHARGED AND DETERIORATEDSANITARY SEWERS.
REHABILITATE PUBLIC SEWERS USING THE CURED IN PLACE PIPEMETHOD.
§¨¦44BERRYUNIONPACIFIC
LOCKWOOD
KIRKHAM
GRAYDICKSONEDGARLACLEDESTATIONGOREOLD WARSON
NEWPORT
GLENDALE
BURLINGTO
N
N
O
R
T
H
E
R
N
S
A
N
T
A
F
E
LEE
ELMCLARK
BOMPARTHANLEYSAPPINGTONESSEX
HOLMESMAPLEODAYLILACBELLBAKER
BISMARK
JACKSON
BROWNELL
ARGONNE
ATALANTAGL ENBRENTWOODOAK TREE
EUCLID
LITHIABENNETTMADISON
P ACIFIC
PLANTBACON
SUMMITJOYLOUISADAMS
MADGE
ANDREWJEFFERSONSYLVESTERSCOTT OA KGILBERT
O A K L A N D SALEMPARKMARYAUSTINFAIRVI EWHOLLANDMCKINLEY
IOLAREAVISNORTH
YEATMANG A R D E NROCK HILLG
R
ANTPAPIN
IMSEKORTWRIGHTSPRINGFO RESTCLARAHOLLYWOODDESPERES WILSHUSENWAYMIRE
ALMASELMAJOANNA
EUNICE
DOBBIN
RAVENSRIDG
E
HIGHHAMP TONFIELDSTON
VICTORIA
WARWICK
MOODY
ARBOR
HULLRUTHBUSCHTYLEREAST PORTERGROVE
COLLEGE HILLDALELOCKSLEYCEDARWOODLAWNGASLITE
MABELMINTURN ROCK HILLOAKSELMAELMBERRY
ELMELMSUMMIT
MA
P
L
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11677
Wastewater
11
$270,000
Webster Groves
Lemay/RDP
Deer Creek
Capital
82Page
22 April 2015
Page 1 of 6
WASTEWATER CONSTRUCTION PROJECTS - FY16
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11993 82ND STREET TO I-170 SANITARY RELIEF (UR-
08, UR-09)
$500,000 83
11776 ALPINE DRIVE SEPARATE SEWER I/I REMOVAL $110,000 84
11776 ALPINE DRIVE SEPARATE SEWER I/I REMOVAL $680,000 85
11682 BALLAS ROAD SUBTRUNK SOUTH I/I
REDUCTION
$550,000 86
10407 BAUMGARTNER & BLACK FOREST SANITARY
REPLACEMENT PHASE II
$2,100,000 87
12060 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2016)
CONTRACT A
$4,880,000 88
12434 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2016)
CONTRACT D
$4,532,000 89
11923 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2016)
CONTRACT E
$4,550,000 90
11685 BISSELL HILLS SANITARY RELIEF/CALUMET I/I
REDUCTION (BP-317)
$290,000 91
11686 BISSELL POINT I/I REDUCTION (BP-619)
(VALLEY DR)
$610,000 92
11883 BLACK CREEK SANITARY SEWER AND I/I
REDUCTION
$2,200,000 93
11719 BRINWOOD I/I REDUCTION $300,000 94
11719 BRINWOOD I/I REDUCTION $650,000 95
11790 CAULKS CREEK FORCEMAIN (RIVER VALLEY
RD TO L-52)
$6,600,000 96
11720 CAULKS CREEK TRUNK SEWER (SKME-011)
PHASE I
$4,000,000 97
11009 CHANDELLAY DR. SANITARY SEWER
REPLACEMENT
$570,000 98
11115 CLAVERACH PARK I/I REDUCTION AND SEWER
SEPARATION
$1,700,000 99
22 April 2015
Page 2 of 6
WASTEWATER CONSTRUCTION PROJECTS - FY16
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11115 CLAVERACH PARK I/I REDUCTION AND SEWER
SEPARATION
$280,000 100
11723 COLDWATER CREEK WATERSHED I/I
REMOVAL - SHARON STUDY AREA (N
LINDBERGH BLVD AND LINDSAY LN)
$77,000 101
11726 COLDWATER SANITARY RELIEF SECTION B, C
& D WET WEATHER STORAGE FACILITY TANK
C
$22,000,000 102
11146 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
$5,000,000 103
10021 DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD) PHASE I
$6,000,000 104
10576 DC-06 DEER CREEK SANITARY RELIEF PHASE
III AND I/I REDUCTION
$125,000 105
10576 DC-06 DEER CREEK SANITARY RELIEF PHASE
III AND I/I REDUCTION
$125,000 106
11851 DEER CREEK PUBLIC I/I REDUCTION (2016)$3,360,000 107
11738 DIXIE I/I REDUCTION $2,000,000 108
11739 DUCHESNE AND GOTT I/I REDUCTION $770,000 109
11744 EASEMENT ACQUISITION FOR COMBINED /
SANITARY PROJECTS (FY 2016)
$3,000,000 110
11107 EMERGENCY REPAIR FUNDS (WASTEWATER)$500,000 111
10489 FF-15 MCKELVEY/R.R. TO ADIE SANITARY
RELIEF PHASE III
$5,900,000 112
11748 FLORISSANT I/I REDUCTION $700,000 113
11932 FLORISSANT PUBLIC I/I REDUCTION $3,700,000 114
11749 FLORLAND SANITARY RELIEF PHASE I - I/I
REDUCTION
$600,000 115
11749 FLORLAND SANITARY RELIEF PHASE I - I/I
REDUCTION
$640,000 116
22 April 2015
Page 3 of 6
WASTEWATER CONSTRUCTION PROJECTS - FY16
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12626 FLOW METERING MANHOLE IMPROVEMENTS
(2016)
$400,000 117
11944 FOREST BROOK SANITARY RELIEF (SKME-003
AND SKME-016) PUBLIC REHABILITATION AND
I/I REDUCTION
$3,840,000 118
10456 FOREST BROOK SANITARY RELIEF (SKME-003
AND SKME-016) REHABILITATION AND I/I
REDUCTION
$150,000 119
11750 FORESTATE AND TEXAS SANITARY RELIEF
(SKME-513)
$1,660,000 120
11758 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2015) CONTRACT A
$70,000 121
12379 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2015) CONTRACT B
$70,000 122
12380 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2015) CONTRACT C
$70,000 123
12381 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2015) CONTRACT D
$70,000 124
11765 GRAND GLAIZE TRUNK SANITARY RELIEF
AND I/I REDUCTION (SKME-417)
$50,000 125
12569 GRAVOIS TRUNK SANITARY STORAGE
FACILITY (PARDEE LN AND PARDEE RD)
$8,000,000 126
11770 HARLEM - BADEN RELIEF PHASE IV (HEBERT)
(IMPROVEMENTS FROM BASIN TO HAMILTON
TRUNK)
$3,900,000 127
11097 HOLLY DRIVE SEWER SEPARATION $1,120,000 128
11097 HOLLY DRIVE SEWER SEPARATION $370,000 129
11709 INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY2016) CONTRACT A
$5,000,000 130
11868 INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY2016) CONTRACT B
$5,000,000 131
11705 INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2016)
$1,500,000 132
11705 INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2016)
$5,500,000 133
22 April 2015
Page 4 of 6
WASTEWATER CONSTRUCTION PROJECTS - FY16
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11711 JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
$2,500,000 134
11712 LACKLAND I/I REDUCTION $1,600,000 135
12061 LEMAY PUBLIC I/I REDUCTION (2016)$4,000,000 136
12488 LEMAY PUMP STATIONS 1 AND 2
IMPROVEMENTS
$1,750,000 137
12496 LEMAY WWTF CHANNEL AERATION BLOWERS $1,000,000 138
12501 LOWER MERAMEC RIVER WWTF SCREEN
CHANNEL IMPROVEMENTS
$700,000 139
11928 LUCAS & HUNT AND I-70 SANITARY SEWER $640,000 140
11651 LYNKIRK STUDY AREA I/I REDUCTION $200,000 141
11656 MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR TO
CHURCH DR)
$1,050,000 142
11659 MARIETTA DR STORM SEPARATION AND I/I
REDUCTION (BP-292)
$730,000 143
11659 MARIETTA DR STORM SEPARATION AND I/I
REDUCTION (BP-292)
$90,000 144
11661 MARTIGNEY I/I REDUCTION $1,000,000 145
11662 MCNULTY - PALLARDY I/I REDUCTION $1,400,000 146
11662 MCNULTY - PALLARDY I/I REDUCTION $3,200,000 147
11840 MEADOWRIDGE AND EASTWOOD STORM AND
SANITARY RELIEF
$280,000 148
11840 MEADOWRIDGE AND EASTWOOD STORM AND
SANITARY RELIEF
$830,000 149
11663 MIDLAND SANITARY RELIEF - PUBLIC AND
PRIVATE I/I REDUCTION
$350,000 150
22 April 2015
Page 5 of 6
WASTEWATER CONSTRUCTION PROJECTS - FY16
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11663 MIDLAND SANITARY RELIEF - PUBLIC AND
PRIVATE I/I REDUCTION
$810,000 151
12310 MISSOURI RIVER BONFILS SANITARY SEWER
REHABILITATION PHASE II
$2,000,000 152
11774 MISSOURI RIVER SERVICE AREA I/I
REDUCTION - CREVE COEUR CREEK EAST
$3,680,000 153
12616 MISSOURI RIVER WWTF BERM AND WATER
FEED UPGRADE
$810,000 154
12643 MISSOURI RIVER WWTF SECONDARY
TREATMENT ELECTRICAL / MECHANICAL
MODIFICATIONS
$900,000 155
10465 MISSOURI RIVER WWTP SECONDARY
TREATMENT EXPANSION (MITIGATION
CREDIT)
$150,000 156
11664 NEWCASTLE I/I REDUCTION $70,000 157
11693 NORTH BADEN CREEK I/I REDUCTION (BP-532)
(WINCHESTER DR)
$1,600,000 158
11696 PADDOCK CREEK I/I REDUCTION (PRIVATE)$1,080,000 159
11698 PICKWICK - BERNADINE - BIMINI SANITARY
RELIEF
$1,880,000 160
10737 POWELL AVE AND ANNALEE SEWER
SEPARATION
$430,000 161
11700 PROVIDENCE SANITARY RELIEF (SKME-640)$50,000 162
11700 PROVIDENCE SANITARY RELIEF (SKME-640)$750,000 163
11701 PUMP STATION REPLACEMENT PROJECTS
(PHASE I)
$950,000 164
10748 ROSEMARY, PHILO, & KATHLEEN SEWER
SEPARATION
$1,090,000 165
10748 ROSEMARY, PHILO, & KATHLEEN SEWER
SEPARATION
$1,700,000 166
11665 SELVIDGE AREA I/I REDUCTION $240,000 167
22 April 2015
Page 6 of 6
WASTEWATER CONSTRUCTION PROJECTS - FY16
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
10754 SHERWYN SANITARY RELIEF (SKME-651) AND
I/I REDUCTION
$1,200,000 168
11668 SUB-TRUNK #2 LATERAL SANITARY RELIEF $230,000 169
11898 SUPPLEMENTAL ENVIRONMENTAL PROJECTS
(SEP) PROGRAM
$500,000 170
11672 UNIVERSITY CITY I/I REDUCTION - WEST $60,000 171
11672 UNIVERSITY CITY I/I REDUCTION - WEST $915,000 172
12062 UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (WC-01)
$2,900,000 173
12063 UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (WC-02 AND WC-03)
$5,120,000 174
12435 UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (BEL-NOR)
$4,530,000 175
12436 UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (HANLEY HILLS)
$4,530,000 176
11992 UNIVERSITY CITY SANITARY STORAGE
FACILITY (HAFNER CT)
$4,000,000 177
11681 UPPER COLDWATER SECTION D I/I REDUCTION $450,000 178
11681 UPPER COLDWATER SECTION D I/I REDUCTION $970,000 179
11089 VINITA DRIVE SANITARY RELIEF $250,000 180
11678 WEBSTER GROVES TRUNK E SANITARY
REHABILITATION AND I/I REDUCTION PHASE
IV
$3,800,000 181
TOTAL:$195,334,000
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
82ND STREET TO I-170 SANITARY RELIEF (UR-08,UR-09)
Property RightsAcquisition
6660 - SanitaryReplacement Fund
UNDERSIZED SEWER. ELIMINATION OF CONSTRUCTED SSO BP-421REQUIRED. PREDECESSOR PROJECT FOR FUTURE SSO REMOVALS.
CONSTRUCT 5,800 FEET OF 15-INCH TO 30-INCH DIAMETER SEWER.ELIMINATE CONSTRUCTED SSO OUTFALL BP-421, AND FACILITATEFUTURE ELIMINATION OF MULTIPLE UPSTREAM CONSTRUCTED SSOOUTFALLS (BP-416, BP-417, BP-433, AND BP-476).
§¨¦170
§¨¦170 82ND81STMCKNIGHTOLD BONHOMME GROBYHILLTOPPR
I
CEWOODSONBALSON
B
R
A
D
D
O
C
K
ELMORE
APPLETON
GRANTRICHARD
S
H
E
R
I
D
A
N
GAYORCHARD
MILAN
TULANE
C
O
O
L
I
D
G
E
ALICE
SPOON
CANTON
A
L
A
N
S
O
N
LE PEREBERICKFULLERTONPENNELL
PRIVATEHAFNERBELL ARCHERKEMPLANDSEVILLE
CRIXDALE
VILLA LAUGHLINIROQUOIS
B
LACKBERRYMULBERRYCOLLINGWOODBON HILLS
WATSONIA ARROWHEADLOCUST
ALDANBLANCHA
BON P RICEV A R DA M A N
VILLA CAPRICHICKASAW
MAYFLOWER
ROWLANDBRISCOECOMSTOCK
ORCHARD
PRICEELMORE
RICHARD
COOLIDGE
OLIVE BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11993
Wastewater
13
$500,000
University City
Lemay/RDP
University City Branch
Capital
83Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ALPINE DRIVE SEPARATE SEWER I/I REMOVAL
Construction Task
5571 - Gravois CreekOMCI Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11927.
WEBER
MACKENZIEHALEIVY
REAVIS RADIOALICETON
ROCKHILL
ELIS
E KITVALCOURRADIOM
IONELUCIAVITALENORTIBERLEMONAALTHEAVASEL
STO
N
E
L
LLACLEDE STATIONSOUT H V I E W
BONNIE
NEMO
NIL
E
SZE NITHBRENDABUF
F
T
O
N
MAXWELL
AFFTONEDEN
ERIEPORTDELMA
RAMBLERW OLFFDANALAK
E
S
I
D
E PILOTNEIERASTEREVA
N
DALEKIDDERSTERLING
ARDALE
DARLOW
AVILAPUTT
I
N
G
T
O
N
TALBO T
WIL BESUPLAND
B E R W I CK
KOERBER ELSAPANCHO
DORISANN
ANCHOR
REAVIS BARRACKSBRINKERARVELLEN
ARVIN
PRIVATELAVERN
CISCOLINDHAL
L
HOSMER
SEQUOIA DARL
EN
E
CASAROSA
WILL
D
A
N HUNTINGDONJUDITH
DA M S ONM ARLENEPROVO ALPINE
BIXBY
LETA CHARLTONWILMAPALMETTONIGER
WHITCO
M
B
EUCALYPTUS
FELICIA
DEXTER
WAGERCONSULRAYWOOD
HALLOCKIRENEGRASSO JONMARH E R I T A G ECYRUSALPINE PI
LOTWEBER
AFFTON RADIOVA
SEL
GRAVOIS R
D
TESSONFERRYRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11776
Wastewater
15
$110,000
Unincorporated
Lemay/RDP
Gravois Creek
Capital
84Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ALPINE DRIVE SEPARATE SEWER I/I REMOVAL
Construction Task
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11927.
WEBER
MACKENZIEHALEIVY
REAVIS RADIOALICETON
ROCKHILL
ELIS
E KITVALCOURRADIOM
IONELUCIAVITALENORTIBERLEMONAALTHEAVASEL
STO
N
E
L
LLACLEDE STATIONSOUT H V I E W
BONNIE
NEMO
NIL
E
SZE NITHBRENDABUF
F
T
O
N
MAXWELL
AFFTONEDEN
ERIEPORTDELMA
RAMBLERW OLFFDANALAK
E
S
I
D
E PILOTNEIERASTEREVA
N
DALEKIDDERSTERLING
ARDALE
DARLOW
AVILAPUTT
I
N
G
T
O
N
TALBO T
WIL BESUPLAND
B E R W I CK
KOERBER ELSAPANCHO
DORISANN
ANCHOR
REAVIS BARRACKSBRINKERARVELLEN
ARVIN
PRIVATELAVERN
CISCOLINDHAL
L
HOSMER
SEQUOIA DARL
EN
E
CASAROSA
WILL
D
A
N HUNTINGDONJUDITH
DA M S ONM ARLENEPROVO ALPINE
BIXBY
LETA CHARLTONWILMAPALMETTONIGER
WHITCO
M
B
EUCALYPTUS
FELICIA
DEXTER
WAGERCONSULRAYWOOD
HALLOCKIRENEGRASSO JONMARH E R I T A G ECYRUSALPINE PI
LOTWEBER
AFFTON RADIOVA
SEL
GRAVOIS R
D
TESSONFERRYRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11776
Wastewater
15
$680,000
Unincorporated
Lemay/RDP
Gravois Creek
Capital
85Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BALLAS ROAD SUBTRUNK SOUTH I/I REDUCTION
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS,OVERCHARGING SANITARY SEWERS, AND ACTIVATING ACONSTRUCTED SSO (BP-556).
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11934.
§¨¦270
§¨¦64
§¨¦270
§¨¦64
CLAYTON
GEYERDESPERESBALLASOAKNORTH F O R T Y
CA
R
BERRY
OA K V ALLE Y SPOEDETOPPINGBRIDLEG RAYCEDAR VALLEYSELLENRICKPOSTOAK PORTL AN D
FIRETHORNCLAY C H E STER
BOPP
TWIN FAWN SROTHDUBON
WOODGATEK END
ONC H IPPE R
DUNMOR R
CREEKHAVEN
DEV O N DALEHICKORYDIVOTHARFLOCLAYMARKRANCH
MALVERN
T H ORNHILL PAMELA
SPRINGDALE
HOLIDAY
TREGAR O N
SERAMA
IRON S TONEFALLBROOK
OAKSPRINGSD U R B IN
COUNTRYSI D E
BAMBURYREVEREPUTTERDELVIN
T O P P IN G ACRES
TINDALL
B A L WYCK
BORCHERDINGGLENMARO
RIDGEFIELDMUELLER CROYDONBICKFORD
PRIVATEF R O N T E N A C F O R E ST
HICKO R Y
BOPP§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11682
Wastewater
15
$550,000
Various
Lemay/RDP
Deer Creek
Capital
86Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BAUMGARTNER & BLACK FOREST SANITARYREPLACEMENT PHASE II
Construction Task
6660 - SanitaryReplacement Fund
SANITARY BACKUPS, OVERFLOWING MANHOLES, AND OVERCHARGEDSANITARY SEWERS DURING WET WEATHER EVENTS.
CONSTRUCT 3,700 FEET OF 8-INCH TO 15-INCH SANITARY SEWER, FROM500 FEET SOUTH OF BLACK FOREST TO CHALET FOREST DRIVE.BAUMGARTNERWINDFORD
FOXFIRE
MILBURNFIRELEAFSKY H
ILL
CHALET HILLB
LAC
K
FOREST SOUTHFIELDNAHNWESTPHALIA DELOAK
OLD BAUMGARTNER
DELI
NTRYSEAGRAVEINNS
B
R
U
C
K
MOUNTAIN TOP
PIN OAK TERRACE
BIRCHHOLLOWCHALETFOREST
WALDWICK
FIRERIDGENEWBRIDGE
PRIVATE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10407
Wastewater
15
$2,100,000
Unincorporated
Meramec
Mattese Creek
Capital
87Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2016) CONTRACT A
Construction Task
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE 55,000 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11777, 11687, AND11723.
§¨¦70
§¨¦270
§¨¦170
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12060
Wastewater
15
$4,880,000
Various
Various
Various
Capital
88Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2016) CONTRACT D
Construction Task
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE 28,000 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12080, 12102, AND12237.
§¨¦270
§¨¦170 LINDBERGHLEWIS N CLARK BLVDRIVERVIEWDRL IN D B E R G H §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12434
Wastewater
15
$4,532,000
Various
Bissell
Maline Creek
Capital
89Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2016) CONTRACT E
Construction Task
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE 42,000 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 12119, 11664, AND11696.
§¨¦44
§¨¦64
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦70
§¨¦44
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11923
Wastewater
15
$4,550,000
Various
Coldwater
Coldwater Creek
Capital
90Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL HILLS SANITARY RELIEF/CALUMET I/IREDUCTION (BP-317)
Construction, Phase II
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11853.LILACTOELLEST CYR
S H EPLEY
FRY
BLUFF
SCENIC VA
L
LE
YCOBURGLANDS
BELGROVE
DARRBLISS
ADRIAN
K IL G O R E CABOT
A SHBROOKC AMERO N
HOYT
EWELLNECTAR
BURLINGTONNORTHERNSANTAFEDURNESSRENFREWCASTLELOOKAWAYDELHILEBON
MEAD
SCRANTO
NELBACOMET
COBURG
CAMBRIAATTICA
LEETONGLOUCES TERDURHAMHABECKINGHOBKIRK
BIRITZ
SURRE
Y
ADLERDOROTHYPRESLEYCRET E TRION
E
L
A
N STIMSONM A RALDOBOSW O RTH
T AYGOLDEN
FORKDIAMOND GRAMPIANHAVILAND
ROSSTWILL
JE
F
F
R
E
YMCCARTNEYBAGNELLTHRIFT DENNESSNORBRIDGEFOXPATHO D E S S A
HANSOM
SIEBE
RONT EL
PRESTIGE
LANDWEHR
ZELLWEGER DUDLEYSUNBEAM GARDOLILACSHEPLEY
CASTLEST CYRLEWIS N CLARK BLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11685
Wastewater
15
$290,000
Bellefontaine Neighbors
Bissell
Maline Creek
Capital
91Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL POINT I/I REDUCTION (BP-619) (VALLEYDR)
Construction, Phase II
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS.ELIMINATE CONSTRUCTED SSO OUTFALL BP-619.
PROJECT COMPLETES A PORTON OF SYSTEM IMPROVEMENTSNECESSARY TO REMOVE CONSTRUCTED SSO BP-619. PUBLIC I/IREDUCTION INCLUDED IN PROJECT 11925.LILACTOELLELOOKAWAYS H EPLEY
FRY
BLUFF
SCENIC VA
L
L
EY
B ELGROVE
DARRBLISSC OBURGL A NDSADRIANCABOT
C AMERO N
HOYT
EWELLSPRINGGARDENA SHBROOKBURLINGTONNORTHERNSANTAFENECTAR
ST CYR DURNESSRENFREWLEBON
SCRANTO
NELBA COBURG
G L E N GARRYLEETON
A S H FORDKILGORE
GLOUCESTERHABECKINGHOBKIRK
BIRITZ
SURRE
Y
DUN
D
E
E
DOROTHYPRESLEYTRION
E
L
A
N
FORE S T HOME STIMSONM A RALDOBOSWORTH
T AYFORKDIAMOND GRAMPIAN
ROSSJE
F
F
R
E
YMCCARTNEYBAGNELLTHRIFT DENNESSFOXPATHO D E S S A
HANSOM
RONT EL
LANDWEHR
ZELLWEGER DUDLEYGARDOLILACST CYR
SHEPLEY §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11686
Wastewater
15
$610,000
Various
Bissell
MISSISSIPPI RIVER (CITY)
Capital
92Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BLACK CREEK SANITARY SEWER AND I/IREDUCTION
Construction Task
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS.
REMOVE EXCESSIVE I/I FROM THE PUBLIC SEWER BY CONSTRUCTING1,100 FEET OF 8-INCH SANITARY SEWER AND BY REMOVING PRIVATE I/ISOURCES FROM SANITARY SEWERS.
SCOPE OF WORK ORIGINALLY PART OF PROJECT 11689.
§¨¦170
§¨¦170
DELMAR
PRICELADUE
LAYDIELMANFORSYTH
BRENTWOODMCKNIGHTCORNELL
M E T R O L IN K
O LD BONHO
M
M
E
MARYLANDBEMISTON
DAVIS
GROBY
MERAMECWE
N
N
E
K
E
R HANLEYLAFON
FRANC
I
S NORTH N SOUTHWARDERCELLALE PEREJACKSONTOPTONAHERN
GANNON
CENTRALCLAYTON LINDENDREXEL
P
OLO
H
U
NTERBERICKRIO VISTAYORK
ST A N DREWSGRANADATEASDALEGAY
BRAE
B
U
R
NGRAYBRIDGE 81STWYDOWN
AMHERST
BONHOMME
BARBYENFIELD
PR IV A T E
CRANDONWESTWOODDROM
A
RABON AIREINDIAN
BALSON
GLEN E A G L ESOLETAWASHINGTON
LITTLE
LEECARONDELETBERKLEY
CARSW O L DBONHILLSGEOFFRYKINGSBURY
DAYTONA
REAR
BLACK CREEK DUKETERRYDELCRESTRYEVILLA
MISSIONWHITE ROSEEXMOORLORENZOSAXONYWATSONIA
ORLANDO
SUDBURYMCKNIGHTGAYVILLA
PRIVATEHANLEYPRIVATE
P
R
I
V
A
T
E
B A LSON
GAY§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11883
Wastewater
15
$2,200,000
Various
Lemay/RDP
Black Creek
Capital
93Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BRINWOOD I/I REDUCTION
Construction Task
5564 - Coldwater CreekOMCI Fund
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 1,000 FEET OF 8-INCH TO 18-INCH SANITARY SEWER, 900FEET OF 12-INCH STORM SEWER, AND REMOVE PRIVATE I/I SOURCESFROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11854.
LIN
D
S
A
Y
CH
A
R
B
O
N
I
E
RPAUL
KEE
V
E
N
MU
L
L
A
N
P
H
Y
FLO
R
D
A
W
N
J
ENKEE EST
E
S
FLA
M
I
N
G
O
KINGSFORD
LOE
K
E
S LOVELANDCENTRALHU
M
E
S
ASP
E
N
LAY
V
E
N
DO
V
E
SU
N
S
E
T
P
A
R
K
SW
A
L
L
O
WSWANDEWAYNEFLI
C
K
E
R
BLU E HERON
PRATTBLUEBIRD
PRIVATE NIGHTMANORALBERTHARKEEMOSELLEJACKSON
NAOMIRIVERWOODESTATES
DA
V
I
D
TEA
K
W
O
O
D
M
A
N
O
R
RIVERWOODTRAILS
DEL
R
E
Y
BOBBINRAY MERCURYTHRUSHFR A N CISCA
HIG
H
S
U
N
DOWNINGRONDABLUFF PARKSGERALDRAYMONDBLACK PINEBOBOLINKMO
N
T
E
R
E
Y
MERRIHAMM E S
MIL
L
E
RTORER OSUCASA MALLARDELWOODRHAPSODYCLOVERMERE
SHIRL EYMU
N
D
Y
ALANDALEMARY ANNPARAKEETP
RI
V
ATE
ALBERTPRIVATE
PRIVATENAOMINIGHTPRI
V
A
T
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11719
Wastewater
15
$300,000
Florissant
Coldwater
Coldwater Creek
Capital
94Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BRINWOOD I/I REDUCTION
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 1,000 FEET OF 8-INCH TO 18-INCH SANITARY SEWER, 900FEET OF 12-INCH STORM SEWER, AND REMOVE PRIVATE I/I SOURCESFROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11854.
LIN
D
S
A
Y
CH
A
R
B
O
N
I
E
RPAUL
KEE
V
E
N
MU
L
L
A
N
P
H
Y
FLO
R
D
A
W
N
J
ENKEE EST
E
S
FLA
M
I
N
G
O
KINGSFORD
LOE
K
E
S LOVELANDCENTRALHU
M
E
S
ASP
E
N
LAY
V
E
N
DO
V
E
SU
N
S
E
T
P
A
R
K
SW
A
L
L
O
WSWANDEWAYNEFLI
C
K
E
R
BLU E HERON
PRATTBLUEBIRD
PRIVATE NIGHTMANORALBERTHARKEEMOSELLEJACKSON
NAOMIRIVERWOODESTATES
DA
V
I
D
TEA
K
W
O
O
D
M
A
N
O
R
RIVERWOODTRAILS
DEL
R
E
Y
BOBBINRAY MERCURYTHRUSHFR A N CISCA
HIG
H
S
U
N
DOWNINGRONDABLUFF PARKSGERALDRAYMONDBLACK PINEBOBOLINKMO
N
T
E
R
E
Y
MERRIHAMM E S
MIL
L
E
RTORER OSUCASA MALLARDELWOODRHAPSODYCLOVERMERE
SHIRL EYMU
N
D
Y
ALANDALEMARY ANNPARAKEETP
RI
V
ATE
ALBERTPRIVATE
PRIVATENAOMINIGHTPRI
V
A
T
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11719
Wastewater
15
$650,000
Florissant
Coldwater
Coldwater Creek
Capital
95Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CAULKS CREEK FORCEMAIN (RIVER VALLEY RDTO L-52)
Construction Task
6660 - SanitaryReplacement Fund
EXISTING FORCEMAIN IS UNDERSIZED AND THIRTY YEARS OLD.
CONSTRUCT 17,000 FEET OF 30-INCH FORCEMAIN AND 1,000 FEET OF36-INCH SANITARY SEWER.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 17. TOTAL BUDGET IS $14,000,000.CENTRAL MIDLANDRIVER VALLEYHOG HOLLOWCREVE
COE
U
RMI
LLWATERWO
R
K
SJOHNPELLET
PRIV
A
T
E
WATER W
ORKS
G L E N COVERIDGECRE STR IDGET RAILLAKERIVERBEND
AMIOT
R ID G E C RESTCO L IS E U M
S P Y G L A S S
PRIVATE
PRIVATE
PRIVATE
OLIVEBLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11790
Wastewater
15
$6,600,000
Maryland Heights
Missouri
Caulks Creek
Capital
96Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CAULKS CREEK TRUNK SEWER (SKME-011) PHASEI
Construction Task
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 14,200 FEET OF 8-INCH TO 36-INCH DIAMETER SANITARYSEWER.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 17. TOTAL BUDGET IS $7,270,000.
V
A
L
L
E
Y
STRECKER
S
H
EPARDOR R V I L L E
CL A Y TONJOESINDIANTREEMCBRIDEPOINTE SUNMEADOWQU
A
E
T
H
E
M
PR I V ATEGARD EN RIDGE
K E H R S RID
G
E
A
NNASL ONECAB I N
WILL STRACELASIANDRA
PEPPERMILLC
HIPPENHAM
HIG
HLANDSUMMIT
AUTUMNRUNBASKIN FARM
THIEL
RIDGLEY WOODS
BEAR VALLEYLEWISSPRINGFARMS
YULETIDETRAILHIGHLAN DVALLEYPRIVATE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11720
Wastewater
15
$4,000,000
Wildwood
Missouri
Caulks Creek
Capital
97Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CHANDELLAY DR. SANITARY SEWERREPLACEMENT
Construction Task
6660 - SanitaryReplacement Fund
CRACKED AND COLLAPSED SANITARY SEWER AND AN INVERTEDSIPHON LEADING TO BUILDING BACKUPS.
CONSTRUCT 1,180 FEET OF 8-INCH SANITARY SEWER AND 155 FEET OF8-INCH PIPE IN TUNNEL.
C
R
A
I
G
BARKMAN CHANDELLAYSPRUCE HAVEN
TIMBERWOODH O L L Y SPRINGSSU M M ERHAVENSHADYSIDEGOLDLEAFSPRUCEORCHARDWATERWO
O
D
JEANNE H
ILLS
CRAI
G
V
I
E
W
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11009
Wastewater
15
$570,000
Unincorporated
Missouri
Fee Fee Creek
Capital
98Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CLAVERACH PARK I/I REDUCTION AND SEWERSEPARATION
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE I/I IN THE SANITARY SYSTEM.
CONSTRUCT 650 FEET OF 12-INCH STORM SEWER, AND REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS.HANLEYWYDOWN
WISE
CLAYTON
ETHEL
YORK
HOOVER
PAR K
FORSYTH
AUDUBONBYRON
BOLANDRI
DGEMOOROXFORD
NORTHMOOR
ASBURYH ILLVALEPARKDALE
LIL
EWESTWOODH
A
M
P
T
ONPARKSHEPLEY
CROMWELL
CLAYTONIASOUTHMOORLANDSWELLINGTON
ARCHMETROLIN
K
BUCKINGHAMEDGEWOOD
HIGHLANDBROADVIEWSAN BONITA
BELLEVUERALPHCEN
TE
R
SHIRLEY
PRIVATE
OAKKNOLLHILLSIDEARTHUR
BENNETTDARTFORDARUNDEL
ST RITAPOLOBRENTMOOR
EDWARDABERDEEN
SURREY HILLSWALINCA
REAR
CREST
WOODC L A V E RACHCONCORDIAHARCOURTFOREST
SOUTHMOOR
T U S C ANYARCHIVESFORESTRIDGE
OAKLAND
PRIVATE
PRIVATEBRENTM O O R
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11115
Wastewater
15
$1,700,000
Clayton
Lemay/RDP
Black Creek
Capital
99Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CLAVERACH PARK I/I REDUCTION AND SEWERSEPARATION
Construction Task
5566 - Deer CreekOMCI Fund
EXCESSIVE I/I IN THE SANITARY SYSTEM.
CONSTRUCT 650 FEET OF 12-INCH STORM SEWER, AND REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS.HANLEYWYDOWN
WISE
CLAYTON
ETHEL
YORK
HOOVER
PAR K
FORSYTH
AUDUBONBYRON
BOLANDRI
DGEMOOROXFORD
NORTHMOOR
ASBURYH ILLVALEPARKDALE
LIL
EWESTWOODH
A
M
P
T
ONPARKSHEPLEY
CROMWELL
CLAYTONIASOUTHMOORLANDSWELLINGTON
ARCHMETROLIN
K
BUCKINGHAMEDGEWOOD
HIGHLANDBROADVIEWSAN BONITA
BELLEVUERALPHCEN
TE
R
SHIRLEY
PRIVATE
OAKKNOLLHILLSIDEARTHUR
BENNETTDARTFORDARUNDEL
ST RITAPOLOBRENTMOOR
EDWARDABERDEEN
SURREY HILLSWALINCA
REAR
CREST
WOODC L A V E RACHCONCORDIAHARCOURTFOREST
SOUTHMOOR
T U S C ANYARCHIVESFORESTRIDGE
OAKLAND
PRIVATE
PRIVATEBRENTM O O R
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11115
Wastewater
15
$280,000
Clayton
Lemay/RDP
Black Creek
Capital
100Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
COLDWATER CREEK WATERSHED I/I REMOVAL -SHARON STUDY AREA (N LINDBERGH BLVD ANDLINDSAY LN)
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12060.
LIN
D
S
A
Y
PAULHU
M
E
S
KE
E
V
E
N
CH
A
R
B
O
N
I
E
R
EST
E
S
MU
L
L
A
N
P
H
Y
LOE
K
E
S
AS
P
E
N
FLO
R
L
A
N
D
LIL
A
C
WASHINGTON
FLI
C
K
E
R
RUE
S
T
D
E
N
I
S
JE
N
K
E
E
MANRESA ST JEANBO
U
L
D
E
R
KO
S
T
K
A
SW
A
L
L
O
W
RU
T
H
MA
D
I
S
O
N
JEFFERSONWRE
N
BEL
L
A
R
M
I
N
E
FLOR ABLU
E
B
I
R
D
CAMPIONRYA
N
MANORTYSO N
LAY
V
E
N RADFORDFLIGHTNAOMIRUE ST JEANHAR
R
I
S
O
N
FLO
R
D
A
W
N LOVEDEWAYNE
ROS E TTADEL
R
E
Y
LAFAYETTEVE
RLENE
MERCURYGO
N
Z
A
G
ACORTEZ SAL
L
YFRANCISCA
CLARKBA
B
L
E
R
FLA
M
I
N
G
O
LO YOLA
RA
V
E
N
RUE ST CHARLESLILARONDAST CHARLESGERALDVIOLETCLAVERMO
N
T
E
R
E
Y
MERRITHO
M
P
S
O
N
BLANCHETTEHAMM ES
MIL
L
E
R
DANIELBOO
N
ETOREROVESPERBR
U
C
E
CARMELITA MCNULTYMESCA
L
E
R
O
MATERDIE
MY
R
T
L
E
LINKOUSLA VENTAFLOWERIDGEST FERDINANDLA SIERRAALANDALESAN MATEOJEA
N
E
T
T
E
CHE
R
R
Y
D
A
L
E
HU
N
D
L
E
Y
MEN
K
E
LIM
E
D
A
L
E
ST PIERRESPRINGWOOD PLACET O R EROASPENGERALD
NAOMILIN D B ERGH
LINDBERGH§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11723
Wastewater
15
$77,000
Florissant
Coldwater
Coldwater Creek
Capital
101Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
COLDWATER SANITARY RELIEF SECTION B, C & DWET WEATHER STORAGE FACILITY TANK C
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFILTRATION CAUSING OVERCHARGED SANITARYSEWERS.
CONSTRUCT AN 8 MILLION GALLON, 180 FOOT DIAMETER SANITARYWET WEATHER STORAGE TANK.
§¨¦270§¨¦270
DUNN
FO
R
D
PERSHALL
POLSONTA
Y
L
O
R
NORFOLK
SOU
T
H
E
R
N
NORFOLKSOUTHERN§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11726
Wastewater
15
$22,000,000
Hazelwood
Coldwater
Coldwater Creek
Capital
102Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CSO VOLUME REDUCTION GREENINFRASTRUCTURE
Construction Task
1101 - General Fund
CONTROL AND REDUCTION OF COMBINED SEWER OVERFLOWS AREREQUIRED BY THE CONSENT DECREE.
INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCESTORMWATER VOLUMES TO THE COMBINED SEWER SYSTEM.
THIS PROJECT TO BE IMPLEMENTED IN COOPERATION WITH THE CITYOF ST. LOUIS AND OTHER AGENCIES. MAY INCLUDE CAPITAL ANDNON-CAPITAL SERVICES.
§¨¦70
§¨¦270
§¨¦55
§¨¦64
§¨¦44
§¨¦170
§¨¦64 §¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11146
Wastewater
15
$5,000,000
Various
Bissell
Various
Non-recurring
103Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DC-02 & DC-03 SANITARY RELIEF (BRENTWOODBLVD TO CONWAY RD) PHASE I
Construction Task
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY TRUNK SEWER.
CONSTRUCT 5,000 FEET OF 6-INCH TO 78-INCH SANITARY SEWER TOALLEVIATE SURCHARGING. ELIMINATE CONSTRUCTED SSO OUTFALLBP-545, AND FACILITATE FUTURE REMOVAL OF BP-170, BP-198, BP-348,BP-349, BP-155, AND BP-591.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 17. TOTAL BUDGET IS $11,000,000.GLENBELLBRENTWOODELMMADGE
MARYTHORNTON
RUSSE
L
L
MARSHALL
WAYMIRE
FLORENCE
CORNELLUNIONPACIFICPENDLETONPRIVATEBRAZEAU
ATALANTA RUTHLITHIA
MERRITT
MANDERLYPOWELL
CRAWFOR
D
HILLDALECOLLIERR
O
CKF
ORDJOSEPH
MASON
HOLLANDLAWNDELL
ALMENTOR
ALLISONREASNOR
MAGDALEN
WILLIS BOMPARTKIRKHAMBREMERTONC
R
E
V
E
C
O
E
U
R
KEYSTONE
BREMERTONWILLIS
GLENATALANTA
PRIVATE
GLENMARYCOLLIERBOMPARTMANCHESTER RD §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10021
Wastewater
15
$6,000,000
Brentwood
Lemay/RDP
Deer Creek
Capital
104Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DC-06 DEER CREEK SANITARY RELIEF PHASE IIIAND I/I REDUCTION
Construction, Phase II
5566 - Deer CreekOMCI Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 800 FEET OF 12-INCH STORM SEWER, AND REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS.
LADUE GRAESERMOSLEYPRIV ATECRAIGDAUTELRUNNYMEDESCHULTE
ROND E L A Y
FIESTA
SONAAL D E N
BALHARB
O
URLARKINOFFIC
E
TU R E ENFAIRWAYS
SP O EDEDAYK IN
OLD BALLASDEAVERTRIESTE
RENEELEISURE
OLDOLIV E STREET
ALLE GROO LDE C A B I N
BENWOOD
MARFORDSHERWYNTRILANE
COUNTRY FAIRMOR WOODNASS AULAWREN C E
SPOEDE HILLS
Q U A I L W A Y S
MOSLEY HILL CO U NTR Y V IE W
MOSLEY ACRES
SPOEDE WOODS
W
O
O
D
S
H
I
RECOLONIAL HILLSMOSLEY FOREST
CHALET
N
O
B
L
E
M
A
N
HUNTINGTONBARBEEFARON HILL
GRAESON
WEDGEWOOD
C
R
A
I
G
PRIVATE
CRAIG OLIVE BLVD §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10576
Wastewater
15
$125,000
Various
Lemay/RDP
Deer Creek
Capital
105Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DC-06 DEER CREEK SANITARY RELIEF PHASE IIIAND I/I REDUCTION
Construction, Phase II
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 800 FEET OF 12-INCH STORM SEWER, AND REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS.
LADUE GRAESERMOSLEYPRIV ATECRAIGDAUTELRUNNYMEDESCHULTE
ROND E L A Y
FIESTA
SONAAL D E N
BALHARB
O
URLARKINOFFIC
E
TU R E ENFAIRWAYS
SP O EDEDAYK IN
OLD BALLASDEAVERTRIESTE
RENEELEISURE
OLDOLIV E STREET
ALLE GROO LDE C A B I N
BENWOOD
MARFORDSHERWYNTRILANE
COUNTRY FAIRMOR WOODNASS AULAWREN C E
SPOEDE HILLS
Q U A I L W A Y S
MOSLEY HILL CO U NTR Y V IE W
MOSLEY ACRES
SPOEDE WOODS
W
O
O
D
S
H
I
RECOLONIAL HILLSMOSLEY FOREST
CHALET
N
O
B
L
E
M
A
N
HUNTINGTONBARBEEFARON HILL
GRAESON
WEDGEWOOD
C
R
A
I
G
PRIVATE
CRAIG OLIVE BLVD §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10576
Wastewater
15
$125,000
Various
Lemay/RDP
Deer Creek
Capital
106Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK PUBLIC I/I REDUCTION (2016)
Construction Task
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 29,600 FEET OF PUBLIC SEWERS USING THE CURED INPLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11964, 10851, 11965,AND 11713.
§¨¦64
§¨¦270
§¨¦44
§¨¦170
§¨¦270
§¨¦170 §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11851
Wastewater
15
$3,360,000
Various
Lemay/RDP
Deer Creek
Capital
107Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DIXIE I/I REDUCTION
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 1,500 FEET OF 8-INCH TO 12-INCH STORM SEWER ANDREMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11926.
§¨¦70
WOODSONBROWNNORTH
WISMERWRIGHTEMINENCEASHBYBALTIMORE
BOBB
GUTHRIE
ARGYLEDIXSIMSPOEREXSTJOACHIMJANEBURTONKREMGERALDINECOLESGORDONWINDOMBOSWELLTHORPE
TUDOR MARSHALLMARGOANN
CHAUCERST LOUISROY
PASTEURAIRWAYHAROLD
SANJOSEFAIRFIELDORLANDOCARLYLE
MCKIBBONHERBERTARLINE
BATAAN
H O L T WOOD
STKAT HERINE
MARVINTIP TONSTELLAQUIETLEITH
CALVERTISOLDASTGREGORYTENNYSONBRISTOL
ST ANN
MCNULTY
EDMUNDSONW INNCORREGIDOR
SUNCRESTMURIEL
MILTONROYALTONTRAV E RSE
EASTRIDGETUTWILER
PATRICK
MACON
GOCKEROSLANEDMUND
ANGELODELTA
KATHLYN
STCHARLES
AMBRO
EDMILST JOANDEHARTLIVINGSTON
JOELWESTWISE
AERO SPACE
OSGOODHOL
T
W
I
C
KST MONICAELSARONALDMECCAFAIRWAY
LYNROSRATONST DENNIS
ST JEROME
BUDERJANET
BRECKENRIDGENACE GORDONMURIEL BROWNDIXTENNYSONBRISTOL
KATHLYN
MARVINHAROLD
AIRWAYCALVERTGORDONMILTONBATAAN
CALVERTBOSWELLSIMSSIMSCALVERTREX§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11738
Wastewater
15
$2,000,000
Various
Coldwater
Coldwater Creek
Capital
108Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DUCHESNE AND GOTT I/I REDUCTION
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 1,220 FEET OF 12-INCH SANITARY SEWER AND REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS. ELIMINATECONSTRUCTED SSO OUTFALL BP-129.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11926.
§¨¦270§¨¦270 DUNN
PERSHALL
LATTY CLOVERWILLIAMSFLORA
BARTO
ELBRINGANISTASIAGOTTBERKRIDGEBASCOMYOUNGBECKER
MORANCAPRIJEAN WA
S
H
I
N
G
T
O
N
CONNOLLYGAHAN
BUDDIE
D
E
S
M
E
T
S
A
D
O
N
I
A
ELM
A
R
G
O
REASOR CADYP RIVA T E
GLADYS
GRETHERS T M A U RICE
ZURICHJACKLIN MILBANKN
I
EBOELLNERBRACKLEIGHCALVERTON
ST
M
A
R
KSTEVE LYNN MEADOWSDUC
H
ESNE
LARIAT
W A D S WORTHCLEARVIEW
MARLACRENAST PATRICELAUPHERSTOLAF
S
PRING
ST
M
A
T
T
H
E
W
HATINA STG REGORYCHATEAUST MADELEINE
ST FLORENT
ST JAMES
RYAN LA HAVRETROTWOODMIDWOODCLAIREST GENEVIE
V
E
BUDDIE BUDDIE
GLADYS
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11739
Wastewater
15
$770,000
Various
Coldwater
Coldwater Creek
Capital
109Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
EASEMENT ACQUISITION FOR COMBINED /SANITARY PROJECTS (FY 2016)
Property RightsAcquisition
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY AND COMBINEDSEWERS.
EASEMENT ACQUISITION BUDGET FOR CAPITAL IMPROVEMENT ANDREPLACEMENT PROGRAM WASTEWATER PROJECTS.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11744
Wastewater
13
$3,000,000
St. Louis City and County
Various
Various
Asset Management
110Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
EMERGENCY REPAIR FUNDS (WASTEWATER)
Construction Task
4122 - WastewaterEmergency Fund
AGING AND DETERIORATED SEWER STRUCTURES CAN FAIL WITHOUTNOTICE, CREATING EMERGENCY SITUATIONS IN WHICH THE DISTRICTMUST ACT IMMEDIATELY.
PROVIDE A PLACEHOLDER APPROPRIATION FOR THE EMERGENCYFUND, TO FACILITATE EMERGENCY RESPONSE AS NEEDED.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11107
Wastewater
15
$500,000
Various
Various
Various
Asset Management
111Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FF-15 MCKELVEY/R.R. TO ADIE SANITARY RELIEFPHASE III
Construction, Phase I(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
THE THIRD AND FINAL PHASE OF A MULTI-PHASE PROJECT. THIS PHASECONSISTS OF THE CONSTRUCTION OF 4,700 FEET OF 8-INCH TO 42-INCHSANITARY SEWER SOUTH OF SCHUETZ ROAD.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 16. TOTAL BUDGET IS $11,900,000.
ADIEFEE FEESCHUETZCHAFFEEMIKELNORFO LKSOUTHERNGRISSOMMETROROCK ISLANDNORTHLI
NEINDUSTRIALF
AIR
G
ROVE INDUSTRIAL
CENTERLINE INDUSTRIALNORTHLINE INDUSTRIAL
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10489
Wastewater
15
$5,900,000
Maryland Heights
Missouri
Fee Fee Creek
Capital
112Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FLORISSANT I/I REDUCTION
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 1,000 FEET OF 8-INCH TO 15-INCH SANITARY SEWER ANDREMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11932.
§¨¦270
§¨¦170
§¨¦270
§¨¦170
FROSTH ANLEYST ANTHONY
P E RS H A L L WA
S
H
I
N
G
T
O
N
DERHAKE
DUNN WATERFORDLAFAYETTEE
LIZ
A
B
E
T
H
JANUARY
ST CATHERINE
GRAHAMBOONEEVAHUDSON
ST M
A
R
I
E
HARRISON
REASORJEFFERSONST J
O
S
E
P
H
LATTY CASTELLOPOWELLMIDWOODWABAS
H CLOVERWILLIAMSFLORA
MAPLE
BARTO
STLOUIS
A L L ENELBRINGF
L
O
RLAND
C A L VER TONOLYMPIA
NYFLOT
SMITHKE
E
V
E
N
T H A T C HERYOUNGSADDLESTEINMORANCAPRIJEANELM
ST
C
I
N
ALDER ZURICHN
E
W
H
A
L
L
S
F
E
R
R
Y
STD E N I S
FORDPR I VATE STOLAFST PATRICEGAHANROMISSTRINITYAL
M
A
CARMONATANEYROBERT
ROGERS
NARA
JACKLIN
B O ELLNERTORLINACADILLAC
MA
N
O
R BON AIREPOLSONSTEED
STARLIGHTWILSHIRESTMARK
LILAAVANT
SCOTTEISELEBR
U
C
E
DERBY
LAUPHERHEATHER
REGIN
A
SLUSSER
RIDGELAWN
S
T
J
O
A
N
THATCHERPRIVATELATTY PR I V ATE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11748
Wastewater
15
$700,000
Various
Coldwater
Coldwater Creek
Capital
113Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FLORISSANT PUBLIC I/I REDUCTION
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE PUBLIC I/I ENTERING SECTIONS OF THE PUBLIC SANITARYSEWER SYSTEM THAT ARE DEFECTIVE.
REHABILITATE 44,800 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 11748.
§¨¦270
§¨¦170
§¨¦170
FROST
ST ANTHONY
DUNN
HANLEYWAS
H
I
N
G
T
O
N
PERSHALLGRAHAM WATERFORDST CATHERINE
LATTYLAFAYETTE E
L
I
Z
A
B
E
T
H
ST M
A
R
I
E
REASOR
HAR
R
I
S
O
N
MIDWOODCLOVERBOONEWILLIAMSFLORA
MAPLE
BARTO
STLOUIS
ALLENAUBUCHON
ELBRINGC A LVER T ONNYFLOT
YOUNGKINGSLEYJEFFERSON
BECKER
MORANCAPRIJEAN SADDLEELM
D E R H AKE
JONASSTCHARLESHAZELWOODZURICHBUCKEYE MILBANKH U D SON
STDENI S
S T EDWARDCADYGAHANROMISSTRINITY PADDOCKRIDGEHOLLINSFORDSTJACQUESALDERCARMONATANEYROGERS
SIELOFF LARRYBROWNA
R
G
O
BROWERP R IV ATE GRANDVIEWPUEBLOST M A U R ICE
ST REGISST EDITHJACKLIN
B OELLNERMA
N
O
R BON AIRELYNNMEADOWSWILSHIRESTMA
RKKNOLLLILA
DUCHESNE
R O B INWOODMOONLIGHTCASTELLOSTNICHO LA S
KNOLLWAYST JEANLOMOND
REGIN
A
SLUSSER
CARMEL
BARAT
HOLLY
R
E
E
B
CHARTIERST STEPHEN
ERMANDAP E RSHALL
DERHAKE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11932
Wastewater
15
$3,700,000
Various
Coldwater
Coldwater Creek
Capital
114Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FLORLAND SANITARY RELIEF PHASE I - I/IREDUCTION
Construction Task
5564 - Coldwater CreekOMCI Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 2,600 FEET OF 12-INCH STORM SEWER AND REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11854.
KE
E
V
E
NPAUL
TAH
O
E
FLO
R
D
A
W
N
CO
A
C
H
W
A
Y
YA
Q
U
I
CH
A
R
B
O
N
I
E
R
LIN
D
S
A
Y
LOE
K
E
S
HO
L
I
D
A
Y
CO
A
C
H
L
I
G
H
T
KO
S
T
K
A
LAY
V
E
N
FLO
R
L
A
N
D
LYN
N
H
A
V
E
N CANISIUSTES
O
N BROWERL
AMPLIGHT
MANRESAQU
E
E
N
A
N
NLILACAMPIONPRATTOLIVETO
BEL
L
A
R
M
I
N
E
FLOR AHA
Z
E
L
V
A
L
L
E
YALBERTRADFORDAVI
O
N NAOMIROS E TTANAPLESOLIANLOY
OLA
RIVERWOODTRAILS MERCURYBOR
G
I
A
GO
N
Z
A
G
A
CRO
F
T
D
A
L
E
CARRIA
G
ECA
N
D
L
E
L
I
G
H
TFOX T R AILDOWNING
HA
V
E
N
T
R
E
E GERALD
CLAVERMO
N
T
E
R
E
Y
GE
R
A
R
D
P
A
R
K
ACORNTRAIL
A VANT
THO
M
P
S
O
N
BLANCHETTEPRIVATERAYMONDLANDIHOLLY RIVEREN
CIN
O HAMMESFOXC R E STDEVILLERIVERWOO
DESTATES
BR
U
C
E
CARMELITA
FOXFIELDCA
P
O
S
E
L
L
E
GEORGETOWNMESCA
L
E
R
O
MATERDIELINKOUS
CAIONELA VENTAFLOWERIDGEINDUSTRIAL ALANDALESIR LORDSJEA
N
E
T
T
E
SPRINGWOOD PLACEGARNIERPRATTMA
N
R
E
S
A
PRI
V
A
T
E
N AOMIPRI
V
A
T
EALBERT
NLINDBERGHBLVDLINDBERGH§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11749
Wastewater
15
$600,000
Various
Coldwater
Coldwater Creek
Capital
115Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FLORLAND SANITARY RELIEF PHASE I - I/IREDUCTION
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 2,600 FEET OF 12-INCH STORM SEWER AND REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11854.
KE
E
V
E
NPAUL
TAH
O
E
FLO
R
D
A
W
N
CO
A
C
H
W
A
Y
YA
Q
U
I
CH
A
R
B
O
N
I
E
R
LIN
D
S
A
Y
LOE
K
E
S
HO
L
I
D
A
Y
CO
A
C
H
L
I
G
H
T
KO
S
T
K
A
LAY
V
E
N
FLO
R
L
A
N
D
LYN
N
H
A
V
E
N CANISIUSTES
O
N BROWERL
AMPLIGHT
MANRESAQU
E
E
N
A
N
NLILACAMPIONPRATTOLIVETO
BEL
L
A
R
M
I
N
E
FLOR AHA
Z
E
L
V
A
L
L
E
YALBERTRADFORDAVI
O
N NAOMIROS E TTANAPLESOLIANLOY
OLA
RIVERWOODTRAILS MERCURYBOR
G
I
A
GO
N
Z
A
G
A
CRO
F
T
D
A
L
E
CARRIA
G
ECA
N
D
L
E
L
I
G
H
TFOX T R AILDOWNING
HA
V
E
N
T
R
E
E GERALD
CLAVERMO
N
T
E
R
E
Y
GE
R
A
R
D
P
A
R
K
ACORNTRAIL
A VANT
THO
M
P
S
O
N
BLANCHETTEPRIVATERAYMONDLANDIHOLLY RIVEREN
CIN
O HAMMESFOXC R E STDEVILLERIVERWOO
DESTATES
BR
U
C
E
CARMELITA
FOXFIELDCA
P
O
S
E
L
L
E
GEORGETOWNMESCA
L
E
R
O
MATERDIELINKOUS
CAIONELA VENTAFLOWERIDGEINDUSTRIAL ALANDALESIR LORDSJEA
N
E
T
T
E
SPRINGWOOD PLACEGARNIERPRATTMA
N
R
E
S
A
PRI
V
A
T
E
N AOMIPRI
V
A
T
EALBERT
NLINDBERGHBLVDLINDBERGH§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11749
Wastewater
15
$640,000
Various
Coldwater
Coldwater Creek
Capital
116Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FLOW METERING MANHOLE IMPROVEMENTS(2016)
Work Order Repair Costs(Capital)
6660 - SanitaryReplacement Fund
TYPICAL MANHOLES DO NOT PROVIDE UNIFORM HYDRAULICS WHICHIMPACTS FLOW METERING DATA ACQUISITION.
REPLACE EXISTING AND/OR INSTALL NEW MANHOLES DESIGNEDSPECIFICALLY TO IMPROVE HYDRAULICS AND FACILITATE FLOWMETERING.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12626
Wastewater
17
$400,000
Various
Various
Various
Capital
117Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FOREST BROOK SANITARY RELIEF (SKME-003 ANDSKME-016) PUBLIC REHABILITATION AND I/IREDUCTION
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE I/I CAUSING SEWER SURCHARGING AND BUILDINGBACKUPS.
REHABILITATE 47,700 FEET OF 8-INCH TO 15-INCH SANITARY SEWER,3,000 FEET OF 12-INCH TO 48-INCH STORM SEWER, AND 277 MANHOLES,TO REDUCE I/I INTO THE SANITARY SYSTEM.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 10456.
ADIE
PAGE
ASHBYSCHUETZLINKW
A
R
SONC
E
N
TR
AL
MIDLAND
LACKLAND
B
A
L
L
BAURFEEFEE
OAK ENTITYS
C
H
U
L
T
E BRUNOPEM
B O RMAN
S
CHAEFE
R
THORPEDECKER
MADDOX
C H IE F T A IN
RIDGE
GR
A
E
L
E
R
D O R SETTWURDACK
MILLPARK
RESEARCHK
R
ATKY
DRIVERCON
COURSEWARNEN
TRENTON
VIL L A D O R A D O
VAN
CLEVE
CHAFFEECLARENDON
G A N DYLINPAGETIVOLI
FAIRVIEWLACKLINK
PORT DIANEBOOTH
M O M A R T E
GUELBRETHCRAIG VIEW
D E C O R A HPRIVATELAKENIBLIC
BOYLSTON
WAYCROFF
MIDWEST INDUSTRIALFOWLERPROUHET
C H A N DE LL AY
TU XFORDQUEENSWAYMEDIAWE
A
THERBY
ARC
SC H E N K BONANZACINNAMON
PAS T UREROCK ISLAND
RAEVERNABRISTONHARLEYTRENTON
OAK
PRIVATE NLINDBERGHBLVDN
LIN
D
BERGHBLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11944
Wastewater
15
$3,840,000
Various
Missouri
Fee Fee Creek
Capital
118Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FOREST BROOK SANITARY RELIEF (SKME-003 ANDSKME-016) REHABILITATION AND I/I REDUCTION
Construction, Phase II
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11944.
§¨¦270
§¨¦270 ASHBYPAGE
ADIE
W
A
RSONSCHU
E
TZ
DIELMANFEEFEELINKWOODSONSIMSBALTIMORE
CENTR
A
L
MIDLAND BURNSFLORA
UNIONPACI F I CWRIGHT
SPOEDERIDGEROSS
S
C
H
U
L
T
EBA
L
L HIGHBAUR
D
AUTELTEMPO
DRIVER
NIBLIC DIXWELDONOL
DBONHOMME
BRECKENRIDGE
POESMILEYLITZ
REXME
S
ATRESCOTTMETROAMELING
OAKBORMAN
ENGEL HOODMOSLEYMEEKSKREMDYER
EMERSONDELORDCAN T ERMAR
S
SC
HA
E
F
E
R
ST FRANCIS
GUELBRETHGASSTHORPE
STUDT
P
R
I
CELAKELANSINGRESEARCHHILLTOPSCHULTEHILLPRIVATEGRI
SS
OMCRAIGCRAIG V I E WOLD DORSETTTEALWOOD
ZYKAN PASTEURWISMERUCEYLEWURDACK
MORROW
SAN JOSEWARNEN
IVAN
OLIVAIREDUNSTONFIE S T A
SONAFAIRVIEWLONGMONT HAROLD
BROUSTERANDESEASYDALEYRENEEROSLAN
BULLERPLUMEASTHAMAMBRO
ARC
ESSEX
VILLAFEEFEE
PRICESCHULTEC
R
A
I
G PRICEADIEROSSDIXCANTER
OLIVE BLVDNLINDBERGHBLVD §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10456
Wastewater
15
$150,000
Various
Missouri
Fee Fee Creek
Capital
119Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FORESTATE AND TEXAS SANITARY RELIEF(SKME-513)
Construction Task
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING A CONSTRUCTED SSO.
CONSTRUCT 2,500 FEET OF 15-INCH SANITARY SEWER. ELIMINATECONSTRUCTED SSO OUTFALL BP-389.
GRANT
WEBERROCKHILL
MUSICKALICETONVALCOUR
PR IVATEELIS
E
SUN
R
AY
LENORREAVISLACLEDE STATIONVASEL
STO
N
E
L
L NEW HAMPSHIREBONNIE
ZINZERBUF
F
T
O
N
R ALEIGH
AFFTONEDENDELMA
LAK
E
S
I
D
E
WOLFFMCNARYROCK FORESTKIDDERMAYOARDALE
BU
L
L
R
U
N
FERNALDCHARRETTE
WIL BESB E R W I CK
GR
A
N
T
V
I
E
W
NAVA R REARVELLEN
BROOK M E RE GRANTWO OD
STAFFORDHOSMERSKYLINE
GRANTPARKSTOLZ
M ARLENE
KNOLLSHIREPROVOMISSY BURNTOAKLETA
CA
P
I
L
I
A
CONSULL A RKSPUR REAVIS PARKANTRIM SECURITYGRASSO
H E R I T A G EGLENSHIRE CYRUSPR
I
VA
T
EPRIVATEPRIVATE
AFFTON
M I S S Y
GRAVOIS
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11750
Wastewater
15
$1,660,000
Grantwood Village
Lemay/RDP
Gravois Creek
Capital
120Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2015) CONTRACT A
Appraisal Services
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SCAPITAL PROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2017BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11758
Unallocated
12
$70,000
Various
Various
Various
Non-recurring
121Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2015) CONTRACT B
Appraisal Services
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SCAPITAL PROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2017BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12379
Unallocated
12
$70,000
Various
Various
Various
Non-recurring
122Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2015) CONTRACT C
Appraisal Services
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SCAPITAL PROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2017BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12380
Unallocated
12
$70,000
Various
Various
Various
Non-recurring
123Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2015) CONTRACT D
Appraisal Services
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SCAPITAL PROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2017BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12381
Unallocated
12
$70,000
Various
Various
Various
Non-recurring
124Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GRAND GLAIZE TRUNK SANITARY RELIEF AND I/IREDUCTION (SKME-417)
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. ELIMINATECONSTRUCTED SSO OUTFALL BP-062.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11924.
CLAYTON
CLAYMONT
HOLLOWAYHIGHVIEWVLASISHILLSDALECRESTLA N D
IVYSKYLINESUNSETCORALMIMOSAALGONQUIN
PAR
KPROVIDENCE
SHIRLEYBRIARWYC K
W E S TW OOD
SEVENTRAILS
K EN ILW O RTHELMCRESTG
R
E
E
NBRI
ARSTREI
F
FCLAYHEATH CORONADO
WHITETREEPACKFORDNORTHMOOR
BIRCHWOODMO
N
T
I
C
E
L
L
O
NANTU
C
K
ET
P
R
I
VATEMEA
D
O
W
BROOK
LO G HILLAPPLEGATERAUSCHER
LINDELL
MONROE M IL L
SMITH
GANA
H
L
S P R A G U E SMILLBOLTONCHURCHILL
ORCHARDGLENNKEHR SMILLHATTERASANTIOCH
WELLSHIRE
HAPPYROMINELAKEWOODWATFORDDALE
MIMOSAPRIVATEMANCHESTER RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11765
Wastewater
15
$50,000
Ballwin
Meramec
Grand Glaize Creek
Capital
125Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GRAVOIS TRUNK SANITARY STORAGE FACILITY(PARDEE LN AND PARDEE RD)
Land Purchase
6660 - SanitaryReplacement Fund
WET WEATHER I/I CAUSING SYSTEM SURCHARGING ANDCONSTRUCTED SSO ACTIVATION.
CONSTRUCT SANITARY STORAGE FACILITY TO STORE WET WEATHERSANITARY FLOW, TO MITIGATE SURCHARGING AND ELIMINATE TWOCONSTRUCTED SSOS.
PA
R
D
E
E
GRA
N
T
ARBANBR
O
O
K
V
I
E
W
W H IT ECLIFFPARKPRIVATELODGE POLELURLINESILVERCRESTSIGNATURE PRIVATEPRIVATEWATSON RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12569
Wastewater
13
$8,000,000
Crestwood
Lemay/RDP
Gravois Creek
Capital
126Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HARLEM - BADEN RELIEF PHASE IV (HEBERT)(IMPROVEMENTS FROM BASIN TO HAMILTONTRUNK)
Construction Task
6660 - SanitaryReplacement Fund
STREET FLOODING AND BUILDING BACKUPS DUE TO OVERCHARGEDCOMBINED SEWERS.
CONSTRUCT 5,550 FEET OF 12-INCH TO 108-INCH STORM SEWERS, 540FEET OF SANITARY SEWERS, AND 3,240 FEET OF SEWER LINING IN THECITY OF ST. LOUIS.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 17. TOTAL BUDGET IS $7,800,000.BELTCLARATERMINAL
ST L
O
U
I
S
TERR
Y
GRE
E
R
GOODFELLOWMAFF
I
T
T
LABA
D
I
E
BURDSEMPLEROO
S
E
V
E
L
T
HERB
E
R
T
PALM
WAB
A
D
A
LOT
U
S
KENN
E
R
L
YHAMILTONHIGH
L
A
N
D
SEL
BER
AS
H
L
A
N
D BROWNKIENLENSIEMERSARLINGTONPOW
E
R
S
ST E
D
W
A
R
DROWAN
WAB
A
D
A TERMINAL
MAFF
I
T
THAMILTONGRE
E
R
KENN
E
R
L
Y
TERR
Y
GRE
E
R
HIGH
L
A
N
D
ASHL
A
N
D
NATURALBRIDGERD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11770
Wastewater
15
$3,900,000
St. Louis City
Bissell
Harlem
Capital
127Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HOLLY DRIVE SEWER SEPARATION
Construction Task
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWERS ACTIVATING A CONSTRUCTED SSO.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS ANDCONSTRUCT 2,050 FEET OF 8-INCH TO 24-INCH STORM SEWERS, AND 150FEET OF SANITARY SEWERS. PROJECT WILL LEAD TO FUTUREELIMINATION OF CONSTRUCTED SSO OUTFALL BP-617.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11927.ELMROSE
TULIPHOLLY BELTONOLD WATSONROCK HILLWEXFORDDRAKE
PEARL
TURF
JONQUI
LGARDENIAROSEELM
TULIP
DRAKETURF §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11097
Wastewater
15
$1,120,000
Webster Groves
Lemay/RDP
Mackenzie Creek
Capital
128Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HOLLY DRIVE SEWER SEPARATION
Construction Task
5593 - Sem Br Of RiverDes Peres OMCI Fund
OVERCHARGED SANITARY SEWERS ACTIVATING A CONSTRUCTED SSO.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS ANDCONSTRUCT 2,050 FEET OF 8-INCH TO 24-INCH STORM SEWERS, AND 150FEET OF SANITARY SEWERS. PROJECT WILL LEAD TO FUTUREELIMINATION OF CONSTRUCTED SSO OUTFALL BP-617.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11927.ELMROSE
TULIPHOLLY BELTONOLD WATSONROCK HILLWEXFORDDRAKE
PEARL
TURF
JONQUI
LGARDENIAROSEELM
TULIP
DRAKETURF §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11097
Wastewater
15
$370,000
Webster Groves
Lemay/RDP
Mackenzie Creek
Capital
129Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
INFRASTRUCTURE REPAIRS (REHABILITATION)(FY2016) CONTRACT A
Construction Task
6660 - SanitaryReplacement Fund
OLDER, DAMAGED, AND DETERIORATED SANITARY AND COMBINEDSEWERS THROUGHOUT THE DISTRICT RESULT IN I/I, OVERFLOWS, ANDBUILDING BACKUPS.
USE THE CURED IN PLACE PIPE LINING PROCESS TO REHABILITATEDETERIORATED SEWER LINES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11709
Wastewater
15
$5,000,000
Various
Various
Various
Capital
130Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
INFRASTRUCTURE REPAIRS (REHABILITATION)(FY2016) CONTRACT B
Construction Task
6660 - SanitaryReplacement Fund
OLDER, DAMAGED, AND DETERIORATED SANITARY AND COMBINEDSEWERS THROUGHOUT THE DISTRICT RESULT IN I/I, OVERFLOWS, ANDBUILDING BACKUPS.
USE THE CURED IN PLACE PIPE LINING PROCESS TO REHABILITATEDETERIORATED SEWER LINES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11868
Wastewater
15
$5,000,000
Various
Various
Various
Capital
131Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
INFRASTRUCTURE REPAIRS(SANITARY/COMBINED - FY2016)
Work Order Repair Costs(Non-Capital)
1101 - General Fund
DAMAGED AND DETERIORATED INLETS, MANHOLES, SEWERS OROTHER INFRASTRUCTURE ARE IN NEED OF REPAIR OR REPLACEMENT.
AS PROBLEMS ARE IDENTIFIED THROUGHOUT THE DISTRICT,CONTRACTS WILL BE PROMPTLY ISSUED THROUGHOUT THE FISCALYEAR FOR NEEDED INFRASTRUCTURE REPAIRS OR REPLACEMENT.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11705
Wastewater
17
$1,500,000
Various
Various
Various
Asset Management
132Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
INFRASTRUCTURE REPAIRS(SANITARY/COMBINED - FY2016)
Work Order Repair Costs(Capital)
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED INLETS, MANHOLES, SEWERS OROTHER INFRASTRUCTURE ARE IN NEED OF REPAIR OR REPLACEMENT.
AS PROBLEMS ARE IDENTIFIED THROUGHOUT THE DISTRICT,CONTRACTS WILL BE PROMPTLY ISSUED THROUGHOUT THE FISCALYEAR FOR NEEDED INFRASTRUCTURE REPAIRS OR REPLACEMENT.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11705
Wastewater
17
$5,500,000
Various
Various
Various
Asset Management
133Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
JEFFERSON BARRACKS TUNNEL (LEMAY WWTPTO MARTIGNEY PS)
Land Purchase
6660 - SanitaryReplacement Fund
EXISTING COLLECTION SYSTEM IS UNDERSIZED FOR CURRENTCONDITIONS. PORTIONS OF THE SYSTEM ARE VULNERABLE TODAMAGE IN HIGH RIVER CONDITIONS.
CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER DEEP TUNNEL,ELIMINATING THE MARTIGNEY (P-306) AND JEFFERSON BARRACKS(P-305) PUMP STATIONS.
AN ESTIMATED $200,000 OF THIS BUDGET ITEM WILL BE USED FORAMEREN UTILITY RELOCATION NECESSARY TO ENABLE PROJECTCONSTRUCTION.
§¨¦255
§¨¦55
§¨¦255
§¨¦55
UNIONPACIFICKOCHRIVERK
INSWOOD GREGGREAVIS
B
A
R
R
ACKSFOR
D
E
R CCCGRANTLIN
D TELFOR D
HOFFM
E
IS
T
E
R
ARLEE
S
HERMAN
MILDGENTRYFAIN
IONE
PRIVATEJOPLINCLIFFRINGER
SHE R ID A NPO
T
T
L
E
ORI
E
N
T
RIP
A
LUNAPOP
L
A
R
GARK
WILL LARKCLAGEROUTE R
VICTORY AVENUE HBOUNDARYHO
R
N
JEFFERSONIAN
PAU
L
E
HAL S EYFIRSTPECAN
A
S
HROCK
JAC
I
N
T
O
SOUTHSHIRE
ARRA
S
J
E
FFERSONBLUE RIDGEBANISTERALL
E
N
LI
S
I
E
U
X KASKEBUNKERBIRCHP
R
IVATETELEGRAPHR DLEMAYFERRYRD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11711
Wastewater
13
$2,500,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
134Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LACKLAND I/I REDUCTION
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 600 FEET OF 8-INCH SANITARY SEWER AND REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11871.
§¨¦170
§¨¦170BROWNLACKLAND
NORTH
WOODSONARGYLE
MCKIBBONDIXOLDENREXBURTON
BALTIMORECOLES
WINDOMEMINENCETUDOR
MILTONGASSMARSHALLTENNYSON
H O L T W OOD
TRESCOTT
ST LOUISROY
FORESTPASTEURAIRWAY
WISMERBOSWELLHOODLESLIEGORDONGOODALEORLANDOARLINE
BURNSEVERMAN GRACELAND HILLEMANHUMEMARVINSIMS
MARLOWE STELLAQUIETCALVERTBENSON
BRISTOL
GILROSEWALLISDAWESVERONAEDMUNDSONADDIEEZRA
SPENCERASHLANDSUNCRESTWENGLERGAEBLERROYALTONHARTLANDDAVID
OAKLANDMAVIS
SHE
L
L
E
Y CHARLACKANGELOGOTHLANDJOELCROCUS
HAGNER
HUNTINGTONAPACHELINDSCOTTMECCAANNAPOLISLATROBE
SHAWNEE
DOYLE
BRECKENR
I
D
G
EDIXBRECKENRIDGETENNYSON
SPENCERFOREST
BRISTOL
TENNYSONWALLISWISMERBURNSTUDOR
BRISTOL
MARSHALLMILTON REXAIRWAYMILTONCALVERTT
E
N
N
Y
SO
N ROYCALVERTHOODMILTONCHARLACKST
C
H
A
R
L
E
S
R
O
C
K
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11712
Wastewater
15
$1,600,000
Various
Coldwater
Coldwater Creek
Capital
135Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY PUBLIC I/I REDUCTION (2016)
Construction Task
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE 75,900 FEET OF PUBLIC SEWERS USING THE CURED INPLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 11990, 11989, AND11667. SUPPLEMENTAL APPROPRIATION IN FY 17. TOTAL BUDGET IS$6,800,000.
§¨¦55
§¨¦44
§¨¦270
§¨¦255
§¨¦270
§¨¦255
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12061
Wastewater
15
$4,000,000
Various
Lemay/RDP
Various
Capital
136Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY PUMP STATIONS 1 AND 2 IMPROVEMENTS
Construction Task
6660 - SanitaryReplacement Fund
AGING AND FAILING SYSTEMS IN NEED OF REPLACEMENT ANDUPGRADE TO ENSURE CONSENT DECREE COMPLIANCE.
CONSTRUCT MECHANICAL GATE REPLACEMENT, UPGRADEELECTRICAL SYSTEMS AND SWITCH GEAR, AND UPGRADE PUMPS.
FY16 CONSTRUCTION BUDGET IS FOR EQUIPMENT PROCUREMENT,WITH THE BALANCE OF CONSTRUCTION WORK FUNDED IN FY17.
MA
R
C
E
A
U
HU
R
C
K
DA
V
I
SVIRGINIA
CA
T
A
L
A
NMINNESOTANEL
L
I
E
ES
P
E
N
S
C
H
I
E
DIDAHOAD
E
L
I
A
PENNSYLVANIAFAN
N
I
E WEBERMICHIGANLUX
E
M
B
U
R
G MICHIGANMICHIGANLEMAY FERRY RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12488
Wastewater
15
$1,750,000
St. Louis City
Lemay/RDP
River Des Peres
Capital
137Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY WWTF CHANNEL AERATION BLOWERS
Construction Task
6660 - SanitaryReplacement Fund
IMPROVEMENTS TO CHANNEL AIR FLOWS AND CONTROLS ARENEEDED.
INSTALL CHANNEL AIR BLOWERS, CONSTRUCT NEW AUXILIARYBLOWER BUILDING, AND REPLACE CHANNEL AIR DIFFUSERS.
P
R
I
V
A
T
E
ETTA
H
O
F
F
M
E
I
S
T
E
R
WEI
S
S
UNION PACIFICMANN
RUBYHOR
N
CARTWRIGHT
UNION PACIFICUNION PACIFICUNIONPACIFICP
R
I
V
A
T
E
PRIVATEUNION PACIFICP
R
I
V
A
T
E
UNIONPACIFIC§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12496
Wastewater
15
$1,000,000
St. Louis County
Lemay/RDP
Lemay Creek
Capital
138Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC RIVER WWTF SCREENCHANNEL IMPROVEMENTS
Construction Task
6660 - SanitaryReplacement Fund
SCREEN CHANNELS CORRODING DUE TO CHEMICAL EXPOSURE.
INSTALL SCREEN CHANNEL COATING SYSTEM TO REPAIR AND PROTECTTHE STRUCTURE FROM CHEMICAL DAMAGE.FINEPRIVATEPINETOP
KI
NGSRI
DGEMA
N
OR
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12501
Wastewater
15
$700,000
Unincorporated
Meramec
Meramec Tributary Areas
Capital
139Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LUCAS & HUNT AND I-70 SANITARY SEWER
Construction Task
6660 - SanitaryReplacement Fund
SEWER LINE LOCATED UNDER I-70 IS NOT ACCESSIBLE FORMAINTENANCE AND CLEANING, CONTRIBUTING TO SEWEROVERFLOWS.
RELOCATE 935 FEET OF 10-INCH SANITARY SEWER FROM BENEATH THEINTERSTATE HIGHWAY.
§¨¦70
§¨¦70
LILLIAN
LUCAS N HUNTFORE
S
T
H
I
L
L
WILL
O
W
W
O
O
D
GRO
V
E
L
A
N
D
PINE
R
I
D
G
E
NELSONFLOR
I
A
NSA
N
DIE
GOUPSHAWN
ORSTEAD
ROL
A
N
D
WOODSTEAD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11928
Wastewater
15
$640,000
Northwoods
Bissell
Baden
Capital
140Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LYNKIRK STUDY AREA I/I REDUCTION
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 110 FEET OF 8-INCH SANITARY SEWER, AND REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS. ELIMINATECONSTRUCTED SSO OUTFALL BP-216.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11924.LINDEMANLINDGATE
LILLIAN
LOCKETTFRANCES
GRANT
NANAMOZARTLYNKIRK
DOUGHERTY FERRYGREENING
SHERILINNORTHLIN TALLIEBEN DAVIS
MONTOUR
WINESAP
WHITECLIFF
OAKBL UFF
DOVERGATEARMAT
J
I
L
L
SOUTHLINBLACKTWIGLINDEMANN LISALIN MANOR HAVERSHAMST CROIX
CAMEO
LORIEN
GREENING
LYN K I R K
ST CROIX
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11651
Wastewater
15
$200,000
Kirkwood
Meramec
Grand Glaize Creek
Capital
141Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MALINE CREEK CSO BP 051 & 052 LOCAL STORAGEFACILITY (CHAIN OF ROCKS DR TO CHURCH DR)
Construction Task
6660 - SanitaryReplacement Fund
CONTROL OF COMBINED SEWER OVERFLOWS IS REQUIRED BY THECONSENT DECREE.
CONSTRUCT A 28-FOOT DIAMETER UNDERGROUND COMBINED SEWERSTORAGE FACILITY 3,000 FEET IN LENGTH, A 12.5 MGD PUMP STATION,AND ASSOCIATED COLLECTOR SEWERS.
FIRST YEAR OF A PROJECTED FIVE YEAR CONSTRUCTION PROJECT.TOTAL CONSTRUCTION BUDGET IS $85,000,000.HALLELIAS
FONTAINE
MELVINNEWBYHARLAN
MARIAS
JORDANWALDORFLEBON
ORAN
GUSTAVDONNELL
LOWELLNASSAU
CHAIN OF ROCKS
JENNINGSSTATION
RAFORD
G
A
S
T
JACKSON
TROY FILIBERTDUENKE RIV ER RUNRIVER TRAIL
P O R T L A N D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11656
Wastewater
15
$1,050,000
St. Louis City
Bissell
Maline Creek
Capital
142Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MARIETTA DR STORM SEPARATION AND I/IREDUCTION (BP-292)
Construction, Phase II
5576 - Maline CreekOMCI Fund
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS
CONSTRUCT 700 FEET OF 12"-30" STORM SEWER, AND REMOVE PRIVATEI/I SOURCES FROM SANITARY SEWERS. REMOVE CONSTRUCTED SSOBP-292.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11852.
§¨¦70
§¨¦70
METRO LINKE
A
S
THILLSWESTBERMUDASAN
D
I
E
G
O
RAVI N IA
AUGU
S
T
A
LUCAS N HUNTPASADENAWACOCOUNTRY
C
L
U
B
B
ELLERIVER O S E D A L E
ARLMONTLUCASOVERBROOK
DELAVANEVA
RT
S
ORE O NST ANNSROLAND
WINCHESTER
OXEYE
NOR
M
A
N
D
Y
CONTOUR
CI
RCLE
SUNSET
HENDERSON
WARWI C K HUNT INGTON
MARILAC
SPRI
N
G
D
A
L
E
BRISTOL
FOREST VIEW
HUNTER
NACOMIS
ST MARYSSAN
T
A
M
O
N
I
C
A
PR IVATEWALKERFROWOAKMOUNTSTA NDREWS CANTERBURYLA
C
O
R
N
ARCOLAMAR
K
T
W
A
I
NMET
R
O
LINK
OAKMOUNTWESTEASTNATUR
A
L
BRIDGE
RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11659
Wastewater
15
$730,000
Normandy
Bissell
Maline Creek
Capital
143Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MARIETTA DR STORM SEPARATION AND I/IREDUCTION (BP-292)
Construction, Phase II
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS
CONSTRUCT 700 FEET OF 12"-30" STORM SEWER, AND REMOVE PRIVATEI/I SOURCES FROM SANITARY SEWERS. REMOVE CONSTRUCTED SSOBP-292.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11852.
§¨¦70
§¨¦70
METRO LINKE
A
S
THILLSWESTBERMUDASAN
D
I
E
G
O
RAVI N IA
AUGU
S
T
A
LUCAS N HUNTPASADENAWACOCOUNTRY
C
L
U
B
B
ELLERIVER O S E D A L E
ARLMONTLUCASOVERBROOK
DELAVANEVA
RT
S
ORE O NST ANNSROLAND
WINCHESTER
OXEYE
NOR
M
A
N
D
Y
CONTOUR
CI
RCLE
SUNSET
HENDERSON
WARWI C K HUNT INGTON
MARILAC
SPRI
N
G
D
A
L
E
BRISTOL
FOREST VIEW
HUNTER
NACOMIS
ST MARYSSAN
T
A
M
O
N
I
C
A
PR IVATEWALKERFROWOAKMOUNTSTA NDREWS CANTERBURYLA
C
O
R
N
ARCOLAMAR
K
T
W
A
I
NMET
R
O
LINK
OAKMOUNTWESTEASTNATUR
A
L
BRIDGE
RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11659
Wastewater
15
$90,000
Normandy
Bissell
Maline Creek
Capital
144Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MARTIGNEY I/I REDUCTION
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11930.
§¨¦55
§¨¦270
§¨¦255
§¨¦255 LEMAY FERRY RDTELEGRAPHRDG R A V O IS R D
TESSONFERRYRDSLINDBERGHBLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11661
Wastewater
15
$1,000,000
Various
Lemay/RDP
Martigney Creek
Capital
145Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MCNULTY - PALLARDY I/I REDUCTION
Construction Task
5564 - Coldwater CreekOMCI Fund
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 5,700 FEET OF 12-INCH TO 24-INCH STORM SEWER ANDREMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11871. THIS PROJECTINCLUDES THE SCOPE OF WORK FROM PROJECT 11187.
NORTH
BOBB EMINENCEWOODSONGUTHRIE
DIXBROWNREXMCKIBBONCOLESGORDONBOSWELLST LOUISROYHAROLD
GEDDE
BATAAN FAIRFIELDMARVINCALVERTMCNULTY
EDMUNDSONBESSEMER
EZRA
MARGO ANN
CORREGIDOR HERBERTMURIEL
STANSBERRY
TUTWILER
PATRICK
DAVID
MAVIS
ROSLAN
CHARLACKEDMUND
SUSAN MARSHALLKATHLYNTIPTON
CHESTER
AMBRO
JOELBURDELLA
LINDSCOTTHAVENBROOKTREFORE
PALLARDY
LAMBE
R
T
AIRWAYROSEMORE
LEENORA
MARVISTAPATRICE
BRECKENRIDGE
A
M
I
T
Y
CALWOOD
CENTRAL
CHE STERDIXKATHLYN
EDMUND HERBERTROSLAN
LINDSCOTTBROWNCALVERTTREFORE
HAROLD
CALVERTROYDAVID
MURIEL BOSWELLGORDONMCNULTYGORDON STANSBERRY
KATHLYN
BATAAN
MARVINTUTWILERCORREGIDOR MARSHALLMARSHALL§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11662
Wastewater
15
$1,400,000
Various
Coldwater
Coldwater Creek
Capital
146Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MCNULTY - PALLARDY I/I REDUCTION
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 5,700 FEET OF 12-INCH TO 24-INCH STORM SEWER ANDREMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11871. THIS PROJECTINCLUDES THE SCOPE OF WORK FROM PROJECT 11187.
NORTH
BOBB EMINENCEWOODSONGUTHRIE
DIXBROWNREXMCKIBBONCOLESGORDONBOSWELLST LOUISROYHAROLD
GEDDE
BATAAN FAIRFIELDMARVINCALVERTMCNULTY
EDMUNDSONBESSEMER
EZRA
MARGO ANN
CORREGIDOR HERBERTMURIEL
STANSBERRY
TUTWILER
PATRICK
DAVID
MAVIS
ROSLAN
CHARLACKEDMUND
SUSAN MARSHALLKATHLYNTIPTON
CHESTER
AMBRO
JOELBURDELLA
LINDSCOTTHAVENBROOKTREFORE
PALLARDY
LAMBE
R
T
AIRWAYROSEMORE
LEENORA
MARVISTAPATRICE
BRECKENRIDGE
A
M
I
T
Y
CALWOOD
CENTRAL
CHE STERDIXKATHLYN
EDMUND HERBERTROSLAN
LINDSCOTTBROWNCALVERTTREFORE
HAROLD
CALVERTROYDAVID
MURIEL BOSWELLGORDONMCNULTYGORDON STANSBERRY
KATHLYN
BATAAN
MARVINTUTWILERCORREGIDOR MARSHALLMARSHALL§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11662
Wastewater
15
$3,200,000
Various
Coldwater
Coldwater Creek
Capital
147Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MEADOWRIDGE AND EASTWOOD STORM ANDSANITARY RELIEF
Construction Task
6660 - SanitaryReplacement Fund
FLOODING OF TEN HOMES DUE TO UNDERSIZED REINFORCEDCONCRETE PIPE.
CONSTRUCT 645 FEET OF 6-FOOT BY 3-FOOT AND 6-FOOT BY 4-FOOTREINFORCED CONCRETE BOX CULVERT, AND CONSTRUCT 740 FEET OF15-INCH SANITARY SEWER.WOODLAWNDICKSONKENMORELEWISTON
EA STW OOD
MEADOWRIDGEQUANALWARRENTON
BROOKHAVEN
SOUTHBROOK
ALFRED
TARRYMO
R
E
WOODLAWN ESTATES
MEADOWRIDGE
BR OOK H A VEN
MANCHESTER RD §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11840
Wastewater
15
$280,000
Kirkwood
Lemay/RDP
Deer Creek
Capital
148Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MEADOWRIDGE AND EASTWOOD STORM ANDSANITARY RELIEF
Construction Task
5566 - Deer CreekOMCI Fund
FLOODING OF TEN HOMES DUE TO UNDERSIZED REINFORCEDCONCRETE PIPE.
CONSTRUCT 645 FEET OF 6-FOOT BY 3-FOOT AND 6-FOOT BY 4-FOOTREINFORCED CONCRETE BOX CULVERT, AND CONSTRUCT 740 FEET OF15-INCH SANITARY SEWER.WOODLAWNDICKSONKENMORELEWISTON
EA STW OOD
MEADOWRIDGEQUANALWARRENTON
BROOKHAVEN
SOUTHBROOK
ALFRED
TARRYMO
R
E
WOODLAWN ESTATES
MEADOWRIDGE
BR OOK H A VEN
MANCHESTER RD §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11840
Wastewater
15
$830,000
Kirkwood
Lemay/RDP
Deer Creek
Capital
149Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MIDLAND SANITARY RELIEF - PUBLIC ANDPRIVATE I/I REDUCTION
Construction Task
5564 - Coldwater CreekOMCI Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 800 FEET OF 12-INCH STORM SEWER AND REMOVE PRIVATEI/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11871.ASHBYPAGE
LACKLAND WOODSONSIMSBALTIMORE
FLORA
BURNSRIDGE
ECHO
DRIVER
NIBLIC POEMIRIAM BROWNDIXLITZ
TRESCOTTENTITYHOOD REXKREMDYEROAK
WARSONGOODALECANTER CHAUCERMILTONGASSTENNYSON
THEODOSIA
H O L T W O OD
HOBDAY
MADDOX
DECKERTHORPE
ZYKAN PASTEURLIBERTY GAEBLERWISMERFARVIEW
UCEYLEWURDACK COLESCARLYLE
ARGYLE
TRENTON
ARLINE
SENECA
ST ANN
EASTBROOK
EVERMAN
KORANDOCLARENDON MARVINBRYANTMARLOWE STELLAQUIETWABADAYAIRWAYCALVERT
OCONNELLADDIESTJOACHIMWALLISDAWESVERONAIVELAND
ROMAINELAKEOHARESPENCERBOYLSTONFOWLERSCOTLANDPEBBLEBEACHPROUHET BOSWELLSHE
L
L
E
YGOCKE
LOTSIEROYALTONLULLABY
P IN E HURSTSUNCRESTBRAS S I EANGELOHIGHLANDBRUNOBACHWESTWISEGORDONOSGOODRHYTHM
BRISTOL
CINNAMON
HUNTINGTONMEADOWBROOKRONALDGILWOODBRISTONDENNISONBUDER
KALEN
BRECKENRIDGE
MILTON
SIMSCALVERTT
E
N
N
Y
SO
N
MILTONHOODCHAUCERMIRIAMTENNYSONKREMREXDAWESTHORPEWISMER
SPENCERSIMSMILTONWISMERMILTONPOEAIRWAY§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11663
Wastewater
15
$350,000
Overland
Coldwater
Coldwater Creek
Capital
150Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MIDLAND SANITARY RELIEF - PUBLIC ANDPRIVATE I/I REDUCTION
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 800 FEET OF 12-INCH STORM SEWER AND REMOVE PRIVATEI/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11871.ASHBYPAGE
LACKLAND WOODSONSIMSBALTIMORE
FLORA
BURNSRIDGE
ECHO
DRIVER
NIBLIC POEMIRIAM BROWNDIXLITZ
TRESCOTTENTITYHOOD REXKREMDYEROAK
WARSONGOODALECANTER CHAUCERMILTONGASSTENNYSON
THEODOSIA
H O L T W O OD
HOBDAY
MADDOX
DECKERTHORPE
ZYKAN PASTEURLIBERTY GAEBLERWISMERFARVIEW
UCEYLEWURDACK COLESCARLYLE
ARGYLE
TRENTON
ARLINE
SENECA
ST ANN
EASTBROOK
EVERMAN
KORANDOCLARENDON MARVINBRYANTMARLOWE STELLAQUIETWABADAYAIRWAYCALVERT
OCONNELLADDIESTJOACHIMWALLISDAWESVERONAIVELAND
ROMAINELAKEOHARESPENCERBOYLSTONFOWLERSCOTLANDPEBBLEBEACHPROUHET BOSWELLSHE
L
L
E
YGOCKE
LOTSIEROYALTONLULLABY
P IN E HURSTSUNCRESTBRAS S I EANGELOHIGHLANDBRUNOBACHWESTWISEGORDONOSGOODRHYTHM
BRISTOL
CINNAMON
HUNTINGTONMEADOWBROOKRONALDGILWOODBRISTONDENNISONBUDER
KALEN
BRECKENRIDGE
MILTON
SIMSCALVERTT
E
N
N
Y
SO
N
MILTONHOODCHAUCERMIRIAMTENNYSONKREMREXDAWESTHORPEWISMER
SPENCERSIMSMILTONWISMERMILTONPOEAIRWAY§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11663
Wastewater
15
$810,000
Overland
Coldwater
Coldwater Creek
Capital
151Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MISSOURI RIVER BONFILS SANITARY SEWERREHABILITATION PHASE II
Construction Task
5590 - Mo River BonfilSubd #448 OMCI Fund
EXCESSIVE I/I CAUSING BUILDING BACKUPS AND OVERCHARGEDSANITARY SEWERS.
REHABILITATE 22,000 FEET OF 10-INCH TO 18-INCH SEWER, 182MANHOLES, AND 16 SERVICE LATERAL CONNECTIONS.
§¨¦70
§¨¦270
§¨¦70
E MO370 HWYWMO370
HWYST
C
H
A
R
L
E
S
ROCK
R
D
N LINDBERGHBLVDNATURALBRIDGERD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12310
Wastewater
15
$2,000,000
Hazelwood
Missouri
Bonfils
Capital
152Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MISSOURI RIVER SERVICE AREA I/I REDUCTION -CREVE COEUR CREEK EAST
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
REHABILITATE 43,000 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD.
§¨¦270
§¨¦270
PAGE
FEE FEEROSSTEMPOMASONSCHUETZS
C
H
U
L
T
E
B O RMANWE S T P ORT
MERRICK
BASSTON
STUDT CRAIG VIEW
CRAIGM
A
R
KAIRE
Q
UE
S
TOVERLACKLAND
HYANNISVIL L A D O R A D O
TIMBERRUNMOSLEYVILL A H IL L ACTIVECHIEFTAIN
F
IESTABARDOTWHISPERINGPINES
EMERSONCONCOURSECRAIGSHIREFLAIRGREENWALK
BALHARBO
U
R
G RINNELLDECORAH
NE W BALLASPRIVATE
D
E
C
KERNORTHWINDS
DAYKIN
NIMES KRAMCOEU
R
D
EVI
LLEMASON MANOR
WIL LOWYCKM A T EUS
LANDOLAKESNIEHAUS
MACKINACSTARSPUR
KI
N
G
C
AREYPAPILLONACCENTDEVINE
CROSSCREEKFERN RIDGESPRUCE H A V E N
PARKCENTER
SUMMERHAVEN
GAIET
E
LYRIC CONGRESSIONALFAHRPARK
COHAS
S
E
TARDWICKDANTE
ROSSPAGE
C
R
A
I
G
OLIV
E
B
L
V
D
EMO3 6 4 H W YWMO
364HWY
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11774
Wastewater
15
$3,680,000
Various
Missouri
Creve Coeur Creek
Capital
153Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MISSOURI RIVER WWTF BERM AND WATER FEEDUPGRADE
Construction Task
6660 - SanitaryReplacement Fund
SOLIDS HANDLING BUILDING DRIVE THROUGH BAYS REQUIRE BERMSTO PROTECT THEM FROM FLOOD WATERS.
CONSTRUCT EARTH BERM TO PROTECT THE SOLIDS HANDLINGBUILDING FROM THE 100 YEAR STORM EVENT AND INSTALL ANADDITIONAL POTABLE SUPPLY LINE.
PR
I
VA
T
E
PR
I
VA
T
E
PRIVATE
PRIVATE
PRIVATE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12616
Wastewater
15
$810,000
Maryland Heights
Missouri
Missouri River Tributary Areas
Capital
154Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MISSOURI RIVER WWTF SECONDARY TREATMENTELECTRICAL / MECHANICAL MODIFICATIONS
Construction Task
6660 - SanitaryReplacement Fund
ELECTRICAL AND MECHANICAL MODIFICATIONS ARE REQUIRED FORCODE COMPLIANCE, SAFETY, AND OPERATIONAL EFFICIENCY.
CONSTRUCT ELECTRICAL AND MECHANICAL IMPROVEMENTS AT THEMISSOURI RIVER TREATMENT PLANT.PRIVA
TE
SPOR
T
POR
T
CITYOFMARYLANDHEIGHTSCREVE C
O
E
U
R
MILL RULECOT
TONWOOD
HOO K SR IV E R PRIVA
T
E PRIVATEPRIVA
T
EPRIVATE
PRIVA
TE
PR IV A T E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12643
Wastewater
15
$900,000
Maryland Heights
Missouri
Missouri River Tributary Areas
Capital
155Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MISSOURI RIVER WWTP SECONDARY TREATMENTEXPANSION (MITIGATION CREDIT)
Construction Task
6660 - SanitaryReplacement Fund
MISSOURI RIVER WWTP HAS EXPANDED TO INCREASE CAPACITY FORPEAK FLOW WET WEATHER OPERATION, AND MITIGATION CREDITS AREREQUIRED.
MITIGATION CREDITS WHICH ARE REQUIRED BY PERMITTINGAUTHORITIES WILL BE PURCHASED, TO COMPENSATE FOR THECONSTRUCTION OF THE NEW SECONDARY EXPANSION ANDDISINFECTION FACILITIES AT THE MISSOURI RIVER WASTEWATERTREATMENT PLANT.PRIVATESPOR
T
POR
T COT
TONWOOD
CITYOFMARYLANDHEIGHTSHOO K SR IV E R PRIVATEPR
I
VA
T
EPRIVATE
PRI
VAT
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10465
Wastewater
15
$150,000
Maryland Heights
Missouri
Missouri River Tributary Areas
Capital
156Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
NEWCASTLE I/I REDUCTION
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11923.
N
EW
H
A
L
L
S
F
E
R
R
Y
M
O
N
D
O
U
B
L
E
A
U
CHURCHILL
WELLINGTO
N
ABERDEEN
M ONSOLSLOGI
S
WINTERGREEN
W EDGWOO D
B
R
U
N
S
WI
C
K HIRONDELLED R E SD EN
D
OVERINDIANCUPSEVILLE
W
ESTMINSTER
G
R
A
V
E
L
L
E
MESERTASUNCRESTRO
S
A
N
T
WINDSOR
AQUEDUCTBROOKSHIREA
R
PE
N
T
BRA D W EL L
FARNHAMC R OSSKEYS
COUGAR
ES PACEBARCELONAWOOD SAG ER U E DERENARDCHESHIR
ECHADWICK CHELSEA
S
P
RINGTIME
CONCORD
S O MERSETB A VILLEGREENB R I A R
A V ONDOMENIQUECA N TE R B U R Y
ED
I
N
B
U
R
G
SEAVIEWLINDBERGHLINDBERGH§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11664
Wastewater
15
$70,000
Florissant
Coldwater
Coldwater Creek
Capital
157Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
NORTH BADEN CREEK I/I REDUCTION (BP-532)(WINCHESTER DR)
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 380 FEET OF 12-INCH STORM SEWER, REPLACE 510 FEET OF12-INCH SANITARY SEWER, AND REMOVE PRIVATE I/I SOURCES FROMSANITARY SEWERS.
PROJECT COMPLETES A PORTION OF THE SYSTEM IMPROVEMENTSNECESSARY TO REMOVE CONSTRUCTED SSO BP-532. PUBLIC I/IREDUCTION INCLUDED IN PROJECT 11925.
§¨¦70
LUCAS N HUNTPASAD E N A
LILLIAN
HILLSNELSONMELBAEDIS
O
N BEGGRAV I N IA
LAWLERHU
N
T
E
R
LINCOLNROH
NROL
A
N
D
FLOR
I
A
N
AUGUST
A
COLONIALMANOLAAVONDALEHATZBERMUDAGRE
E
N
W
A
Y
IRACOU
N
T
R
YCLUB
ORE O N
DAIBER
MATHEW
GRO
V
E
L
A
N
D
SALOMESAN
D
IE
G
OOAKRIDGEOVERBROO
K
WINCHESTER
FORE
S
T
H
I
L
L
NOR
M
A
N
D
Y
WILL
O
W
W
O
O
D
KEN WOODROXIECIRCLE
HAZEN
SUNSET
HENDERSON DONALD
WESTFARL
E
Y
HUNTI NGTON
ONEILLBRISTOL
FOREST VIEW
MAYWOODSYLVANST MARYSEASTOAKMOUNTSTA NDREWS CANTERBURYAMMANNWRIGH
TARCOLANEONATOWER GROVEN A D IN E
DUCK
W
O
R
T
H
PASADENAONEILLNELSONEASTMELB AROLAND
NA
TUR
A
LBRIDGERD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11693
Wastewater
15
$1,600,000
Various
Bissell
Baden
Capital
158Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
PADDOCK CREEK I/I REDUCTION (PRIVATE)
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 610 FEET OF 12-INCH STORM SEWER AND REMOVE PRIVATEI/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11923.
N
EW
H
A
L
L
S
F
E
R
R
Y
DERHAKE
ST ANTHONY
DUNN WA
S
H
I
N
G
T
O
N WATERFORD
MEHLST CATHERINECLARK O
L
D
H
A
LL
S
FERRYHUMES
ST J
O
S
E
P
H
5TH
WR
E
N
CASTELLOLAFAYETTEGA
LBANEROPERSHALL
AVO N
MOULE
NARA
STLOUIS
A L L ENAQUEDUCTPOHLMAN
P R IVA T E
TROTTERSADDLEKAYLISAW E D G W OO D
STJEANMAPLE SEVENHILLSCAPRIDANUBETHUNDERBIRD
STD E N I S
H E L M K A MPF
JANA
PAPAL
FAIR W A Y
ORLEY
PATTERSON
GAHANT R EESEDGEINVICTAA
BERDE E N
CORDOBADAVEYCARMONATANEYFLIGHTROGERSLARRY TREMONT
BAYMEADOWSFOX RUN
GR EENGRASS
DRESDEN
DOVERGRANDVIEWPIMLICORETFORD
FLORVALHIALEAHRHINERENEEFAIRMOUNTHIGH C R E S T
BON AIREBROWNGALLOPSTEED
STMARK
TARGET
LILA
LARESFARNHAMDEBORAHVALENCIATURFREGIN
A
NORDELL
HAZELOAKS
T
J
O
A
N
PRIVA T E
PRIVATELINDBERGHLINDBERGH
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11696
Wastewater
15
$1,080,000
Various
Coldwater
Coldwater Creek
Capital
159Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
PICKWICK - BERNADINE - BIMINI SANITARYRELIEF
Construction Task
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 3,100 FEET OF 8-INCH TO 18-INCH SANITARY SEWERS ANDREMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. ELIMINATECONSTRUCTED SSO OUTFALLS BP-401, BP-522, AND BP-629.
LITTIE BAPTIST CHURCHMUSICK
VARGAS
DANDRIDGETWILIGHTEMILPATRINA MAYOFAR
A
D
A
Y
MAPLESHEA
LINCORDFAWN H A V EN
MEAT H
CONCORDGOLF CREST
SAPPINGTON ACRESPICKWICKGAIL
KAPP
CO N C O R D V IL L A G E
OASIS
BIMINI
BEHRWISTERIAMA L LORYSTOLZ
PINE FOREST
ARTHU R
VALDAM E R E
WILL
I
N
D
A
JAN
MUGAN CATH
Y
EDGECLIFFE
HACKBERRYBRIAR S T O NETE AKWOOD
CORAL RIDGE
MIMOSALI
N
F
E
R
RYKINGSMERE
MARLEYRIDGE FOREST
SOUTHFI
E
LDTIM
O
T
H
Y
A L PENATHREE COU R T LAVINIAFIT
ETHAYERLAVIER
L A W NBROOK
PRIVATE
BERNADINE
GEANLEECLEAR
W
A
T
E
R
ABDELLCHILESCARROWOFFICE CENTER
MEATH
LAVINIAS LINDBER
G
H
B
L
V
D
S LINDBER
G
H
B
L
V
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11698
Wastewater
15
$1,880,000
Unincorporated
Lemay/RDP
Gravois Creek
Capital
160Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
POWELL AVE AND ANNALEE SEWER SEPARATION
Construction Task
6660 - SanitaryReplacement Fund
ISOLATED SECTION OF COMBINED SEWER DIRECTED TO SINKHOLEAND ADVERSE GRADES IN SANITARY SEWER LEADING TO BUILDINGBACKUPS AND INCREASED MAINTENANCE.
REPLACE 700 FEET OF 8-INCH DIAMETER SANITARY SEWER ANDREDIRECT SANITARY FLOW FROM COMBINED SEWER.
MADGE
BRENTWOODBREMERTONHIGH SCHOOLPOWELL
COLLIERMANDERLYPENDLETON BRAZEAUPRIVATEANNALEELAWNDELLHILLDALEMAGDALEN
MANCHESTER RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10737
Wastewater
15
$430,000
Brentwood
Lemay/RDP
Deer Creek
Capital
161Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
PROVIDENCE SANITARY RELIEF (SKME-640)
Construction Task
5566 - Deer CreekOMCI Fund
EXCESSIVE INFLOW / INFILTRATION CAUSING SURCHARGING INEXISTING SEWERS AND ACTIVATING A CONSTRUCTED SSO (BP-440).
CONSTRUCT 780 FEET OF 8-INCH SANITARY SEWER, 215 FEET OF 12-INCHSTORM SEWER, AND REMOVE PRIVATE I/I SOURCES FROM SANITARYSEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11933.
§¨¦44
§¨¦44
CLARK
NEWPORT
TUXEDO
BOMPARTSHREWSBURYMURDOCHLACLEDESTATIONATALANTASUMMITJOYMARSHALLGLEN
SELMAFAIRVIEW
LOCKWOOD YEATMANGARDEN SPRINGWEIL
P
A
RKOXFORD
DEVONSHIRE
S U T HERLAND
EDGARARLINGT
O
N
HA W T HO RNEDANBURYWILSHUSENSUFFOLKST CHARLESLAKE
GREELEY
MARIONO A K W OOD
SUNNYSIDE
DALECAROLINE
BRUNSWICK
KUHLMAN
DEVILLELANSDOWNE
KAINGROVE
EXETERLENOXHAZELAMELIA
VERGUENELOGCABINPLYMOUTHMICHAELSWON
PROVIDENCE
KENRIDGE
TAMPA
FAIR
O
A
K
STHEATREELBART
TWINING
MILDREDCORNELIAKEY W
E
S
T
WEIL
FAIRVIEW
GARDENSUMMITGREELEYGLENPARKSUMMIT §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11700
Wastewater
15
$50,000
Webster Groves
Lemay/RDP
Deer Creek
Capital
162Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
PROVIDENCE SANITARY RELIEF (SKME-640)
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW / INFILTRATION CAUSING SURCHARGING INEXISTING SEWERS AND ACTIVATING A CONSTRUCTED SSO (BP-440).
CONSTRUCT 780 FEET OF 8-INCH SANITARY SEWER, 215 FEET OF 12-INCHSTORM SEWER, AND REMOVE PRIVATE I/I SOURCES FROM SANITARYSEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11933.
§¨¦44
§¨¦44
CLARK
NEWPORT
TUXEDO
BOMPARTSHREWSBURYMURDOCHLACLEDESTATIONATALANTASUMMITJOYMARSHALLGLEN
SELMAFAIRVIEW
LOCKWOOD YEATMANGARDEN SPRINGWEIL
P
A
RKOXFORD
DEVONSHIRE
S U T HERLAND
EDGARARLINGT
O
N
HA W T HO RNEDANBURYWILSHUSENSUFFOLKST CHARLESLAKE
GREELEY
MARIONO A K W OOD
SUNNYSIDE
DALECAROLINE
BRUNSWICK
KUHLMAN
DEVILLELANSDOWNE
KAINGROVE
EXETERLENOXHAZELAMELIA
VERGUENELOGCABINPLYMOUTHMICHAELSWON
PROVIDENCE
KENRIDGE
TAMPA
FAIR
O
A
K
STHEATREELBART
TWINING
MILDREDCORNELIAKEY W
E
S
T
WEIL
FAIRVIEW
GARDENSUMMITGREELEYGLENPARKSUMMIT §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11700
Wastewater
15
$750,000
Webster Groves
Lemay/RDP
Deer Creek
Capital
163Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
PUMP STATION REPLACEMENT PROJECTS (PHASEI)
Construction Task
6660 - SanitaryReplacement Fund
DETERIORATING PUMP STATIONS THROUGHOUT THE DISTRICTREQUIRE REPLACEMENT/REHABILITATION.
REPLACE PUMP STATIONS P-708 (EARTH CITY UPS), AND P-702 (EARTHCITY EXPRESSWAY).
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11701
Wastewater
15
$950,000
Various
Various
Various
Capital
164Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ROSEMARY, PHILO, & KATHLEEN SEWERSEPARATION
Construction Task
6660 - SanitaryReplacement Fund
APPROXIMATELY 115 RESIDENCES HAVE DOWNSPOUTS AND DRIVEWAYDRAINS CONNECTED TO THE SANITARY SEWER.
CONSTRUCT 3,610 FEET OF 12-INCH TO 48-INCH STORM SEWERS, ANDDISCONNECT DRIVEWAY DRAINS AND DOWNSPOUTS.
WEBER
KITDANAPILOTPHILOALLEY
VIRGIL
FORMANWAYNEMATHILDA
ROSEMARYKATHLEENOVERTONHENLINDON RON
AUTUMN
CANDACE
STELLAMAC
DAVEMARHERSHEY
MAXWELL
JONMARHARMONYMOCCASIN TERRACEPILOTPHILO
VIRGIL
DON RON
CANDACE
GRAVOIS R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10748
Wastewater
15
$1,090,000
Wilbur Park
Lemay/RDP
Mackenzie Creek
Capital
165Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ROSEMARY, PHILO, & KATHLEEN SEWERSEPARATION
Construction Task
5571 - Gravois CreekOMCI Fund
APPROXIMATELY 115 RESIDENCES HAVE DOWNSPOUTS AND DRIVEWAYDRAINS CONNECTED TO THE SANITARY SEWER.
CONSTRUCT 3,610 FEET OF 12-INCH TO 48-INCH STORM SEWERS, ANDDISCONNECT DRIVEWAY DRAINS AND DOWNSPOUTS.
WEBER
KITDANAPILOTPHILOALLEY
VIRGIL
FORMANWAYNEMATHILDA
ROSEMARYKATHLEENOVERTONHENLINDON RON
AUTUMN
CANDACE
STELLAMAC
DAVEMARHERSHEY
MAXWELL
JONMARHARMONYMOCCASIN TERRACEPILOTPHILO
VIRGIL
DON RON
CANDACE
GRAVOIS R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10748
Wastewater
15
$1,700,000
Wilbur Park
Lemay/RDP
Mackenzie Creek
Capital
166Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SELVIDGE AREA I/I REDUCTION
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 590 FEET OF 6-INCH TO 12-INCH SANITARY SEWER.ELIMINATE CONSTRUCTED SSO OUTFALL BP-056.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11924.PARKERBARTONOLD BALLWINSEAWINDCORAL
NEWTONSHIRLEYSWEETCREEKSTEAMBOATBIRCHWOODAPPLEGATE
VICTORMANCHESTER RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11665
Wastewater
15
$240,000
Ballwin
Meramec
Fishpot Creek
Capital
167Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SHERWYN SANITARY RELIEF (SKME-651) AND I/IREDUCTION
Construction Task
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 1,675 FEET OF 6-INCH TO 16-INCH SANITARY SEWERS ANDREMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. ELIMINATECONSTRUCTED SSO OUTFALLS BP-199 & POTENTIALLY BP-203 AFTERPOST-CONSTRUCTION MONITORING.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11850.
§¨¦64 WARSONSPOEDELADUEGRAESER
MOSLEYMES
A
SCHU
L
T
E
CL A Y T O NDAUTEL BARNESG R A ND V IEWPEM LAJOLL A
STUDT
KENTGUELBRETHENGEL
CRAIGCRAIGVIE W
OLDBONHOMMETEALWOODPRIVATE
BEAVER
STACYRESEARCH
MAGNA
CAR
T
A
ELZEY C L E R M O N T
LAKESHORESARAH RONDELAYFIESTASONABARDOT
CONWAYOAKLEIGHALDE N
BR
OOKTRAIL
ARTHUR P I CARDYDONOHO
NE W B ALLASTUREEN
HI
GHDOWNFAIRWAYSTUCKERL ADUEESTATESWHITEBRIDGE
DAYKIN
ANZEIGER
MANSFIELD
OLD OLI
V
E
S
T
R
E
E
T
LISARENEEALLEGRO
LYLEWOOD
CODY
HASTINGS
SHERWYN
APACHE
M O R WOODRICHARDSON
GAIET
E
CAPITOL
C O U N T R YV IE W
PRIVATE
C
R
A
I
G
PRIVATE
OL I V E B L V D
NLINDBERGHBLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10754
Wastewater
15
$1,200,000
Creve Coeur
Lemay/RDP
Deer Creek
Capital
168Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SUB-TRUNK #2 LATERAL SANITARY RELIEF
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PROJECT COMPLETES A PORTION OF THE SYSTEM IMPROVEMENTSNECESSARY TO REMOVE CONSTRUCTED SSOS BP-210, BP-211, ANDBP-213.
§¨¦270
§¨¦270 DUNN
REDMANLUSHER
BENHAMCRITERIONLILACLAVIDACOVE
PRIGGERAYMONDREALE
COAL BANKMADRIDTRAMPE
JUNE
MALAGA
BAYONNE SPANISHMENDOZASPANISHPONDVALENC IAFONTAINE
DORIS
CORDOVA
CADIGANROSARYBOWERSEDMAR
P E R S H A LL
TWILLMAN PIN T A
MACKIN
R
O
SADO
FARMVIEW
G ARDENSHARDELL
LERIDA
UPHILLP
A
TTERN
MURIEL
CROSSETT
RUESTATALISMAN
PETITE BRIDGEVALENOB HILL
MCQUAY
ZAMORASHEFFIELD GERONASURF S IDEPRIVATESAEGER
LARIMORE
CLAUDINE HALL HOUSEHAR PERTAOSMONTICELLO
L A K E M O N T
FAIRMEADOWS
RO S EVIEWBRIARB R AE
M
OLL
ERUSSENATE RIO G RANDESAN RICARDOCORLYNSCENIC LAKEMIMEAUX
MUNICIPALSPARROW
FARMVIEW
PERSHALL
TRAMPE
G A R D E NLEWIS N CLARK BLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11668
Wastewater
15
$230,000
Unincorporated
Bissell
Watkins Creek
Capital
169Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SUPPLEMENTAL ENVIRONMENTAL PROJECTS(SEP) PROGRAM
Work Order Repair Costs(Capital)
4102 - ImprovementFund
CONSENT DECREE REQUIRES THE DISTRICT TO SPEND $1.6 MILLION TODECOMMISSION PRIVATE SEPTIC TANKS AND REPAIR/REPLACEDEFECTIVE LATERALS.
AS DEFECTIVE SEPTIC TANKS AND PRIVATE SEWER LATERALS AREIDENTIFIED AT OWNER OCCUPIED PROPERTIES IN 2010 LOW TO MEDIANINCOME CENSUS TRACTS THROUGHOUT THE DISTRICT,CONSTRUCTION CONTRACTS WILL BE ISSUED.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11898
Wastewater
17
$500,000
Various
Various
Various
Non-recurring
170Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UNIVERSITY CITY I/I REDUCTION - WEST
Construction Task
5584 - University CityOMCI Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 500 FEET OF 12-INCH STORM SEWER, AND REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11929.
§¨¦170
§¨¦170
PAGE
WARSONLACKLAND
ASHBYWOODSONDIELMANBROWNUNION PACIFIC
OLD B O N H O M M EBURNSLINKFLORA 82NDWALTONARGYLE
RIDGE
ECHO
BAUR SIMSDRIVERNIBLIC
MES
A
TRESCOTT
MCKNIGHTGROBY 81STOAK ENTITYENGEL HOODMEEKSDYER
LAJOLLACHA UCERG R A ND V IEWBRUNOGOODALECANTER
TERM INAL
M I LTON
GASSTHORPE
P
RICERESEARCHB A LSONHILLTOPHOLTWOODCHARLACKMADDOX
C
E
NTRALMIDLAND
LE PEREPRIVATET E A L W O O D
FOREST
ZYKAN
LIBERTY
CANTON
BEAVER WISMERSTACY UCEYLEELMORE GILROSESTANFORD
TRENTON
GAYSENECA
ORCHARDINDIANMEADOWSKORANDO
STONEYSIDELINPAGE
LACKLINK
BOOTH
PICKE RING
MINERVAPOE
ANDESH AR N E Y
ARBORBELLFOWLER
MANSFIELD HARTLANDOLD OLI
V
E
S
T
R
E
E
T 79THLISA
TUX FORDBULLERHASTINGS MASHIEELBRINGLAUGHLINSEVILLE
CRIXDALE
VILLA
CINNAMON
FAYVIEWIROQUOIS
MAGNETCRYSTALREAR
RIDGE
BURNSBURNSWALTONVILLA
PAGEWISMERMEEKS
OAKOAK
PRICESIMSOLIVE BLVD
NLINDBERGHBLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11672
Wastewater
15
$60,000
Various
Lemay/RDP
University City Branch
Capital
171Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UNIVERSITY CITY I/I REDUCTION - WEST
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 500 FEET OF 12-INCH STORM SEWER, AND REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11929.
§¨¦170
§¨¦170
PAGE
WARSONLACKLAND
ASHBYWOODSONDIELMANBROWNUNION PACIFIC
OLD B O N H O M M EBURNSLINKFLORA 82NDWALTONARGYLE
RIDGE
ECHO
BAUR SIMSDRIVERNIBLIC
MES
A
TRESCOTT
MCKNIGHTGROBY 81STOAK ENTITYENGEL HOODMEEKSDYER
LAJOLLACHA UCERG R A ND V IEWBRUNOGOODALECANTER
TERM INAL
M I LTON
GASSTHORPE
P
RICERESEARCHB A LSONHILLTOPHOLTWOODCHARLACKMADDOX
C
E
NTRALMIDLAND
LE PEREPRIVATET E A L W O O D
FOREST
ZYKAN
LIBERTY
CANTON
BEAVER WISMERSTACY UCEYLEELMORE GILROSESTANFORD
TRENTON
GAYSENECA
ORCHARDINDIANMEADOWSKORANDO
STONEYSIDELINPAGE
LACKLINK
BOOTH
PICKE RING
MINERVAPOE
ANDESH AR N E Y
ARBORBELLFOWLER
MANSFIELD HARTLANDOLD OLI
V
E
S
T
R
E
E
T 79THLISA
TUX FORDBULLERHASTINGS MASHIEELBRINGLAUGHLINSEVILLE
CRIXDALE
VILLA
CINNAMON
FAYVIEWIROQUOIS
MAGNETCRYSTALREAR
RIDGE
BURNSBURNSWALTONVILLA
PAGEWISMERMEEKS
OAKOAK
PRICESIMSOLIVE BLVD
NLINDBERGHBLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11672
Wastewater
15
$915,000
Various
Lemay/RDP
University City Branch
Capital
172Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST(WC-01)
Construction Task
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE 31,000 FEET OF PUBLIC SEWERS USING THE CURED INPLACE PIPE METHOD.
§¨¦70§¨¦170
PAG
E
DELMARHANLEY UNIONGOODFELLOWMETRO LINKETZEL
RID
G
E
WEL
L
SBELTCANTON
NORTHNSOUTHKIENLENLUCASNHUNTMINERVA HELENEUCLIDMETROLINKFERGUSONPURDUE MIMIKAPENNSYLVANIAL A C K LA N DWALTON
WAB
A
D
A
ENRIGHTARLINGTON82NDFORSYTH
LILLIAN
MYRO
NWEST
BARTMERHAMILTONGROBY WILBORNCLARAMCKIBBONTULANE SUTTERCATES
E
ASTHODIAMONTWRENEDIS
O
N
BR O WNCOLLEGE
AUBERTBAYARDHILLSST L
O
U
I
S
TERR
Y
T E R M I NAL
BEMISTON81STPASA
DE
NAMAR
K
E
T
WATERMANYALEOLDEN
WASHINGTON
CORNELL PRIVATEPERSHING BEGGLAFON WHEATONKINGSLANDTRINITYRAFTGREE
R
PARTRIDGENELSONLOTU
S
MONROE
ACADEMYENDICOTTWARDERDARBYSNOWWAYNE
JULIANMARSHALLDERBYQUENDORAMONA
AUG
U
S
T
A
LYNDHURSTAUDRAIN
WILSONALBIN
LIBERT Y
MAPLE
WILLIAMSLAUR
A
ARDELIA
PEYTONMARCUSEADS
VERNON
DORSET
GAYROLANDGLENECHO
KINGSBURY
MILAN TEA LLINK
VALLECABANNE
PALM
CHAMBERLAINFARISLEROY ROHN
T R E N TON
AMHERST
GARFIELD
OXEYE
KOREA
JOH
N
OAKDALECOLFAXENRIGHTHANLEYENRIGHT
TER M INALPALM
TERR
YBROWNHAMILTONEAST
CATES
MAPLE
OLIVE BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12062
Wastewater
15
$2,900,000
University City
Lemay/RDP
University City Branch
Capital
173Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST(WC-02 AND WC-03)
Construction Task
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE 66,000 FEET OF PUBLIC SEWERS USING THE CURED INPLACE PIPE METHOD.
§¨¦70§¨¦170
PAG
E
DELMARHANLEY UNIONGOODFELLOWMETRO LINKETZEL
RID
G
E
WEL
L
SBELTCANTON
NORTHNSOUTHKIENLENLUCASNHUNTMINERVA HELENEUCLIDMETROLINKFERGUSONPURDUE MIMIKAPENNSYLVANIAL A C K LA N DWALTON
WAB
A
D
A
ENRIGHTARLINGTON82NDFORSYTH
LILLIAN
MYRO
NWEST
BARTMERHAMILTONGROBY WILBORNCLARAMCKIBBONTULANE SUTTERCATES
E
ASTHODIAMONTWRENEDIS
O
N
BR O WNCOLLEGE
AUBERTBAYARDHILLSST L
O
U
I
S
TERR
Y
T E R M I NAL
BEMISTON81STPASA
DE
NAMAR
K
E
T
WATERMANYALEOLDEN
WASHINGTON
CORNELL PRIVATEPERSHING BEGGLAFON WHEATONKINGSLANDTRINITYRAFTGREE
R
PARTRIDGENELSONLOTU
S
MONROE
ACADEMYENDICOTTWARDERDARBYSNOWWAYNE
JULIANMARSHALLDERBYQUENDORAMONA
AUG
U
S
T
A
LYNDHURSTAUDRAIN
WILSONALBIN
LIBERT Y
MAPLE
WILLIAMSLAUR
A
ARDELIA
PEYTONMARCUSEADS
VERNON
DORSET
GAYROLANDGLENECHO
KINGSBURY
MILAN TEA LLINK
VALLECABANNE
PALM
CHAMBERLAINFARISLEROY ROHN
T R E N TON
AMHERST
GARFIELD
OXEYE
KOREA
JOH
N
OAKDALECOLFAXENRIGHTHANLEYENRIGHT
TER M INALPALM
TERR
YBROWNHAMILTONEAST
CATES
MAPLE
OLIVE BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12063
Wastewater
15
$5,120,000
University City
Lemay/RDP
University City Branch
Capital
174Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST(BEL-NOR)
Construction Task
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE 44,000 FEET OF PUBLIC SEWERS USING THE CURED INPLACE PIPE METHOD.
§¨¦170
§¨¦70
§¨¦170
HANLEYMETRO LINKWESTLA C K LA NDE
ASTHILLSLUCASNHUNTBERMUDAMAR
K
E
TNORTH N SOUTHPRIVATEWHEATONWALTONENDICOTTMONROE ROLANDRAMONA
AUGUSTA
LYNDHURSTAUDRAIN
BLOO
M LINCOLNPAGE
NOL
A
NORTH
ALBIN
HUME SHIRLEYA
L
E
R
TBRISTOWANN
EADSKINCAID CLER
GLENEC H O
GEI G E R
LEADALEBELLE RIVELINKMALINEARDELIA
MYR
O
NEDGARCONNORLUCASSARGENTRIDGEVIEW
M
A
YBELLEKENDALE
UNDERH
I
L
L
MARILLAC
SANDIEGO
FERGUSONMAR
C
E
L
L
A
ALL
E
N
WOLTERSALERNOEVAR
T
S
WINFIELD
PAR
K
TR
U
M
B
E
L
L
JANE
H ORATIO MONITEAUELA
I
N
E
GREENDALE
STILLWATERNORDICLOYD
SHELLBARK
MARILAC
HARRYSST MARYSTAB
E
R WALKERRENZ
CO
R
YBERGAMOT ARCOLAG A R D E N
WASHINGTON
PR I V A TEPRIVATEEASTCLER WEST
METRO LINKSTCHARLESROCKRD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12435
Wastewater
15
$4,530,000
Various
Lemay/RDP
University City Branch
Capital
175Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST(HANLEY HILLS)
Construction Task
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE 50,000 FEET OF PUBLIC SEWERS USING THE CURED INPLACE METHOD.
PAGEHANLEYTERMINAL
LYNNNORTH N SOUTHRAFTMONROE
BLO
O
M
PENNSYLVANIALAMBLIBERTY MALLARD
ALER
T
MADISON
TITUS
UTICAMILAN
TEAL
EADS
D U S K Y
QUENDOVIN
I
TA
UNDERHILL
R ACI N E
ELLERTON
FLORA
WINFIELD
PURDUELEADALE
TRENTON FALCONW A Y NE HAYWO
OD
PRI
V
A
T
E
FARISBALF
O
U
R
JACKSONSTILLWATERRUDDYCOLFAXJEFFERSONRAVENDRIFTWAY
BRADFORDFAIRHAM HARRISONLYNDALECO
R
Y
RABEBAINBRIDGEEA
STMONTA
L
L
E
N
GREEN LARCHPENFIELDELTORA
MADISON
TRENTON
BLOOM
MILANVINITAUNDERHILL
MALLARD
WAYNEHARRISON §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12436
Wastewater
15
$4,530,000
Various
Lemay/RDP
University City Branch
Capital
176Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UNIVERSITY CITY SANITARY STORAGE FACILITY(HAFNER CT)
Land Purchase
6660 - SanitaryReplacement Fund
SANITARY STORAGE IS NECESSARY IN THE UNIVERSITY CITYWATERSHED FOR FLOW ALLOCATION TO THE LEMAY TREATMENTFACILITY DURING WET WEATHER EVENTS.
CONSTRUCT A 6.5 MILLION GALLON UNDERGROUND STORAGEFACILITY.82NDCANTON
81STGRANTFAIRVIEWBRADDOCK
WESTOVERHAFNERGLENSIDEVAUGHANMENDELLBLANCHA GROBYLAUGHRENARCHER
ELMORE
RICHARD LAUGHLINORCHARD
V A RDAM A N
COOLIDGE
PRESIDIO
BRIAR
MALIBOU
BRADDOCK
MENDELLOLIVE BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11992
Wastewater
13
$4,000,000
University City
Lemay/RDP
University City Branch
Capital
177Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UPPER COLDWATER SECTION D I/I REDUCTION
Construction, Phase II
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 3,200 FEET OF 12-INCH STORM SEWER, AND REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11926.
§¨¦70
§¨¦170
§¨¦170
WRIGHTMETRO L I N K
NORTH HANLEYKATHLYN
BOBBWOODSONGUTHRIEJANEEMINENCE HANCOCKGERALDINEENGLERMCKIBBONCALVERTSIMS MADISONASHBYLAMBERTINTERNATIONAL
MARGOANN
WISMERSCUDDER
DIXBOSWELL5TH
HAROLDEDMUNDSON BROWNST LEOFAIRFIELDHERBERTPEAR TREE
BATAAN
MARVINCAMTIPTONGENAIRE
ISOLDASTGREGORYMCNULTYTREADWAY LAGUARDIAW INNMURIEL
ROYEASTRIDGEPATRIC
K LEBOURGETEDMUND
LEI
T
HMARSHALLVANCELIVINGSTON
ROYALTONISAB ELLE
HOL
T
W
I
C
KINDUSTRIAL HEATHGORDONAIRWAYGORDONHAROLD
METROLINK
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11681
Wastewater
15
$450,000
Various
Coldwater
Coldwater Creek
Capital
178Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UPPER COLDWATER SECTION D I/I REDUCTION
Construction, Phase II
5564 - Coldwater CreekOMCI Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 3,200 FEET OF 12-INCH STORM SEWER, AND REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11926.
§¨¦70
§¨¦170
§¨¦170
WRIGHTMETRO L I N K
NORTH HANLEYKATHLYN
BOBBWOODSONGUTHRIEJANEEMINENCE HANCOCKGERALDINEENGLERMCKIBBONCALVERTSIMS MADISONASHBYLAMBERTINTERNATIONAL
MARGOANN
WISMERSCUDDER
DIXBOSWELL5TH
HAROLDEDMUNDSON BROWNST LEOFAIRFIELDHERBERTPEAR TREE
BATAAN
MARVINCAMTIPTONGENAIRE
ISOLDASTGREGORYMCNULTYTREADWAY LAGUARDIAW INNMURIEL
ROYEASTRIDGEPATRIC
K LEBOURGETEDMUND
LEI
T
HMARSHALLVANCELIVINGSTON
ROYALTONISAB ELLE
HOL
T
W
I
C
KINDUSTRIAL HEATHGORDONAIRWAYGORDONHAROLD
METROLINK
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11681
Wastewater
15
$970,000
Various
Coldwater
Coldwater Creek
Capital
179Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
VINITA DRIVE SANITARY RELIEF
Construction Task
6660 - SanitaryReplacement Fund
CONSTRUCTED SSO ELIMINATION REQUIRED BY CONSENT DECREE.
CONSTRUCT 650 FEET OF 12-INCH SANITARY SEWER. ELIMINATECONSTRUCTED SSO OUTFALL BP-412.HANLEYMONROEVIN
I
TA
TITUS
MADISON
ALER
TSTILLWATERBLO
O
M
DRIFTWAYUND
E
R
H
I
L
L
BLUEMONT
GARFIELD
JACKSON
BUCHANAN
ALER
T
VINITAMONROE
MADISON
BLOOM
UNDERHILL
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11089
Wastewater
15
$250,000
Hanley Hills
Lemay/RDP
University City Branch
Capital
180Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WEBSTER GROVES TRUNK E SANITARYREHABILITATION AND I/I REDUCTION PHASE IV
Construction Task
6660 - SanitaryReplacement Fund
BUILDING BACKUPS DUE TO OVERCHARGED AND DETERIORATEDSANITARY SEWERS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
§¨¦44BERRYUNIONPACIFIC
LOCKWOOD
KIRKHAM
GRAYDICKSONEDGARLACLEDESTATIONGOREOLD WARSON
NEWPORT
GLENDALE
BURLINGTO
N
N
O
R
T
H
E
R
N
S
A
N
T
A
F
E
LEE
ELMCLARK
BOMPARTHANLEYSAPPINGTONESSEX
HOLMESMAPLEODAYLILACBELLBAKER
BISMARK
JACKSON
BROWNELL
ARGONNE
ATALANTAGL ENBRENTWOODOAK TREE
EUCLID
LITHIABENNETTMADISON
P ACIFIC
PLANTBACON
SUMMITJOYLOUISADAMS
MADGE
ANDREWJEFFERSONSYLVESTERSCOTT OA KGILBERT
O A K L A N D SALEMPARKMARYAUSTINFAIRVI EWHOLLANDMCKINLEY
IOLAREAVISNORTH
YEATMANG A R D E NROCK HILLG
R
ANTPAPIN
IMSEKORTWRIGHTSPRINGFO RESTCLARAHOLLYWOODDESPERES WILSHUSENWAYMIRE
ALMASELMAJOANNA
EUNICE
DOBBIN
RAVENSRIDG
E
HIGHHAMP TONFIELDSTON
VICTORIA
WARWICK
MOODY
ARBOR
HULLRUTHBUSCHTYLEREAST PORTERGROVE
COLLEGE HILLDALELOCKSLEYCEDARWOODLAWNGASLITE
MABELMINTURN ROCK HILLOAKSELMAELMBERRY
ELMELMSUMMIT
MA
P
L
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11678
Wastewater
15
$3,800,000
Webster Groves
Lemay/RDP
Deer Creek
Capital
181Page
22 April 2015
Page 1 of 1
WASTEWATER CONTINUED PROJECTS - FY16
PROJECT
NUMBER
PROJECT NAME REASON PROJECT CONTINUED COST
ESTIMATE
11788 CAULKS CREEK PUMP
STATION B FORCEMAIN
PROJECT CONTINUED DUE TO COORDINATION WITH
RAILROAD AND CORPS OF ENGINEERS. ANTICIPATE
BOARD INTRODUCTION IN SEPTEMBER, 2015.
$3,100,000
11809 COLDWATER CREEK
WWTF SCREENINGS &
WASHER/COMPACTOR
IMPROVEMENTS
PROJECT CONTINUED DUE TO SCOPE CHANGE.
ANTICIPATE BOARD INTRODUCTION IN AUGUST, 2015.
$3,300,000
10440 FORESTWOOD LATERAL
SANITARY RELIEF (SKME-
321)
PROJECT CONTINUED DUE TO COORDINATION WITH THE
CITY OF FERGUSON AND SCOPE CHANGE. ANTICIPATE
BOARD INTRODUCTION IN AUGUST, 2015.
$2,100,000
10716 NEW ENGLAND TOWN
QUARRY PUMP STATION
(P-307) (SKME-544)
IMPROVEMENTS
PROJECT CONTINUED DUE TO EASEMENT ACQUISITION.
ANTICIPATE BOARD INTRODUCTION IN AUGUST, 2015.
$4,200,000
12460 OAKLAND COMBINED
SEWER DETENTION AND
STORAGE (CLAYTON AVE
AND OAKLAND AVE)
PROJECT CONTINUED DUE TO COORDINATION WITH ST.
LOUIS ZOO. ANTICIPATE BOARD INTRODUCTION IN MAY,
2016.
$1,000,000
10390 RIDGEMOOR DRIVE I/I
REDUCTION & STORM
IMPROVEMENTS (SKME-
574)
PROJECT CONTINUED DUE TO COORDINATION WITH THE
CITY OF CLAYTON AND SCOPE CHANGE. ANTICIPATE
BOARD INTRODUCTION IN NOVEMBER, 2015.
$100,000
10390 RIDGEMOOR DRIVE I/I
REDUCTION & STORM
IMPROVEMENTS (SKME-
574)
PROJECT CONTINUED DUE TO COORDINATION WITH THE
CITY OF CLAYTON AND SCOPE CHANGE. ANTICIPATE
BOARD INTRODUCTION IN NOVEMBER, 2015.
$1,200,000
10390 RIDGEMOOR DRIVE I/I
REDUCTION & STORM
IMPROVEMENTS (SKME-
574)
PROJECT CONTINUED DUE TO COORDINATION WITH THE
CITY OF CLAYTON AND SCOPE CHANGE. ANTICIPATE
BOARD INTRODUCTION IN NOVEMBER, 2015.
$800,000
11069 ROCK HILL SANITARY
RELIEF (SKME-618)
PROJECT CONTINUED DUE TO EASEMENT ACQUISITION.
ANTICIPATE BOARD INTRODUCTION IN SEPTEMBER, 2015.
$1,350,000
10026 UPPER MALINE TRUNK
SANITARY RELIEF PHASE
IV SECTION A
PROJECT CONTINUED DUE TO EASEMENT ACQUISITION.
ANTICIPATE BOARD INTRODUCTION IN JUNE, 2015.
$7,500,000
TOTAL: $24,650,000
22 April 2015
Page 1 of 2
WASTEWATER CONSTRUCTION
CONTINGENCY PROJECTS - FY17
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12102 BRIDGEVALE I/I REDUCTION (BRIDGEVALE
AVE AND LAKEVIEW AVE)
$80,000 182
12119 CHAPEL HILL I/I REDUCTION (MATTIS RD AND
VENARDE DR)
$140,000 183
12432 CREVE COEUR CREEK PUBLIC I/I REDUCTION
SOUTH
$5,900,000 184
11155 DAMMERT AND BROADWAY SANITARY
RELIEF (SKME-551)
$5,000,000 185
11731 DEER CREEK SANITARY TUNNEL (CLAYTON
RD TO RDP)
$1,500,000 186
11731 DEER CREEK SANITARY TUNNEL (CLAYTON
RD TO RDP)
$50,000,000 187
10601 FF-16 SCHUETZ - MEADOWSIDE TO PAGE
SANITARY RELIEF
$3,000,000 188
11137 GASLIGHT SQUARE SEWER IMPROVEMENTS $4,000,000 189
12488 LEMAY PUMP STATIONS 1 AND 2
IMPROVEMENTS
$3,500,000 190
12428 LEMAY WWTF CONCRETE PRESERVATION $1,250,000 191
11653 MACKENZIE I/I REDUCTION $2,400,000 192
10716 NEW ENGLAND TOWN QUARRY PUMP
STATION (P-307) (SKME-544) IMPROVEMENTS
$3,100,000 193
11877 PRIVATE INFLOW AND INFILTRATION
REDUCTION PROGRAM
$500,000 194
11094 PROSPECT HILL LANDFILL VERTICAL
EXPANSION
$4,500,000 195
11919 ROLENS AND TELEGRAPH SANITARY
STORAGE
$710,000 196
11990 SAPPINGTON CREEK I/I REDUCTION (GRAVOIS
RD AND SAPPINGTON RD)
$280,000 197
11059 SENECA PRIVATE I/I REDUCTION $1,300,000 198
22 April 2015
Page 2 of 2
WASTEWATER CONSTRUCTION
CONTINGENCY PROJECTS - FY17
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11059 SENECA PRIVATE I/I REDUCTION $3,500,000 199
11667 STERLING PLACE SEPARATE SEWER I/I
REMOVAL
$1,820,000 200
12237 TRAMPE (PARTIAL) I/I REDUCTION (CASTILON
AVE AND TRAMPE AVE)
$50,000 201
11671 UNIVERSITY CITY I/I REDUCTION - EAST (WC-
01, WC-02, & WC-03)
$1,100,000 202
12437 UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (UR-08 AND UR-09)
$6,400,000 203
12438 UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (UR-10)
$2,415,000 204
11992 UNIVERSITY CITY SANITARY STORAGE
FACILITY (HAFNER CT)
$3,700,000 205
10026 UPPER MALINE TRUNK SANITARY RELIEF
PHASE IV SECTION A
$5,000,000 206
TOTAL:$111,145,000
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BRIDGEVALE I/I REDUCTION (BRIDGEVALE AVEAND LAKEVIEW AVE)
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12434.
PRIGGECRITERIONLAVIDACOVE
COAL BANKRAYMONDREALE
TRAMPE
REDMAN
LILACBAYONNE MADRIDJUNE
MAPLE
DORIS
LAREDOMENDOZA CORDO
V
A
CADIGANBOWERSBURLINGTON NORTHERN SANTA FESPANISHTWILLMAN
VALENCIA
FARMVIEW
RIOGARDEN
UPHILLWALKER
CROSSETT
PETITE BRIDGEVALEMC QUAY
ZAMORA
DU B E R R YRUESTAPATTERN
WIDEFIELDS
ECKERTSAEGER
SURF S IDECLAUDINE
TAOSKRENNING LAKEVIEW
BROADLAWNS
MAJORCAFAIRMEADOWS
PRIVATEBRIARB R A E
SENATE
R IO G RANDERIAZAJARDINCOPPERGATE
LYDIACASTILONDELREOBEL
L
P
A
R
K
ELENOREELTIGRE
CARAWAYPRIGGE
FARMVIEW
LAKEVIEW
COVE
REDMAN
TRAMPE
P R IV ATE
FARMVIEW
REALE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12102
Wastewater
15
$80,000
Unincorporated
Bissell
Spanish Lake
Capital
182Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CHAPEL HILL I/I REDUCTION (MATTIS RD ANDVENARDE DR)
Construction Task
6660 - SanitaryReplacement Fund
INSUFFICIENT CAPACITY FOR WET WEATHER FLOWS IN SOMESEGMENTS OF SEWER.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12434.
§¨¦270
§¨¦55
§¨¦270
§¨¦55
MA
T
T
I
S
T
H
E
I
S
S
CO
N
C
O
R
D
AMBSVO NTALGEK
E
N
N
E
R
L
Y
GE
R
A
L
D
TOWNECENTRE
KE
M
P
F
GREGORY
CARIBEEDIERSELIVALMEYERTESCORDGATESBURY
THEISS
C
O
R
D
GEMINI
DO
R
S
I
E
B R U NSTONLANGTREE VERMILI O NPRIVATE
BUTLERHILL
ST
A
N
H
O
P
E
KERTHFIJIREYNOSA
TEALBYFOUL
KEIME JAMIELONGSPURJOSSE
MUSICC
H
A
P
E
LHILL
A UDJIL LFUCHSLARKINR E VEREWINKEL
W ORTHINGTONCHERYL FLORITONGASA P P I N G T O N
SUNN YVIEW
CAROLYNNE
SHERB
O
RN
E
DAVANA
SEFTONSUNHILL
CHAR WICKBASLERLEONARDHEATHFIELDS
T
G
EMM
E
F IV E OAKSBRIDLEW O O D
OL
D
E
S
I
L
V
E
R
VALLE
Y
CREST
VILLA KNOLLLODGEWOODJU
E
N
G
E
L
NEELYTITANADAMSCONGER
BR
A
W
L
E
Y
ROB ID O U X CONCORDOA K S
QUAIL RUN
T
O
WNESOUTHOLDTES SONFIELDBROOK
ASHLEYTAMARA
MERITOOLD TESSONPRIVATEPR IVATEFUCHSTESSON FERRY RDLEMAY FERRY RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12119
Wastewater
15
$140,000
Unincorporated
Meramec
Mattese Creek
Capital
183Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CREVE COEUR CREEK PUBLIC I/I REDUCTIONSOUTH
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS.
REHABILITATE PUBLIC SEWERS USING THE CURED IN PLACE PIPEMETHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 12135.
§¨¦64
§¨¦270
§¨¦64
§¨¦270
LADUE
CLAYTONMASONWOODSMILLNORT H F ORTYMOSLEYS O U T H FORTY EMERSONW
EI
D
MANROSSSOUTH OUTERFORTY TEMP
O
FALAISEBALLASSCHU
L
T
E
OAKAMBOIS
BABLERRUHLCARBERRY
FOR E S T C R E S T
G LEN COVE
STUDT
TAMMANYPRIVA
T
E CRAIGCRAIG V I E W
DRYRIDGEBRIDLEWALLIN G
NIMES
MASON MANOR
MAGNA
C
A
R
T
A
CR
O
S
STRAILS
BOPP
KR
O
P
P
LAKESHORE
KINGS GLEN
DUBON ACTIVEBO
X
F
O
R
D
PRIORY CLIONARAMISDEVONDALEYVESHARFLOLADUEFARM
TUREENFAIRWAYS
TUCKERROYAL MAN O RKRAM
HEWLETTREVEREHIBLER
PRIVA T E
MASONPRIVATEPRIVATE
OLIVEBLVD
SMO141HWY§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12432
Wastewater
15
$5,900,000
Various
Missouri
Creve Coeur Creek
Capital
184Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DAMMERT AND BROADWAY SANITARY RELIEF(SKME-551)
Construction Task
6660 - SanitaryReplacement Fund
TWO SSOS AND A PUMP STATION REQUIRE ELIMINATION.
CONSTRUCT 10,000 FEET OF 8-INCH TO 24-INCH SANITARY SEWER, ANDREMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. ELIMINATECONSTRUCTED SSO OUTFALLS BP-515 AND BP-624, AND PUMP STATIONP-327.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11927.
§¨¦55
§¨¦55
WACHTELBA
Y
L
E
S
S
ZEISSHOF
F
M
E
I
S
T
E
RPARDELLAREED DA
V
I
S
FAN
N
I
E
ARLEE MILITARYGENTRYP R IV ATEAVENUE HPAU
L
E
MA
R
C
E
A
U
ORI
E
N
T
HU
R
C
KGRAND
UNION PACIFICCLYDEERSKINEWEBERMINNESOTAETTA
CA
T
A
L
A
N
HO
R
N
MO
U
N
T
O
L
I
V
E
FELTON
NAE
R
TVIRGO MICHIGANDALLASGOETZVEGAS
JOPLINPERRINUNIONLORETTAREGINA LAG
R
O
KAY
S
E
R
WEI
S
S
PLA
C
I
D
MANNCORMAR
VELMARUPRECHTLANDOR
BLUE RIDGEDU
M
O
N
T
SANT EN
HOLDEN
CLE
V
E
S
BOBRING
CATSKILL
WA
L
L
E
R
ES
P
E
N
S
C
H
I
E
DIDAHOMAJESTY
POINT
RISCH
CARTWRIGHT
PO
E
P
P
I
N
G
AD
E
L
I
A
JEF
F
O
R
D
SAVENUE ISU
S
A
N BAUMANNPRI
M
M
OLD COU
NT
Y
DAMMERTBA
R
T
O
L
E
T
ELI
A
S
FA
W
N
BAY
L
E
S
S
DAMMERTVELMA
WA
L
L
E
R
FAN
N
I
E
WEI
S
S
PAU
L
E
FELTON
HO
R
N
KAY
S
E
R
ORI
E
N
T
UNIONPACIFICPRIV
A
T
EREGINAWAL
L
E
R
ETTA
WEI
S
S
LEMAY FERRY RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11155
Wastewater
15
$5,000,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
185Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK SANITARY TUNNEL (CLAYTON RD TORDP)
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW AND INFILTRATION CAUSING SURCHARGING INEXISTING SEWERS AND ACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 20,000 FEET OF 19 FOOT DIAMETER SEWER, PUMP STATION,AND DIVERSION STRUCTURES.
§¨¦64
§¨¦44
§¨¦170
§¨¦64
DALEMETROL
IN
K
ELMMCKNIGHTLAYPINE
UNIONPACIFICWYDOWN
FORSYTH
PERNOD
FYLER
FOLK
LOCKWOOD LANSDOWNE
NEWPORT
MARSHALL
LEE YALECLARK
LITZSINGER
ARSENALLACLEDESTATIONSOUTHWESTBRENTWOODHANLEY
G
O
R
E
W E LLSPRICE
ODAYDAVIS
LINDENWOOD
ETHEL
BANCROFT
BRADLEY
FORES T P A R K
WHITE
ODELL
BELLBREDELLBISMARK
SCANLANBOLANDSUTTONEULALIEGLEN
ARUNDEL
EUCLID FRANCISS
WAN
WEST PARK
PAR K
OAKLAND
LITHIA
WABASHDANIELP ACIFIC
SUMMITZEPHYR
OLD WARSONCELLA FORESTLOUISMARQUETTE
W I L L I A MS
ALAMO
LAGOON
MARDELMCCUTCHEONROANOAKLOUWENFLORA
WRENWOOD
MARYASBURYBRUNO
GLADES
JEROME
MANHATTANPRATHERIOLAWISE
YEATMANCECELIAEA G E R
ROSE
C E C ILOXFO RDGODWIN
Y ORKPARKDALE
LYLEDESPERESARLINGT
O
NLANGTON TAMMVILLA
CROMWELL
LAFAYETTEKRAFTINDIAN
FAUQUIER
DOLAN
JAMIESONMERRITT
PORTERCEDAR
BERRY TAMMUNIO N P A CIFICMARYETHEL
WHITEPARK
BANCROFT
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11731
Wastewater
11
$1,500,000
Various
Lemay/RDP
Deer Creek
Capital
186Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK SANITARY TUNNEL (CLAYTON RD TORDP)
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW AND INFILTRATION CAUSING SURCHARGING INEXISTING SEWERS AND ACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 20,000 FEET OF 19 FOOT DIAMETER SEWER, PUMP STATION,AND DIVERSION STRUCTURES.
§¨¦64
§¨¦44
§¨¦170
§¨¦64
DALEMETROL
IN
K
ELMMCKNIGHTLAYPINE
UNIONPACIFICWYDOWN
FORSYTH
PERNOD
FYLER
FOLK
LOCKWOOD LANSDOWNE
NEWPORT
MARSHALL
LEE YALECLARK
LITZSINGER
ARSENALLACLEDESTATIONSOUTHWESTBRENTWOODHANLEY
G
O
R
E
W E LLSPRICE
ODAYDAVIS
LINDENWOOD
ETHEL
BANCROFT
BRADLEY
FORES T P A R K
WHITE
ODELL
BELLBREDELLBISMARK
SCANLANBOLANDSUTTONEULALIEGLEN
ARUNDEL
EUCLID FRANCISS
WAN
WEST PARK
PAR K
OAKLAND
LITHIA
WABASHDANIELP ACIFIC
SUMMITZEPHYR
OLD WARSONCELLA FORESTLOUISMARQUETTE
W I L L I A MS
ALAMO
LAGOON
MARDELMCCUTCHEONROANOAKLOUWENFLORA
WRENWOOD
MARYASBURYBRUNO
GLADES
JEROME
MANHATTANPRATHERIOLAWISE
YEATMANCECELIAEA G E R
ROSE
C E C ILOXFO RDGODWIN
Y ORKPARKDALE
LYLEDESPERESARLINGT
O
NLANGTON TAMMVILLA
CROMWELL
LAFAYETTEKRAFTINDIAN
FAUQUIER
DOLAN
JAMIESONMERRITT
PORTERCEDAR
BERRY TAMMUNIO N P A CIFICMARYETHEL
WHITEPARK
BANCROFT
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11731
Wastewater
15
$50,000,000
Various
Lemay/RDP
Deer Creek
Capital
187Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FF-16 SCHUETZ - MEADOWSIDE TO PAGESANITARY RELIEF
Construction Task
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 9,940 FEET OF 27-INCH TO 36-INCH SANITARY RELIEFSEWERS FROM SCHUETZ ROAD NEAR MEADOWSIDE DRIVENORTHWEST TO ADIE ROAD. ELIMINATE CONSTRUCTED SSO OUTFALLBP-076.
ADIE
PAGE BALLS
C
H
U
E
T
Z
LACKLAN
D
ARC
PAGESERVICEPRIVATENORFOLK SOUTHERNWESTLINE INDUSTRIALCENTERLINE INDUSTRIALC
E
N
T
R
A
L
M
I
D
L
A
N
DVERNA
L
A
KESIDECR O S S IN GHAMMERADMINISTRATION
PAGE
A D M IN IS TRATION
PRIVATE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10601
Wastewater
15
$3,000,000
Maryland Heights
Missouri
Fee Fee Creek
Capital
188Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GASLIGHT SQUARE SEWER IMPROVEMENTS
Construction Task
6660 - SanitaryReplacement Fund
OVERCHARGED COMBINED SEWERS CAUSING WET WEATHERBUILDING BACKUPS.
CONSTRUCT 6,300 FEET OF 8-INCH TO 24-INCH SANITARY SEWER ANDONE PUBLIC PUMP STATION.
OLIV
E SARAHLINDELL
BOYLEDEL
M
A
R
NEWSTEADWAS
H
I
N
G
T
O
N
ENRI
G
H
T
MCP
H
E
R
S
O
N
BELL
WHITTIERWES
T
M
I
N
S
T
E
R
MARYLANDTAYLOR
LACLEDE
WEST PINE
RAIL
R
O
A
D
PERSHING
FOREST PA
R
K VANDEVENTERPENDLETONGREENWICHNEWSTEADPENDLETONWES
T
M
I
N
S
T
E
R
MARYLAND
LACLEDE
MCP
H
E
R
S
O
N WHITTIERWEST PINE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11137
Wastewater
15
$4,000,000
St. Louis City
Bissell
Western Mill Creek
Capital
189Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY PUMP STATIONS 1 AND 2 IMPROVEMENTS
Construction, Phase I(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
AGING AND FAILING SYSTEMS IN NEED OF REPLACEMENT ANDUPGRADE TO ENSURE CONSENT DECREE COMPLIANCE.
CONSTRUCT MECHANICAL GATE REPLACEMENT, UPGRADEELECTRICAL SYSTEMS AND SWITCH GEAR, AND UPGRADE PUMPS.
FY16 CONSTRUCTION BUDGET IS FOR EQUIPMENT PROCUREMENT,WITH THE BALANCE OF CONSTRUCTION WORK FUNDED IN FY17.
MA
R
C
E
A
U
HU
R
C
K
DA
V
I
SVIRGINIA
CA
T
A
L
A
NMINNESOTANEL
L
I
E
ES
P
E
N
S
C
H
I
E
DIDAHOAD
E
L
I
A
PENNSYLVANIAFAN
N
I
E WEBERMICHIGANLUX
E
M
B
U
R
G MICHIGANMICHIGANLEMAY FERRY RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12488
Wastewater
15
$3,500,000
St. Louis City
Lemay/RDP
River Des Peres
Capital
190Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY WWTF CONCRETE PRESERVATION
Construction Task
6660 - SanitaryReplacement Fund
CONCRETE DECKS AND EFFLUENT CHANNEL ARE IN VARIOUS STATESOF DETERIORATION.
REPAIR AND/OR REPLACE DETERIORATED CONCRETE DECKS IN ALLOUTSIDE PROCESS AREAS AND FINAL SETTLING TANK EFFLUENTCHANNEL.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
ETTA
VELMA
P
R
I
V
A
T
E
H
O
F
F
M
E
I
S
T
E
R
WEI
S
S
MILITARYHOR
N
MANN
UNION PACIFICG
O
E
T
Z
CARTWRIGHT
RUBYLAG
R
O
FRA
N
K
E
UNION PACIFICUNION PACIFICVELMAUNION PACIFICUNIONPACIFICP
R
I
V
A
T
E
P
R
I
V
A
T
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12428
Wastewater
15
$1,250,000
Unincorporated
Lemay/RDP
Lemay Creek
Capital
191Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MACKENZIE I/I REDUCTION
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 1,100 FEET OF 12-INCH TO 18-INCH SEWER AND REMOVEPRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 11931.
§¨¦44
§¨¦44 ELMROCK HILLEDGARGRAYGOREGLENDALE
LACLEDE STATIONTULIP LILACBAKER
JACKSONMAPLE
BURLINGT
O
N
N
O
R
T
H
E
R
N
S
A
N
T
A
F
E
O L D WATSON SELMAOAK TREEUNIONPACIFIC
HEEGEHOLLYROSEWELLSTURFLINUMSYLVESTERDRAYTONFLORENCE
RIDGE
REAVISBELTONS H E R W O O D
PARK
GARDEN
PAPIN
IMSECA N N ONBURYALBANYJEFFERSONSOUTHSIDE
ECKRIC
H
FOREST
LANVALECLARA
INNISFAIL
HAMPSHIRECENTRAL WEIL
PINETREEL IGGETT
VIRGINIA
CHESHIREALMACHAPELFORDYALE
G
R
ANTDOBB INFIELDSTON SOMERWORTHCEDAR
R O S E ACREHOLLYWOOD
GENER A L S HER IDAN
SWON
PLANTOAKSCHESTNUT
LARKHILL
P A S A DENAOLIVE PRIVATE BUSCH
C
RO
Y
DONVIOLET
LACLED E G R O V E S
RONALDFIRW OODF
O
U
R
N
I
E
R
G E N E R A L S H E RMAN
WOO
D
L
A
W
N
LYMAN CARM
E
L
DALGREN
LOCUST
CATALPA
AMBERGATE
CAMELLIA
WORTHINGYORKSHIRE BRADFORD
IVANHOEOLA ASHBURYREGENT
CLOVERELMELMSWON
LANVALEJACKSON
ROSE
GRANT
ROCKHILL PLANTSELMAGARDEN
TULIP
WATSON RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11653
Wastewater
15
$2,400,000
Various
Lemay/RDP
Mackenzie Creek
Capital
192Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
NEW ENGLAND TOWN QUARRY PUMP STATION(P-307) (SKME-544) IMPROVEMENTS
Construction, Phase I(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
TWO LIFT STATIONS ARE AT THE END OF THEIR LIFE CYCLE, AND ONE ISRECEIVING ADDITIONAL FLOWS DUE TO ELIMINATION OF A PUMPSTATION.
CONSTRUCT 8,900 FEET OF 8-INCH TO 18-INCH SANITARY SEWER ANDELIMINATE TWO PUMP STATIONS (P-307 AND P-323).
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 17. TOTAL BUDGET IS $7,300,000.
§¨¦255§¨¦255
UNION PACIFICKOCH
PO
T
T
L
E
CLIFF
CAV
E BUS SE N
FOR
D
E
R
MAGOFFIN
KINSWOOD
BURNCOATE
EN GLANDTOWN
YAEGER
BLUFF PRIVATEMARTIGN E Y
ROSYC A T HEDRAL
BUSSEN QUARRYROBERTKOCHHOSPITALKINGSPARKKYMBORDEAUX
WHITSHIRE
P I E R WOODC
H
ATPORTDOBERASHFIELDROL
E
N
S
GOLDENVA L L E Y
BAUMGARTNER
PIONE E RBLACKFORES T SNELSONBERTRA
N
D
SKY H
ILL
LI
S
I
E
U
X
M ASSABIELLEGLENRICHOA KW OODPRIVATEPRIVATEPRIVATEPRIVATE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10716
Wastewater
15
$3,100,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
193Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
PRIVATE INFLOW AND INFILTRATION REDUCTIONPROGRAM
Work Order Repair Costs(Capital)
6660 - SanitaryReplacement Fund
PRIVATE SOURCES OF INFLOW AND INFILTRATION ARE OVERCHARGINGSANITARY SEWERS.
CONTINUE PROGRAM TO REDUCE PRIVATE INFLOW AND INFILTRATIONFLOW SOURCES FROM THE SANITARY SYSTEM.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11877
Wastewater
17
$500,000
Various
Various
Various
Non-recurring
194Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
PROSPECT HILL LANDFILL VERTICAL EXPANSION
Construction, Phase II
6660 - SanitaryReplacement Fund
LANDFILL THAT MSD UTILIZES TO DISPOSE OF INCINERATOR ASH ISNEARING END OF USEFUL LIFE.
CONSTRUCT NEW LEACHATE FIELD AND INTERMEDIATE LINER,RETROFIT EXISTING LEACHATE FIELD, AND GRADING.LILACBLUFF
SCENIC
ADRIAN
V
A
L
L
E
YDIAMOND
BURLINGTON NORTHERN SANTA FESCRANTON
C
A
L
U
METLEETON
ST CYR KELVIN
GLOUCESTERFORK
RIVERMONTJE
F
F
R
E
Y
MID R ID G E
PRIVATELOOKO UT
BIRITZ
FARLO
WESTHADDOCK
MARSHFIELD FOR K
P RIVATE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11094
Wastewater
15
$4,500,000
Various
Bissell
MISSISSIPPI RIVER (CITY)
Capital
195Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ROLENS AND TELEGRAPH SANITARY STORAGE
Construction Task
6660 - SanitaryReplacement Fund
REMOVAL REQUIRED OF SSO BP-222 AND SSO BP-516.
CONSTRUCT 420 FEET OF 60-INCH SANITARY SEWER FOR STORAGE, AND220 FEET OF 8-INCH TO 10-INCH SANITARY SEWER. ELIMINATECONSTRUCTED SSO OUTFALLS BP-222 AND BP-516.KINGS PARKROL
E
N
S
CATHEDRALASHFIELDPRI
V
A
T
E
IRONDALE
PO
T
T
L
E
AS
H
R
O
C
K
BURNCOATEPEGASUSM E A D O W F O RD
EL PAULOFOR
D
E
R
BLOOMFIELDGRAYLAND
GRAYF O R D
PINEDALETELEGRAPH RD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11919
Wastewater
15
$710,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
196Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SAPPINGTON CREEK I/I REDUCTION (GRAVOIS RDAND SAPPINGTON RD)
Construction Task
6660 - SanitaryReplacement Fund
WET WEATHER FLOWS FROM PUBLIC AND PRIVATE SOURCES REDUCETHE CAPACITY OF THE EXISTING SYSTEM.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12061.
EDDIE N PARK
GARBER
SAPPINGTONDENNY
BAPTIST CHURCHLITTIEROBYNPARDEEGEYERMANDA
HILLTOPEMILCRESTOAKDANDRIDGEROXANNAEWERSPATRIN A
HELTA BUXTONRUSDO
N
TWILIGHTPRIV A T E
MAPLELAVANT
SHEA
LINCORDF A WN H A VEN
CONCORDG OLF CREST
CRESTWICKSAPPINGTONACRESCINN A B A R
KAPPBRIARSTONEDEVESTEALRIDGE
OASIS
CRAIGWOOD
HADLEY HIL
L
WISTERIASTOLZ
F
O
X
GLEND OVERHIL L
VALD A M E R E
JO
AN GENELGOLTERMANCOR DOBAMUGAN
L
A
SVEGASBE
T
H
SKY CRESTLARKRIDGE
TIM
BER C REEKPINE SPRAY
CARAVAN
SPITZRICHTER
MILL H IL L PARKLINDDESM ONDCOSMOSGR
A
NTFARM
ALPENAWESTMINSTER
WESTWICK
MORESIALEPPODONALDSROSALINDPRIVATE GRAVOIS RD
S LINDBER
G
H
B
L
V
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11990
Wastewater
15
$280,000
Sunset Hills
Lemay/RDP
Gravois Creek
Capital
197Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SENECA PRIVATE I/I REDUCTION
Construction Task
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION FROM PRIVATE SOURCES CAUSINGBUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 5,700 FEET OF 12-INCH TO 24-INCH STORM SEWER ANDREMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
§¨¦170
§¨¦170BROWNLACKLANDBURNSECHO
RIDGE WOODSONFLORA
MIRIAMHOODTRESCOTT GOODALEMILTONGASSTENNYSON
THEODOSIA
OLDEN
FOREST
GAEBLERLESLIEWENGLERCHARLACKSENECA
EVERMAN
SHERWOODMARLOWE
WABADAY
PALMER
ADDIEWALLISDAWESKENOSHOVERONAROMAINESPENCERCOTE BRILLIANTE HARTLANDSHELLEY
MINERVA BRASS IE
BELT WAYGOTHLANDHOLTWOO
D
GRACELAND
MEADOWBROOK
APACHE
OSAGE
MASHIELEONDALEONEIDA
CEDARGLEN
SHAWNEE
DOYLE
KALEN
SIEVERS
SPENCERMILTONBURNSWABADAYWALLISWALLIS
GOODALEHOODDAWESMILTON
SPENCER§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11059
Wastewater
15
$1,300,000
Overland
Lemay/RDP
University City Branch
Capital
198Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SENECA PRIVATE I/I REDUCTION
Construction Task
5584 - University CityOMCI Fund
INFLOW AND INFILTRATION FROM PRIVATE SOURCES CAUSINGBUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 5,700 FEET OF 12-INCH TO 24-INCH STORM SEWER ANDREMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
§¨¦170
§¨¦170BROWNLACKLANDBURNSECHO
RIDGE WOODSONFLORA
MIRIAMHOODTRESCOTT GOODALEMILTONGASSTENNYSON
THEODOSIA
OLDEN
FOREST
GAEBLERLESLIEWENGLERCHARLACKSENECA
EVERMAN
SHERWOODMARLOWE
WABADAY
PALMER
ADDIEWALLISDAWESKENOSHOVERONAROMAINESPENCERCOTE BRILLIANTE HARTLANDSHELLEY
MINERVA BRASS IE
BELT WAYGOTHLANDHOLTWOO
D
GRACELAND
MEADOWBROOK
APACHE
OSAGE
MASHIELEONDALEONEIDA
CEDARGLEN
SHAWNEE
DOYLE
KALEN
SIEVERS
SPENCERMILTONBURNSWABADAYWALLISWALLIS
GOODALEHOODDAWESMILTON
SPENCER§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11059
Wastewater
15
$3,500,000
Overland
Lemay/RDP
University City Branch
Capital
199Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STERLING PLACE SEPARATE SEWER I/I REMOVAL
Construction Task
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERSACTIVATING CONSTRUCTED SSO.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12061 AND PROJECT11927.MACKENZIEWEBER
IVY
RADIOHALEKITLUCIAFORMANVITA
VA
SEL
TIBERL EMONAALTHEA MOHEGAN
NEMO
NIL
E
S
REAVIS BRENDAMAXWELL
ERIEPORTRAMBLERDANACOR A L PILOTNEIERMATHI
LDAASTERE
V
A
NDALE
STERLING PHILODARLOW
AVILATALBOT PAPOOSESPR
I
N
G
UPLAND
ALLEY
PANCHO MONTBROOKANCHORBRINKERL
Y
DEL
L
ARVIN
PRIVATELAVERN
HEIM
CISCOELGINDAISY
ARROW
HOWERTOND
A
R
L
E
N
E
BLACKHAWK
CAYUGA
BREUERATW
OOD WAYNEPAVIA
DA M S O NALPINE
BIXBY
CHARLTONFRANCIS
WARRIORROSEMARYWILMAPALMETTONIGER
SHUFFLEKATHLEENZANEOVERTONHARMONYDEXTER
PAULINE
WAGER
RAYWOOD
HENLINLABETTELENARD
S
W
I
F
T
O
N
AMONA
HALLOCK
DON RON
CITADEL
JESSESTELLAMAC
MOCCASINIRENE
FLAGLERLEONA FLORESD A N A
WEBER
DANAARVIN
FORMAN
ALPINEBRENDA PI
LOTSTERLING
GRAVOIS R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11667
Wastewater
15
$1,820,000
Unincorporated
Lemay/RDP
Gravois Creek
Capital
200Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
TRAMPE (PARTIAL) I/I REDUCTION (CASTILONAVE AND TRAMPE AVE)
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12434.CRITERIONPRIGGELAVIDARAYMOND PIPING
MADRIDTRAMPE
COVE
MALAGA
REALE SPANISHMENDOZAJUNE
MAPLESPANISHPOND VALENCIALAREDO
CORD
OVA
REDMANP IN T A
BOWERSGARDENRIO
COLUMBUS
BAYONNE
WALKERBRIDGEVALE GERONA
WIDEFIELDS NORTHDALE
ECKERTSAEGER
FARMVIEW COLUMBIABOTTOMLAKEVIEW
LAKESIDE
BROADLAWNS ARAGO N
FAIRMEADOWS
BRIARB R A E
R IO G RANDEPRIVATESANTAMARIACABRILLOSCENICLAKE
CROSSETT
COLUMBIA POINTE
D ORISCASTILONDELREOPIZARROELENORE
PRIVATE
FARMVIEW
REDMAN
GERONA
P R IV ATE
TRAMPE
REALE
LAKEVIEW
BRIARBRAE
COVE PRIVATE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12237
Wastewater
15
$50,000
Unincorporated
Bissell
Spanish Lake
Capital
201Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UNIVERSITY CITY I/I REDUCTION - EAST (WC-01,WC-02, & WC-03)
Construction Task
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPSAND OVERCHARGED SANITARY SEWERS.
REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS.
§¨¦70§¨¦170
PAG
E
TERMINALHANLEY
DELMAR
ETZEL GOODFELLOWUNIONMETRO LINKRID
G
E
WEL
L
SBELTNORTH N SOUTHKIENLENMINERVA
C A N TON LUCASNHUNTFERGUSONPURDUEPENNSYLVANIAST L
O
U
I
S
ARLINGTONLILLIAN
MYRO
N
WAB
A
D
A
BARTMER BURDCLARATULANE HELENLA C K LANDSUTTERCATES
E
ASTCLEMENS
EDIS
O
N
SHAFTESBURY
PAS
A
DE
NALYNN
MAR
K
E
T HAMILTONWALTONWESTCORNELL
AMHERST BEGGW
HEATONKINGSLANDRAFTGRE
E
R
PARTRIDGEENRIGHT NELSONOAKWOODWARDERDARBYHODIAMONTMELBAHILLSEDGEWOODCOLONIALSNOW
TEASDALE
WAYNE
JULI
A
N70THDERBYQUENDO
G A NNON
AHERN LAMBAUG
U
S
T
A
LYNDHURSTRAYMOND
LOT
U
S
AUDRAIN
LENOX
WILSONPRIVATENOL
A
ALBIN
MAPLE
MADISO
NBRISTOW
RO
M
A
I
N
E PEYTONEADS
69THVER N O NMANOLA BEULAH
ROLANDELW
A
R
D
LELANDMEYERLEADALE
MILAN
WELLINGTON TEAL
TRINITYDAW
S
O
N
GULFWAGNE
RNIXONVIN
ITA
VALLEBALSON GREGANMARILLAC
FAIRVIEWLEROYLULUCOLBYBRADFORDA
R
D
S
L
E
Y
WOO
D
R
O
W
ARDENPURCELLPATT
O
NELCOWALES
HAYSSALO
M
AEAST
MAPLE
CATES
CATES
RIDGE
BELTMAPLE HAMILTONVERNON WESTOLIVEBLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11671
Wastewater
15
$1,100,000
Various
Lemay/RDP
University City Branch
Capital
202Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST(UR-08 AND UR-09)
Construction Task
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE 70,800 FEET OF PUBLIC SEWERS USING THE CURED INPLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 11984.
§¨¦170
§¨¦170
PAGE
CANTON
DELMAR 82NDNORTH N SOUTHHANLEYTERMINAL
GANNON
GROBY
W
O
O
DS
O
N
CORNELLMCKNIGHT81STOLDBONH
O
MMELYNN
UNION PACIFIC
SHAFTESBURY
LE PEREP
R
I
CEWAYNE
HILLTOPAHERN LAMBWALTON78THB
RADDOCK
ELMORE
A P P L E TONDREXELGRANT
BERICKRICHARDBURNS MILAN
GAYORCHARD MENDELLAMHERST
G ULFM
O
N
A
ENFIELDPICK E R INGKEMPLAND
MINERVA
PRIVATELINK
COOLIDGE
LIBERTY
MONROE
ALICE
SPOON
AL
A
N
SON FAIRVIEWBALSON
HAR N E Y
BELL
CARLETON
EASTOVERJACKSON
RAISHERVINITAWESTOVERBONHILLS
HOW
MELROSE
MOUNT OLIVEDUKERYELAUGHLINSEVILLE
CRIXDALE
VILLA
LADUE HILLS
IROQUOIS
PRICEWO O DSCRYSTALMULBERRYCOLLINGWOODLADELDOLORES SAXONYSTAN F ORDWATSONIA
TRENTON
LOCUST
ALDANWILNERBLANCHA
PARAMOUNT
ANNAVARNEY
REMLEYLIBERTY
BALSONPRICE TRENTON
PAGE
TR E N TON
PRIVATEAMHERSTSTANFORDPRIVATEPRIVATECORNELLGAYHARNEYWAYNE
VILLA
OLIVE BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12437
Wastewater
15
$6,400,000
Various
Lemay/RDP
University City Branch
Capital
203Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST(UR-10)
Construction Task
6660 - SanitaryReplacement Fund
DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I,BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS.
REHABILITATE 32,000 FEET OF PUBLIC SEWERS USING THE CURED INPLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 11983.
§¨¦170
§¨¦170
PAG
EHANLEY
CANTONWOODSONTERMINALLACKLANDBROWNNORTH N SOUTHBURNS82NDWALTONG R OBYPURDUE81STLYNN
RIDGE
U N I O N P A CIFIC RAFTGOODALEMON
R
O
E
ECHO
WAYNE
HILLTOPQUENDOAHERN LAMB78THPRICE
BLOO
MGAEBLERNOL
A
ALBIN
LIBERTY MALLA
R
D
B
RADDOCK
A
L
E
R
T
WATTSELMORE GILROSEWENGLERGRANTBRISTOWEADS
RICHARDBELT WAYTITUS
S
H
E
RID
A
NMCKNIGHTUT
ICASENECA
MENDELLMEYERMILAN
WELLINGTONGULFSHERWOODMARLOWE NIXONVINITAADDIEPICKER I NGMINERVA
PRIVATECARSONWILSO NLINK KENOSHOMILTONFARISR A C I N E
ELLERTON
FAIRVIEWALL
E
N
HARNEY ASHLANDWINFIELD
CARLETONBRASSIE
MERIDIAN
RABEFULLERTONPENNELL
BRADFORDHAFNERHOW
MELROSE
SHELLBARK
VILLA
IROQUOISLEONDALE
REAR
MILLET
TAB
E
R
LOCUST
PARK
NOEL
BLANCHA
PUTTERERITH
KALEN
BURNSMILTONWAYNE
PRICEPRICEMELROSE
OLIVE BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12438
Wastewater
15
$2,415,000
Various
Lemay/RDP
University City Branch
Capital
204Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UNIVERSITY CITY SANITARY STORAGE FACILITY(HAFNER CT)
Land Purchase
6660 - SanitaryReplacement Fund
SANITARY STORAGE IS NECESSARY IN THE UNIVERSITY CITYWATERSHED FOR FLOW ALLOCATION TO THE LEMAY TREATMENTFACILITY DURING WET WEATHER EVENTS.
CONSTRUCT A 6.5 MILLION GALLON UNDERGROUND STORAGEFACILITY.82NDCANTON
81STWAYNEAPPLETON
GRANTGROBYB
R
A
D
D
O
C
K
MILAN
78THFAIRVIEWELMORE
RICHARD MENDELLEASTOVERCOOLIDGE
ORCHARD
WESTOVERHAFNERARCHER
MOUNT OLIVEGLENSIDE 79THSEVILLE
RAISHERLAUGHLINVAUGHANHOW
BLANCHA
AHERNLAUGHRENM
O
N
A
ELENEMORGAN
N O B H I LLBRIAR
MALIBOU
C
O
O
LID
GE
MENDELLOLIVE BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11992
Wastewater
13
$3,700,000
University City
Lemay/RDP
University City Branch
Capital
205Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UPPER MALINE TRUNK SANITARY RELIEF PHASEIV SECTION A
Construction, Phase I(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 7,300 FEET OF 42-INCH TO 48-INCH SANITARY SEWER,INCLUDING PIPE IN TUNNEL. ELIMINATE CONSTRUCTED SSO OUTFALLBP-305.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 17. TOTAL BUDGET IS $12,500,000.HARVEYBERMUDAWOODSTOCK
NORF
O
L
K
S
O
U
T
H
E
R
N
P A U L BARATCARSON
SUBURBA
N
WIEGEL
FERG
U
S
O
N
DARST
DADEGEORGIAWESLEY CLARKLEE
EVANS
TIFFIN CLAYKIRKHILL
HALEYRUGGLES
DUPREEBLANDINGELIZABETH ROYCEFORESTWOODBROTHERTON
CHURCH
HILLSHALPIN
CA STR O
HAWKESBURY BRA N D
H IGHMONT
ELKAN
GRAF HERNBEHLEPAYNEEDG
E
H
I
L
L
WELEBAST
L
O
U
I
S
LOUISA
ROWLESSPRING RENSHAWHARTNETT
PATRICIA
ROBERTA
FERMOHARRISON
FEN
WICKEMERALDDARTMOORMARGUERITEOAK MEADOWCRES
TELMDALE
RE
D
M
O
N
D
FAIRVIEWGRO
V
E
LAURETTEWYLINPRIVATETHOMASM
A
R
V
I
N
LAGONDASCHLUETEROLIVER
ADA MSANNEX
ANABEL
HASTING DAMESANITA
GOD
FREYF A LMOUTHEL
S
I
E
WEEKSESTELLE
TILFORDBRUCENORINE WILLMANNMILLER
TUXEDOHERNDADE H I G H M O N TCLARKTIFFIN
LEEADAMS
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10026
Wastewater
15
$5,000,000
Ferguson
Bissell
Maline Creek
Capital
206Page
22 April 2015
Page 1 of 11
WASTEWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $800,000
11811 Vendor
Services
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2014)
Various $2,000,000
11810 Vendor
Services
CCTV INSPECTION OF SEWERS (2014) Various $1,000,000
12070 Professional
Services
COMPREHENSIVE AMMONIA AND
NUTRIENT REMOVAL MASTER PLAN
Various $1,500,000
11125 Vendor
Services
CRITICAL INFRASTRUCTURE ASSESSMENT Various $1,200,000
11146 Construction
Task
CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $5,000,000
11110 Professional
Services
DEER CREEK SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
11758 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2015) CONTRACT A
Various $70,000
12379 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2015) CONTRACT B
Various $70,000
12380 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2015) CONTRACT C
Various $70,000
12381 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2015) CONTRACT D
Various $70,000
11705 Work Order
Repair Costs
(Non-Capital)
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2016)
Various $1,500,000
11145 Professional
Services
LEMAY SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $760,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $527,000
11699 Professional
Services
PRIVATE INFLOW/INFILTRATION PUBLIC
ENGAGEMENT PROGRAM 2013
Various $565,000
11702 Vendor
Services
RADAR RAINFALL DATA (FY2014)Various $130,000
11153 Professional
Services
RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $500,000
10766 Vendor
Services
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
St. Louis City And
County
$570,000
11916 Vendor
Services
STREAM FLOW WATER QUALITY
SAMPLING (FY 2014)
Various $625,000
22 April 2015
Page 2 of 11
WASTEWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
FUND TOTAL: $17,557,000
4102 - IMPROVEMENT FUND
11898 Work Order
Repair Costs
(Capital)
SUPPLEMENTAL ENVIRONMENTAL
PROJECTS (SEP) PROGRAM
Various $500,000
FUND TOTAL: $500,000
4122 - WASTEWATER EMERGENCY FUND
11107 Construction
Task
EMERGENCY REPAIR FUNDS
(WASTEWATER)
Various $500,000
FUND TOTAL: $500,000
5564 - COLDWATER CREEK OMCI FUND
11719 Construction
Task
BRINWOOD I/I REDUCTION Florissant $300,000
11749 Construction
Task
FLORLAND SANITARY RELIEF PHASE I - I/I
REDUCTION
Various $600,000
11662 Construction
Task
MCNULTY - PALLARDY I/I REDUCTION Various $1,400,000
11663 Construction
Task
MIDLAND SANITARY RELIEF - PUBLIC AND
PRIVATE I/I REDUCTION
Overland $350,000
11681 Construction,
Phase II
UPPER COLDWATER SECTION D I/I
REDUCTION
Various $970,000
FUND TOTAL: $3,620,000
5566 - DEER CREEK OMCI FUND
11115 Construction
Task
CLAVERACH PARK I/I REDUCTION AND
SEWER SEPARATION
Clayton $280,000
10576 Construction,
Phase II
DC-06 DEER CREEK SANITARY RELIEF
PHASE III AND I/I REDUCTION
Various $125,000
11840 Construction
Task
MEADOWRIDGE AND EASTWOOD STORM
AND SANITARY RELIEF
Kirkwood $830,000
11700 Construction
Task
PROVIDENCE SANITARY RELIEF (SKME-640) Webster Groves $50,000
FUND TOTAL: $1,285,000
5571 - GRAVOIS CREEK OMCI FUND
11776 Construction
Task
ALPINE DRIVE SEPARATE SEWER I/I
REMOVAL
Unincorporated $110,000
22 April 2015
Page 3 of 11
WASTEWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
10748 Construction
Task
ROSEMARY, PHILO, & KATHLEEN SEWER
SEPARATION
Wilbur Park $1,700,000
FUND TOTAL: $1,810,000
5576 - MALINE CREEK OMCI FUND
11659 Construction,
Phase II
MARIETTA DR STORM SEPARATION AND I/I
REDUCTION (BP-292)
Normandy $730,000
FUND TOTAL: $730,000
5584 - UNIVERSITY CITY OMCI FUND
11672 Construction
Task
UNIVERSITY CITY I/I REDUCTION - WEST Various $60,000
FUND TOTAL: $60,000
5590 - MO RIVER BONFIL SUBD #448 OMCI FUND
12310 Construction
Task
MISSOURI RIVER BONFILS SANITARY
SEWER REHABILITATION PHASE II
Hazelwood $2,000,000
FUND TOTAL: $2,000,000
5593 - SEM BR OF RIVER DES PERES OMCI FUND
11097 Construction
Task
HOLLY DRIVE SEWER SEPARATION Webster Groves $370,000
FUND TOTAL: $370,000
5594 - BLACK CREEK SUBD #455 OMCI FUND
10390 Construction
Task
RIDGEMOOR DRIVE I/I REDUCTION &
STORM IMPROVEMENTS (SKME-574)
Clayton $800,000
FUND TOTAL: $800,000
6660 - SANITARY REPLACEMENT FUND
11993 Property Rights
Acquisition
82ND STREET TO I-170 SANITARY RELIEF
(UR-08, UR-09)
University City $500,000
11993 Design Services 82ND STREET TO I-170 SANITARY RELIEF
(UR-08, UR-09)
University City $855,000
12075 Design Services AFFTON I/I REDUCTION (HANOVER,
HILDESHEIM-WEBER RD, SEIBERT, AND
HAMBURG)
Unincorporated $565,000
11776 Construction
Task
ALPINE DRIVE SEPARATE SEWER I/I
REMOVAL
Unincorporated $680,000
22 April 2015
Page 4 of 11
WASTEWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12078 Design Services APPLE ORCHARD - SINGERSON - BAYLESS
PLACE I/I REDUCTION (LEMAY FERRY RD
AND BAYLESS AVE)
Unincorporated $610,000
11682 Construction
Task
BALLAS ROAD SUBTRUNK SOUTH I/I
REDUCTION
Various $550,000
10407 Construction
Task
BAUMGARTNER & BLACK FOREST
SANITARY REPLACEMENT PHASE II
Unincorporated $2,100,000
12060 Construction
Task
BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2016)
CONTRACT A
Various $4,880,000
12434 Construction
Task
BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2016)
CONTRACT D
Various $4,532,000
11923 Construction
Task
BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2016)
CONTRACT E
Various $4,550,000
12023 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2017)
CONTRACT A
Various $80,000
12024 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2017)
CONTRACT B
Various $140,000
12025 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2017)
CONTRACT C
Various $60,000
12617 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2017)
CONTRACT F
Various $60,000
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $3,200,000
11685 Construction,
Phase II
BISSELL HILLS SANITARY
RELIEF/CALUMET I/I REDUCTION (BP-317)
Bellefontaine
Neighbors
$290,000
11686 Construction,
Phase II
BISSELL POINT I/I REDUCTION (BP-619)
(VALLEY DR)
Various $610,000
11883 Construction
Task
BLACK CREEK SANITARY SEWER AND I/I
REDUCTION
Various $2,200,000
11719 Construction
Task
BRINWOOD I/I REDUCTION Florissant $650,000
11790 Construction
Task
CAULKS CREEK FORCEMAIN (RIVER
VALLEY RD TO L-52)
Maryland Heights $6,600,000
11789 Design Services CAULKS CREEK FORCEMAIN
REHABILITATION
Chesterfield $500,000
11788 Construction
Task
CAULKS CREEK PUMP STATION B
FORCEMAIN
Chesterfield $3,100,000
11720 Construction
Task
CAULKS CREEK TRUNK SEWER (SKME-011)
PHASE I
Wildwood $4,000,000
22 April 2015
Page 5 of 11
WASTEWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11009 Construction
Task
CHANDELLAY DR. SANITARY SEWER
REPLACEMENT
Unincorporated $570,000
11115 Construction
Task
CLAVERACH PARK I/I REDUCTION AND
SEWER SEPARATION
Clayton $1,700,000
11723 Construction
Task
COLDWATER CREEK WATERSHED I/I
REMOVAL - SHARON STUDY AREA (N
LINDBERGH BLVD AND LINDSAY LN)
Florissant $77,000
12504 Design Services COLDWATER CREEK WWTF FINAL
CLARIFIERS REPLACEMENT
Unincorporated $900,000
11809 Construction
Task
COLDWATER CREEK WWTF SCREENINGS &
WASHER/COMPACTOR IMPROVEMENTS
Unincorporated $3,300,000
11726 Engineering
During
Construction
Services
COLDWATER SANITARY RELIEF SECTION B,
C & D WET WEATHER STORAGE FACILITY
TANK C
Hazelwood $1,200,000
11726 Construction
Task
COLDWATER SANITARY RELIEF SECTION B,
C & D WET WEATHER STORAGE FACILITY
TANK C
Hazelwood $22,000,000
12125 Design Services COLDWATER SOUTHWEST SUBWATERSHED
I/I REDUCTION (ST. CHARLES ROCK RD AND
ASHBY RD)
Various $3,100,000
12128 Design Services CONCORD I/I REDUCTION (TESSON FERRY
RD AND E CONCORD RD)
St. Louis County $280,000
11152 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL
FACILITIES
Various $1,400,000
11826 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
Various $2,600,000
11151 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION
FACILITIES
Various $4,900,000
10021 Engineering
During
Construction
Services
DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD)
PHASE I
Brentwood $300,000
10021 Construction
Task
DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD)
PHASE I
Brentwood $6,000,000
12472 Design Services DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD)
PHASE III
Various $1,500,000
10576 Construction,
Phase II
DC-06 DEER CREEK SANITARY RELIEF
PHASE III AND I/I REDUCTION
Various $125,000
11997 Design Services DC-09 WEST I/I REDUCTION (S LINDBERGH
BLVD AND LADUE RD)
Ladue $320,000
11851 Construction
Task
DEER CREEK PUBLIC I/I REDUCTION (2016) Various $3,360,000
22 April 2015
Page 6 of 11
WASTEWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12036 Design Services DEER CREEK PUBLIC I/I REDUCTION (2017)
CONTRACT A
Various $170,000
12037 Design Services DEER CREEK PUBLIC I/I REDUCTION (2017)
CONTRACT B
Various $150,000
11110 Professional
Services
DEER CREEK SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $150,000
11731 Design Services DEER CREEK SANITARY TUNNEL
(CLAYTON RD TO RDP)
Various $500,000
11136 Design Services DEGIVERVILLE COMBINED SEWER
RELOCATION
St. Louis City $650,000
11738 Construction
Task
DIXIE I/I REDUCTION Various $2,000,000
11739 Construction
Task
DUCHESNE AND GOTT I/I REDUCTION Various $770,000
11744 Property Rights
Acquisition
EASEMENT ACQUISITION FOR COMBINED /
SANITARY PROJECTS (FY 2016)
St. Louis City And
County
$3,000,000
11996 Design Services FAWN VALLEY, PIONEER PARK,
WESTCHESTER I/I REDUCTION
(MANCHESTER RD W OF N GEYER RD)
Des Peres $530,000
10489 Construction,
Phase I
(Supplemental
Appropriation)
FF-15 MCKELVEY/R.R. TO ADIE SANITARY
RELIEF PHASE III
Maryland Heights $5,900,000
10018 Design Services FF-18 VILLA DORADO - LACKLAND - PAGE
SANITARY RELIEF (ADIE RD TO VILLA
DORADO DR)
Maryland Heights $600,000
11748 Construction
Task
FLORISSANT I/I REDUCTION Various $700,000
11932 Construction
Task
FLORISSANT PUBLIC I/I REDUCTION Various $3,700,000
11749 Construction
Task
FLORLAND SANITARY RELIEF PHASE I - I/I
REDUCTION
Various $640,000
12626 Work Order
Repair Costs
(Capital)
FLOW METERING MANHOLE
IMPROVEMENTS (2016)
Various $400,000
11944 Construction
Task
FOREST BROOK SANITARY RELIEF (SKME-
003 AND SKME-016) PUBLIC
REHABILITATION AND I/I REDUCTION
Various $3,840,000
10456 Construction,
Phase II
FOREST BROOK SANITARY RELIEF (SKME-
003 AND SKME-016) REHABILITATION AND
I/I REDUCTION
Various $150,000
11750 Construction
Task
FORESTATE AND TEXAS SANITARY RELIEF
(SKME-513)
Grantwood Village $1,660,000
10440 Construction
Task
FORESTWOOD LATERAL SANITARY RELIEF
(SKME-321)
Ferguson $2,100,000
22 April 2015
Page 7 of 11
WASTEWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11752 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2016)
Various $250,000
11753 General
Services -
Geotechnical
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2015) CONTRACT A
Various $50,000
11754 General
Services -
Geotechnical
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2015) CONTRACT B
Various $50,000
12064 General
Services -
Geotechnical
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2015) CONTRACT C
Various $50,000
11755 General
Services-
Planning
GENERAL SERVICES AGREEMENT -
PLANNING (FY2014)
Various $400,000
11760 General
Services -
Design CIRP
Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2016)
Various $300,000
11780 General
Services -
Design CIRP
Funds
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT B
Various $90,000
11781 General
Services -
Design CIRP
Funds
GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT C
Various $90,000
11764 General
Services -
Survey
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT A
Various $50,000
12394 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT B
Various $50,000
12395 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT C
Various $50,000
12405 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT D
Various $50,000
12406 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT E
Various $50,000
11765 Construction
Task
GRAND GLAIZE TRUNK SANITARY RELIEF
AND I/I REDUCTION (SKME-417)
Ballwin $50,000
12569 Pre-Design
Services
GRAVOIS TRUNK SANITARY STORAGE
FACILITY (PARDEE LN AND PARDEE RD)
Crestwood $1,500,000
12569 Land Purchase GRAVOIS TRUNK SANITARY STORAGE
FACILITY (PARDEE LN AND PARDEE RD)
Crestwood $8,000,000
12619 Design Services HAMBURG AVE TO AL CLAIRE DR TO
WEBMORE DR CSO L-181 (I-032)
ELIMINATION
Unincorporated $245,000
22 April 2015
Page 8 of 11
WASTEWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11770 Construction
Task
HARLEM - BADEN RELIEF PHASE IV
(HEBERT) (IMPROVEMENTS FROM BASIN TO
HAMILTON TRUNK)
St. Louis City $3,900,000
12304 Design Services HELTA, SAPPINGTON, AND GREGORY
COURT I/I REDUCTION (SAPPINGTON RD
AND I-270)
Unincorporated $560,000
11097 Construction
Task
HOLLY DRIVE SEWER SEPARATION Webster Groves $1,120,000
11994 Design Services HUNTLEIGH MANOR, OLD WARSON,
TIMBERWYCK I/I REDUCTION (S
LINDBERGH BLVD SOUTH OF LITZSINGER
RD)
Ladue $300,000
11709 Construction
Task
INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY2016) CONTRACT A
Various $5,000,000
11868 Construction
Task
INFRASTRUCTURE REPAIRS
(REHABILITATION) (FY2016) CONTRACT B
Various $5,000,000
11705 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2016)
Various $5,500,000
11711 Land Purchase JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
Unincorporated $2,500,000
12314 Design Services KAPPEL (PARTIAL) I/I REDUCTION (EXUMA
DR AND GLEN OWEN DR)
Unincorporated $475,000
12317 Design Services KIRKWOOD I/I REDUCTION (BIG BEND
BLVD AND S KIRKWOOD RD)
Kirkwood $780,000
11995 Design Services KIRKWOOD MIDDLE SCHOOL, SIMMONS,
WILSON, W SARAH I/I REDUCTION
(MANCHESTER RD AND KIRKWOOD RD)
Kirkwood $560,000
11712 Construction
Task
LACKLAND I/I REDUCTION Various $1,600,000
12061 Construction
Task
LEMAY PUBLIC I/I REDUCTION (2016) Various $4,000,000
12048 Design Services LEMAY PUBLIC I/I REDUCTION (2017)
CONTRACT A
Various $100,000
12049 Design Services LEMAY PUBLIC I/I REDUCTION (2017)
CONTRACT B
Various $90,000
12050 Design Services LEMAY PUBLIC I/I REDUCTION (2017)
CONTRACT C
Various $90,000
12038 Design Services LEMAY PUBLIC I/I REDUCTION (2017)
CONTRACT D
Various $130,000
12488 Construction
Task
LEMAY PUMP STATIONS 1 AND 2
IMPROVEMENTS
St. Louis City $1,750,000
12488 Design Services LEMAY PUMP STATIONS 1 AND 2
IMPROVEMENTS
St. Louis City $470,000
11145 Professional
Services
LEMAY SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $4,750,000
12496 Construction
Task
LEMAY WWTF CHANNEL AERATION
BLOWERS
St. Louis County $1,000,000
22 April 2015
Page 9 of 11
WASTEWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11649 Miscellaneous
Services
LEMAY WWTP SECONDARY
IMPROVEMENTS
Unincorporated $510,000
11820 Design Services LMRDP CSO STORAGE TUNNEL
(BROADWAY TO RDP TUBES)
St. Louis City $8,075,000
11959 Design Services LMRDP CSO STORAGE TUNNEL NORTH
CONSOLIDATION SEWERS
St. Louis City $81,000
11958 Design Services LMRDP CSO STORAGE TUNNEL SOUTH
CONSOLIDATION SEWERS
St. Louis City $223,000
11816 Design Services LMRDP TUNNEL DEWATERING PUMP
STATION
Unincorporated $2,050,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $270,000
11746 Pre-Design
Services
LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
Various $3,500,000
12501 Construction
Task
LOWER MERAMEC RIVER WWTF SCREEN
CHANNEL IMPROVEMENTS
Unincorporated $700,000
11928 Construction
Task
LUCAS & HUNT AND I-70 SANITARY SEWER Northwoods $640,000
11651 Construction
Task
LYNKIRK STUDY AREA I/I REDUCTION Kirkwood $200,000
11656 Construction
Task
MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR
TO CHURCH DR)
St. Louis City $1,050,000
11656 Engineering
During
Construction
Services
MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR
TO CHURCH DR)
St. Louis City $211,000
11659 Construction,
Phase II
MARIETTA DR STORM SEPARATION AND I/I
REDUCTION (BP-292)
Normandy $90,000
11661 Construction
Task
MARTIGNEY I/I REDUCTION Various $1,000,000
11662 Construction
Task
MCNULTY - PALLARDY I/I REDUCTION Various $3,200,000
11840 Construction
Task
MEADOWRIDGE AND EASTWOOD STORM
AND SANITARY RELIEF
Kirkwood $280,000
11663 Construction
Task
MIDLAND SANITARY RELIEF - PUBLIC AND
PRIVATE I/I REDUCTION
Overland $810,000
11774 Construction
Task
MISSOURI RIVER SERVICE AREA I/I
REDUCTION - CREVE COEUR CREEK EAST
Various $3,680,000
12616 Construction
Task
MISSOURI RIVER WWTF BERM AND WATER
FEED UPGRADE
Maryland Heights $810,000
12643 Construction
Task
MISSOURI RIVER WWTF SECONDARY
TREATMENT ELECTRICAL / MECHANICAL
MODIFICATIONS
Maryland Heights $900,000
10465 Construction
Task
MISSOURI RIVER WWTP SECONDARY
TREATMENT EXPANSION (MITIGATION
CREDIT)
Maryland Heights $150,000
22 April 2015
Page 10 of 11
WASTEWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12536 Design Services NATURAL BRIDGE RD - DARBY TO
CHEVROLET COMBINED SEWER RELIEF
St. Louis City $200,000
10716 Construction
Task
NEW ENGLAND TOWN QUARRY PUMP
STATION (P-307) (SKME-544)
IMPROVEMENTS
Unincorporated $4,200,000
11664 Construction
Task
NEWCASTLE I/I REDUCTION Florissant $70,000
11693 Construction
Task
NORTH BADEN CREEK I/I REDUCTION (BP-
532) (WINCHESTER DR)
Various $1,600,000
12460 Construction
Task
OAKLAND COMBINED SEWER DETENTION
AND STORAGE (CLAYTON AVE AND
OAKLAND AVE)
St. Louis City $1,000,000
11696 Construction
Task
PADDOCK CREEK I/I REDUCTION (PRIVATE) Various $1,080,000
11698 Construction
Task
PICKWICK - BERNADINE - BIMINI SANITARY
RELIEF
Unincorporated $1,880,000
10737 Construction
Task
POWELL AVE AND ANNALEE SEWER
SEPARATION
Brentwood $430,000
11700 Construction
Task
PROVIDENCE SANITARY RELIEF (SKME-640) Webster Groves $750,000
11701 Construction
Task
PUMP STATION REPLACEMENT PROJECTS
(PHASE I)
Various $950,000
11153 Professional
Services
RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $400,000
12441 Pre-Design
Services
RDP TRIBUTARIES (DEER CREEK) CSO
TUNNEL
Various $600,000
12420 Design Services REAVSDALE I/I REDUCTION (MACKENZIE
RD AND REAVIS BARRACKS RD)
Unincorporated $485,000
10390 Design Services RIDGEMOOR DRIVE I/I REDUCTION &
STORM IMPROVEMENTS (SKME-574)
Clayton $100,000
10390 Construction
Task
RIDGEMOOR DRIVE I/I REDUCTION &
STORM IMPROVEMENTS (SKME-574)
Clayton $1,200,000
11069 Construction
Task
ROCK HILL SANITARY RELIEF (SKME-618) Rock Hill $1,350,000
10748 Construction
Task
ROSEMARY, PHILO, & KATHLEEN SEWER
SEPARATION
Wilbur Park $1,090,000
11665 Construction
Task
SELVIDGE AREA I/I REDUCTION Ballwin $240,000
10754 Construction
Task
SHERWYN SANITARY RELIEF (SKME-651)
AND I/I REDUCTION
Creve Coeur $1,200,000
12209 Design Services SPRINGDALE I/I REDUCTION (ROLLING DR
AND SMITHFIELD PL)
Bel-Ridge $130,000
11668 Construction
Task
SUB-TRUNK #2 LATERAL SANITARY RELIEF Unincorporated $230,000
12240 Design Services UNION CREEK I/I REDUCTION (I-55
BETWEEN S LINDBERGH BLVD AND
BUCKLEY RD)
Unincorporated $565,000
22 April 2015
Page 11 of 11
WASTEWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11672 Construction
Task
UNIVERSITY CITY I/I REDUCTION - WEST Various $915,000
12062 Construction
Task
UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (WC-01)
University City $2,900,000
12063 Construction
Task
UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (WC-02 AND WC-03)
University City $5,120,000
12435 Construction
Task
UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (BEL-NOR)
Various $4,530,000
12436 Construction
Task
UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (HANLEY HILLS)
Various $4,530,000
11992 Design Services UNIVERSITY CITY SANITARY STORAGE
FACILITY (HAFNER CT)
University City $3,100,000
11992 Land Purchase UNIVERSITY CITY SANITARY STORAGE
FACILITY (HAFNER CT)
University City $4,000,000
11681 Construction,
Phase II
UPPER COLDWATER SECTION D I/I
REDUCTION
Various $450,000
10026 Construction
Task
UPPER MALINE TRUNK SANITARY RELIEF
PHASE IV SECTION A
Ferguson $7,500,000
12253 Design Services VALCOUR AND BURLINGTON RR SANITARY
RELIEF AND I/I REDUCTION (VALCOUR RD
AND WATSON RD)
Unincorporated $994,000
11089 Construction
Task
VINITA DRIVE SANITARY RELIEF Hanley Hills $250,000
11677 Design Services WEBSTER GROVES TRUNK E SANITARY
REHABILITATION AND I/I REDUCTION
PHASE III
Webster Groves $270,000
11678 Construction
Task
WEBSTER GROVES TRUNK E SANITARY
REHABILITATION AND I/I REDUCTION
PHASE IV
Webster Groves $3,800,000
FUND TOTAL: $260,093,000
GRAND TOTAL:$289,325,000
22 April 2015
Page 1 of 1
STORMWATER ENGINEERING PROJECTS - FY16
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
10035 BIG BEND TO PAPIN STORM SEWER PHASE I $200,000 207
10302 COTTAGE #206 STORM IMPROVEMENTS $120,000 208
12461 DEER CREEK OMCI STORMWATER DESIGN
(CONTRACT A)
$350,000 209
10020 HUDSON RD. #1401 - #1405 BANK
STABILIZATION (MCDW-120)
$250,000 210
10347 ROSEWOOD LANE & WOODARD DR. STORM
SEWER
$230,000 211
10780 UNIVERSITY CITY BRANCH OF RIVER DES
PERES - CORPS OF ENGINEERS STUDY
$300,000 212
TOTAL:$1,450,000
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BIG BEND TO PAPIN STORM SEWER PHASE I
Design Services
5593 - Sem Br Of RiverDes Peres OMCI Fund
PROPERTY DAMAGE DUE TO BASEMENT AND YARD FLOODING.
CONSTRUCT 1,915 FEET OF 12-INCH TO 36-INCH DIAMETER STORMSEWERS.
§¨¦44
§¨¦44GRAY
ELMBAKER GOREPAPIN ALMAJACKSON
SIMMONS
MCDONALDROCK HILLBURLINGT
O
N
N
O
R
T
H
E
R
N
S
A
N
T
A
F
E
YEDDOIVANHOEK E N ILWORTH
WAVERLY
GORE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10035
Stormwater
11
$200,000
Webster Groves
Lemay/RDP
Seminary Branch
Capital
207Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
COTTAGE #206 STORM IMPROVEMENTS
Design Services
5593 - Sem Br Of RiverDes Peres OMCI Fund
CREEK EROSION ALONG EXISTING IMPROVED CHANNEL.
CONSTRUCT 600 FEET OF 4-F00T WIDE TRAPEZOIDAL CONCRETECHANNEL.
§¨¦44§¨¦44
YALEOLD ORCHARDSWON
CALVERTLACLEDE STATIONGARDEN
KENRIDGE
CATALPA
CHAPELFORDCOTTAGESO
MER
W
O
R
T
HSANDAUCARDINAL RIDGE
RIDGEB URLINGTONNORTHERNSANTAFEGARDEN
SWON
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10302
Stormwater
11
$120,000
Webster Groves
Lemay/RDP
Seminary Branch
Capital
208Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK OMCI STORMWATER DESIGN(CONTRACT A)
Design Services
5566 - Deer CreekOMCI Fund
STORMWATER ISSUES EXIST IN OMCI AREAS WHERE FUNDING ISAVAILABLE.
DESIGN STORMWATER IMPROVEMENTS IN THE DEER CREEKWATERSHED.
§¨¦64
§¨¦270
§¨¦44
§¨¦170
§¨¦270
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12461
Stormwater
11
$350,000
Various
Lemay/RDP
Deer Creek
Asset Management
209Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HUDSON RD. #1401 - #1405 BANK STABILIZATION(MCDW-120)
Design Services
5576 - Maline CreekOMCI Fund
STREAMBANK EROSION ALONG DELLWOOOD CREEK IN THE REARYARDS OF RESIDENTIAL PROPERTIES AT 1401 AND 1405 HUDSON ROAD.
CONSTRUCT 280 FEET OF MODULAR BLOCK WALL, 365 FEET OFBIOSTABILIZED BANK, AND 55 FEET OF HEAVY STONE REVETMENT.
HUDSON ELKHARTHUDSON HILLSHOBSONHEN
D
R
I
C
K
PRIVAT
ECHAR
D
O
N
N
I
ERECHAPLETON
NORTHCOLLEGEW
IL
LIAMSFIELDPRIVATEPRIVATE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10020
Stormwater
11
$250,000
Ferguson
Bissell
Maline Creek
Non-recurring
210Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ROSEWOOD LANE & WOODARD DR. STORMSEWER
Design Services
5583 - Sugar CreekOMCI Fund
STREET AND YARD FLOODING AT RESIDENCES ALONG ROSEWOODLANE AND WOODARD DRIVE.
CONSTRUCT 1,835 FEET OF 12-INCH TO 33-INCH DIAMETER STORMSEWER.GEYERROSE HILL
WOODBINE
LEEANDREWS
MCLAIN
WOODARDCRAIGROSEWOOD ARTER
BE
R
ROSEHEMANWOODDELLGEORGEHICKORYHOLLOWMAGNOLIA
CHIPPENDALE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10347
Stormwater
11
$230,000
Kirkwood
Meramec
Sugar Creek
Capital
211Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UNIVERSITY CITY BRANCH OF RIVER DES PERES -CORPS OF ENGINEERS STUDY
Pre-Design Services
5584 - University CityOMCI Fund
FLOODING AND BANK EROSION FROM I-170 TO HEMAN PARK, ALONGTHE UPPER RIVER DES PERES.
CORPS OF ENGINEERS TO UPDATE A RIVER DES PERES FEASIBILITYSTUDY TO DEFINE AND IDENTIFY A PROJECT TO REDUCE FLOODDAMAGE TO EXISTING STRUCTURES AND REDUCE STREAMBANKEROSION.
STUDY EFFORT TO BE IMPLEMENTED BY THE CORPS OF ENGINEERS,UNDER AN AGREEMENT WITH THE CITY OF UNIVERSITY CITY. MSD TOPROVIDE FINANCIAL ASSISTANCE.
§¨¦64
§¨¦170
§¨¦70
§¨¦170
OLIVE BLVD
ST
C
H
A
R
L
E
S
R
O
C
K
R
DNLINDBERGHBLVD
S LINDBERGH BLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10780
Stormwater
11
$300,000
University City
Lemay/RDP
River Des Peres
Non-recurring
212Page
22 April 2015
Page 1 of 2
STORMWATER CONSTRUCTION PROJECTS - FY16
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11367 ANCHOR DR. AND DANA AVE. STORM SEWER $138,000 213
11213 AUSTIN PLACE AND LOCKWOOD AVE. STORM
SEWER
$847,000 214
11186 CALVERT AVE. #3342 STORM SEWER $42,000 215
11231 CONWAY & CHAPEL OAKS STORM
IMPROVEMENTS (FRONTENAC 7-5)
$176,000 216
11065 DEER CREEK WATERSHED INITIATIVE $207,500 217
10332 DESMET INDUSTRIAL CT. LOT 8 BANK
STABILIZATION
$545,000 218
11120 EMERGENCY REPAIR FUNDS (STORMWATER)$250,000 219
11234 GLEN ABBEY DR. STORM IMPROVEMENTS
(FRONTENAC 7-3)
$325,000 220
11223 GLEN RD #35 BANK STABILIZATION $53,000 221
11045 GRANT #609 BANK STABILIZATION $152,000 222
11020 HERBERT AVE. 4200-4400 BLOCK
STREAMBANK STABILIZATION
$250,000 223
11003 HERMITAGE HILLS BANK STABILIZATION
(FRONTENAC 3-1)
$315,000 224
11354 LAVINIA DR. #10709 STORM SEWER $48,000 225
10370 LIGGETT TO BIG BEND CHANNEL REPAIRS $75,000 226
10221 MADISON #708 STORM SEWER $48,000 227
11105 MANDA LANE #8901 STORM SEWER $55,000 228
11203 MARYHILL DRIVE STORM SEWER $67,000 229
22 April 2015
Page 2 of 2
STORMWATER CONSTRUCTION PROJECTS - FY16
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11363 MC ADOO CT #4325 STORM SEWER $155,000 230
11005 OAK VALLEY EAST STORM SEWER
(FRONTENAC 1-2)
$185,000 231
11370 RAINRIDGE CT. #4125 BANK STABILIZATION &
BUYOUTS (GCMB-370)
$605,000 232
11127 ROANOKE AND LOEKES STORM SEWER $250,000 233
11841 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - COLDWATER CREEK OMCI
$150,000 234
12610 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - FOUNTAIN CREEK OMCI
$77,000 235
12458 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - MALINE CREEK OMCI
$400,000 236
12608 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - UNIVERSITY CITY OMCI
$130,000 237
11000 WEST OAK DRIVE STORM IMPROVEMENTS $35,000 238
TOTAL:$5,580,500
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ANCHOR DR. AND DANA AVE. STORM SEWER
Construction Task
5571 - Gravois CreekOMCI Fund
BASEMENT, STREET, AND YARD FLOODING
CONSTRUCT 460 FEET OF 12-INCH TO 27-INCH STORM SEWER.PORTFORMAN
DANAHALETIBERMONTBROOKANCHOR
L E MONA BREUERHOWERTONDULLESSTARBOARDA
MONA
FLAGLERHARBOR
ANTONETTEHILLSHOLBROOK
ZE L W O O DPALOMINODANADANA§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11367
Stormwater
15
$138,000
Unincorporated
Lemay/RDP
Gravois Creek
Capital
213Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
AUSTIN PLACE AND LOCKWOOD AVE. STORMSEWER
Construction Task
5566 - Deer CreekOMCI Fund
BASEMENT, STREET, AND YARD FLOODING.
CONSTRUCT 2,510 FEET OF 12-INCH TO 36-INCH STORM SEWER .ELMLOCKWOODEDWIN
SAPPINGTONAUSTINHAWBROOK
PARKLANDTREVILLIAN
MINTURNARGONNE GLENKIRKSINGLEPATHSAPPINGTON §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11213
Stormwater
15
$847,000
Glendale
Lemay/RDP
Gravois Creek
Capital
214Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CALVERT AVE. #3342 STORM SEWER
Construction Task
5564 - Coldwater CreekOMCI Fund
STREET AND YARD FLOODING.
CONSTRUCT 99 FEET OF 18-INCH STORM SEWER.DIXREXWOODSONCALVERTMARVINEDMUNDSONJOELLATRO
B
E
BADG
E
R
CALWOOD
SHIRLEY GARDENS
CALVERTDIXST
C
H
A
R
L
E
S
R
O
C
K
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11186
Stormwater
15
$42,000
Breckenridge Hills
Coldwater
Coldwater Creek
Capital
215Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CONWAY & CHAPEL OAKS STORMIMPROVEMENTS (FRONTENAC 7-5)
Construction Task
5566 - Deer CreekOMCI Fund
YARD FLOODING AND EROSION.
CONSTRUCT 410 FEET OF 12-INCH TO 18-INCH STORM SEWER, TWOEARTHEN BERMS AND TWO BIORETENTION CELLS.SPOEDEPRINCESSLYLEWOOD
GERMAN
CAPITOL
CHAPELOAKSP
RI
VATECLAYTONGOLD DUST
LYNNBROOKDWYER
LEELAB A LLANT R A E
MARVILLAPRESIDENTDWYERPRIVATE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11231
Stormwater
15
$176,000
Frontenac
Lemay/RDP
Deer Creek
Capital
216Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK WATERSHED INITIATIVE
Construction Task
5566 - Deer CreekOMCI Fund
MISSOURI BOTANICAL GARDEN HAS REQUESTED PARTNERING COSTSHARE FOR THE DEER CREEK WATERSHED INITIATIVE, WHICH ISSUPPORTED BY A 319 GRANT FROM MDNR.
GREEN INFRASTRUCTURE CONSTRUCTION TO BE COST SHARED BYMSD.
§¨¦64
§¨¦270
§¨¦44
§¨¦170
§¨¦270
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11065
Stormwater
15
$207,500
Various
Lemay/RDP
Deer Creek
Non-recurring
217Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DESMET INDUSTRIAL CT. LOT 8 BANKSTABILIZATION
Construction Task
5564 - Coldwater CreekOMCI Fund
STREAMBANK EROSION AT DESMET INDUSTRIAL COURT.
CONSTRUCT 84 FEET OF 12-INCH TO 24-INCH STORM SEWER, 150SQUARE YARDS OF BANK PROTECTION, AND 298 SQUARE YARDS OFROCK TOE PROTECTION.BROWERAVA
N
T
PAL
M
IND
U
S
T
R
I
A
L
CH
E
Z
P
A
R
E
E
SLUSSER
CADES COVE
L
OY
O
LA
SUNSETST CHARLESMA
N
R
E
S
A
SOUTH
W
ELL
CHALMETTEPRIVATECH EZVANTPRI
V
A
T
E
PRI
V
A
T
E
PRIVATE
PR I VA T EPRIVATEN LINDBERGH BLVDN LINDBERGH BLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10332
Stormwater
15
$545,000
Florissant
Coldwater
Coldwater Creek
Capital
218Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
EMERGENCY REPAIR FUNDS (STORMWATER)
Construction Task
4123 - StormwaterEmergency Fund
AGING AND DETERIORATED SEWER STRUCTURES CAN FAIL WITHOUTNOTICE, CREATING EMERGENCY SITUATIONS IN WHICH THE DISTRICTMUST ACT IMMEDIATELY.
PROVIDE A PLACEHOLDER APPROPRIATION FOR THE EMERGENCYFUND, TO FACILITATE EMERGENCY RESPONSE AS NEEDED.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11120
Stormwater
15
$250,000
Various
Various
Various
Asset Management
219Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GLEN ABBEY DR. STORM IMPROVEMENTS(FRONTENAC 7-3)
Construction Task
5566 - Deer CreekOMCI Fund
YARD FLOODING AND EROSION.
CONSTRUCT 755 FEET OF 12-INCH TO 21-INCH STORM SEWER, AND FOURBIORETENTION CELLS.
MSD WILL PROVIDE FINANCIAL ASSISTANCE TO THE CITY OFFRONTENAC FOR CONSTRUCTION OF THESE STORM IMPROVEMENTS,PART OF WHICH ARE INCLUDED IN MSD'S CIRP.SPOEDEDWYERARTHUR
PRIVATE
GERMAN
DONOHO
OAK GAT
E
ANZEIGER
SAVANNAH
GARIBALDI
CHAMINADE
PRINCESSGLEN ABBEYCABLE
VILLA COUBLAY
CHAPELO
A
KSPRESIDENTPRIVATEPRINCESS §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11234
Stormwater
15
$325,000
Frontenac
Lemay/RDP
Deer Creek
Capital
220Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GLEN RD #35 BANK STABILIZATION
Construction Task
5566 - Deer CreekOMCI Fund
MODERATE RISK STRUCTURAL EROSION.
CONSTRUCT 75 FEET OF ROCK BLOCK WALL AND HEAVY STONEREVETMENT.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.ELMG
L
E
N
LOCKWOODMAPLE ORCHARDSPENCER
ROSEMONT
PLANTU N IO N P A C IFICOAKWOOD
PACIFICSYLVESTERROSEMONT
MAPLE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11223
Stormwater
15
$53,000
Webster Groves
Lemay/RDP
Deer Creek
Non-recurring
221Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GRANT #609 BANK STABILIZATION
Construction Task
5571 - Gravois CreekOMCI Fund
CREEK EROSION.
CONSTRUCT 210 FEET OF FOUR FOOT HIGH ROCK BLOCK TOE, WITHBIOSTABILIZATION ABOVE IT.
S
A
N
D
E
R
S
G
R
A
N
T
H
A
W
K
I
N
SBERRY
CURWOODW
EBSTER FOREST
CROMPTONCLOVERFOREST GREEN
MARSAN WEBSTERP A T H
DENT O NWE
B
STERWOODS
FERNDALECROSSBROOKYOLANDA§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11045
Stormwater
15
$152,000
Webster Groves
Lemay/RDP
Gravois Creek
Non-recurring
222Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HERBERT AVE. 4200-4400 BLOCK STREAMBANKSTABILIZATION
Construction Task
5564 - Coldwater CreekOMCI Fund
EROSION AND FREQUENT STRUCTURAL AND YARD FLOODING.
CONSTRUCT 441 FEET OF BIO-SWALE, 572 CUBIC YARDS OF GRADECONTROL CHANNEL, AND 94 FEET OF 24-INCH DIAMETER STORMSEWER.
GUTHRIE
GEDDEEMINENCE FAIRFIELDBOSWELLHERBERTTREFORE
MACON
BESSEMER
TUTWILER
BATAAN
STANSBERRY
CORREGIDOR LINDSCOTTPICAJUNEVANCESTANSBERRY
MACON
TUTWILER
HERBERT§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11020
Stormwater
15
$250,000
Woodson Terrace
Coldwater
Coldwater Creek
Capital
223Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HERMITAGE HILLS BANK STABILIZATION(FRONTENAC 3-1)
Construction Task
5566 - Deer CreekOMCI Fund
MODERATE RISK STRUCTURAL EROSION.
CONSTRUCT 80 FEET OF 8-INCH TO 12-INCH STORM SEWER, AND 685FEET OF NATURAL CHANNEL STABILIZATION, INCLUDING ROCK LINEDCHANNEL AND BIOSTABILIZED SLOPES.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
GEYER
PORTLAND HERMITAGE HILL
CHIPPER
O U T E R L A D U E
STEEPLECHASE
GEYER DOWNS
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11003
Stormwater
15
$315,000
Frontenac
Lemay/RDP
Two Mile Creek
Non-recurring
224Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LAVINIA DR. #10709 STORM SEWER
Construction Task
5571 - Gravois CreekOMCI Fund
YARD FLOODING.
CONSTRUCT 210 FEET OF 12-INCH TO 15-INCH STORM SEWER.MUSICK
GAIL
FAR
A
D
A
Y
WILL
I
N
D
A
CAT
H
Y FABICKPICKWICKLAVINIAM A LLORYFIT
ETHAYER
LAVI
E
R
COR
N
I
N
G
FLORINDA
GEANLEECRECELIUSSTSIMONVA R GASLAVINIA§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11354
Stormwater
15
$48,000
Unincorporated
Lemay/RDP
Gravois Creek
Capital
225Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LIGGETT TO BIG BEND CHANNEL REPAIRS
Construction Task
5571 - Gravois CreekOMCI Fund
STREAMBANK EROSION.
CONSTRUCT 40 FEET OF LIGHT STONE REVETMENT, 40 FEET OF LIGHTSTONE REVETMENT WITH BIOSTABILIZATION, 65 FEET OF LIVE-STAKEDROCK TOE WITH BIOSTABILIZATION, AND 15 FEET OFBIOSTABILIZATION.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦44
LI
G
G
E
T
T
FRISCO
SCOTT
DI
V
E
R
S
E
YSAPPINGTONSCHULTZ
LOPINAMABEL
GILLESPIERED BUD TREE
BURLINGTO
N
N
O
R
T
H
E
R
N
S
A
N
T
A
F
E
PRIVAT E
BALTIMORE
TOWERBANBURYAYRESW
I
L
D
W
O
O
D
C
I
R
C
L
E
S
A
T
I
N
W
O
O
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10370
Stormwater
15
$75,000
Oakland
Lemay/RDP
Gravois Creek
Non-recurring
226Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MADISON #708 STORM SEWER
Construction Task
5571 - Gravois CreekOMCI Fund
REAR YARD FLOODING AND EROSION, BASEMENT WINDOWS HAVEFLOODED DURING HEAVY RAIN EVENTS.
CONSTRUCT 220 FEET OF 12-INCH STORM SEWER.
MONROE
ARGONNE
MADISON
SCOTT BRENTPARKJEFFERSON
HOLMESDICKSONALICEMITCHELLMIRIAMSAPPINGTONWESTWOOD
HARWOODGRAY OAKS
B
R
E
N
T
HOLMES§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10221
Stormwater
15
$48,000
Oakland
Lemay/RDP
Gravois Creek
Capital
227Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MANDA LANE #8901 STORM SEWER
Construction Task
5571 - Gravois CreekOMCI Fund
INFREQUENT BASEMENT FLOODING.
CONSTRUCT 95 FEET OF 15-INCH TO 18-INCH STORM SEWER AND ONEBIORETENTION FACILITY.MANDARUSDONLOWILL
GLENFIELD STURDYROBYNLYNNHARWICHGLADLEAEGGELINGWOODPARKBARBERTONWATSON WOODS§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11105
Stormwater
15
$55,000
Crestwood
Lemay/RDP
Gravois Creek
Capital
228Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MARYHILL DRIVE STORM SEWER
Construction Task
5566 - Deer CreekOMCI Fund
YARD EROSION.
CONSTRUCT 225 FEET OF 15-INCH STORM SEWER.
LADUE
MARYHILL
COUNTRY FAIRSALEM ESTATESN LINDBERGH BLVDS LINDBERGH BLVDN LINDBERGH BLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11203
Stormwater
15
$67,000
Ladue
Lemay/RDP
Deer Creek
Capital
229Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MC ADOO CT #4325 STORM SEWER
Construction Task
5571 - Gravois CreekOMCI Fund
MODERATE RISK STRUCTURAL EROSION.
CONSTRUCT 245 FEET OF 18-INCH TO 36-INCH STORM SEWER.
§¨¦55
§¨¦55
UNIONBELLEWOOD
LOI
SFORESTDALESUNEREST
MCA
D
O
O BELCANTOCRESCENTS LIN
D
B
E
R
G
H
B
L
V
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11363
Stormwater
15
$155,000
St. Louis County
Lemay/RDP
Gravois Creek
Capital
230Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
OAK VALLEY EAST STORM SEWER (FRONTENAC1-2)
Construction Task
5566 - Deer CreekOMCI Fund
YARD FLOODING.
CONSTRUCT 700 FEET OF 12-INCH TO 18-INCH STORM SEWER ANDRAINGARDENS.
MSD WILL PROVIDE FINANCIAL ASSISTANCE TO THE CITY OFFRONTENAC FOR CONSTRUCTION OF THESE STORM IMPROVEMENTS,PART OF WHICH ARE INCLUDED IN MSD'S CIRP.GEYERHICKORY
OAK VALLEY
TWIN FAWNS
SQUIRES
H
I
G
H
MEADOW
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11005
Stormwater
15
$185,000
Frontenac
Lemay/RDP
Two Mile Creek
Capital
231Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RAINRIDGE CT. #4125 BANK STABILIZATION &BUYOUTS (GCMB-370)
Land Purchase
5571 - Gravois CreekOMCI Fund
MODERATE RISK STRUCTURAL EROSION.
CONSTRUCT 205 FEET OF 15 FOOT HIGH REINFORCED CONCRETERETAINING WALL, 905 CUBIC YARDS OF HEAVY STONE REVETMENT, 325FEET OF 8-INCH DIAMETER SANITARY SEWER, AND THE VOLUNTARYBUYOUT OF THREE RESIDENTIAL PROPERTIES.
CONSTRUCTION OF WALL AND REVETMENT FOR STABILIZATION HASBEEN PLACED ON INDEFINITE HOLD.
§¨¦55
§¨¦55
BAY
L
E
S
S
UNION PACIFICAVENUE HDALLASFAN
N
I
E
MAJESTYBELLAVILLAWEI
S
S SAN GABRIELSAN TEN
RAI
N
R
I
D
G
E
FA
W
N
HO
F
F
M
E
I
S
T
E
R BOENECKELASATA
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11370
Stormwater
13
$605,000
Unincorporated
Lemay/RDP
Gravois Creek
Capital
232Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ROANOKE AND LOEKES STORM SEWER
Construction Task
5564 - Coldwater CreekOMCI Fund
FLOODING OF SEVEN LOTS.
CONSTRUCT 787 FEET OF 15-INCH TO 24-INCH STORM SEWER.
SCOPE OF PROJECTS 11158 AND 11189 NOW INCLUDED WITH THISPROJECT.
LIN
D
S
A
Y
EST
E
S
LOE
K
E
S
HU
M
E
S
MU
L
L
A
N
P
H
Y
AS
P
E
N
CH
A
R
B
O
N
I
E
R
LIL
A
C
KEE
V
E
N
BO
U
L
D
E
R
RUE
S
T
D
E
N
I
S
RU
T
H
RYA
N
FLI
C
K
E
R
MANORTYS
O
N
ROS E T T A MERCURYMA
R
K
T
W
A
I
NCORTEZ
SAL
L
Y
DEL
R
E
Y
SW
A
L
L
O
W
BA
B
L
E
R
F L O RALOVELANDWRE
N
MA
D
I
S
O
N
FERNBROOKRONDAFR
A
N
C
I
S
C
A
NAOMIMO
N
T
E
R
E
Y
EN
S
E
N
A
D
A
RUE ST CHARLESRIVOLIIRIS
MERRIFLIGHTBLANCHETTEST JEANELDORADOHAMMES VIOLETBLUEBIRD
GLYNNDANIELBOON
E
NORINESUNRIDGETH
O
M
P
S
O
N
FLO RISOTAVESPERELWOODMCNULTYCHARLOTTESHIRLENECROWDER
MY
R
T
L
E
ANGELUSLA VENTAFLOWERIDGEALBERTOST FERDINANDLASIERRAALANDALEWASHINGTONSAN MATEOGREELEYCHE
R
R
Y
D
A
L
E
ST CHARLESHU
N
D
L
E
Y
EDNAOCALALIM
E
D
A
L
E
ST PIERRESAL
L
YASPEN
LIN D B E RGH
LINDBERGH§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11127
Stormwater
15
$250,000
Florissant
Coldwater
Coldwater Creek
Capital
233Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STORMWATER INFRASTRUCTURE REPAIR /REPLACEMENT - COLDWATER CREEK OMCI
Work Order Repair Costs(Capital)
5564 - Coldwater CreekOMCI Fund
AGING AND DETERIORATING STORMWATER INFRASTRUCTURE IS INNEED OF REPAIR AND/OR REPLACEMENT.
CONSTRUCT REPAIR AND REPLACEMENT OF STORMWATERINFRASTRUCTURE IN THE COLDWATER CREEK OMCI AREA.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES,AND CONSTRUCTION OF STORM SEWERS RELATED TO PRIVATE INFLOWCORRECTION.
§¨¦70
§¨¦270
§¨¦170
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11841
Stormwater
17
$150,000
Various
Coldwater
Coldwater Creek
Asset Management
234Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STORMWATER INFRASTRUCTURE REPAIR /REPLACEMENT - FOUNTAIN CREEK OMCI
Work Order Repair Costs(Capital)
5569 - Fountain CreekOMCI Fund
AGING AND DETERIORATING STORMWATER INFRASTRUCTURE IS INNEED OF REPAIR AND/OR REPLACEMENT.
CONSTRUCT REPAIR AND REPLACEMENT OF STORMWATERINFRASTRUCTURE IN THE FOUNTAIN CREEK OMCI AREA.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES,AND CONSTRUCTION OF STORM SEWERS RELATED TO PRIVATE INFLOWCORRECTION.
§¨¦270
§¨¦170
§¨¦270
§¨¦170
FROST
ST ANTHONY
P E RSH A L L WA
S
H
I
N
G
T
O
N
DERHAKE
DUNN
HANLEYLAFAYETTEWATERFORD
ST CATHERINE
GRAHAMBOONEE
LIZ
A
B
E
T
H
EVAST M
A
R
I
E
HUDSON
HARRISON
REASORJEFFERSONST J
O
S
E
P
H
LATTY CASTELLOLOE
K
E
S
RUE
S
T
D
E
N
I
S
MIDWOODCLOVERWILLIAMSFLORA
MAPLE
BARTO
STLOUIS
A L L ENN
E
WH
A
L
L
S
FE
R
R
Y
KE
E
V
E
N
ELBRINGLIN
D
S
A
Y
C A L VER TONNYFLOT
YOUNGSADDLELISASTJEANMORANFORDJONASCAPRIJEANELM
RU
T
H
PRIVATEST
C
I
N
ZURICHSTD E N I S
STOLAFST PATRICEGAHANROMISSTRINITY TROTTERAL
M
A
CARMONATANEYROGERSLARRYROSETTAFOX RUN
LO Y O L A
PIMLICOJACKLIN FLORVALB O ELLNERHIALEAHFAIRMOUNTMA
N
O
R BON AIREGALLOPPOLSONSTEED
STARLIGHTSTMARK
LILAAVANT KOCHNORINEEISELEBR
U
C
E TURFLAUPHERREGIN
A
SLUSSER
RIDGELAWN
S
T
J
O
A
N
PRIVATELATTY LINDBERGH§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12610
Stormwater
17
$77,000
Various
Coldwater
Fountain Creek
Asset Management
235Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STORMWATER INFRASTRUCTURE REPAIR /REPLACEMENT - MALINE CREEK OMCI
Work Order Repair Costs(Capital)
5576 - Maline CreekOMCI Fund
AGING AND DETERIORATING STORMWATER INFRASTRUCTURE IS INNEED OF REPAIR AND/OR REPLACEMENT.
CONSTRUCT REPAIR AND REPLACEMENT OF STORMWATERINFRASTRUCTURE IN THE MALINE CREEK OMCI AREA.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES,AND CONSTRUCTION OF STORM SEWERS RELATED TO PRIVATE INFLOWCORRECTION.
§¨¦70
§¨¦270
§¨¦170
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12458
Stormwater
17
$400,000
Various
Bissell
Maline Creek
Asset Management
236Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STORMWATER INFRASTRUCTURE REPAIR /REPLACEMENT - UNIVERSITY CITY OMCI
Work Order Repair Costs(Capital)
5584 - University CityOMCI Fund
AGING AND DETERIORATING STORMWATER INFRASTRUCTURE IS INNEED OF REPAIR AND/OR REPLACEMENT.
CONSTRUCT REPAIR AND REPLACEMENT OF STORMWATERINFRASTRUCTURE IN THE UNIVERSITY CITY OMCI AREA.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES,AND CONSTRUCTION OF STORM SEWERS RELATED TO PRIVATE INFLOWCORRECTION.
§¨¦170
§¨¦170OLIVE BLVDNLINDBERGHBLVD ST
C
H
A
R
L
E
S
R
O
C
K
R
D
NATURALBRIDGERD
SLINDBERGHBLVDNLINDBERGHBLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12608
Stormwater
17
$130,000
Various
Lemay/RDP
University City Branch
Asset Management
237Page
FISCAL YEAR: 2016
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WEST OAK DRIVE STORM IMPROVEMENTS
Construction Task
5566 - Deer CreekOMCI Fund
YARD AND GARAGE FLOODING.
CONSTRUCT 180 FEET OF 12-INCH TO 15-INCH STORM SEWER, AND 80FEET OF CURBING.DICKSONBROWNELL
CHELSEA
VICTORIA
OAKALEXANDRA
QUEEN ANNE
BELSON
VENNEMAN
KIRKHAM
GLENWAYGLENDOWERBROOKHAVEN
DRURY
MEADOWRIDGE
SOUTHBROOK
HARTMANN GLENWAYALEXANDRA
CHELSEA VENNEMAN§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11000
Stormwater
15
$35,000
Glendale
Lemay/RDP
Deer Creek
Capital
238Page
22 April 2015
Page 1 of 1
STORMWATER CONTINUED PROJECTS - FY16
PROJECT
NUMBER
PROJECT NAME REASON PROJECT CONTINUED COST
ESTIMATE
10348 CONWAY - CLERBROOK
STORM CHANNEL
PROJECT CONTINUED DUE TO EASEMENT ACQUISITION
AND COORDINATION WITH OTHERS. ANTICIPATE BOARD
INTRODUCTION IN JANUARY, 2016.
$1,100,000
11216 FIRETHORN DRIVE #1901
STORM IMPROVEMENTS
PROJECT CONTINUED DUE TO EASEMENT ACQUISITION
AND SCOPE CHANGE. ANTICIPATE BOARD INTRODUCTION
IN AUGUST, 2015.
$180,000
10360 FORCEE LANE STORM
SEWER
PROJECT CONTINUED DUE TO EASEMENT ACQUISITION
AND SCOPE CHANGE. ANTICIPATE BOARD INTRODUCTION
IN SEPTEMBER, 2015.
$148,000
11076 LACLEDE STATION -
CHAMBERLAIN STORM
SEWER
PROJECT CONTINUED DUE TO EASEMENT ACQUISITION.
ANTICIPATE BOARD INTRODUCTION IN OCTOBER, 2015.
$230,000
10731 PARK LANE #9568 - #9572
STORM SEWER
PROJECT CONTINUED DUE TO EASEMENT ACQUISITION.
ANTICIPATE BOARD INTRODUCTION IN AUGUST, 2015.
$30,000
TOTAL: $1,688,000
22 April 2015
Page 1 of 1
STORMWATER CONSTRUCTION
CONTINGENCY PROJECTS - FY17
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
10359 BUSIEK AVE. #8044 STORM SEWER $160,000 239
11036 EVERMAN-TENNYSON STORM SEWER $210,000 240
11159 FOX RUN DRIVE #1360 STORM SEWER $50,000 241
10362 FROSTWOOD PARK STREAMBANK
STABILIZATION
$41,000 242
12535 LAKE VALLEY DR STORM SEWER
REPLACEMENT
$45,000 243
10006 LEE AVE. #337 STORM SEWER $323,000 244
10388 MALLARD LANE & PHEASANT DRIVE STORM
SEWER
$270,000 245
10329 PARK AVENUE STORM IMPROVEMENTS $279,000 246
11196 PICARDY LANE SUBDIVISION BANK
STABILIZATION
$438,000 247
11338 RALEIGH DRIVE #8829 STORM SEWER $200,000 248
11360 REDLAND DR. - TAHQUITZ DR. STORM SEWER $48,000 249
11119 ROGERS LANE #975 STORM SEWER $60,000 250
11078 ST. EDMUND #10728 - 10732 STORM SEWER $60,000 251
11039 STANSBERRY AVE #9262 STORM SEWER $115,000 252
11222 TEALWOOD DRIVE AND BEAVER DRIVE BANK
STABILIZATION
$357,000 253
11350 WHITEHAVEN AND RALEIGH STORM SEWER $100,000 254
11362 WINTERGREEN 3503 AND 3507 STORM SEWER $60,000 255
TOTAL:$2,816,000
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BUSIEK AVE. #8044 STORM SEWER
Construction Task
5564 - Coldwater CreekOMCI Fund
YARD PONDING AND EROSION.
CONSTRUCT 285 FEET OF 15-INCH TO 21-INCH STORM SEWER.FAYALINE
NORFOLK
S
O
U
T
H
E
R
N
NEWELLBUSIEK
WITSELLRECTORPEURIFOYABBOTTPACKAR D
EVERETTEATONPATTERS
O
N
CANYON THURSTONDAVENPO
R
T
FAIRBANKSWULFFPLYMOUTH
NOAH
NORFOLK
S
O
U
T
H
E
R
N
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10359
Stormwater
15
$160,000
Berkeley
Coldwater
Coldwater Creek
Capital
239Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
EVERMAN-TENNYSON STORM SEWER
Construction Task
5564 - Coldwater CreekOMCI Fund
OVERLAND FLOODING OF TWO COMMERCIAL BUILDINGS.
CONSTRUCT 720 FEET OF 12-INCH TO 42-INCH STORM SEWER.BURNSWOODSONEVERMAN
MILTON
VERONATENNYSON
MARLOWE
H
O
L
T
W
O
O
D
SHELLEY
GOODALEMILTON
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11036
Stormwater
15
$210,000
Overland
Coldwater
Coldwater Creek
Capital
240Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FOX RUN DRIVE #1360 STORM SEWER
Construction Task
5564 - Coldwater CreekOMCI Fund
REAR YARD PONDING.
CONSTRUCT 85 FEET OF 18-INCH STORM SEWER.
FOX RUNPEPPERHI
LLBLUEFIELDWATERFORD
BURNING TREEWILLOWBROOKPADDOCKNASHUAWOODRIDGE
SPRING VALLEYOLD YORKNEW FLORISSANTBL
U
E
F
I
E
L
DLINDBERGHLINDBERGH §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11159
Stormwater
15
$50,000
Florissant
Coldwater
Coldwater Creek
Capital
241Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FROSTWOOD PARK STREAMBANK STABILIZATION
Construction Task
5564 - Coldwater CreekOMCI Fund
EROSION IN CHANNEL ADJACENT TO FROSTWOOD PARK.
CONSTRUCT 59 SQUARE YARDS OF BANK PROTECTION, 26 SQUAREYARDS OF ROCK TOE PROTECTION, 3 CUBIC YARDS OF GRADECONTROL STABILIZATION, ON THE NORTH CHANNEL BANK ALONGFROSTWOOD PARK.
WABASHHANLEYALDER JANUAR
Y
JO EVERGREENNORFOLK
S
O
U
T
H
E
R
N
BUCKTH
O
R
N
GARFIELDHANCOCKJACKSONMADISONGRAHAM
HALTONIA BITTEROOTWASHINGTONJEFFERSONCADILLAC
PEPPERIDGE §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10362
Stormwater
15
$41,000
Berkeley
Coldwater
Coldwater Creek
Non-recurring
242Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LAKE VALLEY DR STORM SEWER REPLACEMENT
Construction Task
5564 - Coldwater CreekOMCI Fund
EXISTING SEWER IS DETERIORATED, CAUSING CAVE-INS.
CONSTRUCT 65 FEET OF 15-INCH STORM SEWER.LUSHERBENHAMLAKESIDE HILLSVERWOODSHORESIDECHILHAMBAY SHOREJAME STOWN WAY
R Y AN C RESTNORMA
L AKEVALLEY
C A N D LEWICKBLO S S O M VIE
WGLENVALE
OTTERBURN
FARM COUNTRY LEWIS N CLARK BLVDLEWIS N CLARK BLVD§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12535
Stormwater
15
$45,000
Unincorporated
Coldwater
Coldwater Creek
Capital
243Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEE AVE. #337 STORM SEWER
Construction Task
5571 - Gravois CreekOMCI Fund
FLOODING DUE TO INADEQUATE STORM SEWER SYSTEM.
CONSTRUCT 1,110 FEET OF 12-INCH DIAMETER TO 34-INCH BY 53-INCHHORIZONTAL ELLIPTICAL PIPE, FROM ROSE LANE TO LEE AVENUE.
LEEGEYER
ROSE HILL
WOODBINE
HARRISONROSE
HEEGE
MIDWAY
MCLAIN ARTWOODARD
ROSEWOODER
BER
CLAYBINEHEMAN
ROLLINGWOOD WILLOWHILLCRESTVANBURENMIDWAY
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10006
Stormwater
15
$323,000
Kirkwood
Lemay/RDP
Gravois Creek
Capital
244Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MALLARD LANE & PHEASANT DRIVE STORMSEWER
Construction Task
5564 - Coldwater CreekOMCI Fund
YARD, ROADWAY, AND STRUCTURAL FLOODING.
CONSTRUCT 860 FEET OF 12-INCH TO 24-INCH DIAMETER STORMSEWER.SWANFLA
M
I
N
G
O
NIGHTTHRUSHMU
L
L
A
N
P
H
Y
DO
V
E
BOBOLINKMALLARDCHICKADEESTARLINGSU
N
S
E
T
P
A
R
K
PH
E
A
S
A
N
T
PARAKEETHA
W
T
H
O
R
N
E
M
A
N
O
R
MO
C
K
I
N
G
B
I
R
D
CEDARCYPRESSPRIVATEPH
E
A
S
A
N
T
MO
C
K
I
N
G
B
I
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10388
Stormwater
15
$270,000
Florissant
Coldwater
Coldwater Creek
Capital
245Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
PARK AVENUE STORM IMPROVEMENTS
Construction Task
5571 - Gravois CreekOMCI Fund
STREET AND YARD FLOODING ALONG PARK AVENUE.
CONSTRUCT 605 FEET OF 12-INCH TO 15-INCH STORM SEWER ANDCURBING, AND 90 FEET OF 13 FOOT WIDE REINFORCED CONCRETECHANNEL.
STAFF ARE WORKING WITH THE CITY OF OAKLAND TO COMBINEEFFORTS WITH CITY STREET IMPROVEMENTS.
ARGONNE
MADISON PARKADAMS
BRENTLOCKWOOD
OAKWAY
HOLMESSAPPINGTONLUTHERJEFFERSON
MINTURNWESTWOODMITCHELLPARKWOODSHAWTHORNEHANDLANB
R
E
N
TPARK
HOLMES§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10329
Stormwater
15
$279,000
Oakland
Lemay/RDP
Gravois Creek
Capital
246Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
PICARDY LANE SUBDIVISION BANKSTABILIZATION
Construction Task
5566 - Deer CreekOMCI Fund
CREEK EROSION.
CONSTRUCT 400 FEET OF MODULAR BLOCK WALL, ROCK TOEPROTECTION, AND TWO GRADE CONTROL STRUCTURES.WARSONMAYFAIRPICARDYFORCEE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11196
Stormwater
15
$438,000
Ladue
Lemay/RDP
Deer Creek
Non-recurring
247Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RALEIGH DRIVE #8829 STORM SEWER
Construction Task
5571 - Gravois CreekOMCI Fund
BASEMENT AND YARD FLOODING CAUSED BY OVERCHARGED STORMSEWER.
CONSTRUCT 670 FEET OF 30-INCH DIAMETER STORM SEWER.
ROCK
H
I
L
L
ROCK FORESTRALEI
G
HBRACKEN
NAVARRE SKYLINEG R A N B U R YWHITEHAV EN
H
IB
BARD
P R IVATEJULIADENTCA
P
I
L
I
A
PARA G O N
S
HILOH
CA
P
I
L
I
A PRIVATECA
P
I
L
I
A
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11338
Stormwater
15
$200,000
Grantwood Village
Lemay/RDP
Gravois Creek
Capital
248Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
REDLAND DR. - TAHQUITZ DR. STORM SEWER
Construction Task
5571 - Gravois CreekOMCI Fund
YARD FLOODING.
CONSTRUCT 415 FEET OF 15-INCH STORM SEWER.
§¨¦55
§¨¦55
UNIONG R E E N PARK
CAMINOPECANJAC
I
N
T
O
SUN
R
I
S
E
W
A
Y
V I A M IR ALESTABANISTERCO
A
C
H
E
L
L
A
MA
L
U
S
REA
V
I
S
B
A
R
R
A
C
K
S
CO
R
N
U
S
BUCKLEYBURBECKDOLPHSWEET G U M
MA N G R O VE
ME
L
O
N
TAH
Q
U
I
T
ZBIRCH HAPPYAVENUE HGENECAUSEWAYHE
N
Z
L
E
R
NA
V
A
J
O
CAROUSELINW
O
O
DSUNRIDGETUPELO
CHANUTEBOXRED
L
A
N
D
JUBIL
CAPTIVA
GARDENSCIRCLE
UNI
O
N
T
E
R
R
A
C
E
PAR
K
H
I
L
L
P
R
I
V
A
T
E
GR
E
E
N
P
A
R
KBOX
CAPTIVABU
C
K
L
E
Y
BUCKLEY
PRIVAT
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11360
Stormwater
15
$48,000
Unincorporated
Lemay/RDP
Gravois Creek
Capital
249Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ROGERS LANE #975 STORM SEWER
Construction Task
5564 - Coldwater CreekOMCI Fund
FLOODING OF SIDE AND REAR YARDS.
CONSTRUCT 240 FEET OF 15-INCH STORM SEWER.CAPRIROGERS COTEAUWOODEN
GRENOBLE
WATERFORDDAUPHIN
DUQUETTEBARAT
PRIVATEMONTCLAIRCARSONPRIVATEPR IV A T E
PRIV ATEPRIVATEPRIVATE§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11119
Stormwater
15
$60,000
Florissant
Coldwater
Coldwater Creek
Capital
250Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ST. EDMUND #10728 - 10732 STORM SEWER
Construction Task
5564 - Coldwater CreekOMCI Fund
YARD AND GARAGE FLOODING.
CONSTRUCT 243 FEET OF 12-INCH TO 21-INCH STORM SEWER.HIGHLONGDIXIELEE
DUNDEE
ST BERNARDS
T
S
E
B
A
S
T
I
A
NADIEST HEN
R
Y
ST MICHA
E
L
ST COS
M
A
S
ST EDM
U
N
DST KEVIN PARKST HENRY§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11078
Stormwater
15
$60,000
St. Ann
Coldwater
Coldwater Creek
Capital
251Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STANSBERRY AVE #9262 STORM SEWER
Construction Task
5564 - Coldwater CreekOMCI Fund
INFREQUENT STRUCTURAL FLOODING FROM OVERLAND FLOW.
CONSTRUCT 517 FEET OF 12-INCH TO 36-INCH STORM SEWER.
GUTHRIEBOSWELL HERBERTWOODSONSTANSBERRY
TUTWILER
LEITH
MACON VANCEST WILLIAMLINDSCOTTGORDONTREFORE
STANSBERRY
MACON
LINDSCOTTGORDON§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11039
Stormwater
15
$115,000
Woodson Terrace
Coldwater
Coldwater Creek
Capital
252Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
TEALWOOD DRIVE AND BEAVER DRIVE BANKSTABILIZATION
Construction Task
5566 - Deer CreekOMCI Fund
HIGH RISK STRUCTURAL EROSION.
CONSTRUCT 290 FEET OF ROCK BLOCK WALL, 170 FEET OF MODULARBLOCK WALL, AND 55 FEET OF HEAVY STONE REVETMENT.
PRIVATE
WARSONTEALWOOD
BEAVER
HAVEN VIEW
COUNTRYSHIRETEALBROOK
SUFFIELD
SUNDOWN
LISA
WARINGTON
STACY
WARSONDOWNS
CHERRI
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11222
Stormwater
15
$357,000
Creve Coeur
Lemay/RDP
Deer Creek
Non-recurring
253Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WHITEHAVEN AND RALEIGH STORM SEWER
Construction Task
5571 - Gravois CreekOMCI Fund
BASEMENT AND GARAGE FLOODING, AND YARD EROSION.
CONSTRUCT 250 FEET OF 12-INCH TO 24-INCH STORM SEWER.RALEIGHWHITEHAVENROCK FORESTNAVARRE
CA
P
I
L
I
A
FERNALDH
IB
BARDBRA
C
K
E
N
GRA N B U R Y
P
ARAGON
GRAN TWOOD
CA
P
I
L
I
A
CA
P
I
L
I
A
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11350
Stormwater
15
$100,000
Grantwood Village
Lemay/RDP
Gravois Creek
Capital
254Page
FISCAL YEAR: 2017
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WINTERGREEN 3503 AND 3507 STORM SEWER
Construction Task
5571 - Gravois CreekOMCI Fund
YARD FLOODING.
CONSTRUCT 115 FEET OF 12-INCH STORM SEWER.
§¨¦55
§¨¦55
UNIONLIN VALLELONE ELMPINOAKOPA
L
GAPSC
H
W INTERGREENFORESTDALEBELLEWOODCRY
S
T
A
L
L
I
N
E
LONE ELM
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11362
Stormwater
15
$60,000
Unincorporated
Lemay/RDP
Gravois Creek
Capital
255Page
22 April 2015
Page 1 of 3
STORMWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
4123 - STORMWATER EMERGENCY FUND
11120 Construction
Task
EMERGENCY REPAIR FUNDS
(STORMWATER)
Various $250,000
FUND TOTAL: $250,000
5564 - COLDWATER CREEK OMCI FUND
11186 Construction
Task
CALVERT AVE. #3342 STORM SEWER Breckenridge Hills $42,000
10332 Construction
Task
DESMET INDUSTRIAL CT. LOT 8 BANK
STABILIZATION
Florissant $545,000
11020 Construction
Task
HERBERT AVE. 4200-4400 BLOCK
STREAMBANK STABILIZATION
Woodson Terrace $250,000
11127 Construction
Task
ROANOKE AND LOEKES STORM SEWER Florissant $250,000
11841 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - COLDWATER CREEK OMCI
Various $150,000
FUND TOTAL: $1,237,000
5565 - CREVE COEUR FRONTENAC OMCI FUND
10348 Construction
Task
CONWAY - CLERBROOK STORM CHANNEL Ladue $1,100,000
FUND TOTAL: $1,100,000
5566 - DEER CREEK OMCI FUND
11213 Construction
Task
AUSTIN PLACE AND LOCKWOOD AVE.
STORM SEWER
Glendale $847,000
11231 Construction
Task
CONWAY & CHAPEL OAKS STORM
IMPROVEMENTS (FRONTENAC 7-5)
Frontenac $176,000
12461 Design Services DEER CREEK OMCI STORMWATER DESIGN
(CONTRACT A)
Various $350,000
11065 Construction
Task
DEER CREEK WATERSHED INITIATIVE Various $207,500
11216 Construction
Task
FIRETHORN DRIVE #1901 STORM
IMPROVEMENTS
Des Peres $180,000
10360 Construction
Task
FORCEE LANE STORM SEWER Ladue $148,000
11234 Construction
Task
GLEN ABBEY DR. STORM IMPROVEMENTS
(FRONTENAC 7-3)
Frontenac $325,000
11223 Construction
Task
GLEN RD #35 BANK STABILIZATION Webster Groves $53,000
22 April 2015
Page 2 of 3
STORMWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11003 Construction
Task
HERMITAGE HILLS BANK STABILIZATION
(FRONTENAC 3-1)
Frontenac $315,000
11076 Construction
Task
LACLEDE STATION - CHAMBERLAIN STORM
SEWER
Webster Groves $230,000
11203 Construction
Task
MARYHILL DRIVE STORM SEWER Ladue $67,000
11005 Construction
Task
OAK VALLEY EAST STORM SEWER
(FRONTENAC 1-2)
Frontenac $185,000
10731 Construction
Task
PARK LANE #9568 - #9572 STORM SEWER Ladue $30,000
11000 Construction
Task
WEST OAK DRIVE STORM IMPROVEMENTS Glendale $35,000
FUND TOTAL: $3,148,500
5569 - FOUNTAIN CREEK OMCI FUND
12610 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - FOUNTAIN CREEK OMCI
Various $77,000
FUND TOTAL: $77,000
5571 - GRAVOIS CREEK OMCI FUND
11367 Construction
Task
ANCHOR DR. AND DANA AVE. STORM
SEWER
Unincorporated $138,000
11045 Construction
Task
GRANT #609 BANK STABILIZATION Webster Groves $152,000
11354 Construction
Task
LAVINIA DR. #10709 STORM SEWER Unincorporated $48,000
10370 Construction
Task
LIGGETT TO BIG BEND CHANNEL REPAIRS Oakland $75,000
10221 Construction
Task
MADISON #708 STORM SEWER Oakland $48,000
11105 Construction
Task
MANDA LANE #8901 STORM SEWER Crestwood $55,000
11363 Construction
Task
MC ADOO CT #4325 STORM SEWER St. Louis County $155,000
11370 Land Purchase RAINRIDGE CT. #4125 BANK STABILIZATION
& BUYOUTS (GCMB-370)
Unincorporated $605,000
FUND TOTAL: $1,276,000
5576 - MALINE CREEK OMCI FUND
10020 Design Services HUDSON RD. #1401 - #1405 BANK
STABILIZATION (MCDW-120)
Ferguson $250,000
22 April 2015
Page 3 of 3
STORMWATER PROJECTS - FY16
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12458 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - MALINE CREEK OMCI
Various $400,000
FUND TOTAL: $650,000
5583 - SUGAR CREEK OMCI FUND
10347 Design Services ROSEWOOD LANE & WOODARD DR. STORM
SEWER
Kirkwood $230,000
FUND TOTAL: $230,000
5584 - UNIVERSITY CITY OMCI FUND
12608 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - UNIVERSITY CITY OMCI
Various $130,000
10780 Pre-Design
Services
UNIVERSITY CITY BRANCH OF RIVER DES
PERES - CORPS OF ENGINEERS STUDY
University City $300,000
FUND TOTAL: $430,000
5593 - SEM BR OF RIVER DES PERES OMCI FUND
10035 Design Services BIG BEND TO PAPIN STORM SEWER PHASE I Webster Groves $200,000
10302 Design Services COTTAGE #206 STORM IMPROVEMENTS Webster Groves $120,000
FUND TOTAL: $320,000
GRAND TOTAL:$8,718,500
22 April 2015
Page 1 of 17
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY16
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11665 SELVIDGE AREA I/I REDUCTION WASTEWATER BALLWIN 167
11765 GRAND GLAIZE TRUNK SANITARY RELIEF AND
I/I REDUCTION (SKME-417)
WASTEWATER BALLWIN 125
12209 SPRINGDALE I/I REDUCTION (ROLLING DR AND
SMITHFIELD PL)
WASTEWATER BEL-RIDGE 76
11685 BISSELL HILLS SANITARY RELIEF/CALUMET I/I
REDUCTION (BP-317)
WASTEWATER BELLEFONTAINE
NEIGHBORS
91
11186 CALVERT AVE. #3342 STORM SEWER STORMWATER BRECKENRIDGE
HILLS
215
10021 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD
BLVD TO CONWAY RD) PHASE I
WASTEWATER BRENTWOOD 22
10021 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD
BLVD TO CONWAY RD) PHASE I
WASTEWATER BRENTWOOD 104
10737 POWELL AVE AND ANNALEE SEWER
SEPARATION
WASTEWATER BRENTWOOD 161
11789 CAULKS CREEK FORCEMAIN REHABILITATION WASTEWATER CHESTERFIELD 10
11115 CLAVERACH PARK I/I REDUCTION AND SEWER
SEPARATION
WASTEWATER CLAYTON 99
11115 CLAVERACH PARK I/I REDUCTION AND SEWER
SEPARATION
WASTEWATER CLAYTON 100
11105 MANDA LANE #8901 STORM SEWER STORMWATER CRESTWOOD 228
12569 GRAVOIS TRUNK SANITARY STORAGE
FACILITY (PARDEE LN AND PARDEE RD)
WASTEWATER CRESTWOOD 46
22 April 2015
Page 2 of 17
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY16
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12569 GRAVOIS TRUNK SANITARY STORAGE
FACILITY (PARDEE LN AND PARDEE RD)
WASTEWATER CRESTWOOD 126
10754 SHERWYN SANITARY RELIEF (SKME-651) AND
I/I REDUCTION
WASTEWATER CREVE COEUR 168
11996 FAWN VALLEY, PIONEER PARK, WESTCHESTER
I/I REDUCTION (MANCHESTER RD W OF N
GEYER RD)
WASTEWATER DES PERES 31
10020 HUDSON RD. #1401 - #1405 BANK
STABILIZATION (MCDW-120)
STORMWATER FERGUSON 210
10332 DESMET INDUSTRIAL CT. LOT 8 BANK
STABILIZATION
STORMWATER FLORISSANT 218
11127 ROANOKE AND LOEKES STORM SEWER STORMWATER FLORISSANT 233
11664 NEWCASTLE I/I REDUCTION WASTEWATER FLORISSANT 157
11719 BRINWOOD I/I REDUCTION WASTEWATER FLORISSANT 94
11719 BRINWOOD I/I REDUCTION WASTEWATER FLORISSANT 95
11723 COLDWATER CREEK WATERSHED I/I REMOVAL
- SHARON STUDY AREA (N LINDBERGH BLVD
AND LINDSAY LN)
WASTEWATER FLORISSANT 101
11003 HERMITAGE HILLS BANK STABILIZATION
(FRONTENAC 3-1)
STORMWATER FRONTENAC 224
11005 OAK VALLEY EAST STORM SEWER
(FRONTENAC 1-2)
STORMWATER FRONTENAC 231
11231 CONWAY & CHAPEL OAKS STORM
IMPROVEMENTS (FRONTENAC 7-5)
STORMWATER FRONTENAC 216
11234 GLEN ABBEY DR. STORM IMPROVEMENTS
(FRONTENAC 7-3)
STORMWATER FRONTENAC 220
22 April 2015
Page 3 of 17
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY16
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11000 WEST OAK DRIVE STORM IMPROVEMENTS STORMWATER GLENDALE 238
11213 AUSTIN PLACE AND LOCKWOOD AVE. STORM
SEWER
STORMWATER GLENDALE 214
11750 FORESTATE AND TEXAS SANITARY RELIEF
(SKME-513)
WASTEWATER GRANTWOOD
VILLAGE
120
11089 VINITA DRIVE SANITARY RELIEF WASTEWATER HANLEY HILLS 180
11726 COLDWATER SANITARY RELIEF SECTION B, C
& D WET WEATHER STORAGE FACILITY TANK
C
WASTEWATER HAZELWOOD 14
11726 COLDWATER SANITARY RELIEF SECTION B, C
& D WET WEATHER STORAGE FACILITY TANK
C
WASTEWATER HAZELWOOD 102
12310 MISSOURI RIVER BONFILS SANITARY SEWER
REHABILITATION PHASE II
WASTEWATER HAZELWOOD 152
10347 ROSEWOOD LANE & WOODARD DR. STORM
SEWER
STORMWATER KIRKWOOD 211
11651 LYNKIRK STUDY AREA I/I REDUCTION WASTEWATER KIRKWOOD 141
11840 MEADOWRIDGE AND EASTWOOD STORM AND
SANITARY RELIEF
WASTEWATER KIRKWOOD 148
11840 MEADOWRIDGE AND EASTWOOD STORM AND
SANITARY RELIEF
WASTEWATER KIRKWOOD 149
11995 KIRKWOOD MIDDLE SCHOOL, SIMMONS,
WILSON, W SARAH I/I REDUCTION
(MANCHESTER RD AND KIRKWOOD RD)
WASTEWATER KIRKWOOD 52
12317 KIRKWOOD I/I REDUCTION (BIG BEND BLVD
AND S KIRKWOOD RD)
WASTEWATER KIRKWOOD 51
11203 MARYHILL DRIVE STORM SEWER STORMWATER LADUE 229
22 April 2015
Page 4 of 17
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY16
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11994 HUNTLEIGH MANOR, OLD WARSON,
TIMBERWYCK I/I REDUCTION (S LINDBERGH
BLVD SOUTH OF LITZSINGER RD)
WASTEWATER LADUE 49
11997 DC-09 WEST I/I REDUCTION (S LINDBERGH
BLVD AND LADUE RD)
WASTEWATER LADUE 24
10018 FF-18 VILLA DORADO - LACKLAND - PAGE
SANITARY RELIEF (ADIE RD TO VILLA DORADO
DR)
WASTEWATER MARYLAND
HEIGHTS
32
10465 MISSOURI RIVER WWTP SECONDARY
TREATMENT EXPANSION (MITIGATION CREDIT)
WASTEWATER MARYLAND
HEIGHTS
156
10489 FF-15 MCKELVEY/R.R. TO ADIE SANITARY
RELIEF PHASE III
WASTEWATER MARYLAND
HEIGHTS
112
11790 CAULKS CREEK FORCEMAIN (RIVER VALLEY
RD TO L-52)
WASTEWATER MARYLAND
HEIGHTS
96
12616 MISSOURI RIVER WWTF BERM AND WATER
FEED UPGRADE
WASTEWATER MARYLAND
HEIGHTS
154
12643 MISSOURI RIVER WWTF SECONDARY
TREATMENT ELECTRICAL / MECHANICAL
MODIFICATIONS
WASTEWATER MARYLAND
HEIGHTS
155
11659 MARIETTA DR STORM SEPARATION AND I/I
REDUCTION (BP-292)
WASTEWATER NORMANDY 143
11659 MARIETTA DR STORM SEPARATION AND I/I
REDUCTION (BP-292)
WASTEWATER NORMANDY 144
11928 LUCAS & HUNT AND I-70 SANITARY SEWER WASTEWATER NORTHWOODS 140
10221 MADISON #708 STORM SEWER STORMWATER OAKLAND 227
22 April 2015
Page 5 of 17
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY16
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
10370 LIGGETT TO BIG BEND CHANNEL REPAIRS STORMWATER OAKLAND 226
11663 MIDLAND SANITARY RELIEF - PUBLIC AND
PRIVATE I/I REDUCTION
WASTEWATER OVERLAND 150
11663 MIDLAND SANITARY RELIEF - PUBLIC AND
PRIVATE I/I REDUCTION
WASTEWATER OVERLAND 151
11136 DEGIVERVILLE COMBINED SEWER
RELOCATION
WASTEWATER ST. LOUIS CITY 30
11656 MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR TO
CHURCH DR)
WASTEWATER ST. LOUIS CITY 68
11656 MALINE CREEK CSO BP 051 & 052 LOCAL
STORAGE FACILITY (CHAIN OF ROCKS DR TO
CHURCH DR)
WASTEWATER ST. LOUIS CITY 142
11770 HARLEM - BADEN RELIEF PHASE IV (HEBERT)
(IMPROVEMENTS FROM BASIN TO HAMILTON
TRUNK)
WASTEWATER ST. LOUIS CITY 127
11820 LMRDP CSO STORAGE TUNNEL (BROADWAY
TO RDP TUBES)
WASTEWATER ST. LOUIS CITY 61
11958 LMRDP CSO STORAGE TUNNEL SOUTH
CONSOLIDATION SEWERS
WASTEWATER ST. LOUIS CITY 63
11959 LMRDP CSO STORAGE TUNNEL NORTH
CONSOLIDATION SEWERS
WASTEWATER ST. LOUIS CITY 62
12488 LEMAY PUMP STATIONS 1 AND 2
IMPROVEMENTS
WASTEWATER ST. LOUIS CITY 57
12488 LEMAY PUMP STATIONS 1 AND 2
IMPROVEMENTS
WASTEWATER ST. LOUIS CITY 137
12536 NATURAL BRIDGE RD - DARBY TO CHEVROLET
COMBINED SEWER RELIEF
WASTEWATER ST. LOUIS CITY 69
10766 STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
UNALLOCATED ST. LOUIS CITY
AND COUNTY
77
22 April 2015
Page 6 of 17
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY16
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11744 EASEMENT ACQUISITION FOR COMBINED /
SANITARY PROJECTS (FY 2016)
WASTEWATER ST. LOUIS CITY
AND COUNTY
110
11363 MC ADOO CT #4325 STORM SEWER STORMWATER ST. LOUIS
COUNTY
230
12128 CONCORD I/I REDUCTION (TESSON FERRY RD
AND E CONCORD RD)
WASTEWATER ST. LOUIS
COUNTY
17
12496 LEMAY WWTF CHANNEL AERATION BLOWERS WASTEWATER ST. LOUIS
COUNTY
138
10407 BAUMGARTNER & BLACK FOREST SANITARY
REPLACEMENT PHASE II
WASTEWATER UNINCORPORAT
ED
87
11009 CHANDELLAY DR. SANITARY SEWER
REPLACEMENT
WASTEWATER UNINCORPORAT
ED
98
11354 LAVINIA DR. #10709 STORM SEWER STORMWATER UNINCORPORAT
ED
225
11367 ANCHOR DR. AND DANA AVE. STORM SEWER STORMWATER UNINCORPORAT
ED
213
11370 RAINRIDGE CT. #4125 BANK STABILIZATION &
BUYOUTS (GCMB-370)
STORMWATER UNINCORPORAT
ED
232
11649 LEMAY WWTP SECONDARY IMPROVEMENTS WASTEWATER UNINCORPORAT
ED
60
11668 SUB-TRUNK #2 LATERAL SANITARY RELIEF WASTEWATER UNINCORPORAT
ED
169
22 April 2015
Page 7 of 17
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY16
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11698 PICKWICK - BERNADINE - BIMINI SANITARY
RELIEF
WASTEWATER UNINCORPORAT
ED
160
11711 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP
TO MARTIGNEY PS)
WASTEWATER UNINCORPORAT
ED
134
11776 ALPINE DRIVE SEPARATE SEWER I/I REMOVAL WASTEWATER UNINCORPORAT
ED
84
11776 ALPINE DRIVE SEPARATE SEWER I/I REMOVAL WASTEWATER UNINCORPORAT
ED
85
11816 LMRDP TUNNEL DEWATERING PUMP STATION WASTEWATER UNINCORPORAT
ED
64
12075 AFFTON I/I REDUCTION (HANOVER,
HILDESHEIM-WEBER RD, SEIBERT, AND
HAMBURG)
WASTEWATER UNINCORPORAT
ED
2
12078 APPLE ORCHARD - SINGERSON - BAYLESS
PLACE I/I REDUCTION (LEMAY FERRY RD AND
BAYLESS AVE)
WASTEWATER UNINCORPORAT
ED
3
12240 UNION CREEK I/I REDUCTION (I-55 BETWEEN S
LINDBERGH BLVD AND BUCKLEY RD)
WASTEWATER UNINCORPORAT
ED
79
12253 VALCOUR AND BURLINGTON RR SANITARY
RELIEF AND I/I REDUCTION (VALCOUR RD AND
WATSON RD)
WASTEWATER UNINCORPORAT
ED
81
12304 HELTA, SAPPINGTON, AND GREGORY COURT I/I
REDUCTION (SAPPINGTON RD AND I-270)
WASTEWATER UNINCORPORAT
ED
48
12314 KAPPEL (PARTIAL) I/I REDUCTION (EXUMA DR
AND GLEN OWEN DR)
WASTEWATER UNINCORPORAT
ED
50
22 April 2015
Page 8 of 17
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY16
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12420 REAVSDALE I/I REDUCTION (MACKENZIE RD
AND REAVIS BARRACKS RD)
WASTEWATER UNINCORPORAT
ED
75
12501 LOWER MERAMEC RIVER WWTF SCREEN
CHANNEL IMPROVEMENTS
WASTEWATER UNINCORPORAT
ED
139
12504 COLDWATER CREEK WWTF FINAL CLARIFIERS
REPLACEMENT
WASTEWATER UNINCORPORAT
ED
13
12619 HAMBURG AVE TO AL CLAIRE DR TO
WEBMORE DR CSO L-181 (I-032) ELIMINATION
WASTEWATER UNINCORPORAT
ED
47
10780 UNIVERSITY CITY BRANCH OF RIVER DES
PERES - CORPS OF ENGINEERS STUDY
STORMWATER UNIVERSITY
CITY
212
11992 UNIVERSITY CITY SANITARY STORAGE
FACILITY (HAFNER CT)
WASTEWATER UNIVERSITY
CITY
80
11992 UNIVERSITY CITY SANITARY STORAGE
FACILITY (HAFNER CT)
WASTEWATER UNIVERSITY
CITY
177
11993 82ND STREET TO I-170 SANITARY RELIEF (UR-
08, UR-09)
WASTEWATER UNIVERSITY
CITY
1
11993 82ND STREET TO I-170 SANITARY RELIEF (UR-
08, UR-09)
WASTEWATER UNIVERSITY
CITY
83
12062 UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (WC-01)
WASTEWATER UNIVERSITY
CITY
173
12063 UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (WC-02 AND WC-03)
WASTEWATER UNIVERSITY
CITY
174
22 April 2015
Page 9 of 17
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY16
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
10456 FOREST BROOK SANITARY RELIEF (SKME-003
AND SKME-016) REHABILITATION AND I/I
REDUCTION
WASTEWATER VARIOUS 119
10576 DC-06 DEER CREEK SANITARY RELIEF PHASE III
AND I/I REDUCTION
WASTEWATER VARIOUS 105
10576 DC-06 DEER CREEK SANITARY RELIEF PHASE III
AND I/I REDUCTION
WASTEWATER VARIOUS 106
11065 DEER CREEK WATERSHED INITIATIVE STORMWATER VARIOUS 217
11107 EMERGENCY REPAIR FUNDS (WASTEWATER) WASTEWATER VARIOUS 111
11109 LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
WASTEWATER VARIOUS 65
11109 LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
WASTEWATER VARIOUS 66
11110 DEER CREEK SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
WASTEWATER VARIOUS 27
11110 DEER CREEK SANITARY SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
WASTEWATER VARIOUS 28
11120 EMERGENCY REPAIR FUNDS (STORMWATER) STORMWATER VARIOUS 219
11125 CRITICAL INFRASTRUCTURE ASSESSMENT WASTEWATER VARIOUS 21
11144 BISSELL - COLDWATER - MISSOURI - MERAMEC
SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
WASTEWATER VARIOUS 8
11144 BISSELL - COLDWATER - MISSOURI - MERAMEC
SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
WASTEWATER VARIOUS 9
11145 LEMAY SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
WASTEWATER VARIOUS 58
22 April 2015
Page 10 of 17
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY16
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11145 LEMAY SANITARY SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
WASTEWATER VARIOUS 59
11146 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
WASTEWATER VARIOUS 103
11151 CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION FACILITIES
WASTEWATER VARIOUS 20
11152 CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL FACILITIES
WASTEWATER VARIOUS 18
11153 RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
WASTEWATER VARIOUS 72
11153 RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
WASTEWATER VARIOUS 73
11661 MARTIGNEY I/I REDUCTION WASTEWATER VARIOUS 145
11662 MCNULTY - PALLARDY I/I REDUCTION WASTEWATER VARIOUS 146
11662 MCNULTY - PALLARDY I/I REDUCTION WASTEWATER VARIOUS 147
11672 UNIVERSITY CITY I/I REDUCTION - WEST WASTEWATER VARIOUS 171
11672 UNIVERSITY CITY I/I REDUCTION - WEST WASTEWATER VARIOUS 172
11681 UPPER COLDWATER SECTION D I/I REDUCTION WASTEWATER VARIOUS 178
11681 UPPER COLDWATER SECTION D I/I REDUCTION WASTEWATER VARIOUS 179
11682 BALLAS ROAD SUBTRUNK SOUTH I/I
REDUCTION
WASTEWATER VARIOUS 86
22 April 2015
Page 11 of 17
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY16
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11686 BISSELL POINT I/I REDUCTION (BP-619)
(VALLEY DR)
WASTEWATER VARIOUS 92
11693 NORTH BADEN CREEK I/I REDUCTION (BP-532)
(WINCHESTER DR)
WASTEWATER VARIOUS 158
11696 PADDOCK CREEK I/I REDUCTION (PRIVATE) WASTEWATER VARIOUS 159
11699 PRIVATE INFLOW/INFILTRATION PUBLIC
ENGAGEMENT PROGRAM 2013
WASTEWATER VARIOUS 70
11701 PUMP STATION REPLACEMENT PROJECTS
(PHASE I)
WASTEWATER VARIOUS 164
11702 RADAR RAINFALL DATA (FY2014)WASTEWATER VARIOUS 71
11705 INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2016)
WASTEWATER VARIOUS 133
11705 INFRASTRUCTURE REPAIRS
(SANITARY/COMBINED - FY2016)
WASTEWATER VARIOUS 132
11709 INFRASTRUCTURE REPAIRS (REHABILITATION)
(FY2016) CONTRACT A
WASTEWATER VARIOUS 130
11712 LACKLAND I/I REDUCTION WASTEWATER VARIOUS 135
11731 DEER CREEK SANITARY TUNNEL (CLAYTON RD
TO RDP)
WASTEWATER VARIOUS 29
11738 DIXIE I/I REDUCTION WASTEWATER VARIOUS 108
11739 DUCHESNE AND GOTT I/I REDUCTION WASTEWATER VARIOUS 109
11746 LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO FENTON
WWTF TUNNEL
WASTEWATER VARIOUS 67
22 April 2015
Page 12 of 17
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY16
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11748 FLORISSANT I/I REDUCTION WASTEWATER VARIOUS 113
11749 FLORLAND SANITARY RELIEF PHASE I - I/I
REDUCTION
WASTEWATER VARIOUS 115
11749 FLORLAND SANITARY RELIEF PHASE I - I/I
REDUCTION
WASTEWATER VARIOUS 116
11752 GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2016)
WASTEWATER VARIOUS 33
11753 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2015) CONTRACT A
WASTEWATER VARIOUS 34
11754 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2015) CONTRACT B
WASTEWATER VARIOUS 35
11755 GENERAL SERVICES AGREEMENT - PLANNING
(FY2014)
WASTEWATER VARIOUS 37
11758 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2015) CONTRACT A
UNALLOCATED VARIOUS 121
11760 GENERAL SERVICES AGREEMENT - FACILITY &
SEWER DESIGN (2016)
WASTEWATER VARIOUS 38
11764 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT A
WASTEWATER VARIOUS 41
11774 MISSOURI RIVER SERVICE AREA I/I REDUCTION
- CREVE COEUR CREEK EAST
WASTEWATER VARIOUS 153
11780 GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT B
WASTEWATER VARIOUS 39
11781 GENERAL SERVICES AGREEMENT - SEWER
DESIGN (FY2013) CONTRACT C
WASTEWATER VARIOUS 40
11810 CCTV INSPECTION OF SEWERS (2014)WASTEWATER VARIOUS 12
22 April 2015
Page 13 of 17
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY16
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11811 CCTV INSPECTION AND PHYSICAL INSPECTION
OF SEWERS (2014)
WASTEWATER VARIOUS 11
11826 CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK TUNNELS
WASTEWATER VARIOUS 19
11841 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - COLDWATER CREEK OMCI
STORMWATER VARIOUS 234
11851 DEER CREEK PUBLIC I/I REDUCTION (2016) WASTEWATER VARIOUS 107
11868 INFRASTRUCTURE REPAIRS (REHABILITATION)
(FY2016) CONTRACT B
WASTEWATER VARIOUS 131
11883 BLACK CREEK SANITARY SEWER AND I/I
REDUCTION
WASTEWATER VARIOUS 93
11898 SUPPLEMENTAL ENVIRONMENTAL PROJECTS
(SEP) PROGRAM
WASTEWATER VARIOUS 170
11916 STREAM FLOW WATER QUALITY SAMPLING
(FY 2014)
UNALLOCATED VARIOUS 78
11923 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2016) CONTRACT E
WASTEWATER VARIOUS 90
11932 FLORISSANT PUBLIC I/I REDUCTION WASTEWATER VARIOUS 114
11944 FOREST BROOK SANITARY RELIEF (SKME-003
AND SKME-016) PUBLIC REHABILITATION AND
I/I REDUCTION
WASTEWATER VARIOUS 118
12023 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2017) CONTRACT A
WASTEWATER VARIOUS 4
12024 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2017) CONTRACT B
WASTEWATER VARIOUS 5
12025 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2017) CONTRACT C
WASTEWATER VARIOUS 6
22 April 2015
Page 14 of 17
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY16
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12036 DEER CREEK PUBLIC I/I REDUCTION (2017)
CONTRACT A
WASTEWATER VARIOUS 25
12037 DEER CREEK PUBLIC I/I REDUCTION (2017)
CONTRACT B
WASTEWATER VARIOUS 26
12038 LEMAY PUBLIC I/I REDUCTION (2017)
CONTRACT D
WASTEWATER VARIOUS 56
12048 LEMAY PUBLIC I/I REDUCTION (2017)
CONTRACT A
WASTEWATER VARIOUS 53
12049 LEMAY PUBLIC I/I REDUCTION (2017)
CONTRACT B
WASTEWATER VARIOUS 54
12050 LEMAY PUBLIC I/I REDUCTION (2017)
CONTRACT C
WASTEWATER VARIOUS 55
12060 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2016) CONTRACT A
WASTEWATER VARIOUS 88
12061 LEMAY PUBLIC I/I REDUCTION (2016)WASTEWATER VARIOUS 136
12064 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (FY2015) CONTRACT C
WASTEWATER VARIOUS 36
12070 COMPREHENSIVE AMMONIA AND NUTRIENT
REMOVAL MASTER PLAN
WASTEWATER VARIOUS 16
12125 COLDWATER SOUTHWEST SUBWATERSHED I/I
REDUCTION (ST. CHARLES ROCK RD AND
ASHBY RD)
WASTEWATER VARIOUS 15
12379 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2015) CONTRACT B
UNALLOCATED VARIOUS 122
12380 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2015) CONTRACT C
UNALLOCATED VARIOUS 123
12381 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2015) CONTRACT D
UNALLOCATED VARIOUS 124
22 April 2015
Page 15 of 17
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY16
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12394 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT B
WASTEWATER VARIOUS 42
12395 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT C
WASTEWATER VARIOUS 43
12405 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT D
WASTEWATER VARIOUS 44
12406 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2016) CONTRACT E
WASTEWATER VARIOUS 45
12434 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2016) CONTRACT D
WASTEWATER VARIOUS 89
12435 UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (BEL-NOR)
WASTEWATER VARIOUS 175
12436 UNIVERSITY CITY PUBLIC I/I REDUCTION -
EAST (HANLEY HILLS)
WASTEWATER VARIOUS 176
12441 RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL WASTEWATER VARIOUS 74
12458 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - MALINE CREEK OMCI
STORMWATER VARIOUS 236
12461 DEER CREEK OMCI STORMWATER DESIGN
(CONTRACT A)
STORMWATER VARIOUS 209
12472 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD
BLVD TO CONWAY RD) PHASE III
WASTEWATER VARIOUS 23
12608 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - UNIVERSITY CITY OMCI
STORMWATER VARIOUS 237
12610 STORMWATER INFRASTRUCTURE REPAIR /
REPLACEMENT - FOUNTAIN CREEK OMCI
STORMWATER VARIOUS 235
12617 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2017) CONTRACT F
WASTEWATER VARIOUS 7
22 April 2015
Page 16 of 17
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY16
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12626 FLOW METERING MANHOLE IMPROVEMENTS
(2016)
WASTEWATER VARIOUS 117
10035 BIG BEND TO PAPIN STORM SEWER PHASE I STORMWATER WEBSTER
GROVES
207
10302 COTTAGE #206 STORM IMPROVEMENTS STORMWATER WEBSTER
GROVES
208
11045 GRANT #609 BANK STABILIZATION STORMWATER WEBSTER
GROVES
222
11097 HOLLY DRIVE SEWER SEPARATION WASTEWATER WEBSTER
GROVES
128
11097 HOLLY DRIVE SEWER SEPARATION WASTEWATER WEBSTER
GROVES
129
11223 GLEN RD #35 BANK STABILIZATION STORMWATER WEBSTER
GROVES
221
11677 WEBSTER GROVES TRUNK E SANITARY
REHABILITATION AND I/I REDUCTION PHASE III
WASTEWATER WEBSTER
GROVES
82
11678 WEBSTER GROVES TRUNK E SANITARY
REHABILITATION AND I/I REDUCTION PHASE IV
WASTEWATER WEBSTER
GROVES
181
11700 PROVIDENCE SANITARY RELIEF (SKME-640) WASTEWATER WEBSTER
GROVES
162
11700 PROVIDENCE SANITARY RELIEF (SKME-640) WASTEWATER WEBSTER
GROVES
163
22 April 2015
Page 17 of 17
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY16
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
10748 ROSEMARY, PHILO, & KATHLEEN SEWER
SEPARATION
WASTEWATER WILBUR PARK 165
10748 ROSEMARY, PHILO, & KATHLEEN SEWER
SEPARATION
WASTEWATER WILBUR PARK 166
11720 CAULKS CREEK TRUNK SEWER (SKME-011)
PHASE I
WASTEWATER WILDWOOD 97
11020 HERBERT AVE. 4200-4400 BLOCK STREAMBANK
STABILIZATION
STORMWATER WOODSON
TERRACE
223