Loading...
HomeMy Public PortalAbout07282016 Application_Excel FINAL Rev 0 0 0 0 0 0 0 0 180000 0 0 Page of Metropolitan St. Louis Sewer District Project Clear - Rainscaping Program Project Title: Contact Person: Name of Organization: Address: City/State/Zip Code: Telephone Number: Email Address: Address of Project: 1. Please attach a copy of the following with this completed application form. Project parameters provided here should be the same as parameters provided on MEP spreadsheets. Total Drainage Area = Ac. USER INPUT CELL Impervious Area = AUTO POPULATED Pervious or Vegetated Area = 3. Reimbursable Grant Amount Calculating Reimbursable Amount $ [A] MSD’s Reimbursement Rate per Acre of DA Managed $/Ac. [B] Calculated Reimbursable Amount = [A] x [B] Requestable Reimbursable Amount: 4. Certification by Applicant Applicant Signature Date Print Name if known link Cityshed (if known): MSD P-Job Number (if known): CSO Region (if known): a.) A copy of the BMP drainage area map providing total area to each green infrastructure practice, including % impervious of each area. c.) A copy of completed MEP sheets 2. List of Project & BMP Parameters Any documentation required by MSD’s Development Review should be submitted. Submission of this application does not replace the applicant's responsibility to follow applicable MSD rules and regulations and policy for plan approval. Rainscaping Large Scale Grants Program - Development Review Application Form Pre-Construction Development Input Post-Construction Development Input Rainscaping Feature(s) Proposed: Total Drainage Area Managed by Rainscaping = Impervious Area Managed by Rainscaping = Pervious or Vegetated Area to Rainscaping = Total Cost Estimate for Rainscaping Features = Total Drainage Area Managed by Rainscaping = d.) Projected project schedule Reimbursement dollar amount from MSD will not exceed the total cost estimate provided for eligible grant costs including engineering, design, and construction of the approved rainscaping features. Total drainage area managed accepted as reimbursable will be subject to MSD’s Development Review's final plan approval. The current maximum reimbursement rate for the Rainscaping Large Scale Grants - Development Review Application is $180,000/acre of total drainage area managed. The reimbursement rate is applicable tor rainscaping features designed per MSD's standard sizing for stormwater BMPs. MSD's standard sizing requirements are outlined in Chapter 4.080 of MSD's Rules and Regulations and Engineering Design Requirements for Sanitary Sewer and Stormwater Drainage Facilities. This applicant certifies that all information in this application, and all information furnished in support of the application is true and complete to the best of the applicant’s knowledge and belief. This applicant has read and understands the program requirements. This applicant also understands that MSD must approve the project before funds can be committed and that documentation of actual reasonable expenditures must be submitted for reimbursement of qualified expenses. This applicant understands that this is a reimbursement program, and the grantee must have funding available to cover all aspects of the project. b.) BMP Expense Form itemizing costs for the rainscaping features to be installed.