HomeMy Public PortalAbout9526 GIDLEY ST. BUILDING 8-10-2020TEMPLE CITY PERMIT NO. B18-35779
City of Temple City 19701 Las Tunas Drive I Temple City, California 91780 I (626) 285-2171 I www.templecity.us
Address: 9526 Gidley Street, Temple City, California 91780 Parcel: 8592-004-047
Permit No: B18-35779 Type: Building Subtype: NC New
Commercial
Description: NEW 1 -STORY AUTOMOBILE PAINT AND BODY REPAIR
GARAGE WITH MEZZANINE OFFICE SPACE
Issue Date: 04-25-2019
Special
Conditions:
Expire Date: 04-24-2020
Extension: Extension:
Permit expires on date shown if: 1) work does not commence, or 2) work is suspended or abandoned, or 3) applicant fails to obtain code
required inspection.
Contacts _._. E112vsp2lN l;ZS.l�L v-�/Lr�o..
Owner Peter Hong Fixed Auto Temple City 9526 Gidley Street, Temple City, California 91780 (
Applicant Tony 4739 Wanamaker , Jurapa Valley, California 91752 (626) 430-0133
Mendoza
Contractor JP Service DBA JP Construction 2714 Stingle Avenue, Rosemead, California 91770 (626) 572-9181 642751
CO.
Architect A C R C Design Group 4739 Wanamaker Drive , Jurapa Valley , California (626) 430-0133
91752
Building Details
Structure 1: Automobile Paint 2: 3: 4:
Construction Type: V -A
Occupancy Group: S-1 Storage, moderate hazard
New/Added Area: 12,510 0 0 0
Remodel/TI Area: 0 0 0 0
New Dwelling Units: 0 0 0 0
Stories: 0 0 0 0
Fees Total
Valuation $826,605.76 Plan Check Fees $7785.40
Strong Motion Fee $231.45 SB 1473 Fee $34.00
Building Inspections
Permit Fees $9159.29
Parks Dev Fee $0.00 Sewer Const Fee $0.00
Approval Da t Inspecto
y �y Approval Date Ins ed Approval Da Inss e�
Location/Setbacks Roof Sheathing RatedP311 of 12L/20
Soils Engineer Fire Dept Framing —� Floor/Ceiling
0 Foundation Forms �_ Bldg Dept Framing Rated Walls
Shear Panels Rated Shafts
Sprinkler Hangars T -Bar
Insulation/Weather Tr
1O Ceilings
Strip Lot Drainage
Interior :a Smoke
Lath/Drywall Detectors
Exterior Lath Fire Dept ? / ZO I4e•i3
Approval
FINAL o ��
(2^4.T /SnC,r (L1. -e l/levik\ • 1NS ,_e•
' .Slab/Under Floor
gj ea lzdoor
Underfloor
Insulation
1st Floor
Sheathing
2nd Floor
Sheathing
C1 2-I' . Cg,e, s ,.41rte -- >a �
i�Ole g"Grioet
(e41 4;y4- frAfil 0 1.04115 �U 7 1,314 s1n'4'c/ 485 ca
tila !G
Mandull r1;44141' ton- too) oa 2 qm ka stiuvi cgs t ie
DAL
CN`t�►'�' PJ125 L� Apo �ti �.r5 `n� Gv►1,� h'��/Oe'�c�t�ce(�ca�"S �' 0/lei U�