Loading...
HomeMy Public PortalAbout11022 ORDINANCE NO. 11022 AN ORDINANCE, authorizing the Executive Director and Secretary- Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-983 with ILINC Engineering, Inc, for engineering services for the final design of Fishpot Creek Sanitary Relief MDNR/SCS Participation Phase I (90022X). NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The Executive Director and Secretary-Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-983 with ILINC Engineering, Inc. for engineering services for the final design of Fishpot Creek Sanitary Relief – MDNR/SCS Participation Phase I (90022X); said contract to be comprised of such terms and conditions as are approved by the office of the General Counsel of the District. The foregoing Ordinance was adopted July 12, 2001 by the following vote Ayes – T.W. Purcell, M.G. Reichert, C.D. Seward, A.J. Soukenik, J.W. Siscel, and M.C. Williams. Nays – None. Secretary-Treasurer