Loading...
HomeMy Public PortalAbout11082O R D I N A N C E NO. 11082 AN ORDINANCE, appropriating One Hundred Three Thousand Dollars ($103,000.00) from the Operation, Maintenance, and Construction Improvement Fund of Coldwater Creek for engineering services for the final design of January-Thurston Storm Extension (2000040); and authorizing the Executive Director and Secretary-Treasurer on behalf of the Metropolitan St. Louis Sewer District to enter into Contract E-989 with Harding ESE, Inc. for the aforesaid engineering services. WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of One Hundred Three Thousand Dollars ($103,000.00) is hereby appropriated from the Operation, Maintenance, and Construction Improvement Fund of Coldwater Creek for engineering services for the final design of January-Thurston Storm Extension (2000040). Section Two. The Executive Director and Secretary-Treasurer are hereby authorized on behalf of the Metropolitan St. Louis Sewer District to enter into Contract E-989 with Harding ESE, Inc. for engineering services for the final design of January-Thurston Storm Extension (2000040); said contract to be comprised of such terms and conditions as are approved by the office of the General Counsel of the District. 2 Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted October 11, 2001 by the following vote – Ayes – T.W. Purcell, M.G. Reichert, A.J. Soukenik, and M.C. Williams. Nays – None. Secretary-Treasurer