HomeMy Public PortalAbout11082O R D I N A N C E NO. 11082
AN ORDINANCE, appropriating One Hundred Three Thousand
Dollars ($103,000.00) from the Operation, Maintenance, and Construction
Improvement Fund of Coldwater Creek for engineering services for the final
design of January-Thurston Storm Extension (2000040); and authorizing the
Executive Director and Secretary-Treasurer on behalf of the Metropolitan St.
Louis Sewer District to enter into Contract E-989 with Harding ESE, Inc. for
the aforesaid engineering services.
WHEREAS, the Director of Finance has certified that there is an
unencumbered balance in the above-named fund sufficient to pay the
obligation authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF
TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of One Hundred Three Thousand Dollars
($103,000.00) is hereby appropriated from the Operation, Maintenance, and
Construction Improvement Fund of Coldwater Creek for engineering services
for the final design of January-Thurston Storm Extension (2000040).
Section Two. The Executive Director and Secretary-Treasurer are
hereby authorized on behalf of the Metropolitan St. Louis Sewer District to
enter into Contract E-989 with Harding ESE, Inc. for engineering services for
the final design of January-Thurston Storm Extension (2000040); said contract
to be comprised of such terms and conditions as are approved by the office of
the General Counsel of the District.
2
Section Three. This ordinance, being an appropriation ordinance,
shall take effect immediately upon its enactment.
The foregoing Ordinance was adopted October 11, 2001 by the following vote –
Ayes – T.W. Purcell, M.G. Reichert, A.J. Soukenik, and M.C. Williams.
Nays – None.
Secretary-Treasurer