Loading...
HomeMy Public PortalAbout11089O R D I N A N C E NO. 11089 AN ORDINANCE, appropriating One Hundred Sixteen Thousand Dollars ($116,000.00) from the Operation, Maintenance, and Construction Improvement Fund of Coldwater Creek for engineering services for the final design of Coldwater Creek Bank Stabilization – Wright to Geraldine (CLD-11) (2001093); and authorizing the Executive Director and Secretary-Treasurer on behalf of the Metropolitan St. Louis Sewer District to enter into Contract E-996 with Zambrana Engineering, Inc. for the aforesaid engineering services. WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of One Hundred Sixteen Thousand Dollars ($116,000.00) is hereby appropriated from the Operation, Maintenance, and Construction Improvement Fund of Coldwater Creek for engineering services for the final design of Coldwater Creek Bank Stabilization – Wright to Geraldine (CLD-11) (2001093). Section Two. The Executive Director and Secretary-Treasurer are hereby authorized on behalf of the Metropolitan St. Louis Sewer District to enter into Contract E-996 with Zambrana Engineering, Inc. for engineering services for the final design of Coldwater Creek Bank Stabilization – Wright to Geraldine (CLD-11) (2001093); said contract to be comprised of such terms 2 and conditions as are approved by the office of the General Counsel of the District. Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted October 11, 2001 by the following vote – Ayes – T.W. Purcell, M.G. Reichert, A.J. Soukenik, and M.C. Williams. Nays – None. Secretary-Treasurer