HomeMy Public PortalAbout11109 O R D I N A N C E NO. 11109
AN ORDINANCE, appropriating One Hundred Twenty-nine Thousand
Dollars ($129,000.00) from the Operation, Maintenance and Construction
Improvement Fund of University City Branch of River des Peres for engineering
services for the final design of Trenton Creek Storm Sewer (UCTC-110) Phase V
(2000113); and authorizing the Executive Director and Secretary-Treasurer on
behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-1000
with The Clayton Engineering Company for the aforesaid engineering services.
WHEREAS, the Director of Finance has certified that there is an
unencumbered balance in the above-named fund sufficient to pay the obligation
authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF
TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of One Hundred Twenty-nine Thousand
Dollars ($129,000.00) is hereby appropriated from the Operation, Maintenance
and Construction Improvement Fund of University City Branch of River des Peres
for engineering services for the final design of Trenton Creek Storm Sewer (UCTC-
110) Phase V (2000113).
Section Two. The Executive Director and Secretary-Treasurer are
hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter
into Contract E-1000 with The Clayton Engineering Company for engineering
services for the final design of Trenton Creek Storm Sewer (UCTC-110) Phase V
(2000113); said contract to be comprised of such terms and conditions as are
approved by the office of the General Counsel of the District.
Section Three. This ordinance, being an appropriation ordinance,
shall take effect immediately upon its enactment.
The foregoing Ordinance was adopted November 14, 2001 by the following vote-
Ayes – T.W. Purcell, M.G. Reichert, A.J. Soukenik, C.D. Seward, and J.W. Siscel.
Nays – None.
Secretary-Treasurer