HomeMy Public PortalAbout11131 O R D I N A N C E NO. 11131
AN ORDINANCE, appropriating Ninety-nine Thousand Dollars
($99,000.00) from the Operation, Maintenance and Construction Improvement
Fund of Vinita Park for engineering services for the final design of Page and
Walton Storm Relief (2001114); and authorizing the Executive Director and
Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter
into Contract E-1010 with Cole & Associates, Inc. for the aforesaid engineering
services.
WHEREAS, the Director of Finance has certified that there is an
unencumbered balance in the above-named fund sufficient to pay the obligation
authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF
TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Ninety-nine Thousand Dollars ($99,000.00)
is hereby appropriated from the Operation, Maintenance and Construction
Improvement Fund of Vinita Park for engineering services for the final design of
Page and Walton Storm Relief (2001114).
Section Two. The Executive Director and Secretary-Treasurer are
hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter
into Contract E-1010 with Cole & Associates, Inc. for engineering services for the
final design of Page and Walton Storm Relief (2001114); said contract to be
comprised of such terms and conditions as are approved by the Office of the
General Counsel of the District.
Section Three. This ordinance, being an appropriation ordinance,
shall take effect immediately upon its enactment.
The foregoing Ordinance was adopted December 13, 2001 by the following vote –
Ayes – T.W. Purcell, M.G. Reichert, A.J. Soukenik, C.D. Seward, J.W. Siscel, and
M.C. Williams.
Nays – None.
Secretary-Treasurer