HomeMy Public PortalAbout11134 O R D I N A N C E NO. 11134
AN ORDINANCE, appropriating One Hundred Ninety-Seven Thousand
Dollars ($197,000.00) from the Sanitary Replacement Fund for engineering
services for the final design of Harlem Baden Relief Phase III (Broadway)
(2001136); and authorizing the Executive Director and Secretary-Treasurer on
behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-1013
with ABNA Engineering, Inc. for the aforesaid engineering services.
WHEREAS, the Director of Finance has certified that there is an
unencumbered balance in the above-named fund sufficient to pay the obligation
authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF
TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of One Hundred Ninety-Seven Thousand
Dollars ($197,000.00) is hereby appropriated from the Sanitary Replacement Fund
for engineering services for the final design of Harlem Baden Relief Phase III
(Broadway) (2001136).
Section Two. The Executive Director and Secretary-Treasurer are
hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter
into Contract E-1013 with ABNA Engineering, Inc. for engineering services for the
final design of Harlem Baden Relief Phase III (Broadway) (2001136); said contract
to be comprised of such terms and conditions as are approved by the Office of the
General Counsel of the District.
Section Three. This ordinance, being an appropriation ordinance,
shall take effect immediately upon its enactment.
The foregoing Ordinance was adopted December 13, 2001 by the following vote –
Ayes – T.W. Purcell, M.G. Reichert, A.J. Soukenik, C.D. Seward, J.W. Siscel, and
M.C. Williams.
Nays – None.
Secretary-Treasurer