HomeMy Public PortalAbout11135 O R D I N A N C E NO. 11135
AN ORDINANCE, appropriating Sixty-five Thousand Dollars
($65,000.00) from the Improvement Fund for engineering services for the final
design of Fenton Wastewater Treatment Plant Improvements (2001068); and
authorizing the Executive Director and Secretary-Treasurer on behalf of The
Metropolitan St. Louis Sewer District to enter into Contract E-1014 with HDR
Engineering, Inc. for the aforesaid engineering services.
WHEREAS, the Director of Finance has certified that there is an
unencumbered balance in the above-named fund sufficient to pay the obligation
authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF
TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Sixty-five Thousand Dollars ($65,000.00) is
hereby appropriated from the Improvement Fund for engineering services for the
final design of Fenton Wastewater Treatment Plant Improvements (2001068).
Section Two. The Executive Director and Secretary-Treasurer are
hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter
into Contract E-1014 with HDR Engineering, Inc. for engineering services for the
final design of Fenton Wastewater Treatment Plant Improvements (2001068); said
contract to be comprised of such terms and conditions as are approved by the
Office of the General Counsel of the District.
Section Three. This ordinance, being an appropriation ordinance,
shall take effect immediately upon its enactment.
The foregoing Ordinance was adopted December 13, 2001 by the following vote –
Ayes – T.W. Purcell, M.G. Reichert, A.J. Soukenik, C.D. Seward, J.W. Siscel, and
M.C. Williams.
Nays – None.
Secretary-Treasurer