HomeMy Public PortalAbout11339 O R D I N A N C E NO. 11339
AN ORDINANCE, appropriating One Hundred Twenty-one Thousand
Dollars ($121,000.00) from the Operation, Maintenance and Construction
Improvement Fund of Coldwater Creek for engineering services for the final design
of Coldwater Creek Bank Stabilization-Geraldine to Isolda (CLD-12) (2001094);
and authorizing the Executive Director and Secretary-Treasurer on behalf of The
Metropolitan St. Louis Sewer District to enter into Contract E-1028 with George
Butler Associates, Inc. for the aforesaid engineering services.
WHEREAS, the Director of Finance has certified that there is an
unencumbered balance in the above-named fund sufficient to pay the obligation
authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF
TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of One Hundred Twenty-one Thousand Dollars
($121,000.00) is hereby appropriated from the Operation, Maintenance and
Construction Improvement Fund of Coldwater Creek for engineering services for
the final design of Coldwater Creek Bank Stabilization-Geraldine to Isolda (CLD-
12) (2001094).
Section Two. The Executive Director and Secretary-Treasurer are
hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter
into Contract E-1028 with George Butler Associates, Inc. for engineering services
2
for the final design of Coldwater Creek Bank Stabilization-Geraldine to Isolda
(CLD-12) (2001094); said contract to be comprised of such terms and conditions
as are approved by the office of the General Counsel of the District.
Section Three. This ordinance, being an appropriation ordinance,
shall take effect immediately upon its enactment.
The foregoing Ordinance was adopted October 3, 2002 by the following vote –
Ayes – C.D. Seward, A.J. Soukenik, T.W. Purcell, M.C. Williams, and J.W. Siscel.
Nays – None.
Secretary-Treasurer