Loading...
HomeMy Public PortalAbout11387O R D I N A N C E NO. 11387 AN ORDINANCE, appropriating Sixty-Nine Thousand Dollars ($69,000.00) from the Operation, Maintenance and Construction Improvement Fund of Black Creek for engineering services for the final design of Lorenzo Lane Storm Sewer (2001058); and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-1031 with RJN Group, Inc. for the aforesaid engineering services. WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Sixty-Nine Thousand Dollars ($69,000.00) is hereby appropriated from the Operation, Maintenance and Construction Improvement Fund of Black Creek for engineering services for the final design of Lorenzo Lane Storm Sewer (2001058). Section Two. The Executive Director and Secretary-Treasurer are hereby authorized on behalf of the Metropolitan St. Louis Sewer District to enter into Contract E-1031 with RJN Group, Inc. for engineering services for the final design of Lorenzo Lane Storm Sewer (2001058); said contract to be comprised of such terms and conditions as are approved by the Office of the General Counsel of the District. 2 Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted December 13, 2002 by the following vote – Ayes – C.D. Seward, A.J. Soukenik, T.W. Purcell, M.C. Williams, J.W. Siscel, and J.M. Swartz. Nays – None. Secretary-Treasurer