HomeMy Public PortalAbout11387O R D I N A N C E NO. 11387
AN ORDINANCE, appropriating Sixty-Nine Thousand Dollars
($69,000.00) from the Operation, Maintenance and Construction Improvement
Fund of Black Creek for engineering services for the final design of Lorenzo
Lane Storm Sewer (2001058); and authorizing the Executive Director and
Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to
enter into Contract E-1031 with RJN Group, Inc. for the aforesaid engineering
services.
WHEREAS, the Director of Finance has certified that there is an
unencumbered balance in the above-named fund sufficient to pay the
obligation authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF
TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Sixty-Nine Thousand Dollars
($69,000.00) is hereby appropriated from the Operation, Maintenance and
Construction Improvement Fund of Black Creek for engineering services for the
final design of Lorenzo Lane Storm Sewer (2001058).
Section Two. The Executive Director and Secretary-Treasurer are
hereby authorized on behalf of the Metropolitan St. Louis Sewer District to
enter into Contract E-1031 with RJN Group, Inc. for engineering services for
the final design of Lorenzo Lane Storm Sewer (2001058); said contract to be
comprised of such terms and conditions as are approved by the Office of the
General Counsel of the District.
2
Section Three. This ordinance, being an appropriation ordinance,
shall take effect immediately upon its enactment.
The foregoing Ordinance was adopted December 13, 2002 by the following vote –
Ayes – C.D. Seward, A.J. Soukenik, T.W. Purcell, M.C. Williams, J.W. Siscel, and
J.M. Swartz.
Nays – None.
Secretary-Treasurer