HomeMy Public PortalAbout11389O R D I N A N C E NO. 11389
AN ORDINANCE, appropriating Four Hundred Thirteen Thousand
Dollars ($413,000.00) from the Operation, Maintenance and Construction
Improvement Fund of Coldwater Creek for engineering services for the final
design of Daniel Boone Trunk Sewer and Channel Replacement (2001062); and
authorizing the Executive Director and Secretary-Treasurer on behalf of The
Metropolitan St. Louis Sewer District to enter into Contract E-1033 with
Parsons Engineering Science, Inc. for the aforesaid engineering services.
WHEREAS, the Director of Finance has certified that there is an
unencumbered balance in the above-named fund sufficient to pay the
obligation authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF
TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Four Hundred Thirteen Thousand
Dollars ($413,000.00) is hereby appropriated from the Operation, Maintenance
and Construction Improvement Fund of Coldwater Creek for engineering
services for the final design of Daniel Boone Trunk Sewer and Channel
Replacement (2001062).
Section Two. The Executive Director and Secretary-Treasurer are
hereby authorized on behalf of the Metropolitan St. Louis Sewer District to
enter into Contract E-1033 with Parsons Engineering Science, Inc. for
engineering services for the final design of Daniel Boone Trunk Sewer and
Channel Replacement (2001063); said contract to be comprised of such terms
2
and conditions as are approved by the office of the General Counsel of the
District.
Section Three. This ordinance, being an appropriation ordinance,
shall take effect immediately upon its enactment.
The foregoing Ordinance was adopted December 13, 2002 by the following vote –
Ayes – C.D. Seward, A.J. Soukenik, T.W. Purcell, M.C. Williams, J.W. Siscel, and
J.M. Swartz.
Nays – None.
Secretary-Treasurer