HomeMy Public PortalAbout11442 O R D I N A N C E NO. 11442
AN ORDINANCE, appropriating Two Hundred Ten Thousand Dollars
($210,000.00) from the Operation, Maintenance and Construction Improvement Fund
of Maline Creek for engineering services for the final design of Prentice-Granger Storm
Channel (MCBJ-110) (2000110); and authorizing the Executive Director and Secretary-
Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract
E-1034 with EFK Moen, LLC. for the aforesaid engineering services.
WHEREAS, the Director of Finance has certified that there is an
unencumbered balance in the above-named fund sufficient to pay the obligation
authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF
TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Two Hundred Ten Thousand Dollars
($210,000.00) is hereby appropriated from the Operation, Maintenance and
Construction Improvement Fund of Maline Creek for engineering services for the final
design of Prentice-Granger Storm Channel (MCBJ-110) (2000110).
Section Two. The Executive Director and Secretary-Treasurer are hereby
authorized on behalf of The Metropolitan St. Louis Sewer District to enter into
Contract E-1034 with EFK Moen, Inc. for engineering services for the final design of
Prentice-Granger Storm Channel (MCBJ-110) (2000110); said contract to be comprised
of such terms and conditions as are approved by the office of the General Counsel of the
District.
2
Section Three. This ordinance, being an appropriation ordinance,
shall take effect immediately upon its enactment.
The foregoing Ordinance was adopted January 23, 2003 by the following vote –
Ayes – C.D. Seward, A.J. Soukenik, T.W. Purcell, M.C. Williams, and J.M. Swartz.
Nays – None.
Secretary-Treasurer