Loading...
HomeMy Public PortalAbout11442 O R D I N A N C E NO. 11442 AN ORDINANCE, appropriating Two Hundred Ten Thousand Dollars ($210,000.00) from the Operation, Maintenance and Construction Improvement Fund of Maline Creek for engineering services for the final design of Prentice-Granger Storm Channel (MCBJ-110) (2000110); and authorizing the Executive Director and Secretary- Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-1034 with EFK Moen, LLC. for the aforesaid engineering services. WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Two Hundred Ten Thousand Dollars ($210,000.00) is hereby appropriated from the Operation, Maintenance and Construction Improvement Fund of Maline Creek for engineering services for the final design of Prentice-Granger Storm Channel (MCBJ-110) (2000110). Section Two. The Executive Director and Secretary-Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-1034 with EFK Moen, Inc. for engineering services for the final design of Prentice-Granger Storm Channel (MCBJ-110) (2000110); said contract to be comprised of such terms and conditions as are approved by the office of the General Counsel of the District. 2 Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted January 23, 2003 by the following vote – Ayes – C.D. Seward, A.J. Soukenik, T.W. Purcell, M.C. Williams, and J.M. Swartz. Nays – None. Secretary-Treasurer