Loading...
HomeMy Public PortalAbout11507 O R D I N A N C E NO. 11507 AN ORDINANCE, appropriating Two Hundred Sixty-five Thousand Dollars ($265,000.00) from the Sanitary Replacement Fund for engineering services for the final design of CC-22 Schoettler/Clayton to Highway 40 Sanitary Replacement Phase II (90015A); and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-1035 with Kowelman Engineering, Inc. for the aforesaid engineering services. WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Two Hundred Sixty-five Thousand Dollars ($265,000.00) is hereby appropriated from the Sanitary Replacement Fund for engineering services for the final design of CC-12 Schoettler/Clayton to Highway 40 Sanitary Replacement Phase II (90015A). Section Two. The Executive Director and Secretary-Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-1035 with Kowelman Engineering, Inc. for engineering services for the final design of CC-12 Schoettler/Clayton to Highway 40 Sanitary Replacement Phase II (90015A), said contract to be comprised of such terms and conditions as are approved by the Office of the General Counsel of the District. Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted June 12, 2003.