HomeMy Public PortalAbout11508 O R D I N A N C E NO. 11508
AN ORDINANCE, appropriating Two Hundred Nineteen Thousand
Dollars ($219,000.00) from the Sanitary Replacement Fund for engineering services for
the final design of North Price to Pennell Sanitary Replacement (2000045); and
authorizing the Executive Director and Secretary-Treasurer on behalf of The
Metropolitan St. Louis Sewer District to enter into Contract E-1036 with ABNA
Engineering, Inc. for the aforesaid engineering services.
WHEREAS, the Director of Finance has certified that there is an
unencumbered balance in the above-named fund sufficient to pay the obligation
authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF
TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Two Hundred Nineteen Thousand
Dollars ($219,000.00) is hereby appropriated from the Sanitary Replacement Fund
for engineering services for the final design of North Price to Pennell Sanitary
Replacement (2000045).
Section Two. The Executive Director and Secretary-Treasurer are hereby
authorized on behalf of The Metropolitan St. Louis Sewer District to enter into
Contract E-1036 with ABNA Engineering, Inc. for engineering services for the final
design of North Price to Pennell Sanitary Replacement (2000045), said contract to be
comprised of such terms and conditions as are approved by the Office of the General
Counsel of the District.
Section Three. This ordinance, being an appropriation ordinance,
shall take effect immediately upon its enactment.
The foregoing Ordinance was adopted June 12, 2003.