HomeMy Public PortalAbout11509 O R D I N A N C E NO. 11509
AN ORDINANCE, appropriating Two Hundred Twenty-nine Thousand
Dollars ($229,000.00) from the Sanitary Replacement Fund for engineering services for
the final design of Harlem-Baden Relief Phase IV (Rosalie) 2003039; and Harlem-
Baden Relief Phase IV (Hebert) 2003039A and authorizing the Executive Director and
Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter
into Contract E-1037 with Zambrana Engineering, Inc. for the aforesaid engineering
services.
WHEREAS, the Director of Finance has certified that there is an
unencumbered balance in the above-named fund sufficient to pay the obligation
authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF
TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Two Hundred Twenty-nine Thousand
Dollars ($229,000.00) is hereby appropriated from the Sanitary Replacement Fund for
engineering services for the final design of Harlem-Baden Relief Phase IV (Rosalie)
2003039, and Harlem-Baden Relief Phase IV (Hebert) 2003039A.
Section Two. The Executive Director and Secretary-Treasurer are hereby
authorized on behalf of The Metropolitan St. Louis Sewer District to enter into
Contract E-1037 with Zambrana Engineering, Inc. for engineering services for the final
design of Harlem-Baden Relief Phase IV (Rosalie) 2003039, and Harlem-Baden Relief
Phase IV (Hebert) 2003039A; said contract to be comprised of such terms and
conditions as are approved by the Office of the General Counsel of the District.
Section Three. This ordinance, being an appropriation ordinance,
shall take effect immediately upon its enactment.
The foregoing Ordinance was adopted June 12, 2003.