HomeMy Public PortalAbout11588O R D I N A N C E NO. 11588
AN ORDINANCE, appropriating Nine Hundred Sixty-eight
Thousand Dollars ($968,000.00) from the Sanitary Replacement Fund for
engineering services for the final design of MC-01 Webster and
Marlborough Trunk Sanitary Relief (90060) and MC-02 Watson to Edgar
Road Sanitary Relief (90061); and authorizing the Executive Director and
Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer
District to enter into Contract E-1054 with Farnsworth Group, Inc. for
the aforesaid engineering services.
WHEREAS, the Director of Finance has certified that there is
an unencumbered balance in the above-named fund sufficient to pay the
obligation authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF
TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Nine Hundred Sixty-eight
Thousand Dollars ($968,000.00) is hereby appropriated from the
Sanitary Replacement Fund for engineering services for the final design
of MC-01 Webster and Marlborough Trunk Sanitary Relief (90060) and
MC-02 Watson to Edgar Road Sanitary Relief (90061).
Section Two. The Executive Director and Secretary-
Treasurer are hereby authorized on behalf of The Metropolitan St. Louis
Sewer District to enter into Contract E-1054 with Farnsworth Group,
Inc. for engineering services for the final design of MC-01 Webster and
Marlborough Trunk Sanitary Relief (90060) and MC-02 Watson to Edgar
Road Sanitary Relief (90061); said contract to be comprised of such
terms and conditions as are approved by the office of the General
Counsel of the District.
Section Three. This ordinance, being an appropriation
ordinance, shall take effect immediately upon its enactment.
The foregoing ordinance was adopted September 11, 2003.