Loading...
HomeMy Public PortalAbout11588O R D I N A N C E NO. 11588 AN ORDINANCE, appropriating Nine Hundred Sixty-eight Thousand Dollars ($968,000.00) from the Sanitary Replacement Fund for engineering services for the final design of MC-01 Webster and Marlborough Trunk Sanitary Relief (90060) and MC-02 Watson to Edgar Road Sanitary Relief (90061); and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-1054 with Farnsworth Group, Inc. for the aforesaid engineering services. WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Nine Hundred Sixty-eight Thousand Dollars ($968,000.00) is hereby appropriated from the Sanitary Replacement Fund for engineering services for the final design of MC-01 Webster and Marlborough Trunk Sanitary Relief (90060) and MC-02 Watson to Edgar Road Sanitary Relief (90061). Section Two. The Executive Director and Secretary- Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-1054 with Farnsworth Group, Inc. for engineering services for the final design of MC-01 Webster and Marlborough Trunk Sanitary Relief (90060) and MC-02 Watson to Edgar Road Sanitary Relief (90061); said contract to be comprised of such terms and conditions as are approved by the office of the General Counsel of the District. Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing ordinance was adopted September 11, 2003.