HomeMy Public PortalAbout11591O R D I N A N C E NO. 11591
AN ORDINANCE, appropriating One Million Three Hundred
Sixty Thousand Dollars ($1,360,000.00) from the Sanitary Replacement
Fund for engineering services for the final design of Black Creek Sanitary
Relief (Highway 40 to Wenlou Drive) (2002103); and authorizing the
Executive Director and Secretary-Treasurer on behalf of The Metropolitan
St. Louis Sewer District to enter into Contract E-1059 with Horner &
Shifrin, Inc. for the aforesaid engineering services.
WHEREAS, the Director of Finance has certified that there is
an unencumbered balance in the above-named fund sufficient to pay the
obligation authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF
TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of One Million Three Hundred Sixty
Thousand Dollars ($1,360,000.00) is hereby appropriated from the
Sanitary Replacement Fund for engineering services for the final design
of Black Creek Sanitary Relief (Highway 40 to Wenlou Drive) (2002103).
Section Two. The Executive Director and Secretary-
Treasurer are hereby authorized on behalf of The Metropolitan St. Louis
Sewer District to enter into Contract E-1059 with Horner & Shifrin, Inc.
for engineering services for the final design of Black Creek Sanitary Relief
(Highway 40 to Wenlou Drive) (2002103); said contract to be comprised
of such terms and conditions as are approved by the office of the General
Counsel of the District.
Section Three. This ordinance, being an appropriation
ordinance, shall take effect immediately upon its enactment.
The foregoing ordinance was adopted September 11, 2003.