HomeMy Public PortalAbout11592O R D I N A N C E NO. 11592
AN ORDINANCE, appropriating Eight Hundred Fifty-eight
Thousand Dollars ($858,000.00) from the Sanitary Replacement Fund for
engineering services for the final design of Eva-Wabash Sanitary Relief
(2001049); and authorizing the Executive Director and Secretary-
Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter
into Contract E-1064 with The Clayton Engineering Company, Inc. for
the aforesaid engineering services.
WHEREAS, the Director of Finance has certified that there is
an unencumbered balance in the above-named fund sufficient to pay the
obligation authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF
TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Eight Hundred Fifty-eight
Thousand Dollars ($858,000.00) is hereby appropriated from the
Sanitary Replacement Fund for engineering services for the final design
of Eva-Wabash Sanitary Relief (2001049).
Section Two. The Executive Director and Secretary-
Treasurer are hereby authorized on behalf of The Metropolitan St. Louis
Sewer District to enter into Contract E-1064 with The Clayton
Engineering Company, Inc. for engineering services for the final design of
Eva-Wabash Sanitary Relief (2001049); said contract to be comprised of
such terms and conditions as are approved by the office of the General
Counsel of the District.
Section Three. This ordinance, being an appropriation
ordinance, shall take effect immediately upon its enactment.
The foregoing ordinance was adopted September 11, 2003.