HomeMy Public PortalAbout11640O R D I N A N C E NO. 11640
AN ORDINANCE, appropriating Three Hundred Twenty
Thousand Dollars ($320,000.00) from the Sanitary Replacement Fund for
engineering services for the preliminary design of CSO – In-Line Flow
Management and Outfall Treatment Analysis (2003051); and authorizing
the Executive Director and Secretary-Treasurer on behalf of The
Metropolitan St. Louis Sewer District to enter into Contract E-1075 with
HDR Engineering, Inc., for the aforesaid engineering services.
WHEREAS, the Director of Finance has certified that there is
an unencumbered balance in the above-named fund sufficient to pay the
obligation authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF
TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Three Hundred Twenty Thousand
Dollars ($320,000.00) is hereby appropriated from the Sanitary
Replacement Fund for engineering services for the preliminary design of
CSO – In-Line Flow Management and Outfall Treatment Analysis
(2003051).
Section Two. The Executive Director and Secretary-
Treasurer are hereby authorized on behalf of The Metropolitan St. Louis
Sewer District to enter into Contract E-1075 with HDR Engineering, Inc.
for engineering services for the preliminary design of CSO – In-Line Flow
Management and Outfall Treatment Analysis (2003051); said contract to
be comprised of such terms and conditions as are approved by the office
of the General Counsel of the District.
Section Three. This ordinance, being an appropriation
ordinance, shall take effect immediately upon its enactment.
The foregoing Ordinance was adopted December 11, 2003 by the
following vote –
Ayes – M.A. Rhodes, C. Brown, D. Joyce-Hayes, J.M. Swartz, and R.J.
Baer.
Nays – None.
Secretary-Treasurer