HomeMy Public PortalAbout11720O R D I N A N C E NO. 11720
AN ORDINANCE, appropriating Six Hundred Thousand
Dollars ($600,000.00) from the Sanitary Replacement Fund for
engineering services for the final design of Lower Meramec River
Wastewater System Improvements Baumgartner Interceptor Tunnel and
Lift Station (95066B); and authorizing the Executive Director and
Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer
District to enter into Amendment No. 8 of Contract E-898 with Horner
and Shifrin, Inc., for the aforesaid engineering services.
WHEREAS, the Director of Finance has certified that there is
an unencumbered balance in the above-named fund sufficient to pay the
obligation authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF
TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Six Hundred Thousand Dollars
($600,000.00) is hereby appropriated from the Sanitary Replacement
Fund for engineering services for the final design of Lower Meramec River
Wastewater System Improvements Baumgartner Interceptor Tunnel and
Lift Station (95066B).
Section Two. The Executive Director and Secretary-
Treasurer are hereby authorized on behalf of The Metropolitan St. Louis
Sewer District to enter into Amendment No. 8 of Contract E-898 with
Horner and Shifrin, Inc., for engineering services for the final design of
Lower Meramec River Wastewater System Improvements Baumgartner
Interceptor Tunnel and Lift Station (95066B); said contract amendment
to be comprised of such terms and conditions as are approved by the
office of the General Counsel of the District.
Section Three. This ordinance, being an appropriation
ordinance, shall take effect immediately upon its enactment.
The foregoing Ordinance was adopted May 13, 2004.