Loading...
HomeMy Public PortalAbout11720O R D I N A N C E NO. 11720 AN ORDINANCE, appropriating Six Hundred Thousand Dollars ($600,000.00) from the Sanitary Replacement Fund for engineering services for the final design of Lower Meramec River Wastewater System Improvements Baumgartner Interceptor Tunnel and Lift Station (95066B); and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 8 of Contract E-898 with Horner and Shifrin, Inc., for the aforesaid engineering services. WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Six Hundred Thousand Dollars ($600,000.00) is hereby appropriated from the Sanitary Replacement Fund for engineering services for the final design of Lower Meramec River Wastewater System Improvements Baumgartner Interceptor Tunnel and Lift Station (95066B). Section Two. The Executive Director and Secretary- Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 8 of Contract E-898 with Horner and Shifrin, Inc., for engineering services for the final design of Lower Meramec River Wastewater System Improvements Baumgartner Interceptor Tunnel and Lift Station (95066B); said contract amendment to be comprised of such terms and conditions as are approved by the office of the General Counsel of the District. Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted May 13, 2004.