Loading...
HomeMy Public PortalAbout11795O R D I N A N C E NO. 11795 AN ORDINANCE, appropriating One Hundred Ninety-nine Thousand Dollars ($199,000.00) from the Sanitary Replacement Fund for engineering services for the final design of CC-13 Creve Coeur Creek Sanitary Relief (89131); and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-1088 with Kowelman Engineering, Inc. for the aforesaid engineering services. WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of One Hundred Ninety-nine Thousand Dollars ($199,000.00) is hereby appropriated from the Sanitary Replacement Fund for engineering services for the final design of CC-13 Creve Coeur Creek Sanitary Relief (89131). Section Two. The Executive Director and Secretary- Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-1088 with Kowelman Engineering, Inc., for engineering services for the final design of CC-13 Creve Coeur Creek Sanitary Relief (89131); said contract to be comprised of such terms and conditions as are approved by the office of the General Counsel of the District. Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted August 12, 2004.