Loading...
HomeMy Public PortalAbout11799O R D I N A N C E NO. 11799 AN ORDINANCE, appropriating Two Hundred Four Thousand Dollars ($204,000.00) from the Sanitary Replacement Fund for engineering services for the final design of CC-08 Isleview Drive & Woodsbluff Sanitary Relief (90010); and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-1092 with Engineering Design Source, Inc., for the aforesaid engineering services. WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Two Hundred Four Thousand Dollars ($204,000.00) is hereby appropriated from the Sanitary Replacement Fund for engineering services for the final design of CC-08 Isleview Drive & Woodsbluff Sanitary Relief (90010). Section Two. The Executive Director and Secretary- Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-1092 with Engineering Design Source, Inc., for engineering services for the final design of CC-08 Isleview Drive & Woodsbluff Sanitary Relief (90010); said contract to be comprised of such terms and conditions as are approved by the office of the General Counsel of the District. Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted August 12, 2004.