Loading...
HomeMy Public PortalAbout11802O R D I N A N C E NO. 11802 AN ORDINANCE, appropriating One Hundred Eighty-eight Thousand Dollars ($188,000.00) from the Sanitary Replacement Fund for engineering services for the final design of CSO -- Waverton and Magnolia CSO Interceptor (I-179) Elimination (2003145); and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-1095 with The Benham Companies, Inc., for the aforesaid engineering services. WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of One Hundred Eighty-eight Thousand Dollars ($188,000.00) is hereby appropriated from the Sanitary Replacement Fund for engineering services for the final design of CSO -- Waverton and Magnolia CSO Interceptor (I-179) Elimination (2003145). Section Two. The Executive Director and Secretary- Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-1095 with The Benham Companies, Inc., for engineering services for the final design of CSO -- Waverton and Magnolia CSO Interceptor (I-179) Elimination (2003145); said contract to be comprised of such terms and conditions as are approved by the office of the General Counsel of the District. Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted August 12, 2004.