Loading...
HomeMy Public PortalAbout11803O R D I N A N C E NO. 11803 AN ORDINANCE, appropriating Seventy-one Thousand Dollars ($71,000.00) from the Operation, Maintenance and Construction Improvement Fund of North Affton for engineering services for the final design of Menola Storm Sewer (Infrastructure Repair) (99100); and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-1096 with The Clayton Engineering Company, for the aforesaid engineering services. WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Seventy-one Thousand Dollars ($71,000.00) is hereby appropriated from the Operation, Maintenance and Construction Improvement Fund of North Affton for engineering services for the final design of Menola Storm Sewer (Infrastructure Repair) (99100). Section Two. The Executive Director and Secretary- Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract E-1096 with The Clayton Engineering Company, for engineering services for the final design of Menola Storm Sewer (Infrastructure Repair) (99100); said contract to be comprised of such terms and conditions as are approved by the office of the General Counsel of the District. Section Three. This ordinance, being an appropriation ordinance, shall take effect immediately upon its enactment. The foregoing Ordinance was adopted August 12, 2004.