HomeMy Public PortalAbout11803O R D I N A N C E NO. 11803
AN ORDINANCE, appropriating Seventy-one Thousand
Dollars ($71,000.00) from the Operation, Maintenance and Construction
Improvement Fund of North Affton for engineering services for the final
design of Menola Storm Sewer (Infrastructure Repair) (99100); and
authorizing the Executive Director and Secretary-Treasurer on behalf of
The Metropolitan St. Louis Sewer District to enter into Contract E-1096
with The Clayton Engineering Company, for the aforesaid engineering
services.
WHEREAS, the Director of Finance has certified that there is
an unencumbered balance in the above-named fund sufficient to pay the
obligation authorized herein,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF
TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of Seventy-one Thousand Dollars
($71,000.00) is hereby appropriated from the Operation, Maintenance
and Construction Improvement Fund of North Affton for engineering
services for the final design of Menola Storm Sewer (Infrastructure
Repair) (99100).
Section Two. The Executive Director and Secretary-
Treasurer are hereby authorized on behalf of The Metropolitan St. Louis
Sewer District to enter into Contract E-1096 with The Clayton
Engineering Company, for engineering services for the final design of
Menola Storm Sewer (Infrastructure Repair) (99100); said contract to be
comprised of such terms and conditions as are approved by the office of
the General Counsel of the District.
Section Three. This ordinance, being an appropriation
ordinance, shall take effect immediately upon its enactment.
The foregoing Ordinance was adopted August 12, 2004.